ML19209B227: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19209B229 | | number = ML19209B229 | ||
| issue date = 10/03/1979 | | issue date = 10/03/1979 | ||
| title = | | title = LER 79-106/03L-0:on 790904,during Normal Operation,Steam Generator C Support Temp Dropped Below Tech Specs.Cause Unknown.Temp Returned to Normal within 4-h Time Limit. Heaters & Control Circuits Checked,But No Faults Found | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
Latest revision as of 07:43, 24 January 2020
Date released: 08/11/2019 | Download: ML19209B227 |
---|---|
ML19209B229 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 10/03/1979 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19209B229 (2) | |
ML19209B226 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 10/03/1979 |
From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19209B226 (1) | |