ML19209B227

From kanterella
Jump to navigation Jump to search
Forwards LER 79-106/03L-0
Date released: 08/11/2019 Download: ML19209B227


LER 79-106/03L-0:on 790904,during Normal Operation,Steam Generator C Support Temp Dropped Below Tech Specs.Cause Unknown.Temp Returned to Normal within 4-h Time Limit. Heaters & Control Circuits Checked,But No Faults Found
ML19209B229
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/03/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B229 (2)
Forwards LER 79-106/03L-0
ML19209B226
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/03/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B226 (1)