ML19209C913: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
 
Line 6: Line 6:
| number = ML19209C916
| number = ML19209C916
| issue date = 10/10/1979
| issue date = 10/10/1979
| title = Forwards LER 79-086/03L-0
| title = LER 79-086/03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc
| author name = Cooper J
| author name = Cooper J
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 06:08, 24 January 2020

Forwards LER 79-086/03L-0
Date released: 08/11/2019 Download: ML19209C913


LER 79-086/03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc
ML19209C916
Person / Time
Site: Crystal River 
Issue date: 10/10/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C916 (2)
Forwards LER 79-086/03L-0
ML19209C912
Person / Time
Site: Crystal River 
Issue date: 10/15/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C912 (1)