ML19209C913: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 6: | Line 6: | ||
| number = ML19209C916 | | number = ML19209C916 | ||
| issue date = 10/10/1979 | | issue date = 10/10/1979 | ||
| title = | | title = LER 79-086/03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc | ||
| author name = Cooper J | | author name = Cooper J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. | ||
Latest revision as of 06:08, 24 January 2020
| Date released: 08/11/2019 | Download: ML19209C913 |
|---|---|
| ML19209C916 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/10/1979 |
| From: | Cooper J FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML19209C916 (2) | |
| ML19209C912 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/15/1979 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML19209C912 (1) | |