ML19225B010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19225B014
| number = ML19225B014
| issue date = 07/18/1979
| issue date = 07/18/1979
| title = Forwards LER 79-036/03X-1
| title = LER 79-036/03X-1 on 790602:six Snubbers Found Inoperable. Caused By:Two Had Loose Bolts in Clamps & Four Had Low Fluid Level Due to Leaking Seals.First Two Were Realigned & Bolts Tightened
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 01:00, 24 January 2020

Forwards LER 79-036/03X-1
Date released: 08/27/2019 Download: ML19225B010


LER 79-036/03X-1 on 790602:six Snubbers Found Inoperable. Caused By:Two Had Loose Bolts in Clamps & Four Had Low Fluid Level Due to Leaking Seals.First Two Were Realigned & Bolts Tightened
ML19225B014
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225B014 (1)
Forwards LER 79-036/03X-1
ML19225B009
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19225B009 (1)