ML19240B958: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19240B960 | | number = ML19240B960 | ||
| issue date = 03/05/1981 | | issue date = 03/05/1981 | ||
| title = | | title = Nonproprietary Version of 1981 Calvert Cliffs Unit 2 Refueling Outage:End of Cycle 3 Eddy Current Insp Results on Control Element Assemblies. | ||
| author name = | | author name = | ||
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY | | author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY | ||
Line 21: | Line 21: | ||
| number = ML19240B959 | | number = ML19240B959 | ||
| issue date = 03/25/1981 | | issue date = 03/25/1981 | ||
| title = | | title = Affidavit for Withholding CEN-154(B)-P (Ref 10CFR2.790) | ||
| author name = Scherer A | | author name = Scherer A | ||
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY | | author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
Latest revision as of 23:54, 23 January 2020
Date released: 10/01/2019 | Download: ML19240B958 |
---|---|
ML19240B960 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 03/05/1981 |
From: | ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
To: | |
References | |
Download: ML19240B960 (7) | |
ML19240B959 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 03/25/1981 |
From: | Scherer A ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
To: | |
References | |
Download: ML19240B959 (4) | |
ML19240B957 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 04/10/1981 |
From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
To: | CLARK R A Office of Nuclear Reactor Regulation |
References | |
Download: ML19240B957 (1) | |