ML19246C150: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19246C156 | | number = ML19246C156 | ||
| issue date = 07/18/1979 | | issue date = 07/18/1979 | ||
| title = | | title = LER 79-049/03L-0 on 790619:drywell Oxygen Concentration Exceeded 4% for Approx 4.5-h While Containment Inerting Line Was Under Clearance for Repair.Caused by Rupture of Nitrogen Inerting Line to Reactor Bldg | ||
| author name = Tollison A | | author name = Tollison A | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. |
Latest revision as of 22:13, 23 January 2020
Date released: 09/17/2019 | Download: ML19246C150 |
---|---|
ML19246C156 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 07/18/1979 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19246C156 (1) | |
ML19246C149 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 07/18/1979 |
From: | Banks H CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19246C149 (1) | |