ML19249E392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19249E394
| number = ML19249E394
| issue date = 09/17/1979
| issue date = 09/17/1979
| title = Forwards LER 79-040/03L-0
| title = LER 79-040/03L-0:on 790909,500-kV Transmission Line Taken Out of Svc from 11:50 Am to 5:21 PM to Repair Drop Line Connecting 500-kV Transmission Line to Carrier Current Line Drop.Caused by High Winds.Cable Repaired
| author name = Heibel R
| author name = Heibel R
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
| author affiliation = BALTIMORE GAS & ELECTRIC CO.

Latest revision as of 20:02, 23 January 2020

Forwards LER 79-040/03L-0
Date released: 09/20/2019 Download: ML19249E392


LER 79-040/03L-0:on 790909,500-kV Transmission Line Taken Out of Svc from 11:50 Am to 5:21 PM to Repair Drop Line Connecting 500-kV Transmission Line to Carrier Current Line Drop.Caused by High Winds.Cable Repaired
ML19249E394
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/17/1979
From: Heibel R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19249E394 (1)
Forwards LER 79-040/03L-0
ML19249E391
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/17/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19249E391 (1)