ML19253C987: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19253C988 | | number = ML19253C988 | ||
| issue date = 12/03/1979 | | issue date = 12/03/1979 | ||
| title = | | title = Deficiency Rept Re Ommission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall.Caused by Contractor Oversight. All Omitted Dowels Shall Be Installed in Drilled Holes & Grouted in Place Using Approved Nonshrink Grout | ||
| author name = | | author name = | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Latest revision as of 19:14, 23 January 2020
Date released: 09/24/2019 | Download: ML19253C987 |
---|---|
ML19253C988 | |
Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 12/03/1979 |
From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | |
References | |
Download: ML19253C988 (2) | |
ML19253C985 | |
Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 12/03/1979 |
From: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | ENGELKEN R H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
References | |
Download: ML19253C985 (1) | |