ML19253C987: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19253C988
| number = ML19253C988
| issue date = 12/03/1979
| issue date = 12/03/1979
| title = Forwards Deficiency Rept Re Omission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall
| title = Deficiency Rept Re Ommission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall.Caused by Contractor Oversight. All Omitted Dowels Shall Be Installed in Drilled Holes & Grouted in Place Using Approved Nonshrink Grout
| author name =  
| author name =  
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM

Latest revision as of 19:14, 23 January 2020

Forwards Deficiency Rept Re Omission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall
Date released: 09/24/2019 Download: ML19253C987


Deficiency Rept Re Ommission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall.Caused by Contractor Oversight. All Omitted Dowels Shall Be Installed in Drilled Holes & Grouted in Place Using Approved Nonshrink Grout
ML19253C988
Person / Time
Site: Satsop
Issue date: 12/03/1979
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML19253C988 (2)
Forwards Deficiency Rept Re Omission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall
ML19253C985
Person / Time
Site: Satsop
Issue date: 12/03/1979
From: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: ENGELKEN R H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML19253C985 (1)