ML19254E193: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19254E195 | | number = ML19254E195 | ||
| issue date = 10/25/1979 | | issue date = 10/25/1979 | ||
| title = | | title = LER 79-096/01T-0:on 791015,capacitor Failed in Integrated Control Sys Resulting in Unit Trip from 68.8% of Full Power. Caused by Blown Muffler on Generator Output 345 Kv Breakers. Damaged Mufflers Replaced & Offsite Power re-established | ||
| author name = Batch S | | author name = Batch S | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 18:50, 23 January 2020
Date released: 09/25/2019 | Download: ML19254E193 |
---|---|
ML19254E195 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 10/25/1979 |
From: | Batch S TOLEDO EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19254E195 (4) | |
ML19254E192 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 10/25/1979 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19254E192 (1) | |