ML19256F107: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 6: | Line 6: | ||
| number = ML19256F109 | | number = ML19256F109 | ||
| issue date = 11/15/1979 | | issue date = 11/15/1979 | ||
| title = | | title = LER 79-060/03L-0:on 791020,while Performing Load Test of Diesel Generator 12,operator Unable to Achieve Full Load. Caused by High Exhaust Temp on Cylinder 2 & Clogged Injectors.Injectors Overhauled & Adjusted | ||
| author name = Davis S, Pence W | | author name = Davis S, Pence W | ||
| author affiliation = BALTIMORE GAS & ELECTRIC CO. | | author affiliation = BALTIMORE GAS & ELECTRIC CO. | ||
Latest revision as of 16:31, 23 January 2020
| Date released: 09/27/2019 | Download: ML19256F107 |
|---|---|
| ML19256F109 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/15/1979 |
| From: | Davis S, Pence W BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML19256F109 (2) | |
| ML19256F106 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/15/1979 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML19256F106 (1) | |