ML19256F322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256F324
| number = ML19256F324
| issue date = 12/13/1979
| issue date = 12/13/1979
| title = Forwards LER 79-100/03L-0
| title = LER 79-100/03L-0:on 791120,during Normal Reactor Startup, Full Out Indication Not Received by Reactor Sequence Control Sys from Control Rod 06-27.Caused by Defective Optical Isolator.Isolator Replaced
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 17:24, 23 January 2020

Forwards LER 79-100/03L-0
Date released: 09/27/2019 Download: ML19256F322


LER 79-100/03L-0:on 791120,during Normal Reactor Startup, Full Out Indication Not Received by Reactor Sequence Control Sys from Control Rod 06-27.Caused by Defective Optical Isolator.Isolator Replaced
ML19256F324
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/13/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256F324 (1)
Forwards LER 79-100/03L-0
ML19256F321
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/13/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256F321 (1)