ML19257B302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257B308
| number = ML19257B308
| issue date = 01/08/1979
| issue date = 01/08/1979
| title = Forwards LER 79-129/03L-0
| title = LER 79-129/03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued
| author name = Thomas B
| author name = Thomas B
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 16:34, 23 January 2020

Forwards LER 79-129/03L-0
Date released: 09/28/2019 Download: ML19257B302


LER 79-129/03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued
ML19257B308
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1979
From: Bernard Thomas
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B308 (2)
Forwards LER 79-129/03L-0
ML19257B301
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B301 (1)