ML19261D603: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19261D604
| number = ML19261D604
| issue date = 06/15/1979
| issue date = 06/15/1979
| title = Forwards LER 79-035/03L-0
| title = LER 79-035/03L-0 on 790517:coolant Sample Line Isolation Valves Would Not Close.Caused by Solenoids Stuck in Open Position & Control Switches of Sample Station Shorted. Solenoids Were Cleaned & Returned to Svc
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 12:51, 23 January 2020

Forwards LER 79-035/03L-0
Date released: 10/02/2019 Download: ML19261D603


LER 79-035/03L-0 on 790517:coolant Sample Line Isolation Valves Would Not Close.Caused by Solenoids Stuck in Open Position & Control Switches of Sample Station Shorted. Solenoids Were Cleaned & Returned to Svc
ML19261D604
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/15/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261D604 (2)
Forwards LER 79-035/03L-0
ML19261D602
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/15/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261D602 (1)