ML19269C945: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19269C946
| number = ML19269C946
| issue date = 02/12/1979
| issue date = 02/12/1979
| title = Forwards LER 79-013/03L-0
| title = LER 79-013/03L-0:on 790116,when Makeup Pump 1 Started for Surveillance testing,1/2 Inch Nipple at Discharge of Attached Gear Driven Lube Oil Pump Failed,Resulting in Oil Spray Which Required Pump Shutdown
| author name = Adams J
| author name = Adams J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 10:09, 23 January 2020

Forwards LER 79-013/03L-0
Date released: 10/10/2019 Download: ML19269C945


LER 79-013/03L-0:on 790116,when Makeup Pump 1 Started for Surveillance testing,1/2 Inch Nipple at Discharge of Attached Gear Driven Lube Oil Pump Failed,Resulting in Oil Spray Which Required Pump Shutdown
ML19269C946
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1979
From: Adams J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19269C946 (2)
Forwards LER 79-013/03L-0
ML19269C944
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19269C944 (1)