ML19273B405: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19273B408 | | number = ML19273B408 | ||
| issue date = 03/28/1979 | | issue date = 03/28/1979 | ||
| title = | | title = LER 79-023/03L-0 on 790308:discovered RCS C1 Concentration Was .17ppm,contrary to Tech Specs.Caused by Appearance of Suspended Solids During Cooldown When Boron Concentration Increased.Purification Sys Reduced Concentration | ||
| author name = Cooper J | | author name = Cooper J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. |
Latest revision as of 07:28, 23 January 2020
Date released: 10/14/2019 | Download: ML19273B405 |
---|---|
ML19273B408 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 03/28/1979 |
From: | Cooper J FLORIDA POWER CORP. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19273B408 (2) | |
ML19273B404 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 04/02/1979 |
From: | Stewart J FLORIDA POWER CORP. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19273B404 (1) | |