ML19282C172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19282C176
| number = ML19282C176
| issue date = 03/16/1979
| issue date = 03/16/1979
| title = Forwards LER 79-012/03L-0
| title = LER 79-012/03L-0 on 790214:review of Solid State Protective Sys Train A/B Operability Test Indicated That Portion of Program Did Not Verify Spray Test Actuation Logic.Caused by Sys Train Design Change.Procedure Modified
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 06:08, 23 January 2020

Forwards LER 79-012/03L-0
Date released: 10/23/2019 Download: ML19282C172


LER 79-012/03L-0 on 790214:review of Solid State Protective Sys Train A/B Operability Test Indicated That Portion of Program Did Not Verify Spray Test Actuation Logic.Caused by Sys Train Design Change.Procedure Modified
ML19282C176
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/16/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C176 (3)
Forwards LER 79-012/03L-0
ML19282C171
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/16/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C171 (1)