ML19289D331: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19289D337 | | number = ML19289D337 | ||
| issue date = 08/15/1978 | | issue date = 08/15/1978 | ||
| title = | | title = LER 78-083/03L-1 on 780720:containment vessel-to-annulus Differential Pressure Exceeded Tech Spec Limit by 1 Inch. Purge of Containment Bldg Commenced.Caused by Inadequate Monitoring of Pressure Increase by Shift Check | ||
| author name = Fulmer S | | author name = Fulmer S | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. | ||
Line 21: | Line 21: | ||
| number = ML19289D335 | | number = ML19289D335 | ||
| issue date = 11/27/1978 | | issue date = 11/27/1978 | ||
| title = | | title = LER 78-107/03L-1 on 781031:during Diesel Generator Monthly Test,Room Temp Rose to 110 F & Outside Air Damper Would Not Open.Caused by Damper Linkage Being Out of Adjustment & Bound in Guide | ||
| author name = Hartigan J | | author name = Hartigan J | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. | ||
Line 36: | Line 36: | ||
| number = ML19289D334 | | number = ML19289D334 | ||
| issue date = 07/28/1978 | | issue date = 07/28/1978 | ||
| title = | | title = LER 78-066/99X-1:on 780429,during Operation at 20% Power, RCS Pressure Dropped to Approx 1620 Psig & Safety Features Actuation Sys Channels 1 & 3 Tripped on RCS Low Pressure, Initiating Incident Levels 1 & 2 | ||
| author name = Batch S | | author name = Batch S | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 04:06, 23 January 2020
Date released: 10/30/2019 | Download: ML19289D331 |
---|---|
ML19289D337 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 08/15/1978 |
From: | Fulmer S TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19289D337 (1) | |
ML19289D335 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 11/27/1978 |
From: | Hartigan J TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19289D335 (1) | |
ML19289D334 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 07/28/1978 |
From: | Batch S TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19289D334 (1) | |
ML19289D330 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 02/22/1979 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19289D330 (1) | |