Line 6: Line 6:
| number = ML19289D337
| number = ML19289D337
| issue date = 08/15/1978
| issue date = 08/15/1978
| title = Forwards LERs 78-066/99X-1,78-107/03L-1, & 78-083/03L-1
| title = LER 78-083/03L-1 on 780720:containment vessel-to-annulus Differential Pressure Exceeded Tech Spec Limit by 1 Inch. Purge of Containment Bldg Commenced.Caused by Inadequate Monitoring of Pressure Increase by Shift Check
| author name = Fulmer S
| author name = Fulmer S
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 21: Line 21:
| number = ML19289D335
| number = ML19289D335
| issue date = 11/27/1978
| issue date = 11/27/1978
| title = Forwards LERs 78-066/99X-1,78-107/03L-1, & 78-083/03L-1
| title = LER 78-107/03L-1 on 781031:during Diesel Generator Monthly Test,Room Temp Rose to 110 F & Outside Air Damper Would Not Open.Caused by Damper Linkage Being Out of Adjustment & Bound in Guide
| author name = Hartigan J
| author name = Hartigan J
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 36: Line 36:
| number = ML19289D334
| number = ML19289D334
| issue date = 07/28/1978
| issue date = 07/28/1978
| title = Forwards LERs 78-066/99X-1,78-107/03L-1, & 78-083/03L-1
| title = LER 78-066/99X-1:on 780429,during Operation at 20% Power, RCS Pressure Dropped to Approx 1620 Psig & Safety Features Actuation Sys Channels 1 & 3 Tripped on RCS Low Pressure, Initiating Incident Levels 1 & 2
| author name = Batch S
| author name = Batch S
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 04:06, 23 January 2020

Forwards LERs 78-066/99X-1,78-107/03L-1, & 78-083/03L-1
Date released: 10/30/2019 Download: ML19289D331


LER 78-083/03L-1 on 780720:containment vessel-to-annulus Differential Pressure Exceeded Tech Spec Limit by 1 Inch. Purge of Containment Bldg Commenced.Caused by Inadequate Monitoring of Pressure Increase by Shift Check
ML19289D337
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1978
From: Fulmer S
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19289D337 (1)
LER 78-107/03L-1 on 781031:during Diesel Generator Monthly Test,Room Temp Rose to 110 F & Outside Air Damper Would Not Open.Caused by Damper Linkage Being Out of Adjustment & Bound in Guide
ML19289D335
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/27/1978
From: Hartigan J
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19289D335 (1)
LER 78-066/99X-1:on 780429,during Operation at 20% Power, RCS Pressure Dropped to Approx 1620 Psig & Safety Features Actuation Sys Channels 1 & 3 Tripped on RCS Low Pressure, Initiating Incident Levels 1 & 2
ML19289D334
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1978
From: Batch S
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19289D334 (1)
Forwards LERs 78-066/99X-1,78-107/03L-1, & 78-083/03L-1
ML19289D330
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/22/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19289D330 (1)