ML19350A947: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19350A948 | | number = ML19350A948 | ||
| issue date = 03/12/1981 | | issue date = 03/12/1981 | ||
| title = | | title = LER 81-008/03L-0:on 810210,water Seepage Observed Along West Wall of Nrw Bldg.Direct Survey Showed Detectable Ground Contamination Only within 6 Inches of Wall.Caused by High Levels in Tank Vaults.Herculite Secured & Sealed to Wall | ||
| author name = Fitzgerald M | | author name = Fitzgerald M | ||
| author affiliation = JERSEY CENTRAL POWER & LIGHT CO. | | author affiliation = JERSEY CENTRAL POWER & LIGHT CO. |
Latest revision as of 20:23, 16 January 2020
Date released: 12/30/2019 | Download: ML19350A947 |
---|---|
ML19350A948 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 03/12/1981 |
From: | Fitzgerald M JERSEY CENTRAL POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19350A948 (1) | |
ML19350A946 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 03/12/1981 |
From: | Finfrock I JERSEY CENTRAL POWER & LIGHT CO. |
To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19350A946 (3) | |