| number = ML16109A151
| issue date = 04/08/2015
| issue date = 04/08/2015
| title = 2015/04/08 NRR E-mail Capture - Monticello ESEP Report Clarifications
| title = NRR E-mail Capture - Monticello ESEP Report Clarifications
| author name = Wyman S M
| author name = Wyman S
| author affiliation = NRC/NRR/JLD
| author affiliation = NRC/NRR/JLD
| addressee name = Fields J
| addressee name = Fields J
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Wyman, Stephen Sent: Wednesday, April 08, 2015 1:08 PM To:'John.Fields@exnuclear.com' Cc: DiFrancesco, Nicholas
{{#Wiki_filter:NRR-PMDAPEm Resource From:                               Wyman, Stephen Sent:                               Wednesday, April 08, 2015 1:08 PM To:                                 'John.Fields@exnuclear.com' Cc:                                 DiFrancesco, Nicholas


==Subject:==
==Subject:==
Monticello ESEP Report Clarifications Tracking Tracking:RecipientDelivery
Monticello ESEP Report Clarifications Tracking:
'John.Fields@exnuclear.com' DiFrancesco, NicholasDelivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8 th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:
Tracking                             Recipient                            Delivery
: 1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.  
                                    'John.Fields@exnuclear.com' DiFrancesco, Nicholas                Delivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:
: 2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system he at exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.  
: 1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.
: 3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.  
: 2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system heat exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
: 4. 8 relays in the ESEL are identified as "bad actors", and are assigned a functional HCLPF capacity = 0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.
: 3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.
: 5. 12 switches in the ESEL are identified as "No public capacity data available for this item." and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
: 4. 8 relays in the ESEL are identified as bad actors, and are assigned a functional HCLPF capacity =
: 6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell. The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 2be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results. 
0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.
: 7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented. 
: 5. 12 switches in the ESEL are identified as No public capacity data available for this item. and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
: 6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell.
The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 1


be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results.
: 7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented.
In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.
In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.
: Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)
Stephen.Wyman@nrc.gov 2


Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns. 
Hearing Identifier:   NRR_PMDA Email Number:         2785 Mail Envelope Properties     (089976021C4CD3459B2B51E28655AB580184F7724F85)
: Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice)
 
301-415-8333 (Fax)
 
Stephen.Wyman@nrc.gov
 
Hearing Identifier: NRR_PMDA Email Number: 2785   Mail Envelope Properties   (089976021C4CD3459B2B51E28655AB580184F7724F85)


==Subject:==
==Subject:==
Monticello ESEP Report Clarifications Sent Date:   4/8/2015 1:08:26 PM Received Date: 4/8/2015 1:08:00 PM From:   Wyman, Stephen Created By:   Stephen.Wyman@nrc.gov Recipients:     "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov> Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM "'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>
Monticello ESEP Report Clarifications Sent Date:             4/8/2015 1:08:26 PM Received Date:         4/8/2015 1:08:00 PM From:                 Wyman, Stephen Created By:           Stephen.Wyman@nrc.gov Recipients:
Tracking Status: None Post Office:   HQCLSTR02.nrc.gov
"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>
Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM
"'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                          Size                      Date & Time MESSAGE                        4478                      4/8/2015 1:08:00 PM Options Priority:                      Standard Return Notification:          Yes Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


Files    Size      Date & Time MESSAGE    4478      4/8/2015 1:08:00 PM 
NRR-PMDAPEm Resource From:                               Wyman, Stephen Sent:                               Wednesday, April 08, 2015 1:08 PM To:                                 'John.Fields@exnuclear.com' Cc:                                 DiFrancesco, Nicholas
 
Options  Priority:    Standard  Return Notification:    Yes  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1 NRR-PMDAPEm Resource From: Wyman, Stephen Sent: Wednesday, April 08, 2015 1:08 PM To:'John.Fields@exnuclear.com' Cc: DiFrancesco, Nicholas


==Subject:==
==Subject:==
Monticello ESEP Report Clarifications Tracking Tracking:RecipientDelivery
Monticello ESEP Report Clarifications Tracking:
'John.Fields@exnuclear.com' DiFrancesco, NicholasDelivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8 th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:
Tracking                             Recipient                            Delivery
: 1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.  
                                    'John.Fields@exnuclear.com' DiFrancesco, Nicholas                Delivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:
: 2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system he at exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.  
: 1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.
: 3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.  
: 2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system heat exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
: 4. 8 relays in the ESEL are identified as "bad actors", and are assigned a functional HCLPF capacity = 0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.
: 3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.
: 5. 12 switches in the ESEL are identified as "No public capacity data available for this item." and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
: 4. 8 relays in the ESEL are identified as bad actors, and are assigned a functional HCLPF capacity =
: 6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell. The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 2be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results. 
0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.
: 7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented. 
: 5. 12 switches in the ESEL are identified as No public capacity data available for this item. and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
: 6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell.
The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 1


be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results.
: 7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented.
In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.
In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.
: Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)
Stephen.Wyman@nrc.gov 2


Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns. 
Hearing Identifier:   NRR_PMDA Email Number:         2785 Mail Envelope Properties     (089976021C4CD3459B2B51E28655AB580184F7724F85)
: Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice)
 
301-415-8333 (Fax)
 
Stephen.Wyman@nrc.gov
 
Hearing Identifier: NRR_PMDA Email Number: 2785   Mail Envelope Properties   (089976021C4CD3459B2B51E28655AB580184F7724F85)


==Subject:==
==Subject:==
Monticello ESEP Report Clarifications Sent Date:   4/8/2015 1:08:26 PM Received Date: 4/8/2015 1:08:00 PM From:   Wyman, Stephen Created By:   Stephen.Wyman@nrc.gov Recipients:     "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov> Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM "'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>
Monticello ESEP Report Clarifications Sent Date:             4/8/2015 1:08:26 PM Received Date:         4/8/2015 1:08:00 PM From:                 Wyman, Stephen Created By:           Stephen.Wyman@nrc.gov Recipients:
Tracking Status: None Post Office:   HQCLSTR02.nrc.gov
"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>
 
Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM
Files     Size     Date & Time MESSAGE   4478     4/8/2015 1:08:00 PM
"'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>
 
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                         Size                       Date & Time MESSAGE                       4478                       4/8/2015 1:08:00 PM Options Priority:                     Standard Return Notification:           Yes Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Options Priority:     Standard   Return Notification:   Yes   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Latest revision as of 17:49, 4 December 2019

NRR E-mail Capture - Monticello ESEP Report Clarifications
ML16109A151
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/08/2015
From: Steve Wyman
Japan Lessons-Learned Division
To: Fields J
Northern States Power Co
References
Download: ML16109A151 (3)


Text

NRR-PMDAPEm Resource From: Wyman, Stephen Sent: Wednesday, April 08, 2015 1:08 PM To: 'John.Fields@exnuclear.com' Cc: DiFrancesco, Nicholas

Subject:

Monticello ESEP Report Clarifications Tracking:

Tracking Recipient Delivery

'John.Fields@exnuclear.com' DiFrancesco, Nicholas Delivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:

1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.
2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system heat exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.
4. 8 relays in the ESEL are identified as bad actors, and are assigned a functional HCLPF capacity =

0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.

5. 12 switches in the ESEL are identified as No public capacity data available for this item. and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell.

The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 1

be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results.

7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented.

In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.

An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.

Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.

Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)

Stephen.Wyman@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2785 Mail Envelope Properties (089976021C4CD3459B2B51E28655AB580184F7724F85)

Subject:

Monticello ESEP Report Clarifications Sent Date: 4/8/2015 1:08:26 PM Received Date: 4/8/2015 1:08:00 PM From: Wyman, Stephen Created By: Stephen.Wyman@nrc.gov Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM

"'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 4478 4/8/2015 1:08:00 PM Options Priority: Standard Return Notification: Yes Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Wyman, Stephen Sent: Wednesday, April 08, 2015 1:08 PM To: 'John.Fields@exnuclear.com' Cc: DiFrancesco, Nicholas

Subject:

Monticello ESEP Report Clarifications Tracking:

Tracking Recipient Delivery

'John.Fields@exnuclear.com' DiFrancesco, Nicholas Delivered: 4/8/2015 1:08 PM Mr. Fields, In follow-up to my April 8th voicemail, as part of the NRC review of the Monticello ESEP report, the staff would appreciate clarification on the following technical items:

1. Please clarify if the RCIC CST suction valve should be included in the ESEP scope or discuss why it is not necessary.
2. The ESEP submittal identifies the Residual Heat Removal Service Water System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path, except for the passive RHR system heat exchangers. Confirm that no additional components within this flow-path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the identified flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
3. In attachment A, the ESEL, there are a large number of items that have blank operating states and note/comment. Please update the table with the appropriate information.
4. 8 relays in the ESEL are identified as bad actors, and are assigned a functional HCLPF capacity =

0.0. Of the 18 remaining relays, 17 relays are designated with a HCLPF capacity = 0.21g, based on the anchorage capacity of the parent (i.e., rule of the box). For these 17 relays, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each relay.

5. 12 switches in the ESEL are identified as No public capacity data available for this item. and are assigned a HCLPF capacity = 0.0. Of the remaining 37 switches, 35 switches apparently have a HCLPF capacity controlled by something other than function. For these 35 switches, identify the functional HCLPF capacities, and also discuss how in-cabinet amplification was considered in determining the functional capacity for each switch.
6. There are approximately 50 ESEL items identified as inaccessible because they are inside the drywell.

The licensee does NOT intend to complete a walk-by or remote visual of the inaccessible ESEL items at a later date. It is relying on A-46 walkdown results, which are around 20 years old. This appears to 1

be inconsistent with the augmented approach proposed by EPRI and accepted by NRC. Discuss the technical basis why these approximately 50 items do not need to be looked at, in order to verify condition and re-affirm the A-46 walkdown results.

7. Section 8.2 identifies 24 ESEL components that have a HCLPF capacity less than the RLGM; 23 are relays and switches. A more detailed analysis of capacity for the RHR Heat Exchanger E-200B anchorage, and changing the bolting material are discussed as options, but have not been implemented. 20 of the 23 relays and switches lack adequate qualification test data. Several avenues for resolution are discussed, but none have been implemented.

In Section 8.4, the Licensee indicates that the 24 components are entered into the plant Corrective Actions Program (CAP) for resolution. The analysis and completion of the 24 components should have been part of the submittal. There are no regulatory commitments made in the ESEP submittal. Discuss the status of the resolution for each of the 24 components, including the method being employed, the schedule for completing the resolution activities, and the schedule for implementing any required hardware modifications. Also discuss the technical basis for relying on the plant CAP for resolution, in lieu of including regulatory commitments in the ESEP submittal, consistent with the EPRI Augmented Approach guidance.

An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.

Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.

Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)

Stephen.Wyman@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2785 Mail Envelope Properties (089976021C4CD3459B2B51E28655AB580184F7724F85)

Subject:

Monticello ESEP Report Clarifications Sent Date: 4/8/2015 1:08:26 PM Received Date: 4/8/2015 1:08:00 PM From: Wyman, Stephen Created By: Stephen.Wyman@nrc.gov Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status:: Response: Delivered : 4/8/2015 1:08:00 PM

"'John.Fields@exnuclear.com'" <John.Fields@exnuclear.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 4478 4/8/2015 1:08:00 PM Options Priority: Standard Return Notification: Yes Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: