ML19101A090: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML19101A090 | | number = ML19101A090 | ||
| issue date = 04/11/2019 | | issue date = 04/11/2019 | ||
| title = Beyond Nuclear Letter to | | title = Beyond Nuclear Letter to ASLB | ||
| author name = Curran D | | author name = Curran D | ||
| author affiliation = Harmon, Curran, Spielberg & Eisenberg, LLP | | author affiliation = Harmon, Curran, Spielberg & Eisenberg, LLP | ||
| addressee name = Abreu S | | addressee name = Abreu S, Gibson M, Kennedy M | ||
| addressee affiliation = NRC/ASLBP | | addressee affiliation = NRC/ASLBP | ||
| docket = 05000277, 05000278 | | docket = 05000277, 05000278 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:April 11, 2019 Michael M. Gibson, Chairman Dr. Sue H. Abreu Dr. Michael F. Kennedy Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | ||
==SUBJECT:== | |||
Peach Bottom Subsequent License Renewal Proceeding, Docket Nos. | |||
50-227-SLR and 50-278-SLR | |||
==Dear Atomic Safety and Licensing Board Panel Members:== | |||
I am writing to you regarding PNNL-27120, Rev. 1, Criteria and Planning Guidance to Ex-Plant Harvesting to Support Subsequent License Renewal (March 31, 2019) (ML19081A006), which the NRC Staff recently posted on ADAMS. The report is referenced in the NRC Staffs letter to you dated April 2, 2019. | |||
Beyond Nuclear has reviewed the document and found that it contains some information not included in the version of the report referenced in Beyond Nuclears hearing request, which previously was posted on the U.S. Department of Energys website and then withdrawn.1 Therefore, Beyond Nuclear and Mr. Lochbaum, are reviewing the new document to determine whether its content warrants the submission of new or amended contentions. This process may or may not take the entire 30 days generally provided for the filing of new and amended contentions. | |||
We provide this information in anticipation that it may affect the timing of your decision on Beyond Nuclears hearing request. If we decide not to file new or amended contentions, we will let you know as soon as possible. | |||
Sincerely, | |||
/s/ | |||
Diane Curran Cc: Service List 1 The previous document is cited in David Lochbaums expert report as Ramuhali, P., Glass S.W., Devanathan, R., Knobbs, K., and Meyer, R. M., Pacific Northwest National Laboratory. | |||
2017. PNNL-27120: Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal (December 2017).}} |
Latest revision as of 02:31, 30 November 2019
ML19101A090 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 04/11/2019 |
From: | Curran D Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP |
To: | Sue Abreu, Michael Gibson, Kennedy M Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-277-SLR, 50-278-SLR, ASLBP 19-960-01-SLR-BD01, RAS 54916 | |
Download: ML19101A090 (1) | |
Text
April 11, 2019 Michael M. Gibson, Chairman Dr. Sue H. Abreu Dr. Michael F. Kennedy Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
Peach Bottom Subsequent License Renewal Proceeding, Docket Nos.
50-227-SLR and 50-278-SLR
Dear Atomic Safety and Licensing Board Panel Members:
I am writing to you regarding PNNL-27120, Rev. 1, Criteria and Planning Guidance to Ex-Plant Harvesting to Support Subsequent License Renewal (March 31, 2019) (ML19081A006), which the NRC Staff recently posted on ADAMS. The report is referenced in the NRC Staffs letter to you dated April 2, 2019.
Beyond Nuclear has reviewed the document and found that it contains some information not included in the version of the report referenced in Beyond Nuclears hearing request, which previously was posted on the U.S. Department of Energys website and then withdrawn.1 Therefore, Beyond Nuclear and Mr. Lochbaum, are reviewing the new document to determine whether its content warrants the submission of new or amended contentions. This process may or may not take the entire 30 days generally provided for the filing of new and amended contentions.
We provide this information in anticipation that it may affect the timing of your decision on Beyond Nuclears hearing request. If we decide not to file new or amended contentions, we will let you know as soon as possible.
Sincerely,
/s/
Diane Curran Cc: Service List 1 The previous document is cited in David Lochbaums expert report as Ramuhali, P., Glass S.W., Devanathan, R., Knobbs, K., and Meyer, R. M., Pacific Northwest National Laboratory.
2017. PNNL-27120: Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal (December 2017).