ML012610103: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/14/2001
| issue date = 09/14/2001
| title = Request for Meeting to Discuss Potential Industry Activities Related to CRDM TGSCC Leakage Found at Palisades
| title = Request for Meeting to Discuss Potential Industry Activities Related to CRDM TGSCC Leakage Found at Palisades
| author name = Sheron B W
| author name = Sheron B
| author affiliation = NRC/NRR/ADPT
| author affiliation = NRC/NRR/ADPT
| addressee name = Marion A
| addressee name = Marion A
Line 9: Line 9:
| docket = 05000255, PROJ0689
| docket = 05000255, PROJ0689
| license number = DPR-020
| license number = DPR-020
| contact person = Carpenter C E, NRR/EMCB, 415-2169
| contact person = Carpenter C, NRR/EMCB, 415-2169
| document type = Letter
| document type = Letter
| page count = 5
| page count = 5
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:September 14, 2001Mr. Alex Marion, Director   Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
{{#Wiki_filter:September 14, 2001 Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708


==SUBJECT:==
==SUBJECT:==
REQUEST FOR MEETING TO DISCUSS POTENTIAL INDUSTRY ACTIVITIESRELATED TO CRDM TGSCC LEAKAGE FOUND AT PALISADES
REQUEST FOR MEETING TO DISCUSS POTENTIAL INDUSTRY ACTIVITIES RELATED TO CRDM TGSCC LEAKAGE FOUND AT PALISADES


==Dear Mr. Marion:==
==Dear Mr. Marion:==


On June 21, 2001, while shut down to investigate the source of a primary leak at Palisades, thelicensee (Nuclear Management Company or NMC) found a through-wall axial crack on the #21 control rod drive mechanism (CRDM) housing. This crack was located several feet above the nozzle head penetration through the upper head. The licensee has made a preliminary root cause determination for this crack as being initiated by trans-granular stress corrosion cracking (TGSCC). The licensee performed further investigations of the remaining 44 CRDM housings at Palisades and has reported indications in 39 housings, axial and some circumferential, none of which are through-wall. At this time, the plant remains shut down and is procuring replacement CRDM housings. This is the second such reported instance of through-wall cracking in CRDM housings causedby TGSCC and the first where circumferential cracking was reported. The first instance was of axial through-wall cracking in two spare penetrations at Fort Calhoun in December 1990.
On June 21, 2001, while shut down to investigate the source of a primary leak at Palisades, the licensee (Nuclear Management Company or NMC) found a through-wall axial crack on the #21 control rod drive mechanism (CRDM) housing. This crack was located several feet above the nozzle head penetration through the upper head. The licensee has made a preliminary root cause determination for this crack as being initiated by trans-granular stress corrosion cracking (TGSCC). The licensee performed further investigations of the remaining 44 CRDM housings at Palisades and has reported indications in 39 housings, axial and some circumferential, none of which are through-wall. At this time, the plant remains shut down and is procuring replacement CRDM housings.
These cracks were found at a different location than at Palisades in an internal weld overlay above the housing. The licensee removed and capped these spares. TGSCC is characterized by cracking through the matrix of the grains, and is not necessarilylimited to the heat affected zone (HAZ) around weldments. It is different from primary water stress corrosion cracking (PWSCC) which has been observed in CRDM vessel head nozzle penetrations and associated J-grove welds at Oconee Units 1, 2 and 3 and at Arkansas Nuclear One Unit 1 (ANO1). The cracking mode of PWSCC is intergranular in nature and occurs in a low oxygen environment, whereas TGSCC is generally associated with the presence of contaminants (e.g., chlorides) and dissolved oxygen in the operating environment. While the licensee identified chlorine in the area of the motor housing, the concentration was reported to be within acceptable limits. It should be noted that the CRDM housings were fabricated of Types 347 or 304 stainlesssteels. Of the four most common types of stainless steel used in the industry (304, 316, 321, and 347), the stabilized types (321 and 347) have been demonstrated to be more resistant to intergranular stress corrosion cracking (IGSCC), and would be expected to be at least as Mr. Alex Marion- 2 -resistant to TGSCC as the Type 304 and Type 316 materials. The housing with a through-wallcrack at Palisades was fabricated of Type 347 stabilized stainless steel, while the cracking observed at Fort Calhoun was reported to be in Type 304 material. Based on this, there is a potential generic concern related to TGSCC in these materials.Of further concern to the NRC staff is that the Palisades licensee experienced significantdifficulty in performing non-destructive examinations (NDE) of their CRDM housings. NDE should consistently identify and characterize potential crack indications; however, at Palisades, several methods were utilized and did not give uniform results. Additionally, while the ASME Code in-service inspection (ISI) requirements for the CRDM housing welds (Table IWB-2500-1, Examination Category B-O, "Pressure Retaining Welds in Control Rod Housings") offer the option of either volumetric or surface examination of 10-percent of peripheral housings each 10-year interval, such limited number and scope of surface exams have been shown to not be useful in identifying this cracking mechanism, since the cracking initiates from the inside. The prudent licensee should consider what, if any, effect this will have on the continued safe operation of their plant.In accordance with the policy stated in SECY-99-143, "Revisions to Generic CommunicationProgram," dated May 26, 1999, the staff believes that early and more frequent interactions with representatives of the nuclear power industry on emergent issues will lead to more efficient and effective use of industry and NRR resources. There is an additional advantage to be gained by interacting with the industry on emerging issues, and that is the public will have additional opportunity to follow their evolution in public meetings. Therefore, the staff has identified this as an emerging issue, and has received the approval of senior NRR management to pursue this matter further. Therefore, the staff proposes to discuss with the nuclear industry potential actions that could betaken in the near term to address the above concerns. The NRC requests that the Nuclear Energy Institute (NEI), as the regulatory interface for the EPRI Materials Reliability Program (MRP), and representatives from the nuclear industry, meet with the staff the week of October 8, 2001, to discuss an industry-wide response to the potential generic implications arising from the above instances. In particular, the staff is primarily concerned that plants have not inspected their CRDM housings in an effective manner for evidence of cracking, especially that initiated by TGSCC. Further, investigations into the potential need for augmenting NDE methodologies and/or tooling to more readily locate such indications in the CRDM housings should be discussed.
This is the second such reported instance of through-wall cracking in CRDM housings caused by TGSCC and the first where circumferential cracking was reported. The first instance was of axial through-wall cracking in two spare penetrations at Fort Calhoun in December 1990.
Mr. Alex Marion- 3 -If you have any question regarding this request, please contact Jack Strosnider of my staff at301-415-3298.Sincerely,/ra by JRStrosnider f/ Brian Sheron, Associate Director  Project Licensing & Technical Analysis Office of Nuclear Reactor RegulationProject No. 689 cc:  See next page Mr. Alex Marion- 3 -If you have any question regarding this request, please contact Jack Strosnider of my staff at301-415-3298.Sincerely,Brian Sheron, Associate Director  Project Licensing & Technical Analysis Office of Nuclear Reactor RegulationProject No. 689 cc:  See next pageDistribution
These cracks were found at a different location than at Palisades in an internal weld overlay above the housing. The licensee removed and capped these spares.
:EMCB R/FSDuraiswamy
TGSCC is characterized by cracking through the matrix of the grains, and is not necessarily limited to the heat affected zone (HAZ) around weldments. It is different from primary water stress corrosion cracking (PWSCC) which has been observed in CRDM vessel head nozzle penetrations and associated J-grove welds at Oconee Units 1, 2 and 3 and at Arkansas Nuclear One Unit 1 (ANO1). The cracking mode of PWSCC is intergranular in nature and occurs in a low oxygen environment, whereas TGSCC is generally associated with the presence of contaminants (e.g., chlorides) and dissolved oxygen in the operating environment. While the licensee identified chlorine in the area of the motor housing, the concentration was reported to be within acceptable limits.
It should be noted that the CRDM housings were fabricated of Types 347 or 304 stainless steels. Of the four most common types of stainless steel used in the industry (304, 316, 321, and 347), the stabilized types (321 and 347) have been demonstrated to be more resistant to intergranular stress corrosion cracking (IGSCC), and would be expected to be at least as


JLarkinsWDTraversWFKane SJCollins JRJohnsonJAZwolinskiGMHolahan DBMatthews
Mr. Alex Marion                                  resistant to TGSCC as the Type 304 and Type 316 materials. The housing with a through-wall crack at Palisades was fabricated of Type 347 stabilized stainless steel, while the cracking observed at Fort Calhoun was reported to be in Type 304 material. Based on this, there is a potential generic concern related to TGSCC in these materials.
Of further concern to the NRC staff is that the Palisades licensee experienced significant difficulty in performing non-destructive examinations (NDE) of their CRDM housings. NDE should consistently identify and characterize potential crack indications; however, at Palisades, several methods were utilized and did not give uniform results. Additionally, while the ASME Code in-service inspection (ISI) requirements for the CRDM housing welds (Table IWB-2500-1, Examination Category B-O, Pressure Retaining Welds in Control Rod Housings) offer the option of either volumetric or surface examination of 10-percent of peripheral housings each 10-year interval, such limited number and scope of surface exams have been shown to not be useful in identifying this cracking mechanism, since the cracking initiates from the inside. The prudent licensee should consider what, if any, effect this will have on the continued safe operation of their plant.
In accordance with the policy stated in SECY-99-143, Revisions to Generic Communication Program, dated May 26, 1999, the staff believes that early and more frequent interactions with representatives of the nuclear power industry on emergent issues will lead to more efficient and effective use of industry and NRR resources. There is an additional advantage to be gained by interacting with the industry on emerging issues, and that is the public will have additional opportunity to follow their evolution in public meetings. Therefore, the staff has identified this as an emerging issue, and has received the approval of senior NRR management to pursue this matter further.
Therefore, the staff proposes to discuss with the nuclear industry potential actions that could be taken in the near term to address the above concerns. The NRC requests that the Nuclear Energy Institute (NEI), as the regulatory interface for the EPRI Materials Reliability Program (MRP), and representatives from the nuclear industry, meet with the staff the week of October 8, 2001, to discuss an industry-wide response to the potential generic implications arising from the above instances. In particular, the staff is primarily concerned that plants have not inspected their CRDM housings in an effective manner for evidence of cracking, especially that initiated by TGSCC. Further, investigations into the potential need for augmenting NDE methodologies and/or tooling to more readily locate such indications in the CRDM housings should be discussed.


BABogerMEMayfieldNCChokshi CACarpenter PCWenWHKooMAMitchell CMCraig DHoodWDLanning, R1CCasto, R2 JGrobe, R3 AHowell, R4Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\Palisades NEI Letter.wpd* Concurred PreviouslyINDICATE IN BOX: "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N"=NO COPY EMCB:DEEEMCB:DEEEMCB:DEEDE:DENRR:ADPTECECarpenter:cecKRWichman:krwWHBateman:whbJRStrosnider:jrsBWSheron:jrsf/
Mr. Alex Marion                              If you have any question regarding this request, please contact Jack Strosnider of my staff at 301-415-3298.
08/24/200108/27/200109/13/200108/27/200109/14/2001OFFICIAL RECORD COPY cc:Ralph Beedle, Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708Mr. Jack Bailey, Chair  Materials Reliability Program 1101 Market Street - LP 6A Chattanooga, TN  37402Larry Mathews, MRP Southern Nuclear Operating Company Manager, Inspection and Testing Services P. O. Box 1295 Birmingham, AL  35201Vaughn Wagoner, Technical Chair Assessment Committee Carolina Power & Light Company One Hannover Square 9C1 P.O. Box 1551 Raleigh, NC 27612Frank Ammirato, EPRI   Inspection Manager EPRI NDE Center P. O. Box 217097 1300 W. T. Harris Blvd.
Sincerely,
Charlotte, NC 28221C. Thomas Alley, Jr., Technical Chair  Inspection Task Duke Power Company Nuclear General Office 526 South Church Street Mail Code EC09O PO Box 1006 Charlotte NC 28201Avtar Singh, EPRI MRP ManagerChuck Welty, EPRI MRP Manager Allan McIlree, EPRI Assessment Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.
                                            /ra by JRStrosnider f/
Palo Alto, CA 94303Gary D. Moffatt, Technical Chair  Repair/Mitigation Task V. C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC  29065}}
Brian Sheron, Associate Director Project Licensing & Technical Analysis Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
 
Mr. Alex Marion                                        If you have any question regarding this request, please contact Jack Strosnider of my staff at 301-415-3298.
Sincerely, Brian Sheron, Associate Director Project Licensing & Technical Analysis Office of Nuclear Reactor Regulation Project No. 689 cc: See next page Distribution:
EMCB R/F          WDTravers          JAZwolinski      MEMayfield      WHKoo              WDLanning, R1 SDuraiswamy        WFKane              GMHolahan        NCChokshi        MAMitchell          CCasto, R2 JLarkins          SJCollins          DBMatthews        CACarpenter      CMCraig            JGrobe, R3 JRJohnson          BABoger          PCWen            DHood              AHowell, R4 Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\Palisades NEI*Letter.wpd     Concurred Previously INDICATE IN BOX: C=COPY W/O ATTACHMENT/ENCLOSURE, E=COPY W/ATT/ENCL, N=NO COPY EMCB:DE          E EMCB:DE          E EMCB:DE        E DE:D            E NRR:ADPT        E CECarpenter:cec    KRWichman:krw      WHBateman:whb JRStrosnider:jrs      BWSheron:jrsf/
08/24/2001          08/27/2001        09/13/2001        08/27/2001        09/14/2001 OFFICIAL RECORD COPY
 
cc:
Ralph Beedle, Senior Vice President     Mr. Jack Bailey, Chair and Chief Nuclear Officer                 Materials Reliability Program Nuclear Energy Institute                 1101 Market Street - LP 6A Suite 400                               Chattanooga, TN 37402 1776 I Street, NW Washington, DC 20006-3708 Larry Mathews, MRP                       Vaughn Wagoner, Technical Chair Southern Nuclear Operating Company       Assessment Committee Manager, Inspection and Testing Services Carolina Power & Light Company P. O. Box 1295                           One Hannover Square 9C1 Birmingham, AL 35201                    P.O. Box 1551 Raleigh, NC 27612 Frank Ammirato, EPRI                     C. Thomas Alley, Jr., Technical Chair Inspection Manager                       Inspection Task EPRI NDE Center                         Duke Power Company P. O. Box 217097                         Nuclear General Office 1300 W. T. Harris Blvd.                 526 South Church Street Charlotte, NC 28221                      Mail Code EC09O PO Box 1006 Charlotte NC 28201 Avtar Singh, EPRI MRP Manager            Gary D. Moffatt, Technical Chair Chuck Welty, EPRI MRP Manager             Repair/Mitigation Task Allan McIlree, EPRI Assessment Manager   V. C. Summer Nuclear Station Electric Power Research Institute       P. O. Box 88 P. O. Box 10412                         Jenkinsville, SC 29065 3412 Hillview Ave.
Palo Alto, CA 94303}}

Latest revision as of 04:42, 24 November 2019

Request for Meeting to Discuss Potential Industry Activities Related to CRDM TGSCC Leakage Found at Palisades
ML012610103
Person / Time
Site: Palisades, Nuclear Energy Institute  Entergy icon.png
Issue date: 09/14/2001
From: Sheron B
NRC/NRR/ADPT
To: Marion A
Nuclear Energy Institute
Carpenter C, NRR/EMCB, 415-2169
References
Download: ML012610103 (5)


Text

September 14, 2001 Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708

SUBJECT:

REQUEST FOR MEETING TO DISCUSS POTENTIAL INDUSTRY ACTIVITIES RELATED TO CRDM TGSCC LEAKAGE FOUND AT PALISADES

Dear Mr. Marion:

On June 21, 2001, while shut down to investigate the source of a primary leak at Palisades, the licensee (Nuclear Management Company or NMC) found a through-wall axial crack on the #21 control rod drive mechanism (CRDM) housing. This crack was located several feet above the nozzle head penetration through the upper head. The licensee has made a preliminary root cause determination for this crack as being initiated by trans-granular stress corrosion cracking (TGSCC). The licensee performed further investigations of the remaining 44 CRDM housings at Palisades and has reported indications in 39 housings, axial and some circumferential, none of which are through-wall. At this time, the plant remains shut down and is procuring replacement CRDM housings.

This is the second such reported instance of through-wall cracking in CRDM housings caused by TGSCC and the first where circumferential cracking was reported. The first instance was of axial through-wall cracking in two spare penetrations at Fort Calhoun in December 1990.

These cracks were found at a different location than at Palisades in an internal weld overlay above the housing. The licensee removed and capped these spares.

TGSCC is characterized by cracking through the matrix of the grains, and is not necessarily limited to the heat affected zone (HAZ) around weldments. It is different from primary water stress corrosion cracking (PWSCC) which has been observed in CRDM vessel head nozzle penetrations and associated J-grove welds at Oconee Units 1, 2 and 3 and at Arkansas Nuclear One Unit 1 (ANO1). The cracking mode of PWSCC is intergranular in nature and occurs in a low oxygen environment, whereas TGSCC is generally associated with the presence of contaminants (e.g., chlorides) and dissolved oxygen in the operating environment. While the licensee identified chlorine in the area of the motor housing, the concentration was reported to be within acceptable limits.

It should be noted that the CRDM housings were fabricated of Types 347 or 304 stainless steels. Of the four most common types of stainless steel used in the industry (304, 316, 321, and 347), the stabilized types (321 and 347) have been demonstrated to be more resistant to intergranular stress corrosion cracking (IGSCC), and would be expected to be at least as

Mr. Alex Marion resistant to TGSCC as the Type 304 and Type 316 materials. The housing with a through-wall crack at Palisades was fabricated of Type 347 stabilized stainless steel, while the cracking observed at Fort Calhoun was reported to be in Type 304 material. Based on this, there is a potential generic concern related to TGSCC in these materials.

Of further concern to the NRC staff is that the Palisades licensee experienced significant difficulty in performing non-destructive examinations (NDE) of their CRDM housings. NDE should consistently identify and characterize potential crack indications; however, at Palisades, several methods were utilized and did not give uniform results. Additionally, while the ASME Code in-service inspection (ISI) requirements for the CRDM housing welds (Table IWB-2500-1, Examination Category B-O, Pressure Retaining Welds in Control Rod Housings) offer the option of either volumetric or surface examination of 10-percent of peripheral housings each 10-year interval, such limited number and scope of surface exams have been shown to not be useful in identifying this cracking mechanism, since the cracking initiates from the inside. The prudent licensee should consider what, if any, effect this will have on the continued safe operation of their plant.

In accordance with the policy stated in SECY-99-143, Revisions to Generic Communication Program, dated May 26, 1999, the staff believes that early and more frequent interactions with representatives of the nuclear power industry on emergent issues will lead to more efficient and effective use of industry and NRR resources. There is an additional advantage to be gained by interacting with the industry on emerging issues, and that is the public will have additional opportunity to follow their evolution in public meetings. Therefore, the staff has identified this as an emerging issue, and has received the approval of senior NRR management to pursue this matter further.

Therefore, the staff proposes to discuss with the nuclear industry potential actions that could be taken in the near term to address the above concerns. The NRC requests that the Nuclear Energy Institute (NEI), as the regulatory interface for the EPRI Materials Reliability Program (MRP), and representatives from the nuclear industry, meet with the staff the week of October 8, 2001, to discuss an industry-wide response to the potential generic implications arising from the above instances. In particular, the staff is primarily concerned that plants have not inspected their CRDM housings in an effective manner for evidence of cracking, especially that initiated by TGSCC. Further, investigations into the potential need for augmenting NDE methodologies and/or tooling to more readily locate such indications in the CRDM housings should be discussed.

Mr. Alex Marion If you have any question regarding this request, please contact Jack Strosnider of my staff at 301-415-3298.

Sincerely,

/ra by JRStrosnider f/

Brian Sheron, Associate Director Project Licensing & Technical Analysis Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

Mr. Alex Marion If you have any question regarding this request, please contact Jack Strosnider of my staff at 301-415-3298.

Sincerely, Brian Sheron, Associate Director Project Licensing & Technical Analysis Office of Nuclear Reactor Regulation Project No. 689 cc: See next page Distribution:

EMCB R/F WDTravers JAZwolinski MEMayfield WHKoo WDLanning, R1 SDuraiswamy WFKane GMHolahan NCChokshi MAMitchell CCasto, R2 JLarkins SJCollins DBMatthews CACarpenter CMCraig JGrobe, R3 JRJohnson BABoger PCWen DHood AHowell, R4 Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\Palisades NEI*Letter.wpd Concurred Previously INDICATE IN BOX: C=COPY W/O ATTACHMENT/ENCLOSURE, E=COPY W/ATT/ENCL, N=NO COPY EMCB:DE E EMCB:DE E EMCB:DE E DE:D E NRR:ADPT E CECarpenter:cec KRWichman:krw WHBateman:whb JRStrosnider:jrs BWSheron:jrsf/

08/24/2001 08/27/2001 09/13/2001 08/27/2001 09/14/2001 OFFICIAL RECORD COPY

cc:

Ralph Beedle, Senior Vice President Mr. Jack Bailey, Chair and Chief Nuclear Officer Materials Reliability Program Nuclear Energy Institute 1101 Market Street - LP 6A Suite 400 Chattanooga, TN 37402 1776 I Street, NW Washington, DC 20006-3708 Larry Mathews, MRP Vaughn Wagoner, Technical Chair Southern Nuclear Operating Company Assessment Committee Manager, Inspection and Testing Services Carolina Power & Light Company P. O. Box 1295 One Hannover Square 9C1 Birmingham, AL 35201 P.O. Box 1551 Raleigh, NC 27612 Frank Ammirato, EPRI C. Thomas Alley, Jr., Technical Chair Inspection Manager Inspection Task EPRI NDE Center Duke Power Company P. O. Box 217097 Nuclear General Office 1300 W. T. Harris Blvd. 526 South Church Street Charlotte, NC 28221 Mail Code EC09O PO Box 1006 Charlotte NC 28201 Avtar Singh, EPRI MRP Manager Gary D. Moffatt, Technical Chair Chuck Welty, EPRI MRP Manager Repair/Mitigation Task Allan McIlree, EPRI Assessment Manager V. C. Summer Nuclear Station Electric Power Research Institute P. O. Box 88 P. O. Box 10412 Jenkinsville, SC 29065 3412 Hillview Ave.

Palo Alto, CA 94303