| issue date = 09/30/2002
| issue date = 09/30/2002
| title = Proposed Changes to the Safety System Unavailability Performance Indicators
| title = Proposed Changes to the Safety System Unavailability Performance Indicators
| author name = Beckner W D
| author name = Beckner W
| author affiliation = NRC/NRR/DRIP/RORP
| author affiliation = NRC/NRR/DRIP/RORP
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 5
| page count = 5
}}
}}
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555-0001September 30, 2002NRC REGULATORY ISSUE SUMMARY 2002-14, SUPPLEMENT 1PROPOSED CHANGES TO THE SAFETY SYSTEM UNAVAILABILITYPERFORMANCE INDICATORS  
{{#Wiki_filter:UNITED STATES
                            NUCLEAR REGULATORY COMMISSION
                        OFFICE OF NUCLEAR REACTOR REGULATION
                                WASHINGTON, D.C. 20555-0001 September 30, 2002 NRC REGULATORY ISSUE SUMMARY 2002-14, SUPPLEMENT 1 PROPOSED CHANGES TO THE SAFETY SYSTEM UNAVAILABILITY
                            PERFORMANCE INDICATORS


==ADDRESSEES==
==ADDRESSEES==
All holders of operating licenses for nuclear power reactors, except those who havepermanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


==INTENT==
==INTENT==
The U. S. Nuclear Regulatory Commission (NRC) is issuing this supplement to RegulatoryIssue Summary (RIS) 2002-14 to provide to the addressees revised versions of the three attachments to the RIS.
The U. S. Nuclear Regulatory Commission (NRC) is issuing this supplement to Regulatory Issue Summary (RIS) 2002-14 to provide to the addressees revised versions of the three attachments to the RIS.


==BACKGROUND==
==BACKGROUND==
Regulatory Issue Summary 2002-14 informed addressees that the NRC was starting a 6-monthpilot program on September 1, 2002, to evaluate changes to the safety system unavailability (SSU) performance indicators (PIs), and that the pilot program would be assessed midway through the test period to determine if more than six months were needed to obtain meaningful results. The RIS and its three attachments provided guidance to participating addressees for submitting PI data to the NRC and on the program success criteria. Addressee participation in the pilot program is voluntary and participants were asked to conformto the guidance in the RIS for the voluntary submission of PI data.
Regulatory Issue Summary 2002-14 informed addressees that the NRC was starting a 6-month pilot program on September 1, 2002, to evaluate changes to the safety system unavailability (SSU) performance indicators (PIs), and that the pilot program would be assessed midway through the test period to determine if more than six months were needed to obtain meaningful results. The RIS and its three attachments provided guidance to participating addressees for submitting PI data to the NRC and on the program success criteria.
 
Addressee participation in the pilot program is voluntary and participants were asked to conform to the guidance in the RIS for the voluntary submission of PI data.


==Addressees==
==Addressees==
were also informed that updated guidance would be provided in the form of revisions to the attachments to the RIS, namely, Attachment 1, an excerpt from Draft NEI 99-02, Rev. 0, "Regulatory Assessment Performance Indicator Guideline," Section 2.2, "Mitigating System Performance Index," and Attachment 2, Draft NEI 99-02, Rev. 0, Appendix F, " Methodologies For Computing the Unavailability Index, the Unreliability Index and Determining Performance Index Validity.
were also informed that updated guidance would be provided in the form of revisions to the attachments to the RIS, namely, Attachment 1, an excerpt from Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Section 2.2, Mitigating System Performance Index, and Attachment 2, Draft NEI 99-02, Rev. 0, Appendix F, Methodologies For Computing the Unavailability Index, the Unreliability Index and Determining Performance Index Validity.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
Since the issuance of RIS 2002-14 on August 28, 2002, Attachments 1 and 2 have beenupdated and Attachment 3 has been revised. The revised attachments are attached to this RIS
Since the issuance of RIS 2002-14 on August 28, 2002, Attachments 1 and 2 have been updated and Attachment 3 has been revised. The revised attachments are attached to this RIS
supplement.ML022740008 RIS 2002-14, Sup. 1  
supplement.
 
ML022740008
 
RIS 2002-14, Sup. 1  


==BACKFIT DISCUSSION==
==BACKFIT DISCUSSION==
This RIS supplement requires no action or written response. Therefore, the staff did notperform a backfit analysis.
This RIS supplement requires no action or written response. Therefore, the staff did not perform a backfit analysis.


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
A notice of opportunity for public comment was not published in the Federal Register becausethis RIS supplement is informational.
A notice of opportunity for public comment was not published in the Federal Register because this RIS supplement is informational.


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS supplement does not request any information collections.If there are any questions about this matter, please contact one of the persons listed below./Original signed by: TReis/William D. Beckner, Program Director Operating Reactor Improvements program Division of Regulatory Improvement Programs Office of Nuclear Reactor RegulationTechnical contact:Serita Sanders, NRR 301-415-2956 E-mail: sxs5@nrc.gov Attachments:1. Draft NEI 99-02, Rev. 0, "Regulatory Assessment Performance Indicator Guideline," Section 2.2, "Mitigating System Performance Index
This RIS supplement does not request any information collections.
" 2. Draft NEI 99-02, Rev. 0, "Regulatory Assessment Performance Indicator Guideline," Appendix F, "Methodologies For Computing the Unavailability Index, the Unreliability Index, and Determining Performance Index Validity
 
" 3.Mitigating System Performance Index Pilot Program Success Criteria  
If there are any questions about this matter, please contact one of the persons listed below.
4.List of Recently Issued NRC Regulatory Issue Summaries  
 
/Original signed by: TReis/
                                              William D. Beckner, Program Director Operating Reactor Improvements program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contact: Serita Sanders, NRR
                      301-415-2956 E-mail: sxs5@nrc.gov Attachments:
1. Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Section 2.2, Mitigating System Performance Index
2. Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Appendix F, Methodologies For Computing the Unavailability Index, the Unreliability Index, and Determining Performance Index Validity
3. Mitigating System Performance Index Pilot Program Success Criteria
4. List of Recently Issued NRC Regulatory Issue Summaries
 
Package ML022740008, ML022740012, ML022740072
                                                                    *See previous concurrence OFFICE OE:RORP:DRIP IIPB:DIPM                    SC:IIPB:DIPM    BC:IIPM:DIPM
  NAME JWShapaker*              SSanders*          MSatorious*      CCarpenter*
  DATE      09/ /2002          09/19/2002        09/26/2002      09/29/2002 OFFICE OGC                    SC:RORP:DRIP PD:RORP:DRIP
  NAME HJMcGurren*              TReis*            WDBeckner*
  DATE      09/30/2002          09/30/2002        09/30/2002
 
Attachment 3 RIS 2002-14, Sup. 1 Mitigating System Performance Index Pilot Program Success Criteria The Mitigating System Performance Index (MSPI) success criteria listed below will be met if there is general agreement among internal and external stakeholders that the criteria have been met.
 
a. The occurrence of a single failure of an MSPI monitored component by itself, absent any other failures or unavailabilities, should rarely exceed the green/white MSPI threshold as measured from the baseline value. The term rare is defined as minimizing the inconsistencies across plants, within plants, and within systems such that there is no undue burden on resources, and the objective of having consistent publicly displayed results can be achieved.
 
b. False positive and false negative rates can be established for the chosen statistical method, and instances where the MSPI cannot meet the criteria are rare.
 
c. Instances where the results from the MSPI calculational methodology are not consistent with the SPAR-3 models are rare and the differences are explainable.
 
d. The MSPI pilot plant participants can identify and compile the risk significant functions for the monitored systems in a readily inspectable format and can compile a set of predetermined success criteria for those risk significant functions.
 
e. The active components in the monitored systems are appropriate for inclusion in the MSPI and are a manageable number of components under the MSPI.
 
f. By the end of the pilot, MSPI data can be accurately reported and quality checked.
 
g. By the end of the pilot program, inspection procedures and MSPI pilot guidelines are sufficiently detailed to minimize MSPI Questions and NRC feedback forms.
 
h. MSPI Questions and NRC feedback do not reveal any unresolvable issues.
 
i. Data collection inconsistencies between the maintenance rule and the MSPI can be reconciled in order to eliminate or significantly reduce separate reporting.
 
j. Differences between the linear approximation models generated by licensee probabilistic risk assessments and those generated by the NRC SPAR-3 models can be reconciled.
 
k. The MSPI produces no new unintended consequences that cannot be resolved.
 
Upon the successful meeting of the success criteria, with a determination that the MSPI pilot is a valid and appropriate means of measuring risk for the monitored systems, the MSPI will suffice as the measure of assessment and not the significance determination process for single failures of the active components within the scope of the MSPI. Any significant problems will be resolved before full MSPI implementation.
 
Attachment 4 RIS 2002-14, Sup. 1 LIST OF RECENTLY ISSUED
                                NRC REGULATORY ISSUE SUMMARIES
_____________________________________________________________________________________
Regulatory Issue                                            Date of Summary No.                  Subject                      Issuance      Issued to
_____________________________________________________________________________________
2002-17          Guidance on Performing Military            09/19/2002 All holders of operating licenses Service Verification                                  for nuclear power reactors.


Package ML022740008, ML022740012, ML022740072*See previous concurrence  OFFICEOE:RORP:DRIPIIPB:DIPMSC:IIPB:DIPMBC:IIPM:DIPMNAMEJWShapaker*SSanders*MSatorious*CCarpenter*DATE09/  /200209/19/200209/26/200209/29/2002OFFICEOGCSC:RORP:DRIPPD:RORP:DRIPNAMEHJMcGurren*TReis*WDBeckner*DATE09/30/200209/30/200209/30/2002 Attachment 3RIS 2002-14, Sup. 1 Mitigating System Performance Index Pilot Program Success CriteriaThe Mitigating System Performance Index (MSPI) success criteria listed below will be met ifthere is general agreement among internal and external stakeholders that the criteria have been met.      a.The occurrence of a single failure of an MSPI monitored component by itself, absent anyother failures or unavailabilities, should rarely exceed the green/white MSPI threshold as measured from the baseline value.  The term
2002-16          Current Incident Response Issues          09/13/2002 All holders of operating licenses for nuclear power plants.
"rare" is defined as minimizing theinconsistencies across plants, within plants, and within systems such that there is no undue burden on resources, and the objective of having consistent publicly displayed results can be achieved.      b.False positive and false negative rates can be established for the chosen statisticalmethod, and instances where the MSPI cannot meet the criteria are rare.      c.Instances where the results from the MSPI calculational methodology are not consistentwith the SPAR-3 models are rare and the differences are explainable.      d.The MSPI pilot plant participants can identify and compile the risk significant functionsfor the monitored systems in a readily inspectable format and can compile a set of predetermined success criteria for those risk significant functions.      e.The active components in the monitored systems are appropriate for inclusion in theMSPI and are a manageable number of components under the MSPI.      f.By the end of the pilot, MSPI data can be accurately reported and quality checked.


g.By the end of the pilot program, inspection procedures and MSPI pilot guidelines aresufficiently detailed to minimize MSPI Questions and NRC feedback forms.      h.MSPI Questions and NRC feedback do not reveal any unresolvable issues.
2002-15          NRC Approval of Commercial Data            08/28/2002 All authorized recipients and Encryption Systems for the                            holders of sensitive unclassified Electronic Transmission of                            safeguards information (SGI).
                Safeguards Information
2002-14          Proposed Changes to the Safety            08/28/2002 All holders of operating licenses System Unavailability Performance                    for nuclear power reactors, except Indicators                                            those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


i.Data collection inconsistencies between the maintenance rule and the MSPI can bereconciled in order to eliminate or significantly reduce separate reporting.      j.Differences between the linear approximation models generated by licensee        probabilistic risk assessments and those generated by the NRC SPAR-3 models can be reconciled.      k.The MSPI produces no new unintended consequences that cannot be resolved.
2002-13          Confirmation of Employment                08/27/2002 All holders of operating licenses Eligibility                                          for nuclear power reactors.


Upon the successful meeting of the success criteria, with a determination that the MSPI pilot isa valid and appropriate means of measuring risk for the monitored systems, the MSPI will suffice as the measure of assessment and not the significance determination process for single failures of the active components within the scope of the MSPI.  Any significant problems will be resolved before full MSPI implementation.
2002-12          NRC Threat Advisory and                   Various    Various Protective Measures System
2002-11          Requalification Program Test              08/09/2002 All holders operating licenses for Results for Okonite Okolon Single-                    nuclear power reactors, except Conductor Bonded-Jacket Cable                        those who have permanently (Followup to Regulatory Issue                        ceased operations and have Summary 2000-25)                                      certified that fuel has been permanently removed from the reactor vessel.


______________________________________________________________________________________OL = Operating License
2002-10          Revision of the Skin Dose Limit in        07/09/2002 All U.S. Nuclear Regulatory
                10 CFR Part 20                                        Commission material licensees.


CP = Construction PermitAttachment 4RIS 2002-14, Sup. 1 LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES
Note:             NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:
_____________________________________________________________________________________Regulatory Issue  Date of Summary No.      Subject  IssuanceIssued to
                  To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:
_____________________________________________________________________________________2002-17Guidance on Performing MilitaryService Verification09/19/2002All holders of operating licensesfor nuclear power reactors.2002-16Current Incident Response Issues09/13/2002All holders of operating licensesfor nuclear power plants.2002-15NRC Approval of Commercial DataEncryption Systems for the Electronic Transmission of Safeguards Information08/28/2002All authorized recipients andholders of sensitive unclassified safeguards information (SGI).2002-14Proposed Changes to the SafetySystem Unavailability Performance Indicators08/28/2002All holders of operating licensesfor nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2002-13Confirmation of EmploymentEligibility08/27/2002All holders of operating licensesfor nuclear power reactors.2002-12NRC Threat Advisory andProtective Measures SystemVariousVarious2002-11Requalification Program TestResults for Okonite Okolon Single- Conductor Bonded-Jacket Cable (Followup to Regulatory Issue Summary 2000-25)08/09/2002All holders operating licenses fornuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2002-10Revision of the Skin Dose Limit in10 CFR Part 2007/09/2002All U.S. Nuclear RegulatoryCommission material licensees.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
                                    subscribe gc-nrr firstname lastname
______________________________________________________________________________________
OL = Operating License CP = Construction Permit
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Latest revision as of 05:09, 24 November 2019

Proposed Changes to the Safety System Unavailability Performance Indicators
ML022740012
Person / Time
Issue date: 09/30/2002
From: Beckner W
NRC/NRR/DRIP/RORP
To:
Sanders S, NRR/DIPM, 415-2956
Shared Package
ML022740008 List:
References
RIS-02-014, Suppl 1
Preceding documents:
Download: ML022740012 (5)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001 September 30, 2002 NRC REGULATORY ISSUE SUMMARY 2002-14, SUPPLEMENT 1 PROPOSED CHANGES TO THE SAFETY SYSTEM UNAVAILABILITY

PERFORMANCE INDICATORS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U. S. Nuclear Regulatory Commission (NRC) is issuing this supplement to Regulatory Issue Summary (RIS) 2002-14 to provide to the addressees revised versions of the three attachments to the RIS.

BACKGROUND

Regulatory Issue Summary 2002-14 informed addressees that the NRC was starting a 6-month pilot program on September 1, 2002, to evaluate changes to the safety system unavailability (SSU) performance indicators (PIs), and that the pilot program would be assessed midway through the test period to determine if more than six months were needed to obtain meaningful results. The RIS and its three attachments provided guidance to participating addressees for submitting PI data to the NRC and on the program success criteria.

Addressee participation in the pilot program is voluntary and participants were asked to conform to the guidance in the RIS for the voluntary submission of PI data.

Addressees

were also informed that updated guidance would be provided in the form of revisions to the attachments to the RIS, namely, Attachment 1, an excerpt from Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Section 2.2, Mitigating System Performance Index, and Attachment 2, Draft NEI 99-02, Rev. 0, Appendix F, Methodologies For Computing the Unavailability Index, the Unreliability Index and Determining Performance Index Validity.

SUMMARY OF ISSUE

Since the issuance of RIS 2002-14 on August 28, 2002, Attachments 1 and 2 have been updated and Attachment 3 has been revised. The revised attachments are attached to this RIS

supplement.

ML022740008

RIS 2002-14, Sup. 1

BACKFIT DISCUSSION

This RIS supplement requires no action or written response. Therefore, the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment was not published in the Federal Register because this RIS supplement is informational.

PAPERWORK REDUCTION ACT STATEMENT

This RIS supplement does not request any information collections.

If there are any questions about this matter, please contact one of the persons listed below.

/Original signed by: TReis/

William D. Beckner, Program Director Operating Reactor Improvements program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contact: Serita Sanders, NRR

301-415-2956 E-mail: sxs5@nrc.gov Attachments:

1. Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Section 2.2, Mitigating System Performance Index

2. Draft NEI 99-02, Rev. 0, Regulatory Assessment Performance Indicator Guideline, Appendix F, Methodologies For Computing the Unavailability Index, the Unreliability Index, and Determining Performance Index Validity

3. Mitigating System Performance Index Pilot Program Success Criteria

4. List of Recently Issued NRC Regulatory Issue Summaries

Package ML022740008, ML022740012, ML022740072

  • See previous concurrence OFFICE OE:RORP:DRIP IIPB:DIPM SC:IIPB:DIPM BC:IIPM:DIPM

NAME JWShapaker* SSanders* MSatorious* CCarpenter*

DATE 09/ /2002 09/19/2002 09/26/2002 09/29/2002 OFFICE OGC SC:RORP:DRIP PD:RORP:DRIP

NAME HJMcGurren* TReis* WDBeckner*

DATE 09/30/2002 09/30/2002 09/30/2002

Attachment 3 RIS 2002-14, Sup. 1 Mitigating System Performance Index Pilot Program Success Criteria The Mitigating System Performance Index (MSPI) success criteria listed below will be met if there is general agreement among internal and external stakeholders that the criteria have been met.

a. The occurrence of a single failure of an MSPI monitored component by itself, absent any other failures or unavailabilities, should rarely exceed the green/white MSPI threshold as measured from the baseline value. The term rare is defined as minimizing the inconsistencies across plants, within plants, and within systems such that there is no undue burden on resources, and the objective of having consistent publicly displayed results can be achieved.

b. False positive and false negative rates can be established for the chosen statistical method, and instances where the MSPI cannot meet the criteria are rare.

c. Instances where the results from the MSPI calculational methodology are not consistent with the SPAR-3 models are rare and the differences are explainable.

d. The MSPI pilot plant participants can identify and compile the risk significant functions for the monitored systems in a readily inspectable format and can compile a set of predetermined success criteria for those risk significant functions.

e. The active components in the monitored systems are appropriate for inclusion in the MSPI and are a manageable number of components under the MSPI.

f. By the end of the pilot, MSPI data can be accurately reported and quality checked.

g. By the end of the pilot program, inspection procedures and MSPI pilot guidelines are sufficiently detailed to minimize MSPI Questions and NRC feedback forms.

h. MSPI Questions and NRC feedback do not reveal any unresolvable issues.

i. Data collection inconsistencies between the maintenance rule and the MSPI can be reconciled in order to eliminate or significantly reduce separate reporting.

j. Differences between the linear approximation models generated by licensee probabilistic risk assessments and those generated by the NRC SPAR-3 models can be reconciled.

k. The MSPI produces no new unintended consequences that cannot be resolved.

Upon the successful meeting of the success criteria, with a determination that the MSPI pilot is a valid and appropriate means of measuring risk for the monitored systems, the MSPI will suffice as the measure of assessment and not the significance determination process for single failures of the active components within the scope of the MSPI. Any significant problems will be resolved before full MSPI implementation.

Attachment 4 RIS 2002-14, Sup. 1 LIST OF RECENTLY ISSUED

NRC REGULATORY ISSUE SUMMARIES

_____________________________________________________________________________________

Regulatory Issue Date of Summary No. Subject Issuance Issued to

_____________________________________________________________________________________

2002-17 Guidance on Performing Military 09/19/2002 All holders of operating licenses Service Verification for nuclear power reactors.

2002-16 Current Incident Response Issues 09/13/2002 All holders of operating licenses for nuclear power plants.

2002-15 NRC Approval of Commercial Data 08/28/2002 All authorized recipients and Encryption Systems for the holders of sensitive unclassified Electronic Transmission of safeguards information (SGI).

Safeguards Information

2002-14 Proposed Changes to the Safety 08/28/2002 All holders of operating licenses System Unavailability Performance for nuclear power reactors, except Indicators those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2002-13 Confirmation of Employment 08/27/2002 All holders of operating licenses Eligibility for nuclear power reactors.

2002-12 NRC Threat Advisory and Various Various Protective Measures System

2002-11 Requalification Program Test 08/09/2002 All holders operating licenses for Results for Okonite Okolon Single- nuclear power reactors, except Conductor Bonded-Jacket Cable those who have permanently (Followup to Regulatory Issue ceased operations and have Summary 2000-25) certified that fuel has been permanently removed from the reactor vessel.

2002-10 Revision of the Skin Dose Limit in 07/09/2002 All U.S. Nuclear Regulatory

10 CFR Part 20 Commission material licensees.

Note: NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:

To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:

subscribe gc-nrr firstname lastname

______________________________________________________________________________________

OL = Operating License CP = Construction Permit