NRC Generic Letter 1977-07: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/15/1977
| issue date = 12/15/1977
| title = NRC Generic Letter 1977-007: Questionnaire Sent Out to Each Operating Reactor Licensee to Be Complete and Provide NRC Data for a Study on the Reliability of Standby Diesel Generators
| title = NRC Generic Letter 1977-007: Questionnaire Sent Out to Each Operating Reactor Licensee to Be Complete and Provide NRC Data for a Study on the Reliability of Standby Diesel Generators
| author name = Goller K R
| author name = Goller K
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 53
| page count = 53
}}
}}
{{#Wiki_filter:UNITED STATES "%..NUCLEAR REGULATORY  
{{#Wiki_filter:I\
COMMISSION
                                                              "%..
w WASHINGTON, D. C. 20555 GL-77-?' December 15, 1977 All Power Reactor Licensees The demonstrated reliability of standby diesel generator (DG) units in operating nuclear power plants has been less than anticipated.
                                  UNITED STATES
                        NUCLEAR REGULATORY COMMISSION
  w                           WASHINGTON, D. C. 20555               GL-77-?
'                                                     December 15, 1977 All Power Reactor Licensees The demonstrated reliability of standby diesel generator (DG) units in operating nuclear power plants has been less than anticipated.


The NRC has concluded that a systematic review and analysis of operating problems associated with diesel generator units is necessary to establish what practical measures may be taken to enhance the reliability of these units. The NRC, with the assistance of the University of Dayton, has initiated such a study. It is our intent that this study will provide practical results that will prove useful to each nuclear utility, there-fore, each operating reactor licensee is requested to respond to the enclosed questionnaire.
The NRC has concluded that a systematic review and analysis of operating problems associated with diesel generator units is necessary to establish what practical measures may be taken to enhance the reliability of these units. The NRC, with the assistance of the University of Dayton, has initiated such a study. It is our intent that this study will provide practical results that will prove useful to each nuclear utility, there- fore, each operating reactor licensee is requested to respond to the enclosed questionnaire.


An analysis will be performed on the information received and the results of this analysis, along with recommendations that mnay lead to improved reliability, will be transmitted to licensees and applicants for their use. We believe that this information will assist in identifying as well as avoiding or minimizing operating experiences encountered by others. We view this effort as one of mutual interest.We ask that a single completed copy of the enclosed questionnaire be returned to the Director of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, by January 20, 1978.Please include on a separate sheet the name, address and phone number of the person(s)
An analysis will be performed on the information received and the results of this analysis, along with recommendations that mnay lead to improved reliability, will be transmitted to licensees and applicants for their use. We believe that this information will assist in identifying as well as avoiding or minimizing operating experiences encountered by others. We view this effort as one of mutual interest.
at the reactor site responsible for completing the questionnaire and responsible for responding to any follow-up communi-cations concerning the questionnaire or for arranging a reactor site visit.The responses to the majority of the questions can be answered with just a few words or by checking the appropriate space. In responding to those questions which do not apply to a particular installation and/or situation, please indicate ¶N/W' for "not applicable".
If the question does apply to a particular installation or situation but the answer is not known, please indicate "UN" for "unknown".
For those entries on the questionnaire where the requested information is not known by January 20, 1978, please provide it in follow-up correspondence when it becomes available.


I\
We ask that a single completed copy of the enclosed questionnaire be returned to the Director of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, by January 20, 1978.
-2 -Further, the detailed information obtained in this study will be subject to disclosure pursuant to the Freedom on Information Act Regulations as implemented by 10 CFR Part 9 -Public Records.In the event that any information requested as a part of this study, is considered by you (or your contractor)
to be proprietary, it is necessary that you make a written application to withhold such information from public disclosure.


Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which address with specificity the items which will be considered by the Commission as listed in subparagraph (b)(4) of Section 2.790 of NRC's"Rules and Practice", Part 2, Title 10, Code of Federal Regulations.
Please include on a separate sheet the name, address and phone number of the person(s) at the reactor site responsible for completing the questionnaire and responsible for responding to any follow-up communi- cations concerning the questionnaire or for arranging a reactor site visit.
 
The responses to the majority of the questions can be answered with just a few words or by checking the appropriate space. In responding to those questions which do not apply to a particular installation and/or situation, please indicate ¶N/W' for "not applicable". If the question does apply to a particular installation or situation but the answer is not known, please indicate "UN" for "unknown".  For those entries on the questionnaire where the requested information is not known by January 20, 1978, please provide it in follow-up correspondence when it becomes available.
 
- 2 -
Further, the detailed information obtained in this study will be subject to disclosure pursuant to the Freedom on Information Act Regulations as implemented by 10 CFR Part 9 - Public Records.
 
In the event that any information requested as a part of this study, is considered by you (or your contractor) to be proprietary, it is necessary that you make a written application to withhold such information from public disclosure. Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which address with specificity the items which will be considered by the Commission as listed in subparagraph (b)(4) of Section 2.790 of NRC's
"Rules and Practice", Part 2, Title 10, Code of Federal Regulations.


The information sought 'to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
The information sought 'to be withheld shall be incorporated as far as possible into a separate part of the affidavit.


In the event any portion of the questionnaire needs clarification, please contact F. Clemenson at (301) 492-8077.This request for generic information was approved by GAO under a blanket clearance number B-180225 (R0072); this clearance expires July 31, 1980.Sincerely, ,klj A? GoA Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors Enclosure:
In the event any portion of the questionnaire needs clarification, please contact F. Clemenson at (301) 492-8077.
 
This request for generic information was approved by GAO under a blanket clearance number B-180225 (R0072); this clearance expires July 31, 1980.
 
Sincerely,
                                  ,klj A? GoA
                                Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors Enclosure:
Questionnaire cc w/enclosure:
Questionnaire cc w/enclosure:
See next page Docket No. 50-313 Arkansas Power & Light Company ATTN: Mr. William Cavanaugh, III Executive Director Generation and Construction Department P. 0. Box 551 Little Rock, Arkansas 722U3 I cc: Phillip K. Lyon, Esquire House, Holms & Jewell 1550 Tower Building Little Rock, Arkansas 72201 Mr. Daniel H. Williams Manager, Licensing Arkansas Power & Light Company Post Office Box 551 Little Rock, Arkansas 72203 Mr. John W. Anderson, Jr.Plant Superintendent Arkansas Nuclear One Post Office Box 608 Russellville, Arkansas 72801 Arkansas Polytechnic College Russellville, Arkansas 72801 Docket Nos. 50-317 and 50-318 Baltimore Gas and Electric Company ATTN: Mr. A. E. Lundvall, Jr.Vice President  
See next page
-Supply P. 0. Box 1475 Baltimore, Maryland 21203 cc: James A. Biddison, Jr.General Counsel G and E Building Charles Center Baltimore, Maryland 21203 Mr. R. C. L. Olson Baltimore Gas and Electric Company Room 922 -G and E Building Post Office Box 1475 BlItimore, Maryland 21203 Mr. R. M. Douglass, Chief Engineer Calvert Cliffs Nuclear Power Plant Baltimore Gas and Electric Company Lusby, Maryland 20657 Bechtel Power Corporation ATTN: Mr. R. L. Ashley Chief Nuclear Engineer P. 0. Box 607 Gaithersburg, Maryland 20760 Combustion Engineering, Inc.ATTN: Mr. J. A. Honey Project Manager P. 0. Box 500 Windsor, Connecticut  
 
06095 Calvert County Library Prince Frederick, Maryland 20678/  
Docket No. 50-313 Arkansas Power & Light Company ATTN: Mr. William Cavanaugh, III
Docket No. 50-293 Boston Edison Company M/C NUCLEAR ATTN: Mr. G. Carl Andognini 800 Boylston Street Boston, Massachusetts  
      Executive Director Generation and Construction Department P. 0. Box 551 Little Rock, Arkansas 722U3 I
02199 cc: Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts  
cc: Phillip K. Lyon, Esquire House, Holms & Jewell
02360 Anthony Z. Roisman, Esquire Sheldon, Harmon & Roisman 1025 15th Street, N. W., 5th Floor Washington, D. C. 20005 Henry Herrmann, Esquire Massachusetts Wildlife Federation
    1550 Tower Building Little Rock, Arkansas 72201 Mr. Daniel H. Williams Manager, Licensing Arkansas Power & Light Company Post Office Box 551 Little Rock, Arkansas 72203 Mr. John W. Anderson, Jr.
151 Tremont Street Boston, Massachusetts  
 
02111 Plymouth Public Library North Street Plymouth, Massachusetts  
Plant Superintendent Arkansas Nuclear One Post Office Box 608 Russellville, Arkansas 72801 Arkansas Polytechnic College Russellville, Arkansas 72801
02360 Docket No. 50-261 Carolina Power & Light Company ATTN: Mr. J. A. Jones Senior Vice President 336 Fayetteville Street Raleigh, North Carolina 27602 cc: Hartsville Memorial Library Home and Fifth Avenue Hartsville, South Carolina 29550  
 
Docket Nos. 50-325 and 50-324 Carolina Power & Light Company ATTN: Mr. J. A. Jones Executive Vice President 336 Fayetteville Street Raleigh, North Carolina 27602 cc: Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge
Docket Nos. 50-317 and 50-318 Baltimore Gas and Electric Company ATTN: Mr. A. E. Lundvall, Jr.
1800 M Street, N. W.Washington, D. C. 20036 John J. Burney, Jr., Esquire Burney, Burney, Sperry & Barefoot 110 North Fifth Avenue Wilmington, North Carolina 28401 Southport-Brunswick County Library 109 West Moore Street Southport, North Carolina 28461 Docket No. 50-10 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690 cc: Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 I
 
Docket Nos. 50-237 and 50-249 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690 cc: Morris Public Library 604 Liberty Street Morris, Illinois 60451 Docket Nos. 50-254 and 50-265 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690 cc: Mr. D. R. Stichnoth President Iowa-Illinois Gas and Electric Company 206 East Second Avenue Davenport, Iowa 52801 Mr. Nick Kalivianakas Plant Superintendent Quad-Cities Nuclear Power Station 22710 -206th Avenue -North Cordova, Illinois 61242 Moline Public Library 504 -17th Street Moline, Illinois 61265 Docket Nos. 50-295 and 50-304 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President Post Office Box 767 Chicago, Illinois 60690 cc: Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Robert J. Vollen, Esquire 109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research & Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Waukegan Public Library 128 North County Street Waukegan, Illinois 60085 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. Donald C. Switzer President Post Office Box 270 Hartford, Connecticut  
Vice President - Supply P. 0. Box 1475 Baltimore, Maryland 21203 cc: James A. Biddison, Jr.
06101 cc: Day, Berry, & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut  
 
06103 Russell Library 119 Broad Street Middletown, Connecticut  
General Counsel G and E Building Charles Center Baltimore, Maryland 21203 Mr. R. C. L. Olson Baltimore Gas and Electric Company Room 922 - G and E Building Post Office Box 1475 BlItimore, Maryland 21203 Mr. R. M. Douglass, Chief Engineer Calvert Cliffs Nuclear Power Plant Baltimore Gas and Electric Company Lusby, Maryland 20657 Bechtel Power Corporation ATTN: Mr. R. L. Ashley Chief Nuclear Engineer P. 0. Box 607 Gaithersburg, Maryland 20760
16457 Docket Nos. 50-3 '-'and 50-241 Consolidated Edison Company of New York, Inc.ATTN: Mr. William J. Cahill, Jr.Vice President 4 Irving Place New York, New York 10003 cc: Leonard M. Trosten, Esquire LeBoeuf, Lamb, Leiby & MacRae 1757 N Street, N. W.Washington, D. C. 20036 Paul S. Shemin, Esquire Assistant Attorney General State of New York Department of Law Two World Trade Center New York, New York 10047 Sarah Chasis, Esquire Natural Resources Defense Council 122 East 42nd Street New York, New York 10017 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 White Plains Public Library 100 Martine Avenue White Plains, New York 10601 Docket No. 50-286 Consolidated Edison Company of New York, Inc.ATTN: Mr. William J. Cahill, Jr.Vice President 4 Irving Place New York, New York 10003 cc: Admiral Paul Early (IP-3)Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 White Plains Public Library 100 Martine Avenue White Plains, New York 10601 Consumers Power Company ATTN: Mr. David A. Bixel Nuclear Licensing Adminstrator
      Combustion Engineering, Inc.
212 West Michigan Avenue Jackson, Michigan 49201 cc: Charles F. Bayless Of Counsel Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 George C. Freeman, Jr., Esquire Hunton, Williams, Gay and Gibson 700 East Main Street Richmond, Virginia 23212 Peter W. Steketee, Esquire 505 Peoples Building Grand Rapids, Michigan 49503 Charlevoix Public Library 107 Clinton Street Charlevoix, Michigan 49720 Docket No. 50-255 Consumers Power Company ATTN: Mr. Dave Bixel Nuclear Licensing Adminstrator
 
212 West Michigan Avenue.Jackson, Michigan 49201 cc: M. I. Miller, Esquire Isham, Lincoln & Beale Suite 4200 One First National Plaza Chicago, Illinois 60670 J. L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Paul A. Perry, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Kalamazoo Public Library 315 South Rose Street Kalamazoo, Michigan 49006 Myron M. Cherry, Esquire Suite 4501 One IBM Plaza Chicago, Illinois 60611 Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. John P. Madgett General Manager 2615 East Avenue, South La Crosse, Wisconsin  
ATTN: Mr. J. A. Honey Project Manager P. 0. Box 500
54601 cc: Fritz Schubert, Esquire Staff Attorney Dairyland Power Cooperative
      Windsor, Connecticut 06095 Calvert County Library Prince Frederick, Maryland   20678
2615 East Avenue, South La Crosse, Wisconsin  
                                        /
54601 0. S. Heistand, Jr., Esquire Morgan, Lewis & Bockius 1800 M Street, N. W.Washington, D. C. 20036 Mr. R. E. Shimshak LaCrosse Boiling Water Reactor Dairyland Power Cooperative P. 0. Box 135 Genoa, Wisconsin  
 
54632 La Crosse Public Library 800 Main Street La Crosse, Wisconsin  
Docket No. 50-293 Boston Edison Company M/C NUCLEAR
54601 Docket Nos. 50-269 50-270 and 50-287 Duke Power Company ATTN: Mr. William 0. Parker, Jr.Vice President Steam Production Post Office Box 2178 422 South Church Street Charlotte, North Carolina 28242 cc: Mr. William L. Porter Duke Power Company Post Office Box 2178 422 South Church Street Charlotte, North Carolina 28242 J. Michael McGarry, III, Esquire DeBevoise  
ATTN: Mr. G. Carl Andognini
& Liberman 700 Shoreham Building 806 -15th Street, N. W.Washington, D. C. 20005 Oconee County Library 201 Scuth Spring Street Walhalla, South Carolina 29691 Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn, Vice President Operations Division 435 Sixth Avenue Pittsburge, Pennsylvania  
800 Boylston Street Boston, Massachusetts 02199 cc:   Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360
15219 cc: Karin Carter, Esq.Special Assistant Attorney General Bureau of Administrative Enforcement
      Anthony Z. Roisman, Esquire Sheldon, Harmon & Roisman
5th Floor, Executive House Harrisburg, Pennsylvania  
      1025 15th Street, N. W., 5th Floor Washington, D. C. 20005 Henry Herrmann, Esquire Massachusetts Wildlife Federation
17120 larvin Fein Utility Counsel City of Pittsburgh
      151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts   02360
313 City-County Building Pittsburgh, Pennsylvania  
Docket No. 50-261 Carolina Power & Light Company ATTN: Mr. J. A. Jones Senior Vice President
15219 Mr. J. M. Cumiskey Stone & Webster Engineering Corporation P. 0. Box 2325 Boston, Massachusetts  
336 Fayetteville Street Raleigh, North Carolina 27602 cc:   Hartsville Memorial Library Home and Fifth Avenue Hartsville, South Carolina 29550
02107 Mr. J. D. Woodward R&D Center Westinghouse Electric Corporation Building 7-303 Pittsburgh, Pennsylvania  
 
15230 Mr. Jack Carey Technical Assistant Duquesne Light Company P. 0. Box 4 Shippingport, Pennsylvania  
Docket Nos. 50-325 and 50-324 Carolina Power & Light Company ATTN: Mr. J. A. Jones Executive Vice President
1507, Mr. R. E. Martin Duquesne Light Company 435 6th Avenue Pittsburgh, Pennsylvania  
  336 Fayetteville Street Raleigh, North Carolina 27602 cc: Richard E. Jones, Esquire Carolina Power & Light Company
15219 Beaver Area Memorial Library 100 College Avenue Beaver, Pennsylvania  
      336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge
15009 Docket Nos. 50-250 and 50-251 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President P. 0. Box 013100 Miami, Florida 33101 cc: Mr. Jack R. Newman, Esquire Lowenstein, Newman, Reis & Axelrad 1025 Connecticut Avenue, N. W.Suite 1214 Washington, D. C. 20036 Environmental  
      1800 M Street, N. W.
& Urban Affairs Library Florida International University Miami, Florida 33199 Docket No. 50-335 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President Nuclear and General Engineering Post Office Box 013100 Miami, Florida 33101 cc: Robert Lowenstein, Esquire Lowenstein, Newman, Reis & Axelrad 1025 Connecticut Avenue, N. IJ.Washington, D. C. 20036 Norman A. Coll, Esquire McCarthy, Steel, Hector & Davis 14th Floor, First National Bank Building Miami, Florida 33131 Indian River Junior College Library 3209 Virginia Avenue Ft. Pierce, Florida 33450 Docket No. 50-302 Mr. W. P. Stewart Director, Power Production Florida Power Corporation P. 0. Box 14042, Mail Stop C-4 St. Petesburg, Florida 33733 cc: Mr. S. A. Brandimore Vice President and General Counsel P. 0. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629 Docket No. 50-321 Georgia Power Company Oglethorpe Electric Membership Corporation Municipal Electric Association of Georgia City of Dalton, Georgia ATTN: Mr. Charles F. Whetmer Vice President  
 
-Engineering Georgia Power Company Atlanta, Georgia 30302 cc: Ruble A. Thonas Vice President P. 0. Box 2625 Southern Services, Inc.Birmingham, Alabama 35202 Mr. Harry Majors Southern Services, Inc.300 Office Park Birmingham, Alabama 35202 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. 0. Box 4545 Atlanta, Georgia 30302 Mr. C. P. Moore Georgia Power Company Production Department P. 0. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31513/  
Washington, D. C. 20036 John J. Burney, Jr., Esquire Burney, Burney, Sperry & Barefoot
Docket No. 50-315 Indiane & Michigan Electric Company Indiana & M1ichigan Power Company ATTN: Mr. John Tillinghast Vice President P. 0. Box 18 Bowling Green Station New York, New York 10004 cc: Mr. Robert Hunter Vice President American Electric Power Service Corporation
      110 North Fifth Avenue Wilmington, North Carolina 28401 Southport-Brunswick County Library
2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittnan, Potts & Trowbridge
      109 West Moore Street Southport, North Carolina 28461 Docket No. 50-10
1800 M Street, N. W.Washington, D. C. 20036 Donald Cook Nuclear Plant ATTN: Mr. D. Shaller Plant Manager P. 0. Box 458 Bridgman, Michigan 49106 Mr. David Dinsmore Comey Executive Director Citizens for a Better Environment
  Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690
59 East Van Buren Street Chicago, Illinois 60605 Maude Reston Palenske Memorial Library 500 Market Street St. Joseph, Michigan 49085 Docket No. 50-331 Iowa Electric Light & Power Company ATTN: Mr. Duane Arnold President P. 0. Box 351 Cedar Rapids, Iowa 52406 cc: Cedar Rapids Public Library 426 Third Avenue, S. E.Cedar Rapids, Iowa 52401 Docket No. 50-219 Jersey Central Power & Light Company ATTN: Mr. I. R. Finfrock, Jr.i Vice President  
  cc: Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 I      Morris, Illinois 60450
-Generation Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 cc: Steven P. Russo, Esquire 248 Washington Street P. 0. Box 1060 Toms River, New Jersey 08753 Jersey Central Power & Light Company ATTN: Mr. T. Gary Broughton Safety and Licensing Manager GPU Service Corporation
 
260 Cherry Hill Road Parsippany, New Jersey 07054 Honorable Joseph W. Ferraro, Jr.Deputy Attorney General State of New Jersey Department of Law & Public Safety Consumer Affairs Section 1100 Raymond Boulevard Newark, New Jersey 07102 Ocean County Library Brick Township Branch 401 Chambers Bridge Road Brick Town, New Jersey 08723 t 4 Docket No. 50-289 Metropolitan Edison Company ATTN: Mr. J. G. Herbein Vice President P. 0. Box 542 Reading, Pennsylvania  
Docket Nos. 50-237 and 50-249 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690
19603 cc: GPU Service Corporation Richard W. Heward, Project Manager Mr. T. Gary Broughton, Safety and Licensing Manager 260 Cherry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation
cc:   Morris Public Library
1001 Broad Street Johnstown, Pennsylvania  
      604 Liberty Street Morris, Illinois 60451 Docket Nos. 50-254 and 50-265 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690
15907 Miss Mary V. Southard, Chairman Citizens for a Safe Environment P. 0. Box 405 Harrisburg, Pennsylvania  
cc: Mr. D. R. Stichnoth President Iowa-Illinois Gas and Electric Company
17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)Harrisburg, Pennsylvania  
      206 East Second Avenue Davenport, Iowa 52801 Mr. Nick Kalivianakas Plant Superintendent Quad-Cities Nuclear Power Station
17126 Docket No. 50-298 Nebraska Public Power District ATTN: Mr. J. M. Pilant, Director Licensing and Quality Assurance P. 0. Box 499 Columbus, Nebraska 68601 cc: Mr. G. D. Watson, General Counsel Nebraska Public Power District P. 0. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 400 Security Building Phoenix, Arizona 85004 Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P. 0. Box 98 Brownville, Nebraska 68321 Auburn Public Library 118 -15th Street Auburn, Nebraska 68305 Docket No. 50-220 Niagara Mohawk Power Corporation ATTN: Mr. D. P. Dise Vice President  
      22710 - 206th Avenue - North Cordova, Illinois 61242 Moline Public Library
-Engineering
        504 - 17th Street Moline, Illinois 61265
300 Erie Boulevard West Syracuse, New York 13202 cc: Eugene B. Thomas, Jr., Esquire LeBoeuf, Lamb, Leiby & MacRae 1757 N Street, N. W.Washington, D. C. 20036 Oswego County Office Building 46 E. Bridge Street Oswego, New York 13126 Docket-Nos.
 
Docket Nos. 50-295 and 50-304 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President Post Office   Box 767 Chicago,   Illinois   60690
cc:   Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Robert J. Vollen, Esquire
      109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research & Development Metropolitan Sanitary District of Greater Chicago
      100 East Erie Street Chicago, Illinois 60611 Waukegan Public Library
      128 North County Street Waukegan, Illinois 60085 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. Donald C. Switzer President Post Office Box 270
Hartford, Connecticut 06101 cc:   Day, Berry, & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Russell Library
      119 Broad Street Middletown, Connecticut   16457
 
Docket Nos. 50-3       '-'
          and 50-241 Consolidated Edison Company of New York, Inc.
 
ATTN: Mr. William J. Cahill, Jr.
 
Vice President
4 Irving Place New York, New York 10003 cc:   Leonard M. Trosten, Esquire LeBoeuf, Lamb, Leiby & MacRae
      1757 N Street, N. W.
 
Washington, D. C. 20036 Paul S. Shemin, Esquire Assistant Attorney General State of New York Department of Law Two World Trade Center New York, New York 10047 Sarah Chasis, Esquire Natural Resources Defense Council
      122 East 42nd Street New York, New York 10017 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 White Plains Public Library
      100 Martine Avenue White Plains, New York 10601 Docket No. 50-286 Consolidated Edison Company of New York, Inc.
 
ATTN: Mr. William J. Cahill, Jr.
 
Vice President
4 Irving Place New York, New York 10003 cc:   Admiral Paul Early (IP-3)
        Power Authority of the State of New York
        10 Columbus Circle New York, New York 10019 White Plains Public Library
        100 Martine Avenue White Plains, New York 10601
 
Consumers Power Company ATTN: Mr. David A. Bixel Nuclear Licensing Adminstrator
212 West Michigan Avenue Jackson, Michigan 49201 cc:   Charles F. Bayless Of Counsel Consumers Power Company
      212 West Michigan Avenue Jackson, Michigan 49201 George C. Freeman, Jr., Esquire Hunton, Williams, Gay and Gibson
      700 East Main Street Richmond, Virginia 23212 Peter W. Steketee, Esquire
      505 Peoples Building Grand Rapids, Michigan 49503 Charlevoix Public Library
      107 Clinton Street Charlevoix, Michigan 49720
Docket No. 50-255 Consumers Power Company ATTN: Mr. Dave Bixel Nuclear Licensing Adminstrator
212 West Michigan Avenue.
 
Jackson, Michigan 49201 cc: M. I. Miller, Esquire Isham, Lincoln & Beale Suite 4200
      One First National Plaza Chicago, Illinois 60670
      J. L. Bacon, Esquire Consumers Power Company
      212 West Michigan Avenue Jackson, Michigan 49201 Paul A. Perry, Secretary Consumers Power Company
      212 West Michigan Avenue Jackson, Michigan 49201 Kalamazoo Public Library
        315 South Rose Street Kalamazoo, Michigan 49006 Myron M. Cherry, Esquire Suite 4501 One IBM Plaza Chicago, Illinois 60611
 
Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. John P. Madgett General Manager
2615 East Avenue, South La Crosse, Wisconsin 54601 cc:   Fritz Schubert, Esquire Staff Attorney Dairyland Power Cooperative
      2615 East Avenue, South La Crosse, Wisconsin 54601
      0. S. Heistand, Jr., Esquire Morgan, Lewis & Bockius
      1800 M Street, N. W.
 
Washington, D. C. 20036 Mr. R. E. Shimshak LaCrosse Boiling Water Reactor Dairyland Power Cooperative P. 0. Box 135 Genoa, Wisconsin 54632 La Crosse Public Library
      800 Main Street La Crosse, Wisconsin 54601 Docket Nos. 50-269
              50-270
          and 50-287 Duke Power Company ATTN: Mr. William 0. Parker, Jr.
 
Vice President Steam Production Post Office Box 2178
422 South Church Street Charlotte, North Carolina 28242 cc:   Mr. William L. Porter Duke Power Company Post Office Box 2178
      422 South Church Street Charlotte, North Carolina 28242 J. Michael McGarry, III, Esquire DeBevoise & Liberman
      700 Shoreham Building
      806 - 15th Street, N. W.
 
Washington, D. C. 20005 Oconee County Library
      201 Scuth Spring Street Walhalla, South Carolina 29691
 
Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn, Vice President Operations Division
435 Sixth Avenue Pittsburge, Pennsylvania 15219 cc:   Karin Carter, Esq.
 
Special Assistant Attorney General Bureau of Administrative Enforcement
      5th Floor, Executive House Harrisburg, Pennsylvania   17120
      larvin Fein Utility Counsel City of Pittsburgh
    313 City-County Building Pittsburgh, Pennsylvania 15219 Mr. J. M. Cumiskey Stone & Webster Engineering Corporation P. 0. Box 2325 Boston, Massachusetts 02107 Mr. J. D. Woodward R&D Center Westinghouse Electric Corporation Building 7-303 Pittsburgh, Pennsylvania 15230
    Mr. Jack Carey Technical Assistant Duquesne Light Company P. 0. Box 4 Shippingport, Pennsylvania   1507, Mr. R. E. Martin Duquesne Light Company
    435 6th Avenue Pittsburgh, Pennsylvania   15219 Beaver Area Memorial Library
    100 College Avenue Beaver, Pennsylvania 15009
 
Docket Nos. 50-250
            and 50-251 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President P. 0. Box 013100
Miami, Florida 33101 cc:   Mr. Jack R. Newman, Esquire Lowenstein, Newman, Reis & Axelrad
        1025 Connecticut Avenue, N. W.
 
Suite 1214 Washington, D. C. 20036 Environmental & Urban Affairs Library Florida International University Miami, Florida 33199 Docket No. 50-335 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President Nuclear and General Engineering Post Office Box 013100
Miami, Florida 33101 cc:   Robert Lowenstein, Esquire Lowenstein, Newman, Reis & Axelrad
      1025 Connecticut Avenue, N. IJ.
 
Washington, D. C. 20036 Norman A. Coll, Esquire McCarthy, Steel, Hector & Davis
      14th Floor, First National Bank Building Miami, Florida 33131 Indian River Junior College Library
      3209 Virginia Avenue Ft. Pierce, Florida 33450
Docket No. 50-302 Mr. W. P. Stewart Director, Power Production Florida Power Corporation P. 0. Box 14042, Mail Stop C-4 St. Petesburg, Florida 33733 cc:   Mr. S. A. Brandimore Vice President and General Counsel P. 0. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629
 
Docket No. 50-321 Georgia Power Company Oglethorpe Electric Membership Corporation Municipal Electric Association of Georgia City of Dalton, Georgia ATTN: Mr. Charles F. Whetmer Vice President - Engineering Georgia Power Company Atlanta, Georgia 30302 cc:   Ruble A. Thonas Vice President P. 0. Box 2625 Southern Services, Inc.
 
Birmingham, Alabama 35202 Mr. Harry Majors Southern Services, Inc.
 
300 Office Park Birmingham, Alabama 35202 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. 0. Box 4545 Atlanta, Georgia 30302 Mr. C. P. Moore Georgia Power Company Production Department P. 0. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31513
                                          /
 
Docket No. 50-315 Indiane & Michigan Electric Company Indiana & M1ichigan Power Company ATTN: Mr. John Tillinghast Vice President P. 0. Box 18 Bowling Green Station New York, New York 10004 cc:   Mr. Robert Hunter Vice President American Electric Power Service Corporation
      2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittnan, Potts & Trowbridge
      1800 M Street, N. W.
 
Washington, D. C. 20036 Donald Cook Nuclear Plant ATTN: Mr. D. Shaller Plant Manager P. 0. Box 458 Bridgman, Michigan 49106 Mr. David Dinsmore Comey Executive Director Citizens for a Better Environment
      59 East Van Buren Street Chicago, Illinois 60605 Maude Reston Palenske Memorial Library
      500 Market Street St. Joseph, Michigan 49085 Docket No. 50-331 Iowa Electric Light & Power Company ATTN: Mr. Duane Arnold President P. 0. Box 351 Cedar Rapids, Iowa 52406 cc:   Cedar Rapids Public Library
      426 Third Avenue, S. E.
 
Cedar Rapids, Iowa 52401
 
Docket No. 50-219 Jersey Central Power & Light Company ATTN: Mr. I. R. Finfrock, Jr.
 
i Vice President - Generation Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960
cc: Steven P. Russo, Esquire
    248 Washington Street P. 0. Box 1060
    Toms River, New Jersey 08753 Jersey Central Power & Light Company ATTN: Mr. T. Gary Broughton Safety and Licensing Manager GPU Service Corporation
    260 Cherry Hill Road Parsippany, New Jersey 07054 Honorable Joseph W. Ferraro, Jr.
 
Deputy Attorney General State of New Jersey Department of Law & Public Safety Consumer Affairs Section
    1100 Raymond Boulevard Newark, New Jersey 07102 Ocean County Library Brick Township Branch
    401 Chambers Bridge Road Brick Town, New Jersey 08723 t 4
 
Docket No. 50-289 Metropolitan Edison Company ATTN: Mr. J. G. Herbein Vice President P. 0. Box 542 Reading, Pennsylvania 19603 cc: GPU Service Corporation Richard W. Heward, Project Manager Mr. T. Gary Broughton, Safety and Licensing Manager
      260 Cherry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation
      1001 Broad Street Johnstown, Pennsylvania 15907 Miss Mary V. Southard, Chairman Citizens for a Safe Environment P. 0. Box 405 Harrisburg, Pennsylvania 17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)
      Harrisburg, Pennsylvania 17126
 
Docket No. 50-298 Nebraska Public Power District ATTN: Mr. J. M. Pilant, Director Licensing and Quality Assurance P. 0. Box 499 Columbus, Nebraska 68601 cc:   Mr. G. D. Watson, General Counsel Nebraska Public Power District P. 0. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer
      400 Security Building Phoenix, Arizona 85004 Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P. 0. Box 98 Brownville, Nebraska 68321 Auburn Public Library
      118 - 15th Street Auburn, Nebraska     68305 Docket No. 50-220
Niagara Mohawk Power Corporation ATTN: Mr. D. P. Dise Vice President - Engineering
300 Erie Boulevard West Syracuse, New York 13202 cc:   Eugene B. Thomas, Jr., Esquire LeBoeuf, Lamb, Leiby & MacRae
      1757 N Street, N. W.
 
Washington, D. C. 20036 Oswego County Office Building
      46 E. Bridge Street Oswego, New York 13126
 
Docket-Nos. 50-245 and 50-336 Northeast Nuclear Energy Company ATTN: Mr. D. C. Switzer President P. 0. Box 270
Hartford, Connecticut 06101 cc:  William H. Cuddy, Esquire Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Plant P. 0. Box 128 Waterford, Connecticut 06385 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Docket Nos. 50-282 and 50-306 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services
414 Nicollet Mall - 8th Floor Minneapolis, Minnesota 55401 cc:  Mr. F. P. Tierney Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Jocelyn F. Olson, Esquire Special Assistant Attorney General Minnesota Pollution Control Agency
    1935 West County Road B-2 Roseville, Minnesota 55113 Mr. Robert L. Nybo, Jr., Chairman Minnesota-Wisconsin Boundary Area Commission
    619 Second Street Hudson, Wisconsin 54016 The Environmental Conservation Library Minneapolis Public Library
    300 Nicollet Mall Minneapolis, Minnesota 55401
 
Docket No.750-263 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services
414 Nicollet Mall - 8th Floor Minneapolis, Minnesota 55401 cc:  Arthur Renquist, Esquire Vice President - Law Northern States Power Company
    414 Nicol let Mall Minneapolis, Minnesota 55401 Mr. L. R. Eliason Plant Manager Monticello Nuclear Generating Plant Northern States Power Company Monticello, Minnesota 55362 Russell J. Hatling, Chainman Minnesota Environmental Control Citizens Association (MECCA)
    Energy Task Force
    144 Melbourne Avenue, S. E.
 
Minneapolis, Minnesota 55414 Mr. Kenneth Dzugan Environmental Planning Consultant Office of City Planner Grace Building
    421 Wabasha Street St. Paul, Minnesota 55102 Sandra S. Gardebring Executive Director Minnesota Pollution Control Agency
    1935 W. County Road B2 Roseville, Minnesota 55113 Mr. Steve Gadler
    2120 Carter Avenue St. Paul, Minnesota  55108 The Environmental Conservation Library Minneapolis Public Library
    300 Nicollet Mall Minneapolis, Minnesota 55401
 
Docket No. 50-285 Omaha Public Power District ATTN: Mr. Theodore E. Short Division Manager - Production Operations
1623 Harney Street Omaha, Nebraska 68102 cc:  Margaret R. A.  Pardis LeBoeuf, Lamb,  Leiby & MacRae
      1757 N Street,  N. W.
 
Washington, D.  C. 20036 Blair Public Library
      1665 Lincoln Street Blair, Nebraska 68008 Docket No. 50-133 Pacific Gas and Electric Company ATTN: Mr. John C. Morrissey Vice President and General Counsel
77 Beale Street San Francisco, California 94106 cc:  Philip A. Crane, Jr.
 
Pacific Gas and Electric Company
      77 Beale Street San Francisco, California 94106 Mr. James Hanchett Public Information Officer Region V - IE
      U. S. Nuclear Regulatory Commission
      1990 N. California Boulevard Walnut Creek, California 94596 Humboldt County Library
      636 F Street Eureka, California 95501
 
Docket Nos. 50-277 and 50-278 Philadelphia Electric Company ATTN: Mr. Edward S. Bauer, Jr., Esquire Vice President and General Counsel
2301 Market Street Philadelphia, Pennsylvania 19101 cc:  Eugene Bradley Philadelphia Electric Company Assistant General Counsel
    2301 Market Street Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr.
 
1747 Pennsylvania Avenue, N. W.
 
Washington, D. C. 20006 Raymend L. Hovis, Esquire
    35 South Duke Street Yo rk, Pennsylvania 17401 Warren K. Rich, Esquire Assistant Attorney General Department of Natural Resources Annapolis, Maryland 21401 Philadelphia Electric Company ATTN: Mr. W. T. Ullrich Peach Bottom Atomic Power Station Delta, Pennsylvania 17314 Martin Memorial Library
      159 E. Market Street York, Pennsylvania 17401 Hr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company
      2301 Market Street Philadelphia, Pennsylvania 19101
 
Docket No. 50-344 Portland General Electric Company ATTN: Mr. Charles Goodwin, Jr.
 
Assistant Vice President
621 SW Alder Street Portland, Oregon 97205 cc:  Mr. H. H. Phillips Portland General Electric Company
    621 Southwest Alder Street Electric Building Portland, Oregon 97205 Warren Hastings, Esquire Phillips, Coughlin, Buell Stoloff and Black
    807 Electric Building Portland, Oregon 97205 Mr. J. L. Frewing, Manager Generation Licensing and Analysis Portland General Electric Company
      621 Southwest Alder Street Portland, Oregon 97205 Columbia County Courthouse Law Library, Circuit Court Room St. Helens, Oregon 97051
 
Docket No. 50-333 Power Authority of the State of New York ATTN: Mr. George T. Berry General Manager and Chief Engineer
10 Columbus Circle New York, New York 10019 cc:  Lewis R. Bennett, General Counsel Power Authority of the State of New York
    10 Columbus Circle New York, New York 10019 Rear Admiral Paul J. Early Assistant Chief Engineer - Projects Power Authority of the State of New York
    10 Columbus Circle New York, New York 10019 Manager-Nuclear Operations Power Authority of the State of New York
    10 Columbus Circle New York, New York 10019 J. D. Leonard, Jr., Resident Manager James A. FitzPatrick Nuclear Power Plant P. 0. Box 41 Lycoming, New York 13093 Lex K. Larson, Esq.
 
LeBoeuf, Lamb, Leiby and MacRae
    1757 N Street, N. W.
 
Washington, D. C. 20036 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 Scott B. Lilly, General Counsel Power Authority of the State of New York
    10 Columbus Circle New York, New York 10019 Oswego County Office Building
    46 E. Bridge Street Oswego, New York 13126
 
Docket No. 50-272 Public Service Electric & Gas Company ATTN: Mr. R. P. Librizzi General Manager - Electric Production Production Department
80 Park Place, Room 7221 Newark, New Jersey 07101 cc:  Richard Fryling, Jr., Esquire Assistant General Counsel Public Service Electric & Gas Company
    80 Park Place Newark, New Jersey 07101 Troy B. Conner, Jr., Esquire
    1747 Pennsylvania Avenue, N. W.
 
Washington, D. C. 20006 Gene Fisher Bureau Chief Bureau of Radiation Protection
    380 Scotts Road Trenton, New Jersey 08628 State House Annex ATTN: Deputy Attorney General State of New Jersey
      36 West State Street Trenton, New Jersey 08625 Attorney General Department of Law & Public Safety State House Annex Trenton, New Jersey 08625 Public Service Electric & Gas Company ATTN: Herbert J. Heller Manager, Salem Nuclear Generating Station Hancocks Bridge, New Jersey 08038 Salem Free Library
      112 West Broadway Salem, New Jersey 08079 Public Service Electric 6 Gas Company ATTN: P. L. ?iittl General Manager - Licensing and Environment
      80 Park Place Newark, New Jersey 07101
 
Docket No. 50-244 Rochester Gas & Electric Corporation ATTN: Mr. Leon D. White, Jr.
 
Vice President Electric and Steam Production
89 East Avenue Rochester, New York 14604 cc:  Lex K. Larson,  Esquire LeBoeuf, Lanb,  Leiby & MacRae
      1757 N Street,  N. W.
 
Washington, D.  C. 20036 Mr. Michael Slade
      1250 Crown Point Drive Webster, New York 14580
      Rochester Committee for Scientific Information Robert E. Lee, Ph.D
      Post Office Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York 12223 Rochester Public Library
      115 South Avenue Rochester, New York 14627 Docket No. 50-312 Sacramento Municipal Utility District ATTN: Mr. J. J. Mattimoe Assistant General Manager and Chief Engineer
6201 S Street P. 0. Box 15830
  Sacramento, California 95813 cc:  David S. Kaplan, Secretary and General Counsel
        6201 S Street P. 0. Box 15830
        Sacramento, California 95813 Business and Municipal Department Sacramento City-County Library
        828 I Street Sacramento, California 95814
 
Docket No. 50-206 Southern California Edison Company ATTN: Mr. James H. Drake Vice President
2244 Walnut Grove Avenue Post Office Box 800
Rosemead, California 91770
cc:  Rollin E. Woodbury, Vice President and General Counsel Southern California Edison Company Post Office Box 800
      Rosemead, California 91770
      Chickering & Gregory, General Counsel ATTN: C. Hayden Ames, Esquire San Diego Gas & Electric Company
      111 Sutter Street San Francisco, California 94104 Mission Viejo Branch Library
      24851 Chrisanta Drive Mission Viejo, California 92676 Docket Nos. 50-259
              50-260
          and 50-296 Tennessee Valley Authority ATTN: Mr. Godwin Williams, Jr.
 
Manager of Power
818 Power Building Chattanooga, Tennessee 37201 cc:  H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority
      400 Commerce Avenue E l1B 33 C
      Knoxville, Tenessee 37902 Mr. D. McCloud Tennessee Valley Authority
      303 Power Building Chattanooga, Tennessee 37401 fir. William E. Garner Route 4, Box 354 Scottsboro, Alabama 35768 Athens Public Library South and Forrest Athens, Alabama 35611 Mr. C. S. Walker Tennessee Valley Authority
      400 Commerce Avenue W 9D199 C
      Knoxville, Tennessee 37902
 
Docket Nos. 50-280
          and 50-281 Virginia Electric & Power Company ATTN: Mr. W. L. Proffitt Senior Vice President - Power P. 0. Box 26666 Richmond, Virginia 23261 cc:  Michael W. Maupin, Esq.
 
Hunton, Williams, Gay & Gibson P. 0. Box 1535 Richmond, Virginia 23213 Swem Library College of William & Mary Williamsburg, Virginia 23185 Docket Nos. 50-266 and 50-301 Wisconsin Electric Power Company Wisconsin Michigan Power Company ATTN: Mr. Sol Burstein Executive Vice President
231 West Michigan Street Milwaukee, Wisconsin 53201 cc:  Mr. Arthur M. Fish Document Department University of Wisconsin -
          Stevens Point Library Stevens Point, Wisconsin 54481 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. E. W. James Senior Vice President Post Office Box 1200
Green Bay, Wisconsin 54305 cc:  Steven E. Keane, Esquire Foley, Sammond & Lardner
      777 East Wisconsin Avenue Milwaukee, Wisconsin 53202 Bruce W. Churchill, Esquire Shaw, Pittman, Potts & Trowbridge
        1800 M Street, N. W.
 
Washington, D. C. 20036 Kewaunee Public Library
        314 Milwaukee Street Kewaunee, Wisconsin 54216
 
Docket No. 50-29 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer
20 Turnpike Road Westboro, Massachusetts 01581 cc: Mr. Donald G. Allen, President Yankee Atomic Electric Company
      20 Turnpike Road Westboro, Massachusetts 01581 Greenfield Public Library
      40 Main Street Greenfield, Massachusetts 01581
 
Docket No. 50-271 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer
20 Turnpike Road Westboro, Massachusetts 01581 cc:  Mr. S. D. Karpyak                  Mr. David M. Scott Vermont Yankee Nuclear            Radiation Health Engineer Power Corporation              Agency of Human Services
    77 Grove Street                    Division of Occupational Health Rutland, Vermont 05701            P. . Box 607 Barre, Vermont 05641 Mr. Donald E. Vandenburgh Vice President                    New England Coalition on Vermont Yankee Nuclear              Nuclear Pollution Power Corporation              Hill and Dale Farm Turnpike Road, Route 9            West Hill - Faraway Road Westboro, Massachusetts 01581      Putney, Vermont 05346 Gregor I. McGregor, Esq.          Public Service Board Assistant Attorney General        State of Vermont Department of the Attorney General 120 State Street State House, Room 370            Montpelier, Vermont 05602 Boston, Massachusetts 02133 Richard E. Ayres, Esq.
 
Natural Resources Defense Council
      917 - 15th Street,, N. W.
 
Washington, D. C. 20005 Honorable M. Jerome Diamond Attorney General John A. Calhoun Assistant Attorney General State of Vermont
      109 State Street Pavilion Office Building tlontpelier, Vermont 05602 Brooks Memorial Library
      224 Main Street Brattleboro, Vermont 05301 John R. Stanton, Director Radiation Control Agency Hazen Drive Concord, New Hampshire 03301 John W. Stevens Conservation Society of Southern Vermont P. 0. Box 256 Townshend, Vermont 05353
 
Docket No. 50-309 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer
20 Turnpike Road Westboro, Massachusetts 01581 cc:  Mr. E. W. Thurlow, President Maine Yankee Atomic Power Company
      9 Green Street Augusta, Maine 04330
      Mr. Donald E. Vandenburgh Vice President - Engineering Yankee Atomic Electric Company
      20 Turnpike Road Westboro, Massachusetts 01581 John A. Ritsher, Esquire Ropes & Gray
      225 Franklin Street Boston, Massachusetts 02110
      Mr. John M. R. Paterson Assistant Attorney General State of Maine Augusta, Maine 04330
      Harold P. Green, Esquire Suite 1000
      The Watergate
        600 New Hampshire Avenue, N. W.
 
Washington, D. C. 20037 Mr. Nicholas Barth Executive Director Sheepscot Valley Conservation Association, Inc.
 
P. O. Box 125 Alna, Maine 04535 Wiscasset Public Library Association High Street Wiscasset, Maine 04578 Mr. Robert R. Radcliffe Office of Energy Resources
        55 Capitol Street Augusta, Maine 04330
        Mrs. Cali Hollander, President SAFE POWER FOR MAINE
          Stockton Springs, Maine 04981
 
Questionnaire for NUCLEAR REGULATORY COMMISSION
                            RELIABILITY STUDY
                                    of Standby Diesel Generator Units Date Questionnaire Completed:
Plant Name:                                    Unit No.
 
Diesel Manufacturer:                          Model:
Number of Units:
Size Kw/Unit:                          Rated Speed:
Average Operating Hours Per Unit to Date:
                            DIESEL GENERATOR STATUS
A. Engine:
    'I. Problems are caused chiefly by (give estimated number)
        a. Defective parts b. Installation errors:
        c. Failure of system to respond properly in function or sequence:
        d. Faulty adjustment:
    2. Would more stringent inspection and testing requirements during acceptance or preoperational tests significantly improve the diesel-generator power plant performance?
        Yes          No B. Starting Systems (indicate which):
    1. Air-to-cylinder cranking.
 
Air cranking motor              Mfr.          Model No.
 
Electric cranking motor        Mfr.          Model No.
 
-2-
2. If air cranking, then:
  Give size of starting air tank:    Length          Diameter Normal standby air tank pressure            psi.
 
Is pressure reducer used?  Yes        No Reducer pipe size?            inches.
 
Starting air control admission valve pipe size in air piping system,                inches.
 
Minimum air tank pressure for engine cranking            psi.
 
Number of five-second cranking periods between above pressures with no tank recharging Number of air tanks per engine  _
    Can starting air tanks serve more than one engine?
    Yes          No Is air pipe to engine from top of air tank?    Yes        No Does starting air tank have water condensate drain?
    Yes      No Does starting air pipe have water condensate trap and drain near engine? Yes _ No Is starting air piping horizontal?    Yes    No Does it slant toward drain?    Yes      No If water condensate drains are provided, then is draining:
    a. Automatic through float valve? Yes _ No b. Manual by hand valve? Yes _ No c. If manual, then is draining water condensate done:
 
-3- daily?
    weekly?
    monthly?
    before each start if manual?
    no procedure?
Is dirt and rust filter provided in starting air pipe?
Yes  _  No _
If provided, where installed?
How is it cleaned?
How often and when?
Give pipe size of filter:                          inches.
 
How is it known whether filter is plugged or has high Dressure drop?                  _  .__
Is starting air pipe to engine positioned:
a. Below floor?
b. On the floor?
c.  Overhead?
What is air pressure drop from air tank to engine during cranking    __    psi Give approximate length (nearest ten feet) of starting air pipe for individual engine or all engines from air tank to:
a. Nearest engine        feet b. Furthest engine      -feet
 
-4- Diameter of starting air pipe from:
  a. Air tank to starting valve        inches b. At air starting valve        inches c. At engine      inches What is the primary source of power for the starting air system?
  Is there a duplicate and redundant motor and air compressor set? Yes      No What is the time required to recharge one air tank?
            minutes Does starting air supply system have independent secondary power supply for compressor? Yes      No _
  If yes, then by:
  a. Gasoline engine?
  b. Motor driven?
  c. Other? (SpecifyF_    _ _
3. If electric (Battery powered) cranking, then:
  a. Battery charging: Continuous trickle charger Intermittent charging If so, how is charging requirement determined?
    -Time cycle Test Other =
  b. Battery used:  Common Plant Individual Unit Other Starting cable size      ; Length:  Battery to engine (longest)
 
-5- C. Fuel Oil System:  Bulk Tank to Day Tank
  1. Does the bulk tank to day tank fuel supply system (viz:
      pump, motor, etc.) have redundant independent power supplies? Yes        No Does this system have a hand-operated emergency fuel pump? Yes        No If yes, is this hand-operated pump and piping in immediate operating condition? Yes        No
  2.  Is there a water and sediment drain from the very bottom of the:
        a. Bulk tank?    Yes      No b. Day tank?    Yes  _  No
  3.  Is the reqular functional fuel oil outlet slightly above (two to three inches) the bottom of the:
        a. Bulk tank? Yes _      No b. Day or integral tank? Yes    _  No
    4. Is bottom of day tank and/or integral tank above all parts and piping of the enqine fuel injection systems?
        Yes      No If yes, Give approximate amount inches      feet
    5. Does the engine fuel system have a fuel bleed return line to the fuel day tank and/or integral tank?
        Yes      No During extended operation, such as more than two to three hours, does the fuel in the day tank become: (yes or no)
        a. Warm?
        b. Hot?        (above 1300 F)
 
-6- What is fuel oil return line size (nominal)?
      a. Pipe size    _    inches b. Tubing size        inches
  6. Do engine fuel oil filters have air bleed or vent valves readily accessible? Yes          No
  7.  How is fuel transferred from day tank to engine fuel system?
      a.  By gravity b.  Engine driven pump c.  Electric motor driven pump d.  Is a manual pump also provide-dfor injection system filling and/or air venting after servicing or replacement of parts in the fuel injection system? Yes        No If yes, is the manual pump in immediate operating condition?
  Yes        No
  8. Type of fuel (e.g., #1, #2, #3, JP-4, etc.)
  9. Approximate bulk tank capacity,                gallons.
 
10. Typical frequency of refilling (weekly, monthly, etc.) _
  11. Typical refill (gallons),
D. Lube Oil System
  1.  Lube oil a.  Type b.  Viscosity_
        c.  Specification number d.  Oil change determined by:
            Time interval: Yes      No Give interval              monthly, yearly By oil analysis: Yes          No
 
-7-
  2. Lube oil filters are:
      a. Full flow b. Bypass C. Combination filter cartridge:
  3. Interval and/or basis for changing a.  Monthly b.  Yearly c.  By running time          hours d.  By oil analysis. Yes -      No e.  By pressure drop. Yes        No Does provisions exist for  changing  cartridges during f.
 
engine operation? Yes      No
  4. Oil Pressure Monitoring a. Normal operating pressure        psi b. Alarm        psi c. Shutdown        psi
  5. Oil temperature control:
                                                        OF.
 
a. By standby heater in engine sump standby  temperature:
      b. Heating means for maintaining Direct in oil Oil-to-water heat exchanger Other (Specify)_
E. Cooling System - Engine Water
    1. Temperature control by:
        a. By thermostat in water?  Yes      No If yes, then:
            Bypass thermostat? Yes      No Throttle thermostat? Yes        No
 
-8- b. By radiator shutter:
      Automatic Manual Other (give type)
2. Corrosion control (water additive)?  Yes      No If yes, give chemical additive or name of compound.
 
Proportion or concentration control:
  a. By additive measurement? Yes        No b. By water coolant analysis? Yes    _  No
3. Engine cooling water cooled by:
  a. Radiator?
  b. Heat exchanger from sea, river or other water?
  c. Other? (give type)                      _  -
4. Engine cooling water temperature-monitoring a.  Standby temperature        OF
  b.  Normal operating temperature            0F
  c.  Alarm temperature        _  OF-_
  d.  Shutdown temperature          OF
  e.  Water circulation during standby:
      Thermo-syphon Pump
5. Water Pressure Monitoring:  Yes      No a. Alarm b. Shutdown c. Both _
 
-9-
  6. Water temperature Sensor Position:
      a. In piping from engine b. In engine piping c. In engine direct
  7. Water surge or supply tank in system.        Yes  -    1o If yes, then bottom connected to:
        a.  Water pump suction? Yes          No b.  Top of system? Yes      - V0
        c.  Both of above? Yes          No d.  Is bottom of surge tank above top of engine system? Yes        No e. Does  engine  have constant  air bleed from top of engine water piping to surge or supply tank?
            Yes      No f. Give  size  of bleed or vent line,            inches.
 
g. Manual air bleed only? Yes        _ No    -
F. Governor - Speed Control Manufacturer Electric (speed sensing)
    Hydraulic Type or code (such as EGR-35, LSG-10, etc.)
    Automatic load sharing? Yes            No of
    1. Is compensation or stability control and/or speed response manually adjustable? Yes          No If yes, adjusted by:
        a. Eye and ear?
        b. Test and specification?
        c. Other? (Specify)
                                                              means
    2. Engine - generator normal shutdown or stopping and method.
 
-10-
    Is the engine stopped:
  a.  Manually?    Yes      No If yes, then:
        Directly at engine?    Yes    No Through local control panel?    Yes  _ No b.  Automatically through the controls in the control room?  Yes  _      No c. By setting governor to "fuel-off" position?
        Yes      No  _
  d. By over-ride of governor settings and control position directly to fuel injection pumps?
        Yes      No e. Other means.      Describe briefly.                i
3. When engine is stopped, is fuel control in:
  a. Full fuel or maximum fuel position?
  b. Full off or no fuel position?
  c. Intermediate?
  d. Random?
  (If not consistent and typical in above, then give the usual.)
4. When starting from the standby condition after shutdown for at least 24 hours, give number of seconds from start- to-crank to full fuel or maximum fuel position of governor and fuel control,                seconds.
 
-  v
                                    -1 1- G. Governor  - Overspeed (shutdown)
    1. Speed sensing?
      a. Electrical b. Flyball c. Other (Specify)
    2. Fuel shutoff force generated by:
      a.    Spring?
      b.    Air?
      c.    Hydraulic?
      d.    Electrical?
      e.    Other? (SpeciTUF_____        __
    3. Overspeed sensing setting?      (in terms of full speed)
        a. 115%
        b. 110%
        c. Other      pecify)
    4. Is overspeed tripping set point tested periodically?
        Yes        No If yes, then how often?                (yearly, monthly, etc.)
H. 1. Generator Mfr.                      Model No.
 
Single bearing or two bearings?
        Does generator have damper windings? Yes          No
    2. Does generator have any obvious fault or difficulty?
        Yes        No -
        Is problem repetitive?  Yes        No If yes, then describe briefly.
 
-12- I. Exciter and Voltage Regulator
  1.  Exciter Manufacturer:                    Model Type:  Rotating                    Static If rotating drive?  Direct Belt or Chain DC with field control Brushless with rectifier
  2. Voltage Regulator:    Manufacturer                  Model _
      Type:  Mechanical                  Static
  3.  Are paralleled units of automatic load sharing control of fully automatic type? Yes        No If yes, has any obvious influence or interrelationship been noted between the stability and response time of the engine governor and the stability and voltage control of the generators?  Yes _    No
  4. Have engine governor and voltage regulator/exciter adjustments been made on the site or under any con- ditions since any of the units have been placed in service? Yes      No If yes, by means of what tests and what standards?
      Give name or very brief description.
 
5. If any difficulties have occurred, give approximate number of problems.
 
a. Components b. Wiring c. Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)
 
-13- J. Paralleling:    Engine-Generator Units
    1. Do all units consistently have the proper voltage output?
        Yes -      No
    2. Do all units automatically share both the "real" or in-phase load and also the reactive load reasonably well? Yes          No _
    3. At the same Kw load, are both the field and the armature line currents of the several units consistently close to the same value? Yes          No If no, approximate percent difference.
 
4.  Synchronizinq a.  In automatic synchronizing do circuit breakers close immediately after reaching full synchronous speed?
                                            Yes          No _
        b.  If "no" above then, does speed of some units drift slowly while failing to synchronize and close circuit breakers?
            How many seconds?
            Occasionally Always Never K. Switch Gear and Electrical Con        (other than exciter/
    voltage regulator)
    1. If any difficulties have occurred, then give approximate number of problems.
 
a.  Components b.  Wirina c.  Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)
        d. Design concept faults. That is, does the switch gear and its controls perform the proper functions and in proper sequence and timing.
 
-14-
  2.  a. Do the on-site diesel generator units and related support equipment have any storage battery power systems for any service whatsoever? Yes          No b. Identify each storage battery power system associated with the on-site diesel generator unit and its function.                      _
      c. Does each system identified above adequately fulfill the service requirements for which it is intended?
          Yes      No If no, briefly describe.
 
d. Is there a DG battery maintenance program?    Yes    No L. Safety Shut downs Give safety shut down settings compared to equilibrium operating conditions.
 
1. Engine and generator speed.    Give rpm or hertz:
      a. Synchronous and usual              rpm or          Hz b. Overspeed shutdown setting                rpm or      Hz
  2. Engine cooling water (see E.4)
      a. Equilibrium          OF
      b. Alarm          OF
      c. Shut down          OF
  3. Lube oil pressure (see D.4)
      a. Equilibrium            psi b. Alarm  _        psi c. Shut down    _      psi
 
-15-
  4. Lube oil temperature a. Equilibrium          OF
      b. Alarm            OF
      c. Shutdown          OF
  5. Indicate all other protective interlocks (give name and;)
      a. Usual or proper condition b. Shutdown condition
  6. a. What source of power is provided to operate alarms and shutdown controls? (See G.2)
      b. Do the generator units automatically shutdown in case of the electrical power loss to its control system? Yes      No M. Emergency or Alert Conditions
    1. Are all safety shutdown and safety interlocks bypassed during emergency conditions? Yes        No
    2. If "no" above, then which are not bypassed.    Name items.
 
3. For each interlock not bypassed is coincident logic used?    Yes        No If yes, is it testable?  Yes      No N. Maintenance
    1. Does plant have reqularly scheduled maintenance pro- cedures?
        If so, return copy of these procedures with questionnaire.
 
-16-
  2. When need for minor adjustments obviously exists, then:
      a. Is remedial action taken immediately or at earliest practical opportunity? Yes        No b. Is remedial action taken only at periodic prescheduled or programmed times and conditions? Yes    .,No c.  For best performance record which of above appears better:
            immediate or early action?
            as scheduled only?
      d.  Must permission for minor maintenace be obtained from some higher out-of-plant authority? Yes          No e.  Is maintenance referred to above allowed and encouraged?
            Yes      No f.  In periodic surveillance tests, simulated alert standby tests, etc., is the criteria "pass/not pass" the test used? Yes        No g. Is there a conscious continuing policy to detect and remedy marginal conditions or imminent trouble: for examples: lube oil pressure shutdown only two to five psi below operating pressure or, perhaps overspeed governor setting only one or two percent above starting speed surge or etc.? Yes        No h. Are efforts to remedy marginal or questionable conditions as mentioned above encouraged by plant management?
            Yes          No i.  Are remedial steps on items similar to the above taken or allowed when the unit has started and operated satisfactorily within specified limits or conditions?
            Yes        No
0.  Starting Conditions
    1.  Give starting or necessary cranking time as experienced.


50-245 and 50-336 Northeast Nuclear Energy Company ATTN: Mr. D. C. Switzer President P. 0. Box 270 Hartford, Connecticut
a.   Starting time per specification            seconds b.   Usual starting time          seconds c.   Maximum starting time observed          seconds
06101 cc: William H. Cuddy, Esquire Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut
06103 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Plant P. 0. Box 128 Waterford, Connecticut
06385 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut
06385 Docket Nos. 50-282 and 50-306 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services 414 Nicollet Mall -8th Floor Minneapolis, Minnesota
55401 cc: Mr. F. P. Tierney Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota
55089 Jocelyn F. Olson, Esquire Special Assistant Attorney General Minnesota Pollution Control Agency 1935 West County Road B-2 Roseville, Minnesota
55113 Mr. Robert L. Nybo, Jr., Chairman Minnesota-Wisconsin Boundary Area Commission
619 Second Street Hudson, Wisconsin
54016 The Environmental Conservation Library Minneapolis Public Library 300 Nicollet Mall Minneapolis, Minnesota
55401 Docket No.7 50-263 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services 414 Nicollet Mall -8th Floor Minneapolis, Minnesota
55401 cc: Arthur Renquist, Esquire Vice President
-Law Northern States Power Company 414 Nicol let Mall Minneapolis, Minnesota
55401 Mr. L. R. Eliason Plant Manager Monticello Nuclear Generating Plant Northern States Power Company Monticello, Minnesota
55362 Russell J. Hatling, Chainman Minnesota Environmental Control Citizens Association (MECCA)Energy Task Force 144 Melbourne Avenue, S. E.Minneapolis, Minnesota
55414 Mr. Kenneth Dzugan Environmental Planning Consultant Office of City Planner Grace Building 421 Wabasha Street St. Paul, Minnesota
55102 Sandra S. Gardebring Executive Director Minnesota Pollution Control Agency 1935 W. County Road B2 Roseville, Minnesota
55113 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota
55108 The Environmental Conservation Library Minneapolis Public Library 300 Nicollet Mall Minneapolis, Minnesota
55401 Docket No. 50-285 Omaha Public Power District ATTN: Mr. Theodore E. Short Division Manager -Production Operations
1623 Harney Street Omaha, Nebraska 68102 cc: Margaret R. A. Pardis LeBoeuf, Lamb, Leiby & MacRae 1757 N Street, N. W.Washington, D. C. 20036 Blair Public Library 1665 Lincoln Street Blair, Nebraska 68008 Docket No. 50-133 Pacific Gas and Electric Company ATTN: Mr. John C. Morrissey Vice President and General Counsel 77 Beale Street San Francisco, California
94106 cc: Philip A. Crane, Jr.Pacific Gas and Electric Company 77 Beale Street San Francisco, California
94106 Mr. James Hanchett Public Information Officer Region V -IE U. S. Nuclear Regulatory Commission
1990 N. California Boulevard Walnut Creek, California
94596 Humboldt County Library 636 F Street Eureka, California
95501 Docket Nos. 50-277 and 50-278 Philadelphia Electric Company ATTN: Mr. Edward S. Bauer, Jr., Esquire Vice President and General Counsel 2301 Market Street Philadelphia, Pennsylvania
19101 cc: Eugene Bradley Philadelphia Electric Company Assistant General Counsel 2301 Market Street Philadelphia, Pennsylvania
19101 Troy B. Conner, Jr.1747 Pennsylvania Avenue, N. W.Washington, D. C. 20006 Raymend L. Hovis, Esquire 35 South Duke Street Yo rk, Pennsylvania
17401 Warren K. Rich, Esquire Assistant Attorney General Department of Natural Resources Annapolis, Maryland 21401 Philadelphia Electric Company ATTN: Mr. W. T. Ullrich Peach Bottom Atomic Power Station Delta, Pennsylvania
17314 Martin Memorial Library 159 E. Market Street York, Pennsylvania
17401 Hr. M. J. Cooney, Superintendent Generation Division -Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania
19101 Docket No. 50-344 Portland General Electric Company ATTN: Mr. Charles Goodwin, Jr.Assistant Vice President 621 SW Alder Street Portland, Oregon 97205 cc: Mr. H. H. Phillips Portland General Electric Company 621 Southwest Alder Street Electric Building Portland, Oregon 97205 Warren Hastings, Esquire Phillips, Coughlin, Buell Stoloff and Black 807 Electric Building Portland, Oregon 97205 Mr. J. L. Frewing, Manager Generation Licensing and Analysis Portland General Electric Company 621 Southwest Alder Street Portland, Oregon 97205 Columbia County Courthouse Law Library, Circuit Court Room St. Helens, Oregon 97051 Docket No. 50-333 Power Authority of the State of New York ATTN: Mr. George T. Berry General Manager and Chief Engineer 10 Columbus Circle New York, New York 10019 cc: Lewis R. Bennett, General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Rear Admiral Paul J. Early Assistant Chief Engineer -Projects Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Manager-Nuclear Operations Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 J. D. Leonard, Jr., Resident Manager James A. FitzPatrick Nuclear Power Plant P. 0. Box 41 Lycoming, New York 13093 Lex K. Larson, Esq.LeBoeuf, Lamb, Leiby and MacRae 1757 N Street, N. W.Washington, D. C. 20036 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 Scott B. Lilly, General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Oswego County Office Building 46 E. Bridge Street Oswego, New York 13126 Docket No. 50-272 Public Service Electric & Gas Company ATTN: Mr. R. P. Librizzi General Manager -Electric Production Production Department
80 Park Place, Room 7221 Newark, New Jersey 07101 cc: Richard Fryling, Jr., Esquire Assistant General Counsel Public Service Electric & Gas Company 80 Park Place Newark, New Jersey 07101 Troy B. Conner, Jr., Esquire 1747 Pennsylvania Avenue, N. W.Washington, D. C. 20006 Gene Fisher Bureau Chief Bureau of Radiation Protection
380 Scotts Road Trenton, New Jersey 08628 State House Annex ATTN: Deputy Attorney General State of New Jersey 36 West State Street Trenton, New Jersey 08625 Attorney General Department of Law & Public Safety State House Annex Trenton, New Jersey 08625 Public Service Electric & Gas Company ATTN: Herbert J. Heller Manager, Salem Nuclear Generating Station Hancocks Bridge, New Jersey 08038 Salem Free Library 112 West Broadway Salem, New Jersey 08079 Public Service Electric 6 Gas Company ATTN: P. L. ?iittl General Manager -Licensing and Environment
80 Park Place Newark, New Jersey 07101 Docket No. 50-244 Rochester Gas & Electric Corporation ATTN: Mr. Leon D. White, Jr.Vice President Electric and Steam Production
89 East Avenue Rochester, New York 14604 cc: Lex K. Larson, Esquire LeBoeuf, Lanb, Leiby & MacRae 1757 N Street, N. W.Washington, D. C. 20036 Mr. Michael Slade 1250 Crown Point Drive Webster, New York 14580 Rochester Committee for Scientific Information Robert E. Lee, Ph.D Post Office Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14627 Docket No. 50-312 Sacramento Municipal Utility District ATTN: Mr. J. J. Mattimoe Assistant General Manager and Chief Engineer 6201 S Street P. 0. Box 15830 Sacramento, California
95813 cc: David S. Kaplan, Secretary and General Counsel 6201 S Street P. 0. Box 15830 Sacramento, California
95813 Business and Municipal Department Sacramento City-County Library 828 I Street Sacramento, California
95814 Docket No. 50-206 Southern California Edison Company ATTN: Mr. James H. Drake Vice President 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California
91770 cc: Rollin E. Woodbury, Vice President and General Counsel Southern California Edison Company Post Office Box 800 Rosemead, California
91770 Chickering
& Gregory, General Counsel ATTN: C. Hayden Ames, Esquire San Diego Gas & Electric Company 111 Sutter Street San Francisco, California
94104 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California
92676 Docket Nos. 50-259 50-260 and 50-296 Tennessee Valley Authority ATTN: Mr. Godwin Williams, Jr.Manager of Power 818 Power Building Chattanooga, Tennessee
37201 cc: H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority 400 Commerce Avenue E l1B 33 C Knoxville, Tenessee 37902 Mr. D. McCloud Tennessee Valley Authority 303 Power Building Chattanooga, Tennessee
37401 fir. William E. Garner Route 4, Box 354 Scottsboro, Alabama 35768 Athens Public Library South and Forrest Athens, Alabama 35611 Mr. C. S. Walker Tennessee Valley Authority 400 Commerce Avenue W 9D199 C Knoxville, Tennessee
37902 Docket Nos. 50-280 and 50-281 Virginia Electric & Power Company ATTN: Mr. W. L. Proffitt Senior Vice President
-Power P. 0. Box 26666 Richmond, Virginia 23261 cc: Michael W. Maupin, Esq.Hunton, Williams, Gay & Gibson P. 0. Box 1535 Richmond, Virginia 23213 Swem Library College of William & Mary Williamsburg, Virginia 23185 Docket Nos. 50-266 and 50-301 Wisconsin Electric Power Company Wisconsin Michigan Power Company ATTN: Mr. Sol Burstein Executive Vice President 231 West Michigan Street Milwaukee, Wisconsin
53201 cc: Mr. Arthur M. Fish Document Department University of Wisconsin
-Stevens Point Library Stevens Point, Wisconsin
54481 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. E. W. James Senior Vice President Post Office Box 1200 Green Bay, Wisconsin
54305 cc: Steven E. Keane, Esquire Foley, Sammond & Lardner 777 East Wisconsin Avenue Milwaukee, Wisconsin
53202 Bruce W. Churchill, Esquire Shaw, Pittman, Potts & Trowbridge
1800 M Street, N. W.Washington, D. C. 20036 Kewaunee Public Library 314 Milwaukee Street Kewaunee, Wisconsin
54216 Docket No. 50-29 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westboro, Massachusetts
01581 cc: Mr. Donald G. Allen, President Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts
01581 Greenfield Public Library 40 Main Street Greenfield, Massachusetts
01581 Docket No. 50-271 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westboro, Massachusetts
01581 cc: Mr. S. D. Karpyak Vermont Yankee Nuclear Power Corporation
77 Grove Street Rutland, Vermont 05701 Mr. Donald E. Vandenburgh Vice President Vermont Yankee Nuclear Power Corporation Turnpike Road, Route 9 Westboro, Massachusetts
01581 Gregor I. McGregor, Esq.Assistant Attorney General Department of the Attorney General State House, Room 370 Boston, Massachusetts
02133 Mr. David M. Scott Radiation Health Engineer Agency of Human Services Division of Occupational Health P. .Box 607 Barre, Vermont 05641 New England Coalition on Nuclear Pollution Hill and Dale Farm West Hill -Faraway Road Putney, Vermont 05346 Public Service Board State of Vermont 120 State Street Montpelier, Vermont 05602 Richard E. Ayres, Natural Resources 917 -15th Street, Washington, D. C.Esq.Defense Council , N. W.20005 Honorable M. Jerome Diamond Attorney General John A. Calhoun Assistant Attorney General State of Vermont 109 State Street Pavilion Office Building tlontpelier, Vermont 05602 Brooks Memorial Library 224 Main Street Brattleboro, Vermont 05301 John R. Stanton, Director Radiation Control Agency Hazen Drive Concord, New Hampshire
03301 John W. Stevens Conservation Society of Southern Vermont P. 0. Box 256 Townshend, Vermont 05353 Docket No. 50-309 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westboro, Massachusetts
01581 cc: Mr. E. W. Thurlow, President Maine Yankee Atomic Power Company 9 Green Street Augusta, Maine 04330 Mr. Donald E. Vandenburgh Vice President
-Engineering Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts
01581 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts
02110 Mr. John M. R. Paterson Assistant Attorney General State of Maine Augusta, Maine 04330 Harold P. Green, Esquire Suite 1000 The Watergate 600 New Hampshire Avenue, N. W.Washington, D. C. 20037 Mr. Nicholas Barth Executive Director Sheepscot Valley Conservation Association, Inc.P. O. Box 125 Alna, Maine 04535 Wiscasset Public Library Association High Street Wiscasset, Maine 04578 Mr. Robert R. Radcliffe Office of Energy Resources 55 Capitol Street Augusta, Maine 04330 Mrs. Cali Hollander, President SAFE POWER FOR MAINE Stockton Springs, Maine 04981 Questionnaire for NUCLEAR REGULATORY
COMMISSION
RELIABILITY
STUDY of Standby Diesel Generator Units Date Questionnaire Completed:
Plant Name: Unit No.Diesel Manufacturer:
Model: Number of Units: Size Kw/Unit: Rated Speed: Average Operating Hours Per Unit to Date: DIESEL GENERATOR
STATUS A. Engine: 'I. Problems are caused chiefly by (give estimated number)a. Defective parts b. Installation errors: c. Failure of system to respond properly in function or sequence: d. Faulty adjustment:
2. Would more stringent inspection and testing requirements during acceptance or preoperational tests significantly improve the diesel-generator power plant performance?
Yes No B. Starting Systems (indicate which): 1. Air-to-cylinder cranking.Air cranking motor Mfr. Model No.Electric cranking motor Mfr. Model No.


-2-2. If air cranking, then: Give size of starting air tank: Length Diameter Normal standby air tank pressure psi.Is pressure reducer used? Yes No Reducer pipe size? inches.Starting air control admission valve pipe size in air piping system, inches.Minimum air tank pressure for engine cranking psi.Number of five-second cranking periods between above pressures with no tank recharging Number of air tanks per engine _Can starting air tanks serve more than one engine?Yes No Is air pipe to engine from top of air tank? Yes No Does starting air tank have water condensate drain?Yes No Does starting air pipe have water condensate trap and drain near engine? Yes _ No Is starting air piping horizontal?
-17-
Yes No Does it slant toward drain? Yes No If water condensate drains are provided, then is draining: a. Automatic through float valve? Yes _ No b. Manual by hand valve? Yes _ No c. If manual, then is draining water condensate done:  
  2. Give usual time intervals as follows:
-3-daily?weekly?monthly?before each start if manual?no procedure?
                                                          of any a. Time from start-to-crank to first firing cylinder.           seconds firing b. Time from start-to-crank to approximate full of all cylinders.                   seconds both tachometer
Is dirt and rust filter provided in starting air pipe?Yes _ No _If provided, where installed?
  3. Give maximum speed surge when starting; use and frequency meter if possible.
How is it cleaned?How often and when?Give pipe size of filter: inches.How is it known whether filter is plugged or has high Dressure drop? _ .__Is starting air pipe to engine positioned:
a. Below floor?b. On the floor?c. Overhead?What is air pressure drop from air tank to engine during cranking __ psi Give approximate length (nearest ten feet) of starting air pipe for individual engine or all engines from air tank to: a. Nearest engine feet b. Furthest engine -feet
-4-Diameter of starting air pipe from: a. Air tank to starting valve inches b. At air starting valve inches c. At engine inches What is the primary source of power for the starting air system?Is there a duplicate and redundant motor and air compressor set? Yes No What is the time required to recharge one air tank?minutes Does starting air supply system have independent secondary power supply for compressor?
Yes No _If yes, then by: a. Gasoline engine?b. Motor driven?c. Other? (SpecifyF_
_ _3. If electric (Battery powered) cranking, then: a. Battery charging:
Continuous trickle charger Intermittent charging If so, how is charging requirement determined?-Time cycle Test Other =b. Battery used: Common Plant Individual Unit Other Starting cable size ; Length: Battery to engine (longest)
-5-C. Fuel Oil System: Bulk Tank to Day Tank 1. Does the bulk tank to day tank fuel supply system (viz: pump, motor, etc.) have redundant independent power supplies?
Yes No Does this system have a hand-operated emergency fuel pump? Yes No If yes, is this hand-operated pump and piping in immediate operating condition?
Yes No 2. Is there a water and sediment drain from the very bottom of the: a. Bulk tank? Yes No b. Day tank? Yes _ No 3. Is the reqular functional fuel oil outlet slightly above (two to three inches) the bottom of the: a. Bulk tank? Yes _ No b. Day or integral tank? Yes _ No 4. Is bottom of day tank and/or integral tank above all parts and piping of the enqine fuel injection systems?Yes No If yes, Give approximate amount inches feet 5. Does the engine fuel system have a fuel bleed return line to the fuel day tank and/or integral tank?Yes No During extended operation, such as more than two to three hours, does the fuel in the day tank become: (yes or no)a. Warm?b. Hot? (above 130 0 F)
-6-What is fuel oil return line size (nominal)?
a. Pipe size _ inches b. Tubing size inches 6. Do engine fuel oil filters have air bleed or vent valves readily accessible?
Yes No 7. How is fuel transferred from day tank to engine fuel system?a. By gravity b. Engine driven pump c. Electric motor driven pump d. Is a manual pump also provide-dfor injection system filling and/or air venting after servicing or replacement of parts in the fuel injection system? Yes No If yes, is the manual pump in immediate operating condition?
Yes No 8. Type of fuel (e.g., #1, #2, #3, JP-4, etc.)9. Approximate bulk tank capacity, gallons.10. Typical frequency of refilling (weekly, monthly, etc.) _11. Typical refill (gallons), D. Lube Oil System 1. Lube oil a. Type b. Viscosity_
c. Specification number d. Oil change determined by: Time interval:
Yes No Give interval monthly, yearly By oil analysis:
Yes No
-7-2. Lube oil filters are: a. Full flow b. Bypass C. Combination
3. Interval and/or basis for changing filter cartridge:
a. Monthly b. Yearly c. By running time hours d. By oil analysis.


Yes -No e. By pressure drop. Yes No f. Does provisions exist for changing cartridges during engine operation?
a. Usual conditions  _rpm Hz b. Maximum observed              rpm Hz start-to-crank
Yes No 4. Oil Pressure Monitoring a. Normal operating pressure psi b. Alarm psi c. Shutdown psi 5. Oil temperature control: a. By standby heater in engine sump OF.b. Heating means for maintaining standby temperature:
  4. During a surveillance test, give time from speed is  attained  and maintained.
Direct in oil Oil-to-water heat exchanger Other (Specify)_
E. Cooling System -Engine Water 1. Temperature control by: a. By thermostat in water? Yes No If yes, then: Bypass thermostat?
Yes No Throttle thermostat?
Yes No
-8-b. By radiator shutter: Automatic Manual Other (give type)2. Corrosion control (water additive)?
Yes No If yes, give chemical additive or name of compound.Proportion or concentration control: a. By additive measurement?
Yes No b. By water coolant analysis?
Yes _ No 3. Engine cooling water cooled by: a. Radiator?b. Heat exchanger from sea, river or other water?c. Other? (give type) _ -4. Engine cooling water temperature-monitoring a. Standby temperature OF b. Normal operating temperature
0 F c. Alarm temperature OF-_ _d. Shutdown temperature OF e. Water circulation during standby: Thermo-syphon Pump 5. Water Pressure Monitoring:
Yes No a. Alarm b. Shutdown c. Both _
-9-6. Water temperature Sensor Position: a. In piping from engine b. In engine piping c. In engine direct 7. Water surge or supply tank in system. Yes -1o If yes, then bottom connected to: a. Water pump suction? Yes No b. Top of system? Yes -V0 c. Both of above? Yes No d. Is bottom of surge tank above top of engine system? Yes No e. Does engine have constant air bleed from top of engine water piping to surge or supply tank?Yes No f. Give size of bleed or vent line, inches.g. Manual air bleed only? Yes _ No -F. Governor -Speed Control Manufacturer Electric (speed sensing)Hydraulic Type or code (such as EGR-35, LSG-10, etc.)Automatic load sharing? Yes No 1. Is compensation or stability control and/or speed of response manually adjustable?
Yes No If yes, adjusted by: a. Eye and ear?b. Test and specification?
c. Other? (Specify)2. Engine -generator normal shutdown or stopping means and method.


-10-Is the engine stopped: a. Manually?
to when steady synchronous a. Usual          seconds b. Maximum            seconds c. As specified                    seconds.
Yes No If yes, then: Directly at engine? Yes No Through local control panel? Yes _ No b. Automatically through the controls in the control room? Yes _ No c. By setting governor to "fuel-off" position?Yes No _d. By over-ride of governor settings and control position directly to fuel injection pumps?Yes No e. Other means. Describe briefly. i 3. When engine is stopped, is fuel control in: a. Full fuel or maximum fuel position?b. Full off or no fuel position?c. Intermediate?
d. Random?(If not consistent and typical in above, then give the usual.)4. When starting from the standby condition after shutdown for at least 24 hours, give number of seconds from start-to-crank to full fuel or maximum fuel position of governor and fuel control, seconds.


-v-1 1-G. Governor -Overspeed (shutdown)
in starting.
1. Speed sensing?a. Electrical b. Flyball c. Other (Specify)2. Fuel shutoff force generated by: a. Spring?b. Air?c. Hydraulic?
d. Electrical?
e. Other? (SpeciTUF_____
__3. Overspeed sensing setting? (in terms of full speed)a. 115%b. 110%c. Other pecify)4. Is overspeed tripping set point tested periodically?
Yes No If yes, then how often? (yearly, monthly, etc.)H. 1. Generator Mfr. Model No.Single bearing or two bearings?Does generator have damper windings?
Yes No 2. Does generator have any obvious fault or difficulty?
Yes No -Is problem repetitive?
Yes No If yes, then describe briefly.


-12-I. Exciter and Voltage Regulator 1. Exciter Manufacturer:
5. Give briefly the most troublesome problems a. Most troublesome b. Next to most troublesome P. Air Cleaner or Air Filter - Combustion Air or inside
Model Type: Rotating Static If rotating drive? Direct Belt or Chain DC with field control Brushless with rectifier 2. Voltage Regulator:
    1. Combustion air source: taken from engine room the building, or from    outdoors?
Manufacturer Model _Type: Mechanical Static 3. Are paralleled units of automatic load sharing control of fully automatic type? Yes No If yes, has any obvious influence or interrelationship been noted between the stability and response time of the engine governor and the stability and voltage control of the generators?
        a. Indoors b. Outdoors    r
Yes _ No 4. Have engine governor and voltage regulator/exciter adjustments been made on the site or under any con-ditions since any of the units have been placed in service? Yes No If yes, by means of what tests and what standards?
Give name or very brief description.


5. If any difficulties have occurred, give approximate number of problems.a. Components b. Wiring c. Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)
-18-
-13-J. Paralleling:  
  2. Give type and make of air cleaners or air filters:
Engine-Generator Units 1. Do all units consistently have the proper voltage output?Yes -No 2. Do all units automatically share both the "real" or in-phase load and also the reactive load reasonably well? Yes No _3. At the same Kw load, are both the field and the armature line currents of the several units consistently close to the same value? Yes No If no, approximate percent difference.
      a. Oil bath                lMake b. Oil wetted screen              Hlake c. Paper                  Make d.  Other _lake e. Precleaner: Yes       No
  3. Excessive air flow restriction and servicing need determined by?
      a. Instrument such as:
          manometer If other give type b. Personal judgement by appearance, etc.


4. Synchronizinq a. In automatic synchronizing do circuit breakers close immediately after reaching full synchronous speed?Yes No _b. If "no" above then, does speed of some units drift slowly while failing to synchronize and close circuit breakers?How many seconds?Occasionally Always Never K. Switch Gear and Electrical Con (other than exciter/voltage regulator)
c. By smoking exhaust d. Time schedule e. Other (SpecifyT)      _      _      _    _
1. If any difficulties have occurred, then give approximate number of problems.a. Components b. Wirina c. Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)d. Design concept faults. That is, does the switch gear and its controls perform the proper functions and in proper sequence and timing.
  4. Are climatic extremes normally experienced such as:
      a. Air heavily loaded with water mist, high humidity and low temperature? Yes             No b. Blowing sand and dust? Yes _            No _
      c. Blowing snow (blizzards)? Yes              No d. Other-Name
  5. Are climatic extremes potentially possible such as:
      a. Air heavily loaded with water mist, high humidity and low temperature? Yes              No b.   Blowing sand and dust?    Yes          No c. Blowing  snow (blizzards)?    Yes        No d. Other-Name _
Q. Temperature Conditions
  1. Ambient outside hottest              "F.


-14-2. a. Do the on-site diesel generator units and related support equipment have any storage battery power systems for any service whatsoever?
2. Ambient outside coldest              "F.
Yes No b. Identify each storage battery power system associated with the on-site diesel generator unit and its function.


_c. Does each system identified above adequately fulfill the service requirements for which it is intended?Yes No If no, briefly describe.d. Is there a DG battery maintenance program? Yes No L. Safety Shut downs Give safety shut down settings compared to equilibrium operating conditions.
3. Engine-generator room hottest              OF.


1. Engine and generator speed. Give rpm or hertz: a. Synchronous and usual rpm or Hz b. Overspeed shutdown setting rpm or Hz 2. Engine cooling water (see E.4)a. Equilibrium OF b. Alarm OF c. Shut down OF 3. Lube oil pressure (see D.4)a. Equilibrium psi b. Alarm _ psi c. Shut down _ psi
4. Engine-generator room coldest              OF.
-15-4. Lube oil temperature a. Equilibrium OF b. Alarm OF c. Shutdown OF 5. Indicate all other protective interlocks (give name and;)a. Usual or proper condition b. Shutdown condition 6. a. What source of power is provided to operate alarms and shutdown controls? (See G.2)b. Do the generator units automatically shutdown in case of the electrical power loss to its control system? Yes No M. Emergency or Alert Conditions
1. Are all safety shutdown and safety interlocks bypassed during emergency conditions?
Yes No 2. If "no" above, then which are not bypassed.


Name items.3. For each interlock not bypassed is coincident logic used? Yes No If yes, is it testable?
5. Inside switch gear hottest
Yes No N. Maintenance
1. Does plant have reqularly scheduled maintenance pro-cedures?If so, return copy of these procedures with questionnaire.


-16-2. When need for minor adjustments obviously exists, then: a. Is remedial action taken immediately or at earliest practical opportunity?
-19- R. Operator Qualifications (as presently exists, and suggested minimums if different)
Yes No b. Is remedial action taken only at periodic prescheduled or programmed times and conditions?
  1. Minimum education required (check)
Yes .,No c. For best performance record which of above appears better: immediate or early action?as scheduled only?d. Must permission for minor maintenace be obtained from some higher out-of-plant authority?
                                        Existing    Suggested a. High School b. Trade School C.  Technical School d. No minimum
Yes No e. Is maintenance referred to above allowed and encouraged?
  2. Minimum Years of operating experience (diesel electric generator)
Yes No f. In periodic surveillance tests, simulated alert standby tests, etc., is the criteria "pass/not pass" the test used? Yes No g. Is there a conscious continuing policy to detect and remedy marginal conditions or imminent trouble: for examples:
                                        Existing    Suggested a.  0-3 b. 3-6 c.  6-10
lube oil pressure shutdown only two to five psi below operating pressure or, perhaps overspeed governor setting only one or two percent above starting speed surge or etc.? Yes No h. Are efforts to remedy marginal or questionable conditions as mentioned above encouraged by plant management?
        d. 10-15
Yes No i. Are remedial steps on items similar to the above taken or allowed when the unit has started and operated satisfactorily within specified limits or conditions?
    3. Operator training Existing    Suggested a. Military b. Industrial c. On-the-job d. Combination of a, b, and c (indicate which)
Yes No 0. Starting Conditions
    4. Licensing required Existin-a    Suggested a. State b. Federal C. Utility or self d. None
1. Give starting or necessary cranking time as experienced.


a. Starting time per specification seconds b. Usual starting time seconds c. Maximum starting time observed seconds
- r
-17-2. Give usual time intervals as follows: a. Time from start-to-crank to first firing of any cylinder.
                                    -20-
S. Are any foreign gases such as propane, freon, halon, carbon dioxide, etc. stored in the: Diesel Engine room?
    Yes    .,No          or adjacent buildings? Yes _  No If yes, (other than hand portable fire extinguishers), then identify gases and give approximate tank size.


seconds b. Time from start-to-crank to approximate full firing of all cylinders.
3 Gases                      Volume (ft  )
T. Does control system automatically bypass, in emergency starting, any engine temporarily out of service for maintenance?  Yes        No If yes, then how many failures to bypass have occured?
U. Does the control system automatically override the test mode under emergency conditions? Yes          No V. Have repetitive mechanical failures occurred in any component part or subsystem of the engine, generator, or switch gear, etc.?
    Yes      No If yes, then which part or subsystem?
    How many failures?
    Give nature of failure.


seconds 3. Give maximum speed surge when starting;
W. Would periodic (yearly or other) evaluation and/or testing by "outside experts" contribute significantly to the diesel- generator reliability?  Yes      No Give brief reasons for the answer.
use both tachometer and frequency meter if possible.a. Usual conditions
_rpm Hz b. Maximum observed rpm Hz 4. During a surveillance test, give time from start-to-crank to when steady synchronous speed is attained and maintained.


a. Usual seconds b. Maximum seconds c. As specified seconds.5. Give briefly the most troublesome problems in starting.a. Most troublesome b. Next to most troublesome P. Air Cleaner or Air Filter -Combustion Air 1. Combustion air source: taken from engine room or inside the building, or from outdoors?a. Indoors b. Outdoors r
-21- X. 1. Give the accumulated time-load operating record for each diesel-generator unit from installation to the present (Running Hours):
-18-2. Give type and make of air cleaners or air filters: a. Oil bath lMake b. Oil wetted screen Hlake c. Paper Make d. Other _lake e. Precleaner:  
      Preoperational test Date Engine    :    Surv. Testing &              Emergency    : Total:
Yes No 3. Excessive air flow restriction and servicing need determined by?a. Instrument such as: manometer If other give type b. Personal judgement by appearance, etc.c. By smoking exhaust d. Time schedule e. Other (SpecifyT)
      :Serial 1o. :       Maintenance Hrs.         :   and Other     Hours No Load : Loaded : Service Hrs.
_ _ _ _4. Are climatic extremes normally experienced such as: a. Air heavily loaded with water mist, high humidity and low temperature?
Yes No b. Blowing sand and dust? Yes _ No _c. Blowing snow (blizzards)?
Yes No d. Other-Name
5. Are climatic extremes potentially possible such as: a. Air heavily loaded with water mist, high humidity and low temperature?
Yes No b. Blowing sand and dust? Yes No c. Blowing snow (blizzards)?
Yes No d. Other-Name
_Q. Temperature Conditions
1. Ambient outside hottest "F.2. Ambient outside coldest "F.3. Engine-generator room hottest OF.4. Engine-generator room coldest OF.5. Inside switch gear hottest
-19-R. Operator Qualifications (as presently exists, minimums if different)
and suggested 1. Minimum education required (check)Existing a.b.C.d.High School Trade School Technical School No minimum Suggested 2. Minimum Years of operating experience (diesel electric generator)
Existing a.b.c.d.0-3 3-6 6-10 10-15 Suggested 3. Operator training Existing Suggested a.b.c.d.Military Industrial On-the-job Combination of a, b, and c (indicate which)4. Licensing required Existin-a a.b.C.d.State Federal Utility or self None Suggested
-r-20-S. Are any foreign gases such as propane, freon, halon, carbon dioxide, etc. stored in the: Diesel Engine room?Yes .,No or adjacent buildings?
Yes _ No If yes, (other than hand portable fire extinguishers), then identify gases and give approximate tank size.3 Gases Volume (ft )T. Does control system automatically bypass, in emergency starting, any engine temporarily out of service for maintenance?
Yes No If yes, then how many failures to bypass have occured?U. Does the control system automatically override the test mode under emergency conditions?
Yes No V. Have repetitive mechanical failures occurred in any component part or subsystem of the engine, generator, or switch gear, etc.?Yes No If yes, then which part or subsystem?
How many failures?Give nature of failure.W. Would periodic (yearly or other) evaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability?
Yes No Give brief reasons for the answer.


-21-X. 1. Give the accumulated time-load operating record for each diesel-generator unit from installation to the present (Running Hours): Preoperational test Date Engine : Surv. Testing & Emergency
2. Surveillance test load (percent of continuous rating)
: Total::Serial 1o. : Maintenance Hrs. : and Other Hours No Load : Loaded : Service Hrs.2. Surveillance test load (percent of continuous rating)3. Give the projected or planned time-load operation for each diesel-generator unit during the next 12 months.:Surveillance
  3. Give the projected or planned time-load operation for each diesel-generator unit during the next 12 months.
& : Emergency
: Total:Maintenance Hrs. : and other : Hours: Service Hrs. : 4. Provide the following summary of the periodic surveillance testing experience:
a.b.c.d.Starting date of surveillance testing (OL date)Periodic test interval ______tests_____
Total number of surveillance tests performed
_Total number of test failures failure to start failure to accept load failure to carry load failures due to operator error failure due to equipment not being operative during emergency conditions
_e. Supply a copy of the surveillance test procedures with this completed questionnaire.


i-22-Additional Comments Y. General Suggestions Briefly give constructive criticism or suggestions as to improvement in reliability of the diesel generators.
:Surveillance & :          Emergency :            Total
      :Maintenance Hrs. :      and other :            Hours
                            : Service Hrs. :
  4. Provide the following summary of the periodic surveillance testing experience:
      a. Starting date of surveillance testing (OL date)
      b.  Periodic test interval ______tests_____
      c.  Total number of surveillance tests performed _
      d.  Total number of test failures failure to start                        failure to accept load failure to carry load                  failures due to operator error failure due to equipment not being operative during emergency conditions          _
      e. Supply a copy of the surveillance test procedures with this completed questionnaire.


These remarks may cover tests, maintenance, Practices, orders, policy, adjustments, etc.}}
i
                                  -22- Additional Comments Y.  General Suggestions Briefly give constructive criticism or suggestions as to improvement in reliability of the diesel generators. These remarks may cover tests, maintenance, Practices, orders, policy, adjustments, etc.}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 01:59, 24 November 2019

NRC Generic Letter 1977-007: Questionnaire Sent Out to Each Operating Reactor Licensee to Be Complete and Provide NRC Data for a Study on the Reliability of Standby Diesel Generators
ML031280314
Person / Time
Issue date: 12/15/1977
From: Goller K
Office of Nuclear Reactor Regulation
To:
References
GL-77-007
Download: ML031280314 (53)


I\

"%..

UNITED STATES

NUCLEAR REGULATORY COMMISSION

w WASHINGTON, D. C. 20555 GL-77-?

' December 15, 1977 All Power Reactor Licensees The demonstrated reliability of standby diesel generator (DG) units in operating nuclear power plants has been less than anticipated.

The NRC has concluded that a systematic review and analysis of operating problems associated with diesel generator units is necessary to establish what practical measures may be taken to enhance the reliability of these units. The NRC, with the assistance of the University of Dayton, has initiated such a study. It is our intent that this study will provide practical results that will prove useful to each nuclear utility, there- fore, each operating reactor licensee is requested to respond to the enclosed questionnaire.

An analysis will be performed on the information received and the results of this analysis, along with recommendations that mnay lead to improved reliability, will be transmitted to licensees and applicants for their use. We believe that this information will assist in identifying as well as avoiding or minimizing operating experiences encountered by others. We view this effort as one of mutual interest.

We ask that a single completed copy of the enclosed questionnaire be returned to the Director of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, by January 20, 1978.

Please include on a separate sheet the name, address and phone number of the person(s) at the reactor site responsible for completing the questionnaire and responsible for responding to any follow-up communi- cations concerning the questionnaire or for arranging a reactor site visit.

The responses to the majority of the questions can be answered with just a few words or by checking the appropriate space. In responding to those questions which do not apply to a particular installation and/or situation, please indicate ¶N/W' for "not applicable". If the question does apply to a particular installation or situation but the answer is not known, please indicate "UN" for "unknown". For those entries on the questionnaire where the requested information is not known by January 20, 1978, please provide it in follow-up correspondence when it becomes available.

- 2 -

Further, the detailed information obtained in this study will be subject to disclosure pursuant to the Freedom on Information Act Regulations as implemented by 10 CFR Part 9 - Public Records.

In the event that any information requested as a part of this study, is considered by you (or your contractor) to be proprietary, it is necessary that you make a written application to withhold such information from public disclosure. Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which address with specificity the items which will be considered by the Commission as listed in subparagraph (b)(4) of Section 2.790 of NRC's

"Rules and Practice", Part 2, Title 10, Code of Federal Regulations.

The information sought 'to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

In the event any portion of the questionnaire needs clarification, please contact F. Clemenson at (301) 492-8077.

This request for generic information was approved by GAO under a blanket clearance number B-180225 (R0072); this clearance expires July 31, 1980.

Sincerely,

,klj A? GoA

Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors Enclosure:

Questionnaire cc w/enclosure:

See next page

Docket No. 50-313 Arkansas Power & Light Company ATTN: Mr. William Cavanaugh, III

Executive Director Generation and Construction Department P. 0. Box 551 Little Rock, Arkansas 722U3 I

cc: Phillip K. Lyon, Esquire House, Holms & Jewell

1550 Tower Building Little Rock, Arkansas 72201 Mr. Daniel H. Williams Manager, Licensing Arkansas Power & Light Company Post Office Box 551 Little Rock, Arkansas 72203 Mr. John W. Anderson, Jr.

Plant Superintendent Arkansas Nuclear One Post Office Box 608 Russellville, Arkansas 72801 Arkansas Polytechnic College Russellville, Arkansas 72801

Docket Nos. 50-317 and 50-318 Baltimore Gas and Electric Company ATTN: Mr. A. E. Lundvall, Jr.

Vice President - Supply P. 0. Box 1475 Baltimore, Maryland 21203 cc: James A. Biddison, Jr.

General Counsel G and E Building Charles Center Baltimore, Maryland 21203 Mr. R. C. L. Olson Baltimore Gas and Electric Company Room 922 - G and E Building Post Office Box 1475 BlItimore, Maryland 21203 Mr. R. M. Douglass, Chief Engineer Calvert Cliffs Nuclear Power Plant Baltimore Gas and Electric Company Lusby, Maryland 20657 Bechtel Power Corporation ATTN: Mr. R. L. Ashley Chief Nuclear Engineer P. 0. Box 607 Gaithersburg, Maryland 20760

Combustion Engineering, Inc.

ATTN: Mr. J. A. Honey Project Manager P. 0. Box 500

Windsor, Connecticut 06095 Calvert County Library Prince Frederick, Maryland 20678

/

Docket No. 50-293 Boston Edison Company M/C NUCLEAR

ATTN: Mr. G. Carl Andognini

800 Boylston Street Boston, Massachusetts 02199 cc: Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360

Anthony Z. Roisman, Esquire Sheldon, Harmon & Roisman

1025 15th Street, N. W., 5th Floor Washington, D. C. 20005 Henry Herrmann, Esquire Massachusetts Wildlife Federation

151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360

Docket No. 50-261 Carolina Power & Light Company ATTN: Mr. J. A. Jones Senior Vice President

336 Fayetteville Street Raleigh, North Carolina 27602 cc: Hartsville Memorial Library Home and Fifth Avenue Hartsville, South Carolina 29550

Docket Nos. 50-325 and 50-324 Carolina Power & Light Company ATTN: Mr. J. A. Jones Executive Vice President

336 Fayetteville Street Raleigh, North Carolina 27602 cc: Richard E. Jones, Esquire Carolina Power & Light Company

336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge

1800 M Street, N. W.

Washington, D. C. 20036 John J. Burney, Jr., Esquire Burney, Burney, Sperry & Barefoot

110 North Fifth Avenue Wilmington, North Carolina 28401 Southport-Brunswick County Library

109 West Moore Street Southport, North Carolina 28461 Docket No. 50-10

Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690

cc: Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 I Morris, Illinois 60450

Docket Nos. 50-237 and 50-249 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690

cc: Morris Public Library

604 Liberty Street Morris, Illinois 60451 Docket Nos. 50-254 and 50-265 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President P. 0. Box 767 Chicago, Illinois 60690

cc: Mr. D. R. Stichnoth President Iowa-Illinois Gas and Electric Company

206 East Second Avenue Davenport, Iowa 52801 Mr. Nick Kalivianakas Plant Superintendent Quad-Cities Nuclear Power Station

22710 - 206th Avenue - North Cordova, Illinois 61242 Moline Public Library

504 - 17th Street Moline, Illinois 61265

Docket Nos. 50-295 and 50-304 Commonwealth Edison Company ATTN: Mr. R. L. Bolger Assistant Vice President Post Office Box 767 Chicago, Illinois 60690

cc: Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Robert J. Vollen, Esquire

109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research & Development Metropolitan Sanitary District of Greater Chicago

100 East Erie Street Chicago, Illinois 60611 Waukegan Public Library

128 North County Street Waukegan, Illinois 60085 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. Donald C. Switzer President Post Office Box 270

Hartford, Connecticut 06101 cc: Day, Berry, & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Russell Library

119 Broad Street Middletown, Connecticut 16457

Docket Nos. 50-3 '-'

and 50-241 Consolidated Edison Company of New York, Inc.

ATTN: Mr. William J. Cahill, Jr.

Vice President

4 Irving Place New York, New York 10003 cc: Leonard M. Trosten, Esquire LeBoeuf, Lamb, Leiby & MacRae

1757 N Street, N. W.

Washington, D. C. 20036 Paul S. Shemin, Esquire Assistant Attorney General State of New York Department of Law Two World Trade Center New York, New York 10047 Sarah Chasis, Esquire Natural Resources Defense Council

122 East 42nd Street New York, New York 10017 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 White Plains Public Library

100 Martine Avenue White Plains, New York 10601 Docket No. 50-286 Consolidated Edison Company of New York, Inc.

ATTN: Mr. William J. Cahill, Jr.

Vice President

4 Irving Place New York, New York 10003 cc: Admiral Paul Early (IP-3)

Power Authority of the State of New York

10 Columbus Circle New York, New York 10019 White Plains Public Library

100 Martine Avenue White Plains, New York 10601

Consumers Power Company ATTN: Mr. David A. Bixel Nuclear Licensing Adminstrator

212 West Michigan Avenue Jackson, Michigan 49201 cc: Charles F. Bayless Of Counsel Consumers Power Company

212 West Michigan Avenue Jackson, Michigan 49201 George C. Freeman, Jr., Esquire Hunton, Williams, Gay and Gibson

700 East Main Street Richmond, Virginia 23212 Peter W. Steketee, Esquire

505 Peoples Building Grand Rapids, Michigan 49503 Charlevoix Public Library

107 Clinton Street Charlevoix, Michigan 49720

Docket No. 50-255 Consumers Power Company ATTN: Mr. Dave Bixel Nuclear Licensing Adminstrator

212 West Michigan Avenue.

Jackson, Michigan 49201 cc: M. I. Miller, Esquire Isham, Lincoln & Beale Suite 4200

One First National Plaza Chicago, Illinois 60670

J. L. Bacon, Esquire Consumers Power Company

212 West Michigan Avenue Jackson, Michigan 49201 Paul A. Perry, Secretary Consumers Power Company

212 West Michigan Avenue Jackson, Michigan 49201 Kalamazoo Public Library

315 South Rose Street Kalamazoo, Michigan 49006 Myron M. Cherry, Esquire Suite 4501 One IBM Plaza Chicago, Illinois 60611

Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. John P. Madgett General Manager

2615 East Avenue, South La Crosse, Wisconsin 54601 cc: Fritz Schubert, Esquire Staff Attorney Dairyland Power Cooperative

2615 East Avenue, South La Crosse, Wisconsin 54601

0. S. Heistand, Jr., Esquire Morgan, Lewis & Bockius

1800 M Street, N. W.

Washington, D. C. 20036 Mr. R. E. Shimshak LaCrosse Boiling Water Reactor Dairyland Power Cooperative P. 0. Box 135 Genoa, Wisconsin 54632 La Crosse Public Library

800 Main Street La Crosse, Wisconsin 54601 Docket Nos. 50-269

50-270

and 50-287 Duke Power Company ATTN: Mr. William 0. Parker, Jr.

Vice President Steam Production Post Office Box 2178

422 South Church Street Charlotte, North Carolina 28242 cc: Mr. William L. Porter Duke Power Company Post Office Box 2178

422 South Church Street Charlotte, North Carolina 28242 J. Michael McGarry, III, Esquire DeBevoise & Liberman

700 Shoreham Building

806 - 15th Street, N. W.

Washington, D. C. 20005 Oconee County Library

201 Scuth Spring Street Walhalla, South Carolina 29691

Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn, Vice President Operations Division

435 Sixth Avenue Pittsburge, Pennsylvania 15219 cc: Karin Carter, Esq.

Special Assistant Attorney General Bureau of Administrative Enforcement

5th Floor, Executive House Harrisburg, Pennsylvania 17120

larvin Fein Utility Counsel City of Pittsburgh

313 City-County Building Pittsburgh, Pennsylvania 15219 Mr. J. M. Cumiskey Stone & Webster Engineering Corporation P. 0. Box 2325 Boston, Massachusetts 02107 Mr. J. D. Woodward R&D Center Westinghouse Electric Corporation Building 7-303 Pittsburgh, Pennsylvania 15230

Mr. Jack Carey Technical Assistant Duquesne Light Company P. 0. Box 4 Shippingport, Pennsylvania 1507, Mr. R. E. Martin Duquesne Light Company

435 6th Avenue Pittsburgh, Pennsylvania 15219 Beaver Area Memorial Library

100 College Avenue Beaver, Pennsylvania 15009

Docket Nos. 50-250

and 50-251 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President P. 0. Box 013100

Miami, Florida 33101 cc: Mr. Jack R. Newman, Esquire Lowenstein, Newman, Reis & Axelrad

1025 Connecticut Avenue, N. W.

Suite 1214 Washington, D. C. 20036 Environmental & Urban Affairs Library Florida International University Miami, Florida 33199 Docket No. 50-335 Florida Power & Light Company ATTN: Dr. Robert E. Uhrig Vice President Nuclear and General Engineering Post Office Box 013100

Miami, Florida 33101 cc: Robert Lowenstein, Esquire Lowenstein, Newman, Reis & Axelrad

1025 Connecticut Avenue, N. IJ.

Washington, D. C. 20036 Norman A. Coll, Esquire McCarthy, Steel, Hector & Davis

14th Floor, First National Bank Building Miami, Florida 33131 Indian River Junior College Library

3209 Virginia Avenue Ft. Pierce, Florida 33450

Docket No. 50-302 Mr. W. P. Stewart Director, Power Production Florida Power Corporation P. 0. Box 14042, Mail Stop C-4 St. Petesburg, Florida 33733 cc: Mr. S. A. Brandimore Vice President and General Counsel P. 0. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629

Docket No. 50-321 Georgia Power Company Oglethorpe Electric Membership Corporation Municipal Electric Association of Georgia City of Dalton, Georgia ATTN: Mr. Charles F. Whetmer Vice President - Engineering Georgia Power Company Atlanta, Georgia 30302 cc: Ruble A. Thonas Vice President P. 0. Box 2625 Southern Services, Inc.

Birmingham, Alabama 35202 Mr. Harry Majors Southern Services, Inc.

300 Office Park Birmingham, Alabama 35202 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. 0. Box 4545 Atlanta, Georgia 30302 Mr. C. P. Moore Georgia Power Company Production Department P. 0. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31513

/

Docket No. 50-315 Indiane & Michigan Electric Company Indiana & M1ichigan Power Company ATTN: Mr. John Tillinghast Vice President P. 0. Box 18 Bowling Green Station New York, New York 10004 cc: Mr. Robert Hunter Vice President American Electric Power Service Corporation

2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittnan, Potts & Trowbridge

1800 M Street, N. W.

Washington, D. C. 20036 Donald Cook Nuclear Plant ATTN: Mr. D. Shaller Plant Manager P. 0. Box 458 Bridgman, Michigan 49106 Mr. David Dinsmore Comey Executive Director Citizens for a Better Environment

59 East Van Buren Street Chicago, Illinois 60605 Maude Reston Palenske Memorial Library

500 Market Street St. Joseph, Michigan 49085 Docket No. 50-331 Iowa Electric Light & Power Company ATTN: Mr. Duane Arnold President P. 0. Box 351 Cedar Rapids, Iowa 52406 cc: Cedar Rapids Public Library

426 Third Avenue, S. E.

Cedar Rapids, Iowa 52401

Docket No. 50-219 Jersey Central Power & Light Company ATTN: Mr. I. R. Finfrock, Jr.

i Vice President - Generation Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960

cc: Steven P. Russo, Esquire

248 Washington Street P. 0. Box 1060

Toms River, New Jersey 08753 Jersey Central Power & Light Company ATTN: Mr. T. Gary Broughton Safety and Licensing Manager GPU Service Corporation

260 Cherry Hill Road Parsippany, New Jersey 07054 Honorable Joseph W. Ferraro, Jr.

Deputy Attorney General State of New Jersey Department of Law & Public Safety Consumer Affairs Section

1100 Raymond Boulevard Newark, New Jersey 07102 Ocean County Library Brick Township Branch

401 Chambers Bridge Road Brick Town, New Jersey 08723 t 4

Docket No. 50-289 Metropolitan Edison Company ATTN: Mr. J. G. Herbein Vice President P. 0. Box 542 Reading, Pennsylvania 19603 cc: GPU Service Corporation Richard W. Heward, Project Manager Mr. T. Gary Broughton, Safety and Licensing Manager

260 Cherry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation

1001 Broad Street Johnstown, Pennsylvania 15907 Miss Mary V. Southard, Chairman Citizens for a Safe Environment P. 0. Box 405 Harrisburg, Pennsylvania 17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)

Harrisburg, Pennsylvania 17126

Docket No. 50-298 Nebraska Public Power District ATTN: Mr. J. M. Pilant, Director Licensing and Quality Assurance P. 0. Box 499 Columbus, Nebraska 68601 cc: Mr. G. D. Watson, General Counsel Nebraska Public Power District P. 0. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer

400 Security Building Phoenix, Arizona 85004 Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P. 0. Box 98 Brownville, Nebraska 68321 Auburn Public Library

118 - 15th Street Auburn, Nebraska 68305 Docket No. 50-220

Niagara Mohawk Power Corporation ATTN: Mr. D. P. Dise Vice President - Engineering

300 Erie Boulevard West Syracuse, New York 13202 cc: Eugene B. Thomas, Jr., Esquire LeBoeuf, Lamb, Leiby & MacRae

1757 N Street, N. W.

Washington, D. C. 20036 Oswego County Office Building

46 E. Bridge Street Oswego, New York 13126

Docket-Nos. 50-245 and 50-336 Northeast Nuclear Energy Company ATTN: Mr. D. C. Switzer President P. 0. Box 270

Hartford, Connecticut 06101 cc: William H. Cuddy, Esquire Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Plant P. 0. Box 128 Waterford, Connecticut 06385 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Docket Nos. 50-282 and 50-306 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services

414 Nicollet Mall - 8th Floor Minneapolis, Minnesota 55401 cc: Mr. F. P. Tierney Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Jocelyn F. Olson, Esquire Special Assistant Attorney General Minnesota Pollution Control Agency

1935 West County Road B-2 Roseville, Minnesota 55113 Mr. Robert L. Nybo, Jr., Chairman Minnesota-Wisconsin Boundary Area Commission

619 Second Street Hudson, Wisconsin 54016 The Environmental Conservation Library Minneapolis Public Library

300 Nicollet Mall Minneapolis, Minnesota 55401

Docket No.750-263 Northern States Power Company ATTN: Mr. L. 0. Mayer, Manager Nuclear Support Services

414 Nicollet Mall - 8th Floor Minneapolis, Minnesota 55401 cc: Arthur Renquist, Esquire Vice President - Law Northern States Power Company

414 Nicol let Mall Minneapolis, Minnesota 55401 Mr. L. R. Eliason Plant Manager Monticello Nuclear Generating Plant Northern States Power Company Monticello, Minnesota 55362 Russell J. Hatling, Chainman Minnesota Environmental Control Citizens Association (MECCA)

Energy Task Force

144 Melbourne Avenue, S. E.

Minneapolis, Minnesota 55414 Mr. Kenneth Dzugan Environmental Planning Consultant Office of City Planner Grace Building

421 Wabasha Street St. Paul, Minnesota 55102 Sandra S. Gardebring Executive Director Minnesota Pollution Control Agency

1935 W. County Road B2 Roseville, Minnesota 55113 Mr. Steve Gadler

2120 Carter Avenue St. Paul, Minnesota 55108 The Environmental Conservation Library Minneapolis Public Library

300 Nicollet Mall Minneapolis, Minnesota 55401

Docket No. 50-285 Omaha Public Power District ATTN: Mr. Theodore E. Short Division Manager - Production Operations

1623 Harney Street Omaha, Nebraska 68102 cc: Margaret R. A. Pardis LeBoeuf, Lamb, Leiby & MacRae

1757 N Street, N. W.

Washington, D. C. 20036 Blair Public Library

1665 Lincoln Street Blair, Nebraska 68008 Docket No. 50-133 Pacific Gas and Electric Company ATTN: Mr. John C. Morrissey Vice President and General Counsel

77 Beale Street San Francisco, California 94106 cc: Philip A. Crane, Jr.

Pacific Gas and Electric Company

77 Beale Street San Francisco, California 94106 Mr. James Hanchett Public Information Officer Region V - IE

U. S. Nuclear Regulatory Commission

1990 N. California Boulevard Walnut Creek, California 94596 Humboldt County Library

636 F Street Eureka, California 95501

Docket Nos. 50-277 and 50-278 Philadelphia Electric Company ATTN: Mr. Edward S. Bauer, Jr., Esquire Vice President and General Counsel

2301 Market Street Philadelphia, Pennsylvania 19101 cc: Eugene Bradley Philadelphia Electric Company Assistant General Counsel

2301 Market Street Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr.

1747 Pennsylvania Avenue, N. W.

Washington, D. C. 20006 Raymend L. Hovis, Esquire

35 South Duke Street Yo rk, Pennsylvania 17401 Warren K. Rich, Esquire Assistant Attorney General Department of Natural Resources Annapolis, Maryland 21401 Philadelphia Electric Company ATTN: Mr. W. T. Ullrich Peach Bottom Atomic Power Station Delta, Pennsylvania 17314 Martin Memorial Library

159 E. Market Street York, Pennsylvania 17401 Hr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company

2301 Market Street Philadelphia, Pennsylvania 19101

Docket No. 50-344 Portland General Electric Company ATTN: Mr. Charles Goodwin, Jr.

Assistant Vice President

621 SW Alder Street Portland, Oregon 97205 cc: Mr. H. H. Phillips Portland General Electric Company

621 Southwest Alder Street Electric Building Portland, Oregon 97205 Warren Hastings, Esquire Phillips, Coughlin, Buell Stoloff and Black

807 Electric Building Portland, Oregon 97205 Mr. J. L. Frewing, Manager Generation Licensing and Analysis Portland General Electric Company

621 Southwest Alder Street Portland, Oregon 97205 Columbia County Courthouse Law Library, Circuit Court Room St. Helens, Oregon 97051

Docket No. 50-333 Power Authority of the State of New York ATTN: Mr. George T. Berry General Manager and Chief Engineer

10 Columbus Circle New York, New York 10019 cc: Lewis R. Bennett, General Counsel Power Authority of the State of New York

10 Columbus Circle New York, New York 10019 Rear Admiral Paul J. Early Assistant Chief Engineer - Projects Power Authority of the State of New York

10 Columbus Circle New York, New York 10019 Manager-Nuclear Operations Power Authority of the State of New York

10 Columbus Circle New York, New York 10019 J. D. Leonard, Jr., Resident Manager James A. FitzPatrick Nuclear Power Plant P. 0. Box 41 Lycoming, New York 13093 Lex K. Larson, Esq.

LeBoeuf, Lamb, Leiby and MacRae

1757 N Street, N. W.

Washington, D. C. 20036 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 Scott B. Lilly, General Counsel Power Authority of the State of New York

10 Columbus Circle New York, New York 10019 Oswego County Office Building

46 E. Bridge Street Oswego, New York 13126

Docket No. 50-272 Public Service Electric & Gas Company ATTN: Mr. R. P. Librizzi General Manager - Electric Production Production Department

80 Park Place, Room 7221 Newark, New Jersey 07101 cc: Richard Fryling, Jr., Esquire Assistant General Counsel Public Service Electric & Gas Company

80 Park Place Newark, New Jersey 07101 Troy B. Conner, Jr., Esquire

1747 Pennsylvania Avenue, N. W.

Washington, D. C. 20006 Gene Fisher Bureau Chief Bureau of Radiation Protection

380 Scotts Road Trenton, New Jersey 08628 State House Annex ATTN: Deputy Attorney General State of New Jersey

36 West State Street Trenton, New Jersey 08625 Attorney General Department of Law & Public Safety State House Annex Trenton, New Jersey 08625 Public Service Electric & Gas Company ATTN: Herbert J. Heller Manager, Salem Nuclear Generating Station Hancocks Bridge, New Jersey 08038 Salem Free Library

112 West Broadway Salem, New Jersey 08079 Public Service Electric 6 Gas Company ATTN: P. L. ?iittl General Manager - Licensing and Environment

80 Park Place Newark, New Jersey 07101

Docket No. 50-244 Rochester Gas & Electric Corporation ATTN: Mr. Leon D. White, Jr.

Vice President Electric and Steam Production

89 East Avenue Rochester, New York 14604 cc: Lex K. Larson, Esquire LeBoeuf, Lanb, Leiby & MacRae

1757 N Street, N. W.

Washington, D. C. 20036 Mr. Michael Slade

1250 Crown Point Drive Webster, New York 14580

Rochester Committee for Scientific Information Robert E. Lee, Ph.D

Post Office Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York 12223 Rochester Public Library

115 South Avenue Rochester, New York 14627 Docket No. 50-312 Sacramento Municipal Utility District ATTN: Mr. J. J. Mattimoe Assistant General Manager and Chief Engineer

6201 S Street P. 0. Box 15830

Sacramento, California 95813 cc: David S. Kaplan, Secretary and General Counsel

6201 S Street P. 0. Box 15830

Sacramento, California 95813 Business and Municipal Department Sacramento City-County Library

828 I Street Sacramento, California 95814

Docket No. 50-206 Southern California Edison Company ATTN: Mr. James H. Drake Vice President

2244 Walnut Grove Avenue Post Office Box 800

Rosemead, California 91770

cc: Rollin E. Woodbury, Vice President and General Counsel Southern California Edison Company Post Office Box 800

Rosemead, California 91770

Chickering & Gregory, General Counsel ATTN: C. Hayden Ames, Esquire San Diego Gas & Electric Company

111 Sutter Street San Francisco, California 94104 Mission Viejo Branch Library

24851 Chrisanta Drive Mission Viejo, California 92676 Docket Nos. 50-259

50-260

and 50-296 Tennessee Valley Authority ATTN: Mr. Godwin Williams, Jr.

Manager of Power

818 Power Building Chattanooga, Tennessee 37201 cc: H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority

400 Commerce Avenue E l1B 33 C

Knoxville, Tenessee 37902 Mr. D. McCloud Tennessee Valley Authority

303 Power Building Chattanooga, Tennessee 37401 fir. William E. Garner Route 4, Box 354 Scottsboro, Alabama 35768 Athens Public Library South and Forrest Athens, Alabama 35611 Mr. C. S. Walker Tennessee Valley Authority

400 Commerce Avenue W 9D199 C

Knoxville, Tennessee 37902

Docket Nos. 50-280

and 50-281 Virginia Electric & Power Company ATTN: Mr. W. L. Proffitt Senior Vice President - Power P. 0. Box 26666 Richmond, Virginia 23261 cc: Michael W. Maupin, Esq.

Hunton, Williams, Gay & Gibson P. 0. Box 1535 Richmond, Virginia 23213 Swem Library College of William & Mary Williamsburg, Virginia 23185 Docket Nos. 50-266 and 50-301 Wisconsin Electric Power Company Wisconsin Michigan Power Company ATTN: Mr. Sol Burstein Executive Vice President

231 West Michigan Street Milwaukee, Wisconsin 53201 cc: Mr. Arthur M. Fish Document Department University of Wisconsin -

Stevens Point Library Stevens Point, Wisconsin 54481 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. E. W. James Senior Vice President Post Office Box 1200

Green Bay, Wisconsin 54305 cc: Steven E. Keane, Esquire Foley, Sammond & Lardner

777 East Wisconsin Avenue Milwaukee, Wisconsin 53202 Bruce W. Churchill, Esquire Shaw, Pittman, Potts & Trowbridge

1800 M Street, N. W.

Washington, D. C. 20036 Kewaunee Public Library

314 Milwaukee Street Kewaunee, Wisconsin 54216

Docket No. 50-29 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer

20 Turnpike Road Westboro, Massachusetts 01581 cc: Mr. Donald G. Allen, President Yankee Atomic Electric Company

20 Turnpike Road Westboro, Massachusetts 01581 Greenfield Public Library

40 Main Street Greenfield, Massachusetts 01581

Docket No. 50-271 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer

20 Turnpike Road Westboro, Massachusetts 01581 cc: Mr. S. D. Karpyak Mr. David M. Scott Vermont Yankee Nuclear Radiation Health Engineer Power Corporation Agency of Human Services

77 Grove Street Division of Occupational Health Rutland, Vermont 05701 P. . Box 607 Barre, Vermont 05641 Mr. Donald E. Vandenburgh Vice President New England Coalition on Vermont Yankee Nuclear Nuclear Pollution Power Corporation Hill and Dale Farm Turnpike Road, Route 9 West Hill - Faraway Road Westboro, Massachusetts 01581 Putney, Vermont 05346 Gregor I. McGregor, Esq. Public Service Board Assistant Attorney General State of Vermont Department of the Attorney General 120 State Street State House, Room 370 Montpelier, Vermont 05602 Boston, Massachusetts 02133 Richard E. Ayres, Esq.

Natural Resources Defense Council

917 - 15th Street,, N. W.

Washington, D. C. 20005 Honorable M. Jerome Diamond Attorney General John A. Calhoun Assistant Attorney General State of Vermont

109 State Street Pavilion Office Building tlontpelier, Vermont 05602 Brooks Memorial Library

224 Main Street Brattleboro, Vermont 05301 John R. Stanton, Director Radiation Control Agency Hazen Drive Concord, New Hampshire 03301 John W. Stevens Conservation Society of Southern Vermont P. 0. Box 256 Townshend, Vermont 05353

Docket No. 50-309 Yankee Atomic Electric Company ATTN: Mr. Robert H. Groce Licensing Engineer

20 Turnpike Road Westboro, Massachusetts 01581 cc: Mr. E. W. Thurlow, President Maine Yankee Atomic Power Company

9 Green Street Augusta, Maine 04330

Mr. Donald E. Vandenburgh Vice President - Engineering Yankee Atomic Electric Company

20 Turnpike Road Westboro, Massachusetts 01581 John A. Ritsher, Esquire Ropes & Gray

225 Franklin Street Boston, Massachusetts 02110

Mr. John M. R. Paterson Assistant Attorney General State of Maine Augusta, Maine 04330

Harold P. Green, Esquire Suite 1000

The Watergate

600 New Hampshire Avenue, N. W.

Washington, D. C. 20037 Mr. Nicholas Barth Executive Director Sheepscot Valley Conservation Association, Inc.

P. O. Box 125 Alna, Maine 04535 Wiscasset Public Library Association High Street Wiscasset, Maine 04578 Mr. Robert R. Radcliffe Office of Energy Resources

55 Capitol Street Augusta, Maine 04330

Mrs. Cali Hollander, President SAFE POWER FOR MAINE

Stockton Springs, Maine 04981

Questionnaire for NUCLEAR REGULATORY COMMISSION

RELIABILITY STUDY

of Standby Diesel Generator Units Date Questionnaire Completed:

Plant Name: Unit No.

Diesel Manufacturer: Model:

Number of Units:

Size Kw/Unit: Rated Speed:

Average Operating Hours Per Unit to Date:

DIESEL GENERATOR STATUS

A. Engine:

'I. Problems are caused chiefly by (give estimated number)

a. Defective parts b. Installation errors:

c. Failure of system to respond properly in function or sequence:

d. Faulty adjustment:

2. Would more stringent inspection and testing requirements during acceptance or preoperational tests significantly improve the diesel-generator power plant performance?

Yes No B. Starting Systems (indicate which):

1. Air-to-cylinder cranking.

Air cranking motor Mfr. Model No.

Electric cranking motor Mfr. Model No.

-2-

2. If air cranking, then:

Give size of starting air tank: Length Diameter Normal standby air tank pressure psi.

Is pressure reducer used? Yes No Reducer pipe size? inches.

Starting air control admission valve pipe size in air piping system, inches.

Minimum air tank pressure for engine cranking psi.

Number of five-second cranking periods between above pressures with no tank recharging Number of air tanks per engine _

Can starting air tanks serve more than one engine?

Yes No Is air pipe to engine from top of air tank? Yes No Does starting air tank have water condensate drain?

Yes No Does starting air pipe have water condensate trap and drain near engine? Yes _ No Is starting air piping horizontal? Yes No Does it slant toward drain? Yes No If water condensate drains are provided, then is draining:

a. Automatic through float valve? Yes _ No b. Manual by hand valve? Yes _ No c. If manual, then is draining water condensate done:

-3- daily?

weekly?

monthly?

before each start if manual?

no procedure?

Is dirt and rust filter provided in starting air pipe?

Yes _ No _

If provided, where installed?

How is it cleaned?

How often and when?

Give pipe size of filter: inches.

How is it known whether filter is plugged or has high Dressure drop? _ .__

Is starting air pipe to engine positioned:

a. Below floor?

b. On the floor?

c. Overhead?

What is air pressure drop from air tank to engine during cranking __ psi Give approximate length (nearest ten feet) of starting air pipe for individual engine or all engines from air tank to:

a. Nearest engine feet b. Furthest engine -feet

-4- Diameter of starting air pipe from:

a. Air tank to starting valve inches b. At air starting valve inches c. At engine inches What is the primary source of power for the starting air system?

Is there a duplicate and redundant motor and air compressor set? Yes No What is the time required to recharge one air tank?

minutes Does starting air supply system have independent secondary power supply for compressor? Yes No _

If yes, then by:

a. Gasoline engine?

b. Motor driven?

c. Other? (SpecifyF_ _ _

3. If electric (Battery powered) cranking, then:

a. Battery charging: Continuous trickle charger Intermittent charging If so, how is charging requirement determined?

-Time cycle Test Other =

b. Battery used: Common Plant Individual Unit Other Starting cable size  ; Length: Battery to engine (longest)

-5- C. Fuel Oil System: Bulk Tank to Day Tank

1. Does the bulk tank to day tank fuel supply system (viz:

pump, motor, etc.) have redundant independent power supplies? Yes No Does this system have a hand-operated emergency fuel pump? Yes No If yes, is this hand-operated pump and piping in immediate operating condition? Yes No

2. Is there a water and sediment drain from the very bottom of the:

a. Bulk tank? Yes No b. Day tank? Yes _ No

3. Is the reqular functional fuel oil outlet slightly above (two to three inches) the bottom of the:

a. Bulk tank? Yes _ No b. Day or integral tank? Yes _ No

4. Is bottom of day tank and/or integral tank above all parts and piping of the enqine fuel injection systems?

Yes No If yes, Give approximate amount inches feet

5. Does the engine fuel system have a fuel bleed return line to the fuel day tank and/or integral tank?

Yes No During extended operation, such as more than two to three hours, does the fuel in the day tank become: (yes or no)

a. Warm?

b. Hot? (above 1300 F)

-6- What is fuel oil return line size (nominal)?

a. Pipe size _ inches b. Tubing size inches

6. Do engine fuel oil filters have air bleed or vent valves readily accessible? Yes No

7. How is fuel transferred from day tank to engine fuel system?

a. By gravity b. Engine driven pump c. Electric motor driven pump d. Is a manual pump also provide-dfor injection system filling and/or air venting after servicing or replacement of parts in the fuel injection system? Yes No If yes, is the manual pump in immediate operating condition?

Yes No

8. Type of fuel (e.g., #1, #2, #3, JP-4, etc.)

9. Approximate bulk tank capacity, gallons.

10. Typical frequency of refilling (weekly, monthly, etc.) _

11. Typical refill (gallons),

D. Lube Oil System

1. Lube oil a. Type b. Viscosity_

c. Specification number d. Oil change determined by:

Time interval: Yes No Give interval monthly, yearly By oil analysis: Yes No

-7-

2. Lube oil filters are:

a. Full flow b. Bypass C. Combination filter cartridge:

3. Interval and/or basis for changing a. Monthly b. Yearly c. By running time hours d. By oil analysis. Yes - No e. By pressure drop. Yes No Does provisions exist for changing cartridges during f.

engine operation? Yes No

4. Oil Pressure Monitoring a. Normal operating pressure psi b. Alarm psi c. Shutdown psi

5. Oil temperature control:

OF.

a. By standby heater in engine sump standby temperature:

b. Heating means for maintaining Direct in oil Oil-to-water heat exchanger Other (Specify)_

E. Cooling System - Engine Water

1. Temperature control by:

a. By thermostat in water? Yes No If yes, then:

Bypass thermostat? Yes No Throttle thermostat? Yes No

-8- b. By radiator shutter:

Automatic Manual Other (give type)

2. Corrosion control (water additive)? Yes No If yes, give chemical additive or name of compound.

Proportion or concentration control:

a. By additive measurement? Yes No b. By water coolant analysis? Yes _ No

3. Engine cooling water cooled by:

a. Radiator?

b. Heat exchanger from sea, river or other water?

c. Other? (give type) _ -

4. Engine cooling water temperature-monitoring a. Standby temperature OF

b. Normal operating temperature 0F

c. Alarm temperature _ OF-_

d. Shutdown temperature OF

e. Water circulation during standby:

Thermo-syphon Pump

5. Water Pressure Monitoring: Yes No a. Alarm b. Shutdown c. Both _

-9-

6. Water temperature Sensor Position:

a. In piping from engine b. In engine piping c. In engine direct

7. Water surge or supply tank in system. Yes - 1o If yes, then bottom connected to:

a. Water pump suction? Yes No b. Top of system? Yes - V0

c. Both of above? Yes No d. Is bottom of surge tank above top of engine system? Yes No e. Does engine have constant air bleed from top of engine water piping to surge or supply tank?

Yes No f. Give size of bleed or vent line, inches.

g. Manual air bleed only? Yes _ No -

F. Governor - Speed Control Manufacturer Electric (speed sensing)

Hydraulic Type or code (such as EGR-35, LSG-10, etc.)

Automatic load sharing? Yes No of

1. Is compensation or stability control and/or speed response manually adjustable? Yes No If yes, adjusted by:

a. Eye and ear?

b. Test and specification?

c. Other? (Specify)

means

2. Engine - generator normal shutdown or stopping and method.

-10-

Is the engine stopped:

a. Manually? Yes No If yes, then:

Directly at engine? Yes No Through local control panel? Yes _ No b. Automatically through the controls in the control room? Yes _ No c. By setting governor to "fuel-off" position?

Yes No _

d. By over-ride of governor settings and control position directly to fuel injection pumps?

Yes No e. Other means. Describe briefly. i

3. When engine is stopped, is fuel control in:

a. Full fuel or maximum fuel position?

b. Full off or no fuel position?

c. Intermediate?

d. Random?

(If not consistent and typical in above, then give the usual.)

4. When starting from the standby condition after shutdown for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, give number of seconds from start- to-crank to full fuel or maximum fuel position of governor and fuel control, seconds.

- v

-1 1- G. Governor - Overspeed (shutdown)

1. Speed sensing?

a. Electrical b. Flyball c. Other (Specify)

2. Fuel shutoff force generated by:

a. Spring?

b. Air?

c. Hydraulic?

d. Electrical?

e. Other? (SpeciTUF_____ __

3. Overspeed sensing setting? (in terms of full speed)

a. 115%

b. 110%

c. Other pecify)

4. Is overspeed tripping set point tested periodically?

Yes No If yes, then how often? (yearly, monthly, etc.)

H. 1. Generator Mfr. Model No.

Single bearing or two bearings?

Does generator have damper windings? Yes No

2. Does generator have any obvious fault or difficulty?

Yes No -

Is problem repetitive? Yes No If yes, then describe briefly.

-12- I. Exciter and Voltage Regulator

1. Exciter Manufacturer: Model Type: Rotating Static If rotating drive? Direct Belt or Chain DC with field control Brushless with rectifier

2. Voltage Regulator: Manufacturer Model _

Type: Mechanical Static

3. Are paralleled units of automatic load sharing control of fully automatic type? Yes No If yes, has any obvious influence or interrelationship been noted between the stability and response time of the engine governor and the stability and voltage control of the generators? Yes _ No

4. Have engine governor and voltage regulator/exciter adjustments been made on the site or under any con- ditions since any of the units have been placed in service? Yes No If yes, by means of what tests and what standards?

Give name or very brief description.

5. If any difficulties have occurred, give approximate number of problems.

a. Components b. Wiring c. Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)

-13- J. Paralleling: Engine-Generator Units

1. Do all units consistently have the proper voltage output?

Yes - No

2. Do all units automatically share both the "real" or in-phase load and also the reactive load reasonably well? Yes No _

3. At the same Kw load, are both the field and the armature line currents of the several units consistently close to the same value? Yes No If no, approximate percent difference.

4. Synchronizinq a. In automatic synchronizing do circuit breakers close immediately after reaching full synchronous speed?

Yes No _

b. If "no" above then, does speed of some units drift slowly while failing to synchronize and close circuit breakers?

How many seconds?

Occasionally Always Never K. Switch Gear and Electrical Con (other than exciter/

voltage regulator)

1. If any difficulties have occurred, then give approximate number of problems.

a. Components b. Wirina c. Other (damage in service or dropping of miscellaneous hardware into switchboard, etc.)

d. Design concept faults. That is, does the switch gear and its controls perform the proper functions and in proper sequence and timing.

-14-

2. a. Do the on-site diesel generator units and related support equipment have any storage battery power systems for any service whatsoever? Yes No b. Identify each storage battery power system associated with the on-site diesel generator unit and its function. _

c. Does each system identified above adequately fulfill the service requirements for which it is intended?

Yes No If no, briefly describe.

d. Is there a DG battery maintenance program? Yes No L. Safety Shut downs Give safety shut down settings compared to equilibrium operating conditions.

1. Engine and generator speed. Give rpm or hertz:

a. Synchronous and usual rpm or Hz b. Overspeed shutdown setting rpm or Hz

2. Engine cooling water (see E.4)

a. Equilibrium OF

b. Alarm OF

c. Shut down OF

3. Lube oil pressure (see D.4)

a. Equilibrium psi b. Alarm _ psi c. Shut down _ psi

-15-

4. Lube oil temperature a. Equilibrium OF

b. Alarm OF

c. Shutdown OF

5. Indicate all other protective interlocks (give name and;)

a. Usual or proper condition b. Shutdown condition

6. a. What source of power is provided to operate alarms and shutdown controls? (See G.2)

b. Do the generator units automatically shutdown in case of the electrical power loss to its control system? Yes No M. Emergency or Alert Conditions

1. Are all safety shutdown and safety interlocks bypassed during emergency conditions? Yes No

2. If "no" above, then which are not bypassed. Name items.

3. For each interlock not bypassed is coincident logic used? Yes No If yes, is it testable? Yes No N. Maintenance

1. Does plant have reqularly scheduled maintenance pro- cedures?

If so, return copy of these procedures with questionnaire.

-16-

2. When need for minor adjustments obviously exists, then:

a. Is remedial action taken immediately or at earliest practical opportunity? Yes No b. Is remedial action taken only at periodic prescheduled or programmed times and conditions? Yes .,No c. For best performance record which of above appears better:

immediate or early action?

as scheduled only?

d. Must permission for minor maintenace be obtained from some higher out-of-plant authority? Yes No e. Is maintenance referred to above allowed and encouraged?

Yes No f. In periodic surveillance tests, simulated alert standby tests, etc., is the criteria "pass/not pass" the test used? Yes No g. Is there a conscious continuing policy to detect and remedy marginal conditions or imminent trouble: for examples: lube oil pressure shutdown only two to five psi below operating pressure or, perhaps overspeed governor setting only one or two percent above starting speed surge or etc.? Yes No h. Are efforts to remedy marginal or questionable conditions as mentioned above encouraged by plant management?

Yes No i. Are remedial steps on items similar to the above taken or allowed when the unit has started and operated satisfactorily within specified limits or conditions?

Yes No

0. Starting Conditions

1. Give starting or necessary cranking time as experienced.

a. Starting time per specification seconds b. Usual starting time seconds c. Maximum starting time observed seconds

-17-

2. Give usual time intervals as follows:

of any a. Time from start-to-crank to first firing cylinder. seconds firing b. Time from start-to-crank to approximate full of all cylinders. seconds both tachometer

3. Give maximum speed surge when starting; use and frequency meter if possible.

a. Usual conditions _rpm Hz b. Maximum observed rpm Hz start-to-crank

4. During a surveillance test, give time from speed is attained and maintained.

to when steady synchronous a. Usual seconds b. Maximum seconds c. As specified seconds.

in starting.

5. Give briefly the most troublesome problems a. Most troublesome b. Next to most troublesome P. Air Cleaner or Air Filter - Combustion Air or inside

1. Combustion air source: taken from engine room the building, or from outdoors?

a. Indoors b. Outdoors r

-18-

2. Give type and make of air cleaners or air filters:

a. Oil bath lMake b. Oil wetted screen Hlake c. Paper Make d. Other _lake e. Precleaner: Yes No

3. Excessive air flow restriction and servicing need determined by?

a. Instrument such as:

manometer If other give type b. Personal judgement by appearance, etc.

c. By smoking exhaust d. Time schedule e. Other (SpecifyT) _ _ _ _

4. Are climatic extremes normally experienced such as:

a. Air heavily loaded with water mist, high humidity and low temperature? Yes No b. Blowing sand and dust? Yes _ No _

c. Blowing snow (blizzards)? Yes No d. Other-Name

5. Are climatic extremes potentially possible such as:

a. Air heavily loaded with water mist, high humidity and low temperature? Yes No b. Blowing sand and dust? Yes No c. Blowing snow (blizzards)? Yes No d. Other-Name _

Q. Temperature Conditions

1. Ambient outside hottest "F.

2. Ambient outside coldest "F.

3. Engine-generator room hottest OF.

4. Engine-generator room coldest OF.

5. Inside switch gear hottest

-19- R. Operator Qualifications (as presently exists, and suggested minimums if different)

1. Minimum education required (check)

Existing Suggested a. High School b. Trade School C. Technical School d. No minimum

2. Minimum Years of operating experience (diesel electric generator)

Existing Suggested a. 0-3 b. 3-6 c. 6-10

d. 10-15

3. Operator training Existing Suggested a. Military b. Industrial c. On-the-job d. Combination of a, b, and c (indicate which)

4. Licensing required Existin-a Suggested a. State b. Federal C. Utility or self d. None

- r

-20-

S. Are any foreign gases such as propane, freon, halon, carbon dioxide, etc. stored in the: Diesel Engine room?

Yes .,No or adjacent buildings? Yes _ No If yes, (other than hand portable fire extinguishers), then identify gases and give approximate tank size.

3 Gases Volume (ft )

T. Does control system automatically bypass, in emergency starting, any engine temporarily out of service for maintenance? Yes No If yes, then how many failures to bypass have occured?

U. Does the control system automatically override the test mode under emergency conditions? Yes No V. Have repetitive mechanical failures occurred in any component part or subsystem of the engine, generator, or switch gear, etc.?

Yes No If yes, then which part or subsystem?

How many failures?

Give nature of failure.

W. Would periodic (yearly or other) evaluation and/or testing by "outside experts" contribute significantly to the diesel- generator reliability? Yes No Give brief reasons for the answer.

-21- X. 1. Give the accumulated time-load operating record for each diesel-generator unit from installation to the present (Running Hours):

Preoperational test Date Engine  : Surv. Testing & Emergency  : Total:

Serial 1o. : Maintenance Hrs.  : and Other Hours No Load : Loaded : Service Hrs.

2. Surveillance test load (percent of continuous rating)

3. Give the projected or planned time-load operation for each diesel-generator unit during the next 12 months.

Surveillance & : Emergency : Total
Maintenance Hrs. : and other : Hours
Service Hrs. :

4. Provide the following summary of the periodic surveillance testing experience:

a. Starting date of surveillance testing (OL date)

b. Periodic test interval ______tests_____

c. Total number of surveillance tests performed _

d. Total number of test failures failure to start failure to accept load failure to carry load failures due to operator error failure due to equipment not being operative during emergency conditions _

e. Supply a copy of the surveillance test procedures with this completed questionnaire.

i

-22- Additional Comments Y. General Suggestions Briefly give constructive criticism or suggestions as to improvement in reliability of the diesel generators. These remarks may cover tests, maintenance, Practices, orders, policy, adjustments, etc.

Template:GL-Nav