RIS 2004-10, Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/14/2004
| issue date = 06/14/2004
| title = Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations
| title = Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations
| author name = Beckner W D
| author name = Beckner W
| author affiliation = NRC/NRR/DIPM/IROB
| author affiliation = NRC/NRR/DIPM/IROB
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 8
| page count = 8
}}
}}
{{#Wiki_filter:Withdrawn   NRC Regulatory Issue Summary 2004
{{#Wiki_filter:Withdrawn NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations, dated June 14, 2004, has been withdrawn.
-10, "Preparation and Scheduling of Operator Licensing Examinations," dated June 14, 2004, has been withdrawn.


ADAMS Accession Number: ML041400040
ADAMS Accession Number: ML041400040
  See Federal Register notice 81 FR 31969, dated May 20, 2016 OMB Clearance No.: 3150-0131UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555-0001June 14, 2004NRC REGULATORY ISSUE SUMMARY 2004-10PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS
  See Federal Register notice 81 FR 31969, dated May 20, 2016
 
OMB Clearance No.: 3150-0131 UNITED STATES
                              NUCLEAR REGULATORY COMMISSION
                        OFFICE OF NUCLEAR REACTOR REGULATION
                                  WASHINGTON, D.C. 20555-0001 June 14, 2004 NRC REGULATORY ISSUE SUMMARY 2004-10
                        PREPARATION AND SCHEDULING OF
                      OPERATOR LICENSING EXAMINATIONS


==ADDRESSEES==
==ADDRESSEES==
All holders of operating licenses for nuclear power reactors, except those who havepermanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


==INTENT==
==INTENT==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)to inform addressees of the NRC staff's need for updated information on projected site-specific operator licensing examination schedules and the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs). This information will help the NRC to more effectively plan the use of its resources.
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)
to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules and the estimated numbers of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations (GFEs). This information will help the NRC to more effectively plan the use of its resources.


This RIS requires no action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.
This RIS requires no action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.


==BACKGROUND==
==BACKGROUND==
On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending10 CFR Part 55, "Operators' Licenses," to allow nuclear power facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41 and 55.43, provided certain conditions are satisfied. The amendment also allows facility licensees to prepare the NRC-administered operating tests required by 10 CFR 55.45. Pursuant to 10 CFR 55.40(c),
On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending
facility licensees that elect not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examination and the operating tests.Regulatory Information Summary (RIS) 2003-14, "Preparation and Scheduling of OperatorLicensing Examinations," issued August 27, 2003, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2004 through 2007. This RIS supersedes RIS 2003-14; the objective is to update examination schedules and applicant estimates for CYs 2005 through 2007 and add an estimate for CY 2008.
10 CFR Part 55, Operators Licenses, to allow nuclear power facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41 and 55.43, provided certain conditions are satisfied. The amendment also allows facility licensees to prepare the NRC-administered operating tests required by 10 CFR 55.45. Pursuant to 10 CFR 55.40(c),
facility licensees that elect not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examination and the operating tests.
 
Regulatory Information Summary (RIS) 2003-14, Preparation and Scheduling of Operator Licensing Examinations, issued August 27, 2003, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2004 through 2007. This RIS supersedes RIS 2003-14; the objective is to update examination schedules and applicant estimates for CYs 2005 through 2007 and add an estimate for CY 2008.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
The NRC uses about twice the resources to prepare an examination as it does to review,approve, administer, and document a facility-prepared examination. Furthermore, the total number of examinations administered by licensees fluctuates from year to year. Consequently, the NRC has found it helpful to request an annual update of power reactor facility licensees
The NRC uses about twice the resources to prepare an examination as it does to review, approve, administer, and document a facility-prepared examination. Furthermore, the total number of examinations administered by licensees fluctuates from year to year. Consequently, the NRC has found it helpful to request an annual update of power reactor facility licensees initial operator licensing examination needs. The update should include an estimate of the number of applicants to be examined and whether the licensee or the NRC will prepare the exam. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.
'initial operator licensing examination needs. The update should include an estimate of the number of applicants to be examined and whether the licensee or the NRC will prepare the exam. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility
 
licensees.The NRC requests that each licensee provide the following information on NRC Form 536,"Operator Licensing Examination Data
" (Attachment 1):A.  Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and estimate the number ofexaminations you will request the NRC to prepare during CYs 2005 through 2008.  For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless otherwise specified (joint NRC/licensee examination development is permitted and should be coordinated with the NRC regional office).    B.  Initial Operator License Examinations 


For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2008. C.  Proposed Generic Fundamentals Examination Schedule
The NRC requests that each licensee provide the following information on NRC Form 536, Operator Licensing Examination Data (Attachment 1):
A. Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and estimate the number of examinations you will request the NRC to prepare during CYs 2005 through 2008. For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless otherwise specified (joint NRC/licensee examination development is permitted and should be coordinated with the NRC regional office).
B. Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2008.


Estimate by examination month the number of applicants who plan to take the GFE in CYs
C. Proposed Generic Fundamentals Examination Schedule Estimate by examination month the number of applicants who plan to take the GFE in CYs
2005 and 2006. As requested by the industry, the GFE will be administered 4 times a year starting in CY 2004.
2005 and 2006. As requested by the industry, the GFE will be administered 4 times a year starting in CY 2004.


==VOLUNTARY RESPONSE==
==VOLUNTARY RESPONSE==


==Addressees==
==Addressees==
that choose to submit the information identified in NRC Form 536 are asked to doso within 30 days of receiving this RIS. NRC Form 536 is available on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/forms/. Your response should be directed to theU.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC  
that choose to submit the information identified in NRC Form 536 are asked to do so within 30 days of receiving this RIS. NRC Form 536 is available on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/forms/. Your response should be directed to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC
20555-0001, and a copy of the response should be sent to the applicable regional office.
20555-0001, and a copy of the response should be sent to the applicable regional office.


==BACKFIT DISCUSSION==
==BACKFIT DISCUSSION==
This RIS requires no action or written response. Any action on the part of addressees to collectand transmit operator licensing examination data in accordance with the guidance in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.
This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the guidance in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
A notice of opportunity for public comment on this RIS was not published in the FederalRegister because it pertains to an administrative aspect of the regulatory process and involvesthe voluntary submission of information by addressees.
A notice of opportunity for public comment on this RIS was not published in the Federal Register because it pertains to an administrative aspect of the regulatory process and involves the voluntary submission of information by addressees.


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS contains information collection requirements that are subject to the PaperworkReduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0131, which expires July 31, 2005. The burden to the public for this voluntary information collection is estimated to average 1 hourper response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Public Protection NotificationThe NRC may not conduct or sponsor, and a person is not required to respond to, a request forinformation or an information collection requirement unless the requesting document displays a currently valid OMB control number. If you have any questions about this matter, please contact one of the technical contacts listedbelow or the appropriate Office of Nuclear Reactor Regulation project manager. /RA/ William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor RegulationTechnical Contacts: David C. Trimble, NRRRichard J. Conte, RI         301-415-2942610-337-5183 E-mail: dct@nrc.govE-mail: rjc@nrc.gov Michael E. Ernstes, RIIRoger D. Lanksbury, RIII 404-562-4638630-829-9631 E-mail: mee@nrc.govE-mail: rdl@nrc.gov Anthony T. Gody, RIV 817-860-8159 E-mail: atg@nrc.gov Attachments:1. NRC Form 536, "Operator Licensing Examination Data
This RIS contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0131, which expires July 31, 2005.
"2. List of Recently Issued NRC Regulatory Issue Summaries
 
The burden to the public for this voluntary information collection is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
 
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.
 
/RA/
                                              William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation Technical Contacts: David C. Trimble, NRR                    Richard J. Conte, RI
                      301-415-2942                            610-337-5183 E-mail: dct@nrc.gov                    E-mail: rjc@nrc.gov Michael E. Ernstes, RII                Roger D. Lanksbury, RIII
                      404-562-4638                            630-829-9631 E-mail: mee@nrc.gov                    E-mail: rdl@nrc.gov Anthony T. Gody, RIV
                      817-860-8159 E-mail: atg@nrc.gov Attachments:
1. NRC Form 536, Operator Licensing Examination Data
2. List of Recently Issued NRC Regulatory Issue Summaries
 
ML041400040
  OFFICE    IROB:DIPM    Tech Editor  SC:IOHS:IROB:DIPM        OES:IROB:DIPM      PIMB:PMAS:NRR
  NAME      EBarnhill*  PKleene*      DCTrimble*              CDPetrone*        DMcCain DATE      05/19/2004  05/18/2004    05/19/2004              05/19/2004        05/19/2004 OFFICE    OCIO        OGC          (A)SC:OES:IROB:DIPM C:IROB:DIPM
  NAME      BShelton    MItzkowitz    CPJackson                WDBeckner DATE      05/27/2004  06/07/2004    06/09/2004              06/14/2004
 
Attachment 1 Attachment 2 LIST OF RECENTLY ISSUED
                                  NRC REGULATORY ISSUE SUMMARIES
_____________________________________________________________________________________
Regulatory Issue                                            Date of Summary No.                  Subject                      Issuance                Issued to
_____________________________________________________________________________________
2004-09          Status on Deferral of Active              06/07/2004 All holders of materials licenses for Regulation of Ground-water                            uranium and thorium recovery Protection At In Situ Leach                          facilities.
 
Uranium Extraction Facilities
2004-08          Results of the License Termination        05/28/2004 All holders of operating licenses Rule Analysis                                        for nuclear power reactors, research and test reactors, as well as decommissioning sites.
 
2004-07          Release of Final Review Standard          05/19/2004 All holders of operating licenses (RS)-002, Processing                                for nuclear power reactors, all Applications for Early Site Permits                  applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.
 
2004-06          Independent Survey of Power                04/16/2004 All holders of operating licenses Reactor Licensees                                    for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


ML041400040OFFICEIROB:DIPMTech EditorSC:IOHS:IROB:DIPMOES:IROB:DIPMPIMB:PMAS:NRRNAMEEBarnhill*PKleene*DCTrimble*CDPetrone*DMcCainDATE05/19/200405/18/200405/19/200405/19/200405/19/2004OFFICEOCIOOGC(A)SC:OES:IROB:DIPMC:IROB:DIPMNAMEBSheltonMItzkowitzCPJacksonWDBecknerDATE05/27/200406/07/200406/09/200406/14/2004 Attachment 1 ______________________________________________________________________________________OL = Operating License
2004-05          Grid Reliability and the Impact on        04/15/2004 All holders of operating licenses Plant Risk and the Operability of                    for nuclear power reactors except Offsite Power                                        those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


CP = Construction PermitAttachment 2 LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES
Note:             NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:
_____________________________________________________________________________________Regulatory Issue  Date of Summary No.      Subject  IssuanceIssued to
                  To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:
_____________________________________________________________________________________2004-09Status on Deferral of ActiveRegulation of Ground-water Protection At In Situ Leach Uranium Extraction Facilities06/07/2004All holders of materials licenses foruranium and thorium recovery facilities.2004-08Results of the License TerminationRule Analysis05/28/2004All holders of operating licensesfor nuclear power reactors, research and test reactors, as well as decommissioning sites.2004-07Release of Final Review Standard(RS)-002, "ProcessingApplications for Early Site Permits
                                    subscribe gc-nrr firstname lastname
"05/19/2004All holders of operating licensesfor nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.2004-06Independent Survey of PowerReactor Licensees04/16/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-05Grid Reliability and the Impact onPlant Risk and the Operability of Offsite Power04/15/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
______________________________________________________________________________________
OL = Operating License CP = Construction Permit
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Latest revision as of 02:08, 24 November 2019

Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations
ML041400040
Person / Time
Issue date: 06/14/2004
From: Beckner W
NRC/NRR/DIPM/IROB
To:
References
OMB-3150-0131 RIS-04-010
Download: ML041400040 (8)


Withdrawn NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations, dated June 14, 2004, has been withdrawn.

ADAMS Accession Number: ML041400040

See Federal Register notice 81 FR 31969, dated May 20, 2016

OMB Clearance No.: 3150-0131 UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001 June 14, 2004 NRC REGULATORY ISSUE SUMMARY 2004-10

PREPARATION AND SCHEDULING OF

OPERATOR LICENSING EXAMINATIONS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules and the estimated numbers of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations (GFEs). This information will help the NRC to more effectively plan the use of its resources.

This RIS requires no action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.

BACKGROUND

On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending

10 CFR Part 55, Operators Licenses, to allow nuclear power facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41 and 55.43, provided certain conditions are satisfied. The amendment also allows facility licensees to prepare the NRC-administered operating tests required by 10 CFR 55.45. Pursuant to 10 CFR 55.40(c),

facility licensees that elect not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examination and the operating tests.

Regulatory Information Summary (RIS) 2003-14, Preparation and Scheduling of Operator Licensing Examinations, issued August 27, 2003, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2004 through 2007. This RIS supersedes RIS 2003-14; the objective is to update examination schedules and applicant estimates for CYs 2005 through 2007 and add an estimate for CY 2008.

SUMMARY OF ISSUE

The NRC uses about twice the resources to prepare an examination as it does to review, approve, administer, and document a facility-prepared examination. Furthermore, the total number of examinations administered by licensees fluctuates from year to year. Consequently, the NRC has found it helpful to request an annual update of power reactor facility licensees initial operator licensing examination needs. The update should include an estimate of the number of applicants to be examined and whether the licensee or the NRC will prepare the exam. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.

The NRC requests that each licensee provide the following information on NRC Form 536, Operator Licensing Examination Data (Attachment 1):

A. Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and estimate the number of examinations you will request the NRC to prepare during CYs 2005 through 2008. For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless otherwise specified (joint NRC/licensee examination development is permitted and should be coordinated with the NRC regional office).

B. Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2008.

C. Proposed Generic Fundamentals Examination Schedule Estimate by examination month the number of applicants who plan to take the GFE in CYs

2005 and 2006. As requested by the industry, the GFE will be administered 4 times a year starting in CY 2004.

VOLUNTARY RESPONSE

Addressees

that choose to submit the information identified in NRC Form 536 are asked to do so within 30 days of receiving this RIS. NRC Form 536 is available on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/forms/. Your response should be directed to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC

20555-0001, and a copy of the response should be sent to the applicable regional office.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the guidance in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because it pertains to an administrative aspect of the regulatory process and involves the voluntary submission of information by addressees.

PAPERWORK REDUCTION ACT STATEMENT

This RIS contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0131, which expires July 31, 2005.

The burden to the public for this voluntary information collection is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.

/RA/

William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation Technical Contacts: David C. Trimble, NRR Richard J. Conte, RI

301-415-2942 610-337-5183 E-mail: dct@nrc.gov E-mail: rjc@nrc.gov Michael E. Ernstes, RII Roger D. Lanksbury, RIII

404-562-4638 630-829-9631 E-mail: mee@nrc.gov E-mail: rdl@nrc.gov Anthony T. Gody, RIV

817-860-8159 E-mail: atg@nrc.gov Attachments:

1. NRC Form 536, Operator Licensing Examination Data

2. List of Recently Issued NRC Regulatory Issue Summaries

ML041400040

OFFICE IROB:DIPM Tech Editor SC:IOHS:IROB:DIPM OES:IROB:DIPM PIMB:PMAS:NRR

NAME EBarnhill* PKleene* DCTrimble* CDPetrone* DMcCain DATE 05/19/2004 05/18/2004 05/19/2004 05/19/2004 05/19/2004 OFFICE OCIO OGC (A)SC:OES:IROB:DIPM C:IROB:DIPM

NAME BShelton MItzkowitz CPJackson WDBeckner DATE 05/27/2004 06/07/2004 06/09/2004 06/14/2004

Attachment 1 Attachment 2 LIST OF RECENTLY ISSUED

NRC REGULATORY ISSUE SUMMARIES

_____________________________________________________________________________________

Regulatory Issue Date of Summary No. Subject Issuance Issued to

_____________________________________________________________________________________

2004-09 Status on Deferral of Active 06/07/2004 All holders of materials licenses for Regulation of Ground-water uranium and thorium recovery Protection At In Situ Leach facilities.

Uranium Extraction Facilities

2004-08 Results of the License Termination 05/28/2004 All holders of operating licenses Rule Analysis for nuclear power reactors, research and test reactors, as well as decommissioning sites.

2004-07 Release of Final Review Standard 05/19/2004 All holders of operating licenses (RS)-002, Processing for nuclear power reactors, all Applications for Early Site Permits applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.

2004-06 Independent Survey of Power 04/16/2004 All holders of operating licenses Reactor Licensees for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2004-05 Grid Reliability and the Impact on 04/15/2004 All holders of operating licenses Plant Risk and the Operability of for nuclear power reactors except Offsite Power those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

Note: NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:

To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:

subscribe gc-nrr firstname lastname

______________________________________________________________________________________

OL = Operating License CP = Construction Permit