| {{#Wiki_filter:m w-Opp" Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 Employment with Equal Opportunity January 20, 2006 LIC-06-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 | | {{#Wiki_filter:w-Opp"m Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 Employment with Equal Opportunity January 20, 2006 LIC-06-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 |
|
| |
|
| ==References:== | | ==References:== |
| | : 1. Docket No. 50-285 |
| | : 2. Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk) dated December 19 2005, "Fort Calhoun Station Unit No. 1 Revised License Amendment Request, "Deletion of Sleeving as a Steam Generator Tube Repair Method," (LIC 0137) |
| | : 3. Technical Specification Task Force, Improved Standard Technical Specifications (TSTF) Change Traveler, Westinghouse Owners Group - 169, Rev. 0, TSTF-449, Rev. |
| | 4, April 14,2005 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| : 1. Docket No. 50-285 2. Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk) dated December 19 2005, "Fort Calhoun Station Unit No. 1 Revised License Amendment Request, "Deletion of Sleeving as a Steam Generator Tube Repair Method," (LIC-05-0137)3. Technical Specification Task Force, Improved Standard Technical Specifications (TSTF) Change Traveler, Westinghouse Owners Group -169, Rev. 0, TSTF-449, Rev.4, April 14,2005 Request for Withdrawal of Fort Calhoun Station Unit No. 1 Revised License Amendment, "Deletion of Sleeving as a Steam Generator Tube Repair Method" rL In the Reference 2 License Amendment Request, Omaha Public Power District (OPPD) proposed a change to the Fort Calhoun Station (FCS) Technical Specifications to delete the sleeving repair alternative to plugging for steam generator tubes. Subsequent discussions with the NRC staff concluded that the proposed revisions should be made in conjunction with the steam generator inspection program updates associated with amendments implementing Reference 3, TSTF-449.
| | Request for Withdrawal of Fort Calhoun Station Unit No. 1 Revised License Amendment, "Deletion of Sleeving as a Steam Generator Tube Repair Method" rL In the Reference 2 License Amendment Request, Omaha Public Power District (OPPD) proposed a change to the Fort Calhoun Station (FCS) Technical Specifications to delete the sleeving repair alternative to plugging for steam generator tubes. Subsequent discussions with the NRC staff concluded that the proposed revisions should be made in conjunction with the steam generator inspection program updates associated with amendments implementing Reference 3, TSTF-449. Therefore, OPPD requests to withdraw, in entirety, the amendment proposed by Reference 2. |
| Therefore, OPPD requests to withdraw, in entirety, the amendment proposed by Reference 2.In accordance with NRC discussions leading to this withdrawal, OPPD is now preparing a TSTF-449 based amendment request. It is our understanding that a May 2006 submittal will enable NRR to support the review leading to implementation of the TSTF-449 based SG tube inspection program, technical specifications, and deletion of the sleeving repair method in sufficient time to startup following the Fall 2006 steam generator replacement outage.No commitments to the NRC are made in this letl er.Highest In Customer Satisfaction WIth Residential Electric Seivice AmongMedium-Sized Utilities For the fifth year in a row, Omaha Public Power District has received a J.D. Power and Associates award for Highest Customer Satisfaction With Residential Electric Service.J.D. Power and Associates 2001 -2005 Electric Utility Residential Customer Satisfaction Studies". | | In accordance with NRC discussions leading to this withdrawal, OPPD is now preparing a TSTF-449 based amendment request. It is our understanding that a May 2006 submittal will enable NRR to support the review leading to implementation of the TSTF-449 based SG tube inspection program, technical specifications, and deletion of the sleeving repair method in sufficient time to startup following the Fall 2006 steam generator replacement outage. |
| 2005 study based on a total of 26,782 consumer responses. | | No commitments to the NRC are made in this letl er. |
| The top 23 medium electric companies were ranked in the study. www.jdpower.com. | | HighestIn Customer Satisfaction WIth ResidentialElectric Seivice AmongMedium-Sized Utilities For the fifth year in a row, Omaha Public Power District has received a J.D. Power and Associates award for Highest Customer Satisfaction With Residential Electric Service. |
| AO(0 U.S. Nuclear Regulatory Commission LIC-06-0005 Page 2 If you have any questions or require additional information, please contact Mr. T. C. Matthews at (402)533-6938.Sincerely, H. J. F Division Manager -Nuclear Engineering Omaha Public Power District HJFJRLJ/rlj C: Division Administrator | | J.D. Power and Associates 2001 - 2005 Electric Utility Residential Customer Satisfaction Studies". 2005 study based on a total of 26,782 consumer responses. The top 23 medium electric companies were ranked in the study. www.jdpower.com. |
| -Public Health Assurance, State of Nebraska}} | | AO(0 |
| | |
| | U.S. Nuclear Regulatory Commission LIC-06-0005 Page 2 If you have any questions or require additional information, please contact Mr. T. C. Matthews at (402) 533-6938. |
| | Sincerely, H. J. F Division Manager - Nuclear Engineering Omaha Public Power District HJFJRLJ/rlj C: Division Administrator - Public Health Assurance, State of Nebraska}} |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] |
Text
w-Opp"m Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 Employment with Equal Opportunity January 20, 2006 LIC-06-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk) dated December 19 2005, "Fort Calhoun Station Unit No. 1 Revised License Amendment Request, "Deletion of Sleeving as a Steam Generator Tube Repair Method," (LIC 0137)
- 3. Technical Specification Task Force, Improved Standard Technical Specifications (TSTF) Change Traveler, Westinghouse Owners Group - 169, Rev. 0, TSTF-449, Rev.
4, April 14,2005
SUBJECT:
Request for Withdrawal of Fort Calhoun Station Unit No. 1 Revised License Amendment, "Deletion of Sleeving as a Steam Generator Tube Repair Method" rL In the Reference 2 License Amendment Request, Omaha Public Power District (OPPD) proposed a change to the Fort Calhoun Station (FCS) Technical Specifications to delete the sleeving repair alternative to plugging for steam generator tubes. Subsequent discussions with the NRC staff concluded that the proposed revisions should be made in conjunction with the steam generator inspection program updates associated with amendments implementing Reference 3, TSTF-449. Therefore, OPPD requests to withdraw, in entirety, the amendment proposed by Reference 2.
In accordance with NRC discussions leading to this withdrawal, OPPD is now preparing a TSTF-449 based amendment request. It is our understanding that a May 2006 submittal will enable NRR to support the review leading to implementation of the TSTF-449 based SG tube inspection program, technical specifications, and deletion of the sleeving repair method in sufficient time to startup following the Fall 2006 steam generator replacement outage.
No commitments to the NRC are made in this letl er.
HighestIn Customer Satisfaction WIth ResidentialElectric Seivice AmongMedium-Sized Utilities For the fifth year in a row, Omaha Public Power District has received a J.D. Power and Associates award for Highest Customer Satisfaction With Residential Electric Service.
J.D. Power and Associates 2001 - 2005 Electric Utility Residential Customer Satisfaction Studies". 2005 study based on a total of 26,782 consumer responses. The top 23 medium electric companies were ranked in the study. www.jdpower.com.
AO(0
U.S. Nuclear Regulatory Commission LIC-06-0005 Page 2 If you have any questions or require additional information, please contact Mr. T. C. Matthews at (402) 533-6938.
Sincerely, H. J. F Division Manager - Nuclear Engineering Omaha Public Power District HJFJRLJ/rlj C: Division Administrator - Public Health Assurance, State of Nebraska