ML061020483: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/12/2006
| issue date = 04/12/2006
| title = EN-06-013, Florida Power and Light Company
| title = EN-06-013, Florida Power and Light Company
| author name = Nolan M C, Trocine L
| author name = Nolan M, Trocine L
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTILVERIFICATION THAT LICENSEE HAS RECEIVED ACTIONApril 12, 2006EN-06-013OFFICE OF ENFORCEMENTNOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTIONLicensee:Florida Power and Light Company(EA-06-027)Turkey Point Nuclear Plant Docket Nos. 05000250 and 05000251
{{#Wiki_filter:April 12, 2006 EN-06-013 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       Florida Power and Light Company             (EA-06-027)
Turkey Point Nuclear Plant Docket Nos. 05000250 and 05000251


==Subject:==
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OFVIOLATIONThis is to inform the Commission that a Notice of Violation associated with a White significancedetermination process finding will be issued on or about April 17, 2006, to Florida Power andLight Company as a result of inspections at the Turkey Point Nuclear Plant. This White finding, an issue of low to moderate safety significance which may require additional NRC inspection,involved the B auxiliary feedwater (AFW) pump that was determined to be due to an incorrectlyinstalled bearing and the licensee's failure to identify and correct the condition of the pump during this time period as required despite several indicators that the pump was degraded.A Notice of Violation is included based on a violation of Technical Specification 3.7.1.2 and10 CFR Part 50, Appendix B, Criterion XVI because the licensee failed to restore the B AFW pump to operable status within 30 days and did not place the unit in at least Hot Standby during this time. In this case, the B AFW pump was placed in service on September 10, 2003, in an inoperable condition due to a misaligned radial bearing, and the inoperable condition was not identified until November 7, 2005. In addition, the licensee failed to identify and correct thecondition adverse to quality during this time frame even though pump bearing vibration levels and oil samples provided indication of the adverse condition.It should be noted that the licensee has not been specifically informed of the enforcementaction. The schedule of issuance and notification is:Mailing of Final Significance DeterminationApril 17, 2006Telephone Notification of LicenseeApril 17, 2006The State of Florida will be notified.
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White significance determination process finding will be issued on or about April 17, 2006, to Florida Power and Light Company as a result of inspections at the Turkey Point Nuclear Plant. This White finding, an issue of low to moderate safety significance which may require additional NRC inspection, involved the B auxiliary feedwater (AFW) pump that was determined to be due to an incorrectly installed bearing and the licensees failure to identify and correct the condition of the pump during this time period as required despite several indicators that the pump was degraded.
Contacts:L. Trocine, OE, 301-415-2319 C. Nolan, OE, 301-415-3360 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTILVERIFICATION THAT LICENSEE HAS RECEIVED ACTIONDistribution
A Notice of Violation is included based on a violation of Technical Specification 3.7.1.2 and 10 CFR Part 50, Appendix B, Criterion XVI because the licensee failed to restore the B AFW pump to operable status within 30 days and did not place the unit in at least Hot Standby during this time. In this case, the B AFW pump was placed in service on September 10, 2003, in an inoperable condition due to a misaligned radial bearing, and the inoperable condition was not identified until November 7, 2005. In addition, the licensee failed to identify and correct the condition adverse to quality during this time frame even though pump bearing vibration levels and oil samples provided indication of the adverse condition.
:OWFN             Chairman DiazComm. McGaffigan Comm. Merrifield Comm. Lyons Comm. JaczkoSECYOCA PA IPOWFN           EDODEDR DEDE OE OGC NRR NSIR OI SPTWFN          OCFOOP CENTER NMSS OIG OCIO RES ACRSRegional OfficesRI          RIIRIII        RIVMAILADAMSFile Name: E:\Filenet\ML061020483.wpdADAMSML061020483 OE:ESOE:CLTrocineJLuehman 04/12 /0504/12 /06}}
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination          April 17, 2006 Telephone Notification of Licensee                  April 17, 2006 The State of Florida will be notified.
Contacts:       L. Trocine, OE, 301-415-2319         C. Nolan, OE, 301-415-3360 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION
 
Distribution:
OWFN                  OWFN             TWFN              Regional Offices Chairman Diaz          EDO              OCFO              RI    RII Comm. McGaffigan       DEDR              OP CENTER        RIII  RIV Comm. Merrifield       DEDE              NMSS Comm. Lyons           OE                OIG Comm. Jaczko           OGC               OCIO              MAIL NRR               RES              ADAMS SECY                  NSIR             ACRS OCA                    OI PA                    SP IP File Name: E:\Filenet\ML061020483.wpd ADAMS        ML061020483 OE:ES        OE:C LTrocine      JLuehman 04/12 /05    04/12 /06 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION}}

Latest revision as of 19:55, 23 November 2019

EN-06-013, Florida Power and Light Company
ML061020483
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/12/2006
From: Nolan M, Trocine L
NRC/OE
To:
Trocine L
References
EA-06-027, EN-06-013
Download: ML061020483 (2)


Text

April 12, 2006 EN-06-013 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company (EA-06-027)

Turkey Point Nuclear Plant Docket Nos. 05000250 and 05000251

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White significance determination process finding will be issued on or about April 17, 2006, to Florida Power and Light Company as a result of inspections at the Turkey Point Nuclear Plant. This White finding, an issue of low to moderate safety significance which may require additional NRC inspection, involved the B auxiliary feedwater (AFW) pump that was determined to be due to an incorrectly installed bearing and the licensees failure to identify and correct the condition of the pump during this time period as required despite several indicators that the pump was degraded.

A Notice of Violation is included based on a violation of Technical Specification 3.7.1.2 and 10 CFR Part 50, Appendix B, Criterion XVI because the licensee failed to restore the B AFW pump to operable status within 30 days and did not place the unit in at least Hot Standby during this time. In this case, the B AFW pump was placed in service on September 10, 2003, in an inoperable condition due to a misaligned radial bearing, and the inoperable condition was not identified until November 7, 2005. In addition, the licensee failed to identify and correct the condition adverse to quality during this time frame even though pump bearing vibration levels and oil samples provided indication of the adverse condition.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination April 17, 2006 Telephone Notification of Licensee April 17, 2006 The State of Florida will be notified.

Contacts: L. Trocine, OE, 301-415-2319 C. Nolan, OE, 301-415-3360 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION

Distribution:

OWFN OWFN TWFN Regional Offices Chairman Diaz EDO OCFO RI RII Comm. McGaffigan DEDR OP CENTER RIII RIV Comm. Merrifield DEDE NMSS Comm. Lyons OE OIG Comm. Jaczko OGC OCIO MAIL NRR RES ADAMS SECY NSIR ACRS OCA OI PA SP IP File Name: E:\Filenet\ML061020483.wpd ADAMS ML061020483 OE:ES OE:C LTrocine JLuehman 04/12 /05 04/12 /06 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION