ML061020483

From kanterella
Jump to navigation Jump to search
EN-06-013, Florida Power and Light Company
ML061020483
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/12/2006
From: Nolan M, Trocine L
NRC/OE
To:
Trocine L
References
EA-06-027, EN-06-013
Download: ML061020483 (2)


Text

April 12, 2006 EN-06-013 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company (EA-06-027)

Turkey Point Nuclear Plant Docket Nos. 05000250 and 05000251

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White significance determination process finding will be issued on or about April 17, 2006, to Florida Power and Light Company as a result of inspections at the Turkey Point Nuclear Plant. This White finding, an issue of low to moderate safety significance which may require additional NRC inspection, involved the B auxiliary feedwater (AFW) pump that was determined to be due to an incorrectly installed bearing and the licensees failure to identify and correct the condition of the pump during this time period as required despite several indicators that the pump was degraded.

A Notice of Violation is included based on a violation of Technical Specification 3.7.1.2 and 10 CFR Part 50, Appendix B, Criterion XVI because the licensee failed to restore the B AFW pump to operable status within 30 days and did not place the unit in at least Hot Standby during this time. In this case, the B AFW pump was placed in service on September 10, 2003, in an inoperable condition due to a misaligned radial bearing, and the inoperable condition was not identified until November 7, 2005. In addition, the licensee failed to identify and correct the condition adverse to quality during this time frame even though pump bearing vibration levels and oil samples provided indication of the adverse condition.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination April 17, 2006 Telephone Notification of Licensee April 17, 2006 The State of Florida will be notified.

Contacts: L. Trocine, OE, 301-415-2319 C. Nolan, OE, 301-415-3360 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION

Distribution:

OWFN OWFN TWFN Regional Offices Chairman Diaz EDO OCFO RI RII Comm. McGaffigan DEDR OP CENTER RIII RIV Comm. Merrifield DEDE NMSS Comm. Lyons OE OIG Comm. Jaczko OGC OCIO MAIL NRR RES ADAMS SECY NSIR ACRS OCA OI PA SP IP File Name: E:\Filenet\ML061020483.wpd ADAMS ML061020483 OE:ES OE:C LTrocine JLuehman 04/12 /05 04/12 /06 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION