{{#Wiki_filter:Nowx Entergy Nuclear Operations, Inc. Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 January 3, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
{{#Wiki_filter:Nowx                                                                               Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 January 3, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001


==SUBJECT:==
==SUBJECT:==
Entergy Nuclear Operations, Inc. Pilgrm Nuclear Power Station Docket No. 50-293 License No. DPR-35 Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO) LETTER NUMBER: 2.05.086  
Entergy Nuclear Operations, Inc.
Pilgrm Nuclear Power Station Docket No. 50-293 License No. DPR-35 Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)
LETTER NUMBER:         2.05.086


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 CFR 50.54(q), Entergy Nuclear Operations, Inc. (Entergy) requests approval of the enclosed change to the Pilgrim Nuclear Station (PNPS) Emergency Plan. The proposed change is being submitted in accordance with 10 CFR 50.4. The change has been evaluated in accordance with 10 CFR 50.54(q) and it has been determined that the change does not decrease the effectiveness of the approved Emergency Plan. The basis for this determination is provided in the enclosure.
 
However, since this proposed change involves a revision to the uon-shifft staff as currently defined in Table B-1 of the Emergency Plan, it was concluded that the NRC should review and approve the change prior to implementation.
Pursuant to 10 CFR 50.54(q), Entergy Nuclear Operations, Inc. (Entergy) requests approval of the enclosed change to the Pilgrim Nuclear Station (PNPS) Emergency Plan.
Entergy requests approval of the proposed change by September 29, 2006. Once approved, the revision will be implemented within 90 days. There are no commitments contained in this letter. If you have any questions or require additional information, please contact me at (508) 830 8403.-~ I:~2 e---Sincerely, Bryan Ford Licensing Manager FM/dm  
The proposed change is being submitted in accordance with 10 CFR 50.4. The change has been evaluated in accordance with 10 CFR 50.54(q) and it has been determined that the change does not decrease the effectiveness of the approved Emergency Plan. The basis for this determination is provided in the enclosure. However, since this proposed change involves a revision to the uon-shifft staff as currently defined in Table B-1 of the Emergency Plan, it was concluded that the NRC should review and approve the change prior to implementation.
Entergy requests approval of the proposed change by September 29, 2006. Once approved, the revision will be implemented within 90 days.
There are no commitments contained in this letter.
If you have any questions or require additional information, please contact me at (508) 830 I:~2 8403.                                                                                                     -~
Sincerely,                                                                                        e---
Bryan Ford Licensing Manager FM/dm


==Enclosure:==
==Enclosure:==
Evaluation of Change to PNPS Emergency Plan, (5 p Attachments:        PNPS Emergency Plan, Table B-1 Mark-up (1 page) 205086


Attachments:
Entergy Nuclear Operations, Inc.                           Letter No. 2.05.086 Pilgrim Nuclear Power Station                                           Page 2 cc:     . James Shea, Project Manager         Ms. Cristine McCombs, Director Office of Nuclear Reactor Regulation Mass. Emergency Management Agency Mail Stop: 0-88-1                     400 Worcester Road U.S. Nuclear Regulatory Commission   Framingham, MA 01702 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission   Mr. Robert Walker, Director Region 1                             Massachusetts Department of Public 475 Allendale Road                   Health King of Prussia, PA 19408           Radiation Control Program 90 Washington Street, 2"d Floor Dorchester, MA 02121 Senior Resident Inspector Pilgrim Nuclear Power Station
Evaluation of Change to PNPS Emergency Plan, (5 p PNPS Emergency Plan, Table B-1 Mark-up (1 page)205086 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: .James Shea, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-88-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19408 Letter No. 2.05.086 Page 2 Ms. Cristine McCombs, Director Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 Mr. Robert Walker, Director Massachusetts Department of Public Health Radiation Control Program 90 Washington Street, 2"d Floor Dorchester, MA 02121 Senior Resident Inspector Pilgrim Nuclear Power Station ENCLOSURE to Letter 2.05.086 Evaluation of Change to PNPS Emergency Plan  
 
ENCLOSURE to Letter 2.05.086 Evaluation of Change to PNPS Emergency Plan


==Subject:==
==Subject:==
Changes to Table B-i: Minimum Staffing Requirements for the PNPS ERO 1. DESCRIPTION
Changes to Table B-i: Minimum Staffing Requirements for the PNPS ERO
: 2. PROPOSED CHANGES 3. BACKGROUND
: 1. DESCRIPTION
: 4. TECHNICAL ANALYSIS 5. PRECEDENTS
: 2. PROPOSED CHANGES
: 6. REFERENCES Letter 2.05.086 Enclosure Evaluation of Change to PNPS Emergency Plan 1. Description This letter is a request to revise the Pilgrim Nuclear Power Station (PNPS) Emergency Plan (EP). The proposed change will revise Table B-1, "Minimum Staffing Requirements for the PNPS ERO" for the "on-shift" Radiation Protection (RP) Technicians currently assigned to support the Operations Accident Assessment Support Functional Area. This change is consistent with the minimum staffing requirements defined in Table B-1 of NUREG-0654/FEMA-REP-1 Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants." Attachment 1 provides a mark-up of the proposed change. 2. Proposed Changes The following changes to Table B-1 are proposed as part of this Emergency Plan revision request.
: 3. BACKGROUND
Operations Accident Assessment Support Functional Area: The number of "on-shift" RP Technicians listed as required to support the Onsite and In-plant Surveys task will be changed from two (2) RP Technicians to one (1) RP Technician.
: 4. TECHNICAL ANALYSIS
The title of the Radio Chemistry Technician position for the "on-shift" responder performing the Chemistry  
: 5. PRECEDENTS
/ Radiochemistry task will be revised to read "RP / Radio Chem Technician." Protective Actions (In Plant) Functional Area The note (***) associated with the =on-shift" RP Technician will be revised from "Task shared with RP Technicians assigned to in plant surveys" to May be provided by shift personnel assigned other functions." 3. Background The Emergency Plan describes the Emergency Preparedness Program for the station. The philosophy that guides the development and maintenance of this program is the protection of the health and safety of the general public In communities around the station and the personnel who work at the plant. The Emergency Plan outlines the basis for response actions that would be implemented in an emergency.
: 6. REFERENCES
The plan is not intended to be used as a procedure.
 
Detailed Emergency Plan Implementing Procedures are maintained and used to guide those responsible to implement the plan. The plan documents the methods by which the Emergency Preparedness Program meets the criteria set forth in 10 CFR 50, Section 47(b) and Appendix E. The plan was formatted in a manner similar to NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness Support of Nuclear Power Plants." 2 Letter 2.05.086 Enclosure Section B of the plan describes the Site Emergency Organization, key positions and associated responsibilities.
Letter 2.05.086 Enclosure Evaluation of Change to PNPS Emergency Plan
It also outlines the staffing requirements, which define initial emergency response actions and provisions for timely augmentation of "on shift" personnel.
: 1. Description This letter is a request to revise the Pilgrim Nuclear Power Station (PNPS)
Table B-1 defines the "on-shift" complement and their emergency duties. Members of the "on-shift" organization are trained on their responsibilities and duties in the event of an emergency, and are capable of performing these response actions in an Unusual Event, and the initial actions of higher classifications.
Emergency Plan (EP). The proposed change will revise Table B-1, "Minimum Staffing Requirements for the PNPS ERO" for the "on-shift" Radiation Protection (RP) Technicians currently assigned to support the Operations Accident Assessment Support Functional Area. This change is consistent with the minimum staffing requirements defined in Table B-1 of NUREG-0654/FEMA-REP-1 Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
In this submittal, Entergy is providing the technical analyses performed to justify the proposed Table B-1 revisions identified above. 4. Technical Analysis This change involves the realignment of the "on-shift" radiological and radiochemistry functional tasks identified in Table B-1 of the Emergency Plan. Table B-1 of the Emergency Plan currently identifies that two (2) Radiation Protection (RP) Technicians and one (1) Chemistry  
Attachment 1 provides a mark-up of the proposed change.
/ Radio Chemistry Technician will make-up the "on-shift" staff complement to perform the functional tasks assigned to Operations Accident Assessment Support. However, both the original and current NRC regulatory guidance detailed in NUREG-0654, Table B-1 (Reference
: 2. Proposed Changes The following changes to Table B-1 are proposed as part of this Emergency Plan revision request.
: 1) identifies that the minimum "on-shift" organization should consist of one (1) Health Physics Technician and one (1) Radio Chemistry Technician.
Operations Accident Assessment Support Functional Area:
The regulatory expectation is that these "on-shift" individuals are trained and proficient in task performance.
The number of "on-shift" RP Technicians listed as required to support the Onsite and In-plant Surveys task will be changed from two (2) RP Technicians to one (1) RP Technician.
NUREG-0654, Table B-1 specifies one (1) Radiochemistry qualified individual to perform the "on-shift" Chemistry  
The title of the Radio Chemistry Technician position for the "on-shift" responder performing the Chemistry / Radiochemistry task will be revised to read "RP /
/ Radiochemistry work and one (1) HP technician qualified individual for in-plant surveys. The NUREG also specifies two (2) HP technician-qualified individuals for access control, HP coverage, personnel monitoring and dosimetry, but noted that these latter functions could be provided by shift personnel assigned other functions.
Radio Chem Technician."
In the past station administrative controls prevented chemistry personnel from performing HP functions and visa-versa.
Protective Actions (In Plant) Functional Area The note (***) associated with the =on-shift" RP Technician will be revised from "Task shared with RP Technicians assigned to in plant surveys" to May be provided by shift personnel assigned other functions."
As a result, it was necessary to assign three individuals to each shift, two (2) HP qualified individuals and one (1) Radio chemistry qualified individual, to fulfill the above listed requirements.
 
===3. Background===
The Emergency Plan describes the Emergency Preparedness Program for the station. The philosophy that guides the development and maintenance of this program is the protection of the health and safety of the general public In communities around the station and the personnel who work at the plant.
The Emergency Plan outlines the basis for response actions that would be implemented in an emergency. The plan is not intended to be used as a procedure.
Detailed Emergency Plan Implementing Procedures are maintained and used to guide those responsible to implement the plan.
The plan documents the methods by which the Emergency Preparedness Program meets the criteria set forth in 10 CFR 50, Section 47(b) and Appendix E.
The plan was formatted in a manner similar to NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness Support of Nuclear Power Plants."
2
 
Letter 2.05.086 Enclosure Section B of the plan describes the Site Emergency Organization, key positions and associated responsibilities. It also outlines the staffing requirements, which define initial emergency response actions and provisions for timely augmentation of "on shift" personnel. Table B-1 defines the "on-shift" complement and their emergency duties. Members of the "on-shift" organization are trained on their responsibilities and duties in the event of an emergency, and are capable of performing these response actions in an Unusual Event, and the initial actions of higher classifications.
In this submittal, Entergy is providing the technical analyses performed to justify the proposed Table B-1 revisions identified above.
: 4. Technical Analysis This change involves the realignment of the "on-shift" radiological and radiochemistry functional tasks identified in Table B-1 of the Emergency Plan. Table B-1 of the Emergency Plan currently identifies that two (2) Radiation Protection (RP)
Technicians and one (1)Chemistry / Radio Chemistry Technician will make-up the "on-shift" staff complement to perform the functional tasks assigned to Operations Accident Assessment Support. However, both the original and current NRC regulatory guidance detailed in NUREG-0654, Table B-1 (Reference 1) identifies that the minimum "on-shift" organization should consist of one (1) Health Physics Technician and one (1) Radio Chemistry Technician. The regulatory expectation is that these "on-shift" individuals are trained and proficient in task performance.
NUREG-0654, Table B-1 specifies one (1) Radiochemistry qualified individual to perform the "on-shift" Chemistry / Radiochemistry work and one (1) HP technician qualified individual for in-plant surveys. The NUREG also specifies two (2) HP technician-qualified individuals for access control, HP coverage, personnel monitoring and dosimetry, but noted that these latter functions could be provided by shift personnel assigned other functions.
Inthe past station administrative controls prevented chemistry personnel from performing HP functions and visa-versa. As a result, it was necessary to assign three individuals to each shift, two (2) HP qualified individuals and one (1) Radio chemistry qualified individual, to fulfill the above listed requirements.
The administrative restriction relative to sharing chemistry and radiation protection work has been removed and the requested change to Table B-1 reflects this administrative realignment such that it is now possible to perform the above listed "on-shift" functions with two (2) properly trained (qualified) technicians.
The administrative restriction relative to sharing chemistry and radiation protection work has been removed and the requested change to Table B-1 reflects this administrative realignment such that it is now possible to perform the above listed "on-shift" functions with two (2) properly trained (qualified) technicians.
The Table B-1 revision will ensure that at least two (2) qualified individuals are "on shift" to perform all expected RP and radiochemistry work. This change will be implemented either by maintaining an "on-shift" staff consisting of one qualified (1) RP Technician and one (1) other individual that is qualified to perform both radiation protection and radiochemistry support tasks or by using the current staff which consists of two (2) qualified RP technicians and one (1) qualified Radiochemistry technician.
The Table B-1 revision will ensure that at least two (2) qualified individuals are "on shift" to perform all expected RP and radiochemistry work. This change will be implemented either by maintaining an "on-shift" staff consisting of one qualified (1)
This change is consistent with NRC regulatory guidance for minimum "on-shift' radiation protection and radiological/radiochemistry staffing as specified in Table B-1 of NUREG-0654.
RP Technician and one (1) other individual that is qualified to perform both radiation protection and radiochemistry support tasks or by using the current staff which consists of two (2) qualified RP technicians and one (1)qualified Radiochemistry technician. This change is consistent with NRC regulatory guidance for minimum "on-shift' radiation protection and radiological/radiochemistry staffing as specified in Table B-1 of NUREG-0654. This change will not degrade the effectiveness of the 3
This change will not degrade the effectiveness of the 3 Letter 2.05.086 Enclosure existing Emergency Plan or the associated implementing procedures because an adequate number of qualified individuals will be available "on-shift" to perform required radiation protection and radio-chemistry support tasks. Subsequent to development and implementation of the initial Emergency Plan, the "on-shift" radiochemistry support task workload has been significantly reduced resulting from the changes to the Post Accident Sampling System (PASS) as defined in License Amendment No. 204 (issued November 14,2003, reference 4). Based on this amendment, the Emergency Plan was updated to eliminate numerous PASS sampling requirements that previously supported emergency response decision making during the initial accident phase. This greatly reduces the task burden for performing radiochemistry tasks prior to arrival of the "60 minute" Radio Chemistry Technician.
 
PNPS has reviewed the existing emergency actions required during the first 60 minutes and ensured that all required radiation protection and radiochemistry tasks can be completed using the two (2), individuals that are assigned to the shift. The individual assigned to fill the RP / Radio Chemistry Technician function will as a minimum be qualified to perform radiochemistry tasks, and may also be cross trained to perform RP tasks. If the assigned RP / Radio Chemistry Technician is not qualified to perform RP tasks, then an additional RP technician will be assigned to the shift. The potential elimination of one (1) of two (2) "on-shift" RP Technicians from the Ops Accident Assessment Support Functional Area will be compensated by ensuring that one of the two individuals assigned to "on-shift" staff is trained to perform required RP and radiochemistry tasks. This ensures that at least two (2) qualified individuals remain "on-shift" to perform all RP and Radiochemistry work. This revised "on-shifr complement meets the minimum "on-shift" radiological and radiochemistry staffing specified in Table B-1 of NUREG-0654 and does not reduce the number of individuals that are available and qualified to perform required radiation protection support tasks. A footnote contained in NUREG-0654, Table B-1 under the Protective Actions (in plant) Functional Area for the "on-shift" Health Physics (HP) Technicians, identifies that coverage "may be provided by shift personnel assigned other functions." Table B-1 to the Emergency Plan will adopt this wording to ensure consistency with the NUREG and to remove unnecessary detail. This change will not adversely impact the plan because the number of "on-shift" individuals qualified to perform radiation protection tasks to support the Protective Action (in-plant)
Letter 2.05.086 Enclosure existing Emergency Plan or the associated implementing procedures because an adequate number of qualified individuals will be available "on-shift" to perform required radiation protection and radio-chemistry support tasks.
Functional Area has not changed.
Subsequent to development and implementation of the initial Emergency Plan, the "on-shift" radiochemistry support task workload has been significantly reduced resulting from the changes to the Post Accident Sampling System (PASS) as defined in License Amendment No. 204 (issued November 14,2003, reference 4). Based on this amendment, the Emergency Plan was updated to eliminate numerous PASS sampling requirements that previously supported emergency response decision making during the initial accident phase. This greatly reduces the task burden for performing radiochemistry tasks prior to arrival of the "60 minute" Radio Chemistry Technician.
Table B-1 staff augmentation levels for the 30 minute and 60 minute Radiation Protection Technician response and the 60 minute Radio Chemistry Technician response are not being revised and continue to be consistent with, Table B-1 of NUREG-0654.
PNPS has reviewed the existing emergency actions required during the first 60 minutes and ensured that all required radiation protection and radiochemistry tasks can be completed using the two (2), individuals that are assigned to the shift. The individual assigned to fill the RP / Radio Chemistry Technician function will as a minimum be qualified to perform radiochemistry tasks, and may also be cross trained to perform RP tasks. Ifthe assigned RP / Radio Chemistry Technician is not qualified to perform RP tasks, then an additional RP technician will be assigned to the shift.
A review of required radiation protection monitoring tasks that are required after 30 and 60 minutes reveals that elimination of one "on-shift" RP Technician will not negatively impact the ability to perform the required workload.4 Letter 2.05.086 Enclosure In summary, the proposed changes were reviewed against the NRC regulations of 10 CFR 50.47(b)(1), 10 CFR 50.47(b)(2) and 10 CFR 50, App. E, IV, A. "Organization" and regulatory guidance of NUREG-0654/FEMA-REP-1, to ensure that the effectiveness of the Emergency Plan and implementing procedures are not compromised or degraded.
The potential elimination of one (1)of two (2) "on-shift" RP Technicians from the Ops Accident Assessment Support Functional Area will be compensated by ensuring that one of the two individuals assigned to "on-shift" staff is trained to perform required RP and radiochemistry tasks. This ensures that at least two (2) qualified individuals remain "on-shift" to perform all RP and Radiochemistry work. This revised "on-shifr complement meets the minimum "on-shift" radiological and radiochemistry staffing specified in Table B-1 of NUREG-0654 and does not reduce the number of individuals that are available and qualified to perform required radiation protection support tasks.
It was determined that: -"on-shift" responsibilities for emergency response continue to be unambiguously defined; -adequate staffing to provide initial accident response in key functional areas continues to be maintained;  
A footnote contained in NUREG-0654, Table B-1 under the Protective Actions (in plant) Functional Area for the "on-shift" Health Physics (HP) Technicians, identifies that coverage "may be provided by shift personnel assigned other functions." Table B-1 to the Emergency Plan will adopt this wording to ensure consistency with the NUREG and to remove unnecessary detail. This change will not adversely impact the plan because the number of "on-shift" individuals qualified to perform radiation protection tasks to support the Protective Action (in-plant) Functional Area has not changed.
-timely augmentation of response capabilities is available; and -interfaces among various onsite response activities and offsite support and response activities remain specified.
Table B-1 staff augmentation levels for the 30 minute and 60 minute Radiation Protection Technician response and the 60 minute Radio Chemistry Technician response are not being revised and continue to be consistent with, Table B-1 of NUREG-0654. A review of required radiation protection monitoring tasks that are required after 30 and 60 minutes reveals that elimination of one "on-shift" RP Technician will not negatively impact the ability to perform the required workload.
4
 
Letter 2.05.086 Enclosure In summary, the proposed changes were reviewed against the NRC regulations of 10 CFR 50.47(b)(1), 10 CFR 50.47(b)(2) and 10 CFR 50, App. E, IV,A.
    "Organization" and regulatory guidance of NUREG-0654/FEMA-REP-1, to ensure that the effectiveness of the Emergency Plan and implementing procedures are not compromised or degraded. It was determined that:
      - "on-shift" responsibilities for emergency response continue to be unambiguously defined;
      - adequate staffing to provide initial accident response in key functional areas continues to be maintained;
      - timely augmentation of response capabilities is available; and
      - interfaces among various onsite response activities and offsite support and response activities remain specified.
The proposed changes ensure that the Emergency Plan meets the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. However, since this proposed change involves a reduction of existing "on-shift" staffing levels and realignment of functional tasks as currently committed in Table B-1 of the Emergency Plan, it has been concluded that the proposed change will require NRC review and approval prior to implementation.
The proposed changes ensure that the Emergency Plan meets the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. However, since this proposed change involves a reduction of existing "on-shift" staffing levels and realignment of functional tasks as currently committed in Table B-1 of the Emergency Plan, it has been concluded that the proposed change will require NRC review and approval prior to implementation.
: 6. Precedents This proposed Table B-1 revision reflects Emergency Plan staffing changes similar to those previously approved by the NRC for R.E. Ginna (Approved July 24, 2003 TAC No. MB7240) and Waterford 3 (Approved September 30, 2002 -TAC No. MB1462). This proposed revision is not identical to those requests due to differences in the Emergency Plans at each site and the exact approach each licensee took to amend their Emergency Plans. However, the overall intent of the requests is believed to be the same with very similar justifications.
: 6. Precedents This proposed Table B-1 revision reflects Emergency Plan staffing changes similar to those previously approved by the NRC for R.E. Ginna (Approved July 24, 2003 TAC No. MB7240) and Waterford 3 (Approved September 30, 2002 - TAC No.
Furthermore, the Emergency Plan change and the evaluation documented in this submittal are consistent with the regulatory criteria used to judge the acceptability of previously approved Emergency Plans. 7. References
MB1462). This proposed revision is not identical to those requests due to differences in the Emergency Plans at each site and the exact approach each licensee took to amend their Emergency Plans. However, the overall intent of the requests is believed to be the same with very similar justifications.
: 1. NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", dated November 1980. 2. 10 CFR 50.47(b)(1) and 10 CFR 50.47(b)(2)
Furthermore, the Emergency Plan change and the evaluation documented in this submittal are consistent with the regulatory criteria used to judge the acceptability of previously approved Emergency Plans.
: 3. 10 CFR 50, Appendix E, IV, A. "Organization" 4. USNRC Letter Number 1.03.128, "Pilgrim Nuclear Power Station -Issuance of Amendment No. 204 Re: Elimination of Requirements for Post Accident Sampling System (TAC No. MB8138)", dated November 14, 2003 5 Attachment I to 2.05.086 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Plant Proposed Revision to the Emergency Plan Table B-1 Minimum Staffing Table (1 total page)
: 7. References
P;,k PNPS EMERGENCY PLAN Table B-1: Minimum Statfino Reauirements for the PNPS ERO 11)Functional Ara Major Task Position Title Plant Oee6rations Plait Stabilzation Shift manager On ShhUf Asassessment OpenOonal Aspects Accidnt MUIgation Control 1ooM 5 ervlsof On ShiS Lic. fAc. Plant Operator (2) On Shins __Un. Nu. Pat Operatof (2) Ons8w Emeigec Direction Effergeny Clast&A~ci Shill MarsgeW On Shift Ezmeqeprcy Contvi PARS Conaro Room Spervio On Shllfl Emergency nln. _________________
: 1. NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", dated November 1980.
_______________
: 2. 10 CFR 50.47(b)(1) and 10 CFR 50.47(b)(2)
Emergency Plait Oms Supi go miln. NcOtlcation and CAmrnunkaflons NOVlt1alln ot PNM~ Local. Enginee (ShAf Cmnrci Nm On Shtit Comniamaili.
: 3. 10 CFR 50, Appendix E, IV,A."Organization"
and Federal Emergency Com Supv 30 atm. personnel and Maintain Co nwicalre StWi 2) 60 min. Rad Makid EOF Direion Emegec, Ofat, Vanager 60 mi,. Ops Accident Assesasweri Support 01iRk Does Assassar"n Olftfte Raddlogklca Supy 30 mn*. O6 fste SWe,,s RUT (2) 30 rin,. _ _ _ _ Maranter.vr'*V" 60 Min. Outsit and n-pla&mt Suryeys "Ti: il 7 F On S"iftn FOPTe&"nc&nII,.-  
: 4. USNRC Letter Number 1.03.128, "Pilgrim Nuclear Power Station - Issuance of Amendment No. 204 Re: Elimination of Requirements for Post Accident Sampling System (TAC No. MB8138)", dated November 14, 2003 5
~ 30 Mkh _____________
 
P Tedwtirim (2) 60l KgLi cherf"tlyl RaI A~ P~ Chan. Temnclietn on 51,111 R g ,adi Chain-. Techncian so Min. Pledt Sysem Enrgtneeftn TS S ! ý E-Mergn Plier LaWOWe SO m. ear e Correcnft Actions Tecnca Support En~ (ShA Corr On Shf Engineer (Fleactor 30 rwidn. Engineer (Medhtricei) 60 froin Equontert Repalrs Nuclear Malm. Technician 30 amn Corrective Actlor. Nuclear Mainl. Tedunclan S ran. Nuc. ait Reactor Operator On SrAfts Nuc. Plant Rector Operalor 60 mi. Nuclear "m~n Elowctalc)(2) 30 ml. Nudear MaW. (lectulcal) 60 Min. Nuclear Cotiml TrhrcanM(2 30 n30m. Proteclie Acions (In P ) adation Proteon. Access RP Technkian E2)- On SUNl Control. RP Coeamge. NP Todrk*lsn (2) 3D min. Persnkel Moniitoulng, w4d RP Techn~fin (2) 60 min. DOsimne ry Fiare lghting Fire Brlgafte on shint _______________
Attachment I to 2.05.086 Entergy Nuclear Operations, Inc.
Plymoatih Fire Dept. on caln Rescue Ops sand First Aid EMP* On ShdWt Amrunlarce service OnCt Ste Aocasa Contr and Pesmnnal Securiy Sec"' ty Force- On Shife Ac=.!!abtft I _ _ _ _ ____ __LL --I a On brmUl -A erson is said to be arn sinm ? w n rV, normat or auuiiotzea ovtie hlus at personlis w the PNPS owner controled ares or on the connecting roads between them with Station Management approval.
Pilgrim Nuclear Power Plant Proposed Revision to the Emergency Plan Table B-1 Minimum Staffing Table (1 total page)
Postion staffed In accordance with technical speol.catlons.u.
 
Position staffed in accordance with technical soeiicarlons and statn procedures. (M EeacyMedical Personneit uaS qaiida MIS [ RNs, First Responders, NOTE: Response times are based on optimum travel conditions.
P;,k PNPS EMERGENCY PLAN Table B-1:       Minimum Statfino Reauirements for the PNPS ERO 11)
Functional Ara                         Major Task                           Position Title     Re2s=9*
Plant Oee6rations                     Plait Stabilzation                     Shift manager               On ShhUf Asassessment OpenOonal Aspects       Accidnt MUIgation                     Control 1ooM 5 ervlsof       On ShiS Lic. fAc. Plant Operator (2) On Shins
__Un. Nu. Pat Operatof (2)   Ons8w Emeigec Direction                     Effergeny Clast&A~ci                   Shill MarsgeW                 On Shift Ezmeqeprcy Contvi                     PARS                                   Conaro Room Spervio           On Shllfl Emergency Direct*r                nln.
_________________   _______________                       Emergency Plait OmsSupi      go miln.
NcOtlcation and CAmrnunkaflons       NOVlt1alln ot PNM~Local.               Enginee (ShAf     Cmnrci Nm   On Shtit Comniamaili. and Federal               Emergency Com Supv           30 atm.
personnel and Maintain                 Co nwicalre StWi 2)           60 min.
Rad Makid     Assesmarne*            EOF Direion                           Emegec, Ofat, Vanager         60 mi,.
Ops Accident Assesasweri Support     01iRk Does Assassar"n                 Olftfte Raddlogklca Supy     30 mn*.
O6fste SWe,,s                         RUT M,*wrer (2)               30 rin,.
_ _   _Maranter.vr'*V"
_                    60 Min.
Outsit and n-pla&mt   Suryeys             "Ti: il         7 F     On S"iftn FOPTe&"nc&nII,.-           ~ 30 Mkh
_____________                   P Tedwtirim (2)             60l KgLi cherf"tlyl RaI                       P~ A~ Chan. Temnclietn         on 51,111 R g                     ,adi Chain-. Techncian         so Min.
Pledt Sysem Enrgtneeftn               TS       S     ! ý                     E-Mergn     Plier LaWOWe   SOm.
ear e   Correcnft Actions         Tecnca Support                         En~ (ShA Corr           R*) On Shf Engineer (Fleactor           30 rwidn.
Engineer (Medhtricei)       60 froin Equontert Repalrs                     Nuclear Malm. Technician     30 amn Corrective Actlor.                     Nuclear Mainl. Tedunclan     S ran.
Nuc. ait Reactor Operator   On SrAfts Nuc. Plant Rector Operalor   60 mi.
Nuclear "m~n Elowctalc)(2)   30 ml.
Nudear MaW. (lectulcal)     60 Min.
Nuclear Cotiml TrhrcanM(2     30 n30m.
Proteclie Acions (In P )               adation Proteon. Access               RP Technkian E2)-                         On SUNl Control. RP Coeamge.                 NP Todrk*lsn (2)             3D min.
Persnkel Moniitoulng, w4d             RP Techn~fin (2)             60 min.
DOsimne ry Fiare lghting                           Fire Brlgafte                 on shint
_______________             Plymoatih Fire Dept.         on caln Rescue Ops sand   First Aid         EMP*                         On ShdWt Amrunlarce   service         OnCt Ste Aocasa Contr and Pesmnnal         Securiy                               Sec"'ty Force-               On Shife Ac=.!!abtft                         I     _       _       _       _         ____               __
LL--I a       On   brmUl personlis w
                      - A erson     issaid to be arn sinm w?
the PNPS owner controled nares orrV,onnormat  or auuiiotzea ovtie           at hlus the connecting roads between them with Station Management approval.
Postion staffed Inaccordance with technical speol.catlons.u.
Position staffed in accordance with technical soeiicarlons and statn procedures.
(MEeacyMedical Personneit                         uaS qaiida[ MIS RNs, First Responders, NOTE: Response times are based on optimum travel conditions.
(1) This table B-1 is incorporated into the Emergency Plan in accomdance wt USNRC Generic Lett 92-33 dated 112/17182..
(1) This table B-1 is incorporated into the Emergency Plan in accomdance wt USNRC Generic Lett 92-33 dated 112/17182..
~s-~IA ( b'~ Y~Kcx~=-Cj c\ f}}
                                              ~s-~
Cj                            c\f
(
b'*~ Y~Kcx~=-
IA}}

Latest revision as of 14:49, 23 November 2019

Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with Handwritten Notes
ML062680359
Person / Time
Site: Pilgrim
Issue date: 01/03/2006
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0159
Download: ML062680359 (9)


Text

Nowx Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 January 3, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrm Nuclear Power Station Docket No. 50-293 License No. DPR-35 Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)

LETTER NUMBER: 2.05.086

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q), Entergy Nuclear Operations, Inc. (Entergy) requests approval of the enclosed change to the Pilgrim Nuclear Station (PNPS) Emergency Plan.

The proposed change is being submitted in accordance with 10 CFR 50.4. The change has been evaluated in accordance with 10 CFR 50.54(q) and it has been determined that the change does not decrease the effectiveness of the approved Emergency Plan. The basis for this determination is provided in the enclosure. However, since this proposed change involves a revision to the uon-shifft staff as currently defined in Table B-1 of the Emergency Plan, it was concluded that the NRC should review and approve the change prior to implementation.

Entergy requests approval of the proposed change by September 29, 2006. Once approved, the revision will be implemented within 90 days.

There are no commitments contained in this letter.

If you have any questions or require additional information, please contact me at (508) 830 I:~2 8403. -~

Sincerely, e---

Bryan Ford Licensing Manager FM/dm

Enclosure:

Evaluation of Change to PNPS Emergency Plan, (5 p Attachments: PNPS Emergency Plan, Table B-1 Mark-up (1 page) 205086

Entergy Nuclear Operations, Inc. Letter No. 2.05.086 Pilgrim Nuclear Power Station Page 2 cc: . James Shea, Project Manager Ms. Cristine McCombs, Director Office of Nuclear Reactor Regulation Mass. Emergency Management Agency Mail Stop: 0-88-1 400 Worcester Road U.S. Nuclear Regulatory Commission Framingham, MA 01702 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Mr. Robert Walker, Director Region 1 Massachusetts Department of Public 475 Allendale Road Health King of Prussia, PA 19408 Radiation Control Program 90 Washington Street, 2"d Floor Dorchester, MA 02121 Senior Resident Inspector Pilgrim Nuclear Power Station

ENCLOSURE to Letter 2.05.086 Evaluation of Change to PNPS Emergency Plan

Subject:

Changes to Table B-i: Minimum Staffing Requirements for the PNPS ERO

1. DESCRIPTION
2. PROPOSED CHANGES
3. BACKGROUND
4. TECHNICAL ANALYSIS
5. PRECEDENTS
6. REFERENCES

Letter 2.05.086 Enclosure Evaluation of Change to PNPS Emergency Plan

1. Description This letter is a request to revise the Pilgrim Nuclear Power Station (PNPS)

Emergency Plan (EP). The proposed change will revise Table B-1, "Minimum Staffing Requirements for the PNPS ERO" for the "on-shift" Radiation Protection (RP) Technicians currently assigned to support the Operations Accident Assessment Support Functional Area. This change is consistent with the minimum staffing requirements defined in Table B-1 of NUREG-0654/FEMA-REP-1 Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."

Attachment 1 provides a mark-up of the proposed change.

2. Proposed Changes The following changes to Table B-1 are proposed as part of this Emergency Plan revision request.

Operations Accident Assessment Support Functional Area:

The number of "on-shift" RP Technicians listed as required to support the Onsite and In-plant Surveys task will be changed from two (2) RP Technicians to one (1) RP Technician.

The title of the Radio Chemistry Technician position for the "on-shift" responder performing the Chemistry / Radiochemistry task will be revised to read "RP /

Radio Chem Technician."

Protective Actions (In Plant) Functional Area The note (***) associated with the =on-shift" RP Technician will be revised from "Task shared with RP Technicians assigned to in plant surveys" to May be provided by shift personnel assigned other functions."

3. Background

The Emergency Plan describes the Emergency Preparedness Program for the station. The philosophy that guides the development and maintenance of this program is the protection of the health and safety of the general public In communities around the station and the personnel who work at the plant.

The Emergency Plan outlines the basis for response actions that would be implemented in an emergency. The plan is not intended to be used as a procedure.

Detailed Emergency Plan Implementing Procedures are maintained and used to guide those responsible to implement the plan.

The plan documents the methods by which the Emergency Preparedness Program meets the criteria set forth in 10 CFR 50, Section 47(b) and Appendix E.

The plan was formatted in a manner similar to NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness Support of Nuclear Power Plants."

2

Letter 2.05.086 Enclosure Section B of the plan describes the Site Emergency Organization, key positions and associated responsibilities. It also outlines the staffing requirements, which define initial emergency response actions and provisions for timely augmentation of "on shift" personnel. Table B-1 defines the "on-shift" complement and their emergency duties. Members of the "on-shift" organization are trained on their responsibilities and duties in the event of an emergency, and are capable of performing these response actions in an Unusual Event, and the initial actions of higher classifications.

In this submittal, Entergy is providing the technical analyses performed to justify the proposed Table B-1 revisions identified above.

4. Technical Analysis This change involves the realignment of the "on-shift" radiological and radiochemistry functional tasks identified in Table B-1 of the Emergency Plan. Table B-1 of the Emergency Plan currently identifies that two (2) Radiation Protection (RP)

Technicians and one (1)Chemistry / Radio Chemistry Technician will make-up the "on-shift" staff complement to perform the functional tasks assigned to Operations Accident Assessment Support. However, both the original and current NRC regulatory guidance detailed in NUREG-0654, Table B-1 (Reference 1) identifies that the minimum "on-shift" organization should consist of one (1) Health Physics Technician and one (1) Radio Chemistry Technician. The regulatory expectation is that these "on-shift" individuals are trained and proficient in task performance.

NUREG-0654, Table B-1 specifies one (1) Radiochemistry qualified individual to perform the "on-shift" Chemistry / Radiochemistry work and one (1) HP technician qualified individual for in-plant surveys. The NUREG also specifies two (2) HP technician-qualified individuals for access control, HP coverage, personnel monitoring and dosimetry, but noted that these latter functions could be provided by shift personnel assigned other functions.

Inthe past station administrative controls prevented chemistry personnel from performing HP functions and visa-versa. As a result, it was necessary to assign three individuals to each shift, two (2) HP qualified individuals and one (1) Radio chemistry qualified individual, to fulfill the above listed requirements.

The administrative restriction relative to sharing chemistry and radiation protection work has been removed and the requested change to Table B-1 reflects this administrative realignment such that it is now possible to perform the above listed "on-shift" functions with two (2) properly trained (qualified) technicians.

The Table B-1 revision will ensure that at least two (2) qualified individuals are "on shift" to perform all expected RP and radiochemistry work. This change will be implemented either by maintaining an "on-shift" staff consisting of one qualified (1)

RP Technician and one (1) other individual that is qualified to perform both radiation protection and radiochemistry support tasks or by using the current staff which consists of two (2) qualified RP technicians and one (1)qualified Radiochemistry technician. This change is consistent with NRC regulatory guidance for minimum "on-shift' radiation protection and radiological/radiochemistry staffing as specified in Table B-1 of NUREG-0654. This change will not degrade the effectiveness of the 3

Letter 2.05.086 Enclosure existing Emergency Plan or the associated implementing procedures because an adequate number of qualified individuals will be available "on-shift" to perform required radiation protection and radio-chemistry support tasks.

Subsequent to development and implementation of the initial Emergency Plan, the "on-shift" radiochemistry support task workload has been significantly reduced resulting from the changes to the Post Accident Sampling System (PASS) as defined in License Amendment No. 204 (issued November 14,2003, reference 4). Based on this amendment, the Emergency Plan was updated to eliminate numerous PASS sampling requirements that previously supported emergency response decision making during the initial accident phase. This greatly reduces the task burden for performing radiochemistry tasks prior to arrival of the "60 minute" Radio Chemistry Technician.

PNPS has reviewed the existing emergency actions required during the first 60 minutes and ensured that all required radiation protection and radiochemistry tasks can be completed using the two (2), individuals that are assigned to the shift. The individual assigned to fill the RP / Radio Chemistry Technician function will as a minimum be qualified to perform radiochemistry tasks, and may also be cross trained to perform RP tasks. Ifthe assigned RP / Radio Chemistry Technician is not qualified to perform RP tasks, then an additional RP technician will be assigned to the shift.

The potential elimination of one (1)of two (2) "on-shift" RP Technicians from the Ops Accident Assessment Support Functional Area will be compensated by ensuring that one of the two individuals assigned to "on-shift" staff is trained to perform required RP and radiochemistry tasks. This ensures that at least two (2) qualified individuals remain "on-shift" to perform all RP and Radiochemistry work. This revised "on-shifr complement meets the minimum "on-shift" radiological and radiochemistry staffing specified in Table B-1 of NUREG-0654 and does not reduce the number of individuals that are available and qualified to perform required radiation protection support tasks.

A footnote contained in NUREG-0654, Table B-1 under the Protective Actions (in plant) Functional Area for the "on-shift" Health Physics (HP) Technicians, identifies that coverage "may be provided by shift personnel assigned other functions." Table B-1 to the Emergency Plan will adopt this wording to ensure consistency with the NUREG and to remove unnecessary detail. This change will not adversely impact the plan because the number of "on-shift" individuals qualified to perform radiation protection tasks to support the Protective Action (in-plant) Functional Area has not changed.

Table B-1 staff augmentation levels for the 30 minute and 60 minute Radiation Protection Technician response and the 60 minute Radio Chemistry Technician response are not being revised and continue to be consistent with, Table B-1 of NUREG-0654. A review of required radiation protection monitoring tasks that are required after 30 and 60 minutes reveals that elimination of one "on-shift" RP Technician will not negatively impact the ability to perform the required workload.

4

Letter 2.05.086 Enclosure In summary, the proposed changes were reviewed against the NRC regulations of 10 CFR 50.47(b)(1), 10 CFR 50.47(b)(2) and 10 CFR 50, App. E, IV,A.

"Organization" and regulatory guidance of NUREG-0654/FEMA-REP-1, to ensure that the effectiveness of the Emergency Plan and implementing procedures are not compromised or degraded. It was determined that:

- "on-shift" responsibilities for emergency response continue to be unambiguously defined;

- adequate staffing to provide initial accident response in key functional areas continues to be maintained;

- timely augmentation of response capabilities is available; and

- interfaces among various onsite response activities and offsite support and response activities remain specified.

The proposed changes ensure that the Emergency Plan meets the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. However, since this proposed change involves a reduction of existing "on-shift" staffing levels and realignment of functional tasks as currently committed in Table B-1 of the Emergency Plan, it has been concluded that the proposed change will require NRC review and approval prior to implementation.

6. Precedents This proposed Table B-1 revision reflects Emergency Plan staffing changes similar to those previously approved by the NRC for R.E. Ginna (Approved July 24, 2003 TAC No. MB7240) and Waterford 3 (Approved September 30, 2002 - TAC No.

MB1462). This proposed revision is not identical to those requests due to differences in the Emergency Plans at each site and the exact approach each licensee took to amend their Emergency Plans. However, the overall intent of the requests is believed to be the same with very similar justifications.

Furthermore, the Emergency Plan change and the evaluation documented in this submittal are consistent with the regulatory criteria used to judge the acceptability of previously approved Emergency Plans.

7. References
1. NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", dated November 1980.
2. 10 CFR 50.47(b)(1) and 10 CFR 50.47(b)(2)
3. 10 CFR 50, Appendix E, IV,A."Organization"
4. USNRC Letter Number 1.03.128, "Pilgrim Nuclear Power Station - Issuance of Amendment No. 204 Re: Elimination of Requirements for Post Accident Sampling System (TAC No. MB8138)", dated November 14, 2003 5

Attachment I to 2.05.086 Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Plant Proposed Revision to the Emergency Plan Table B-1 Minimum Staffing Table (1 total page)

P;,k PNPS EMERGENCY PLAN Table B-1: Minimum Statfino Reauirements for the PNPS ERO 11)

Functional Ara Major Task Position Title Re2s=9*

Plant Oee6rations Plait Stabilzation Shift manager On ShhUf Asassessment OpenOonal Aspects Accidnt MUIgation Control 1ooM 5 ervlsof On ShiS Lic. fAc. Plant Operator (2) On Shins

__Un. Nu. Pat Operatof (2) Ons8w Emeigec Direction Effergeny Clast&A~ci Shill MarsgeW On Shift Ezmeqeprcy Contvi PARS Conaro Room Spervio On Shllfl Emergency Direct*r nln.

_________________ _______________ Emergency Plait OmsSupi go miln.

NcOtlcation and CAmrnunkaflons NOVlt1alln ot PNM~Local. Enginee (ShAf Cmnrci Nm On Shtit Comniamaili. and Federal Emergency Com Supv 30 atm.

personnel and Maintain Co nwicalre StWi 2) 60 min.

Rad Makid Assesmarne* EOF Direion Emegec, Ofat, Vanager 60 mi,.

Ops Accident Assesasweri Support 01iRk Does Assassar"n Olftfte Raddlogklca Supy 30 mn*.

O6fste SWe,,s RUT M,*wrer (2) 30 rin,.

_ _ _Maranter.vr'*V"

_ 60 Min.

Outsit and n-pla&mt Suryeys "Ti: il 7 F On S"iftn FOPTe&"nc&nII,.- ~ 30 Mkh

_____________ P Tedwtirim (2) 60l KgLi cherf"tlyl RaI P~ A~ Chan. Temnclietn on 51,111 R g ,adi Chain-. Techncian so Min.

Pledt Sysem Enrgtneeftn TS S  ! ý E-Mergn Plier LaWOWe SOm.

ear e Correcnft Actions Tecnca Support En~ (ShA Corr R*) On Shf Engineer (Fleactor 30 rwidn.

Engineer (Medhtricei) 60 froin Equontert Repalrs Nuclear Malm. Technician 30 amn Corrective Actlor. Nuclear Mainl. Tedunclan S ran.

Nuc. ait Reactor Operator On SrAfts Nuc. Plant Rector Operalor 60 mi.

Nuclear "m~n Elowctalc)(2) 30 ml.

Nudear MaW. (lectulcal) 60 Min.

Nuclear Cotiml TrhrcanM(2 30 n30m.

Proteclie Acions (In P ) adation Proteon. Access RP Technkian E2)- On SUNl Control. RP Coeamge. NP Todrk*lsn (2) 3D min.

Persnkel Moniitoulng, w4d RP Techn~fin (2) 60 min.

DOsimne ry Fiare lghting Fire Brlgafte on shint

_______________ Plymoatih Fire Dept. on caln Rescue Ops sand First Aid EMP* On ShdWt Amrunlarce service OnCt Ste Aocasa Contr and Pesmnnal Securiy Sec"'ty Force- On Shife Ac=.!!abtft I _ _ _ _ ____ __

LL--I a On brmUl personlis w

- A erson issaid to be arn sinm w?

the PNPS owner controled nares orrV,onnormat or auuiiotzea ovtie at hlus the connecting roads between them with Station Management approval.

Postion staffed Inaccordance with technical speol.catlons.u.

Position staffed in accordance with technical soeiicarlons and statn procedures.

(MEeacyMedical Personneit uaS qaiida[ MIS RNs, First Responders, NOTE: Response times are based on optimum travel conditions.

(1) This table B-1 is incorporated into the Emergency Plan in accomdance wt USNRC Generic Lett 92-33 dated 112/17182..

~s-~

Cj c\f

(

b'*~ Y~Kcx~=-

IA