ML080320360

From kanterella
Jump to navigation Jump to search
Pilgrim - Declaration of William H. Spataro, Steven P. Woods and Brian R. Sullivan and Alan Cox in Support of Entergy'S Pre-filed Testimony on Pilgrim Watch Contention 1
ML080320360
Person / Time
Site: Pilgrim
Issue date: 01/08/2008
From: Cox A, Spataro W, Brian Sullivan, Susanne Woods
Entergy Nuclear Generation Co, Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECYRAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS 15010
Download: ML080320360 (5)


Text

January 8, 2008 UNITED STATES -01<' A.MERICA DOCKETED USNRC N-tJ-(~LLillR£GIJL~TORYCOl\ll'ilSSlO~~

January 28; 2008 (8:30am)

Before the AtomifO S::tfdy and T,1censino: Board Panel OFFICE OF SECRETARY RULEMAKINGS AND In the Maner of J ADJUDICATIONS STAFF

)

E-ntergy Nuclear Generation C01111-1any and )

Entergy Nuclear Operations, Inc. }

)

(Pilgrim Nuclear Power Station)

D£CL~~P~L\.TION OF 'VILLI~~_l\l H .. SP~~T~L\RO IN SiJPPORT OF ENTERGY'S PP-£=

FiLED TESTII\,IONY ON PILGRIIVI WATCH CONTENTION 1 1, William H.Spataro, do hereby state thefollowing:

. UntilDecember 31 ,20U7,1 was the Senior StaffEngineer-Corporate 'Metallurgist with Entersrv NlIc1ear Mv rner<;onal

~ __ L_-Q.J -'~-----'- - -,.;' - - .... --~_*~

address --

--~._-----

is? Rmninf!

~-

Brush Court


...- -0:=;---.--- ---- -:; Pomona NY 10970


~--:;

In that oosition I nrovided technical sunnorr r------ -::J -A.-~ -_._-. --- -----.-- in metalluruv corrosion weldine and forensic

---rr --- ---------------.c;... -7 - ---------;; -------.;;-:: -----. -- ----

investiuation in SUODOli

.i.....

of Enterzv' S oneration of its nuclear nlants. I am a National Board

_ .. - 1. .i Registered Certified Nuclear Safety Related Coating Engineer and have extensive experience in the coating and cortosion.ofburied pipes. A statement of my professional qualifications is attached.

r nrovide this declaration in sunnort ofEntercv's nrc-filed testimony on Pilerim Watch il ~  ;; _... j, _ "'-"

Contention 1 pursuant to the December 19_ 2007 Atomic Safety and Licensing Board Order.

into the record of this proceed-ing. 1 declare under penalty of perjury that those statements, and

i#

my statements in this declaration, are true and correct to the best of my knowledge, information, and belief Executed January 8, 2007 William H. Spataro

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF STEVEN P. WOODS IN SUPPORT OF ENTERGY'S PRE-FILED TESTIMONY ON PILGRIM WATCH CONTENTION 1 I, Steven P. Woods, do hereby state the following:

I am the Manager, Programs & Engineering Components for Pilgrim Nuclear Power Station ("PNPS"). My business address is 600 Rocky Hill Road, Plymouth, MA 02360. I knowledgeable of the PNPS aging management program for buried pipes and tanks and was responsible for site engineering to install buried salt service water inlet piping at PNPS in 1993.

A statement of my professional qualifications is attached.

I provide this declaration in support of Entergy's pre-filed testimony on Pilgrim Watch Contention 1 pursuant to the December 19, 2007 Atomic Safety and Licensing Board Order.

I attest to the accuracy of those statements attributed to me (that material marked by my initials in Entergy's pre-filed testimony), support them as my own, and endorse their introduction into the record of this proceeding. I declare under penalty of perjury that those statements, and my statements in this declaration, are true and correct to the best of my knowledge, information, and belief Executed on January 8, 2008 Steven P. Woods

C, UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF BRIAN R. SULLIVAN IN SUPPORT OF ENTERGY'S PRE-FILED TESTIMONY ON PILGRIM WATCH CONTENTION 1 I, Brian R. Sullivan, do hereby state the following:

I am the Engineering Director for Pilgrim Nuclear Power Station ("PNPS"). My business address is 600 Rocky Hill Road, Plymouth, MA 02360. I am currently responsible for engineering support at PNPS and I am knowledgeableof the intended functions for license renewal components and of the aging management programs credited for buried pipes and tanks for PNPS license renewal. A statement of my professional qualifications is attached.

I provide this declaration in support of Entergy's pre-filed testimony on Pilgrim Watch Contention 1 pursuant to the December 19, 2007 Atomic Safety and Licensing Board Order.

I attest to the accuracy of those statements attributed to me (that material marked by my initials in Entergy's pre-filed testimony), support them as my own, and endorse their introduction into the record of this proceeding. I declare under penalty of perjury that those statements, and my statements in this declaration, are true and correct to the best of my knowledge, information, and belief.

Executed on January 8, 2008 r

B ria h CS u Iiva-n

7 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF ALAN B. COX IN SUPPORT OF ENTERGY'S PRE-FILED TESTIMONY ON PILGRIM WATCH CONTENTION 1 I, Alan B. Cox, do hereby state the following:

I am the Technical Manager, License Renewal for Entergy Nuclear. My business address is 1448 State Road 333, Russelville, AR 72801. I was involved in preparing the license renewal application and developing aging management programs for the Pilgrim Nuclear Power Station license renewal project and have extensive experience and knowledge in the preparation of license renewal applications. A statement of my professional qualifications is attached.

I provide this declaration in support of Entergy's pre-filed testimony on Pilgrim Watch Contention 1 pursuant to the December 19, 2007 Atomic Safety and Licensing Board Order.

I attest to the accuracy of those statements attributed to me (that material marked by my initials in Entergy's pre-filed testimony), support them as my own, and endorse their introduction into the record of this proceeding. I declare under penalty of perjury that those statements, and my statements in this declaration, are true and correct to the best of my knowledge, information, and belief Executed on January 8, 2008 Alan B. Cox