ML070720526: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML070720526
| number = ML070720526
| issue date = 03/01/2007
| issue date = 03/01/2007
| title = Turkey Point Units 3 & 4, Semiannual Fitness for Duty Performance Report for Period of July Through December, 2006
| title = Semiannual Fitness for Duty Performance Report for Period of July Through December, 2006
| author name = Jefferson W
| author name = Jefferson W
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FPL 10 CFR 26.71 L-2007-33 March 1, 2007 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period of July 1, 2006, through December 31, 2006, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.The attachment contains the program performance data, as well as, a list of events reported and a summary of any management actions taken.Should there be any questions or comments regarding this information, please contact Mr. James Connolly at 305-246-6632.
{{#Wiki_filter:FPL 10 CFR 26.71 L-2007-33 March 1, 2007 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period of July 1, 2006, through December 31, 2006, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).
Very truly yours, William J~fferson, Jr.Vice President Turkey Point Nuclear Plant Attachment cc: Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant AokbI an FPL Group company Attachment FPL Letter L-2007-33 Page 1 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 FLORIDA POWER AND LIGHT Company TURKEY POINT PLANT Location JIM DENTON Contact Name Cutoffs: Screen/Confirmation (ng/ml)Marijuana 50/15 Amphetamines Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC)12/31/2006 Six (6) Month Ending (305) 246-7171 Phone (include Area Code)Appendix A to 10 CFR 26 MARIJUANA 100/15 //1000/500 25/25.04%TESTING LICENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access 980 214 458 TOTAL: 1699 CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 139 0 0 0 706 TOTAL: 845 Post 0 0 2 0 1 0 For Cause Accident TOTAL: Observed 0 0 8 Behavior Random 263 1 59 0 129 0 TOTAL: 451 Follow-up 17 0 0 0 11 0 TOTAL: 28 Other:
The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.
* 15 6 0 0 0 9 Listedin preaccess (4)TOTAL 429 1 62 0 856 7 Attachment FPL Letter L-2007-33 Page 2 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending: 12/31/2006 Refusal CATEGORY:
The attachment contains the program performance data, as well as, a list of events reported and a summary of any management actions taken.
Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol to Test Licensee Employees 0 0 0 0 0 1 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 5 3 0 0 0 1 0 TOTAL 5 3 0 0 0 2 0 Total 10* Other: 15 retests observed, 8 due to dilute, all negative and 7 retests due to no temp, which 4 resulted in positives results.** 2 of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50 ng/ml) but did not exceed the DHHS/NRC cutoff level of (100 ng/ml). The remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. Two short term contractors were positive for marijuana and cocaine on their pre-access test.FFD Performance Data Review/Comments:
Should there be any questions or comments regarding this information, please contact Mr. James Connolly at 305-246-6632.
: 1. Were any programmatic weaknesses identified:
Very truly yours, William J~fferson, Jr.
None 2. What management actions have been taken or initiated?
Vice President Turkey Point Nuclear Plant Attachment cc:     Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant AokbI an FPL Group company
If any, explain: None 3. Notate any specimens that were adulterated and substance detected:
 
None 4. 2006 Percent of Random Population Tested: Per ACX % tested was 53.2%}}
Attachment                                                 FITNESS FOR DUTY PROGRAM FPL Letter L-2007-33                                       PERFORMANCE DATA Page 1 of 2                                                 PERSONNEL SUBJECT TO 10 CFR 26 FLORIDA POWER AND LIGHT                                       12/31/2006 Company                                             Six (6) Month Ending TURKEY POINT PLANT Location JIM DENTON                                                 (305) 246-7171 Contact Name                                       Phone (include Area Code)
Cutoffs: Screen/Confirmation (ng/ml)                                 Appendix A to 10 CFR 26 Marijuana       50/15     Amphetamines       1000/500          MARIJUANA 100/15        /
Cocaine         300/150     Phencyclidine       25/25
                                                                                                    /
Opiates         300/300     Alcohol (%BAC)     .04%
TESTING                         LICENSEE                       LONG-TERM                         SHORT-TERM RESULTS                         EMPLOYEES                 CONTRACTOR PERSONNEL           CONTRACTOR PERSONNEL Average Number     with Unescorted Access                         980                           214                               458 TOTAL:     1699 CATEGORIES                     TESTED             POSITIVE       TESTED       POSITIVE           TESTED           POSITIVE Pre-Access 139                 0             0             0                 706 TOTAL: 845 Post                 0                   0             2             0                   1             0 For Cause   Accident TOTAL:       Observed                                                                       0                         0 8       Behavior Random 263                 1             59             0                 129             0 TOTAL: 451 Follow-up                         17                 0             0             0                 11             0 TOTAL: 28 6                 0               0             0                 9           Listedin Other:
* 15 preaccess (4) 429                 1             62             0                 856             7 TOTAL
 
Attachment                                               FITNESS FOR DUTY PROGRAM FPL Letter L-2007-33                                     PERFORMANCE DATA Page 2 of 2                                             PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending:             12/31/2006 Refusal CATEGORY:                       Marijuana         Cocaine       Opiates     Amphetamines       Phencyclidine         Alcohol       to Test Licensee Employees                   0               0             0               0                 0                 1               0 Long-Term Contractors               0               0             0               0                 0                 0               0 Short-Term Contractors               5               3             0               0                 0                 1               0 TOTAL                               5               3             0               0                 0                 2               0 Total 10
* Other: 15 retests observed, 8 due to dilute, all negative and 7 retests due to no temp, which 4 resulted in positives results.
**     2       of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50 ng/ml) but did not exceed the DHHS/NRC cutoff level of (100 ng/ml). The remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. Two short term contractors were positive for marijuana and cocaine on their pre-access test.
FFD Performance Data Review/Comments:
: 1. Were any programmatic weaknesses identified:                         None
: 2. What management actions have been taken or initiated? If any, explain:                         None
: 3. Notate any specimens that were adulterated and substance detected:       None
: 4. 2006 Percent of Random Population Tested:                     Per ACX % tested was 53.2%}}

Latest revision as of 09:32, 23 November 2019

Semiannual Fitness for Duty Performance Report for Period of July Through December, 2006
ML070720526
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/01/2007
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2007-33
Download: ML070720526 (3)


Text

FPL 10 CFR 26.71 L-2007-33 March 1, 2007 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period of July 1, 2006, through December 31, 2006, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).

The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.

The attachment contains the program performance data, as well as, a list of events reported and a summary of any management actions taken.

Should there be any questions or comments regarding this information, please contact Mr. James Connolly at 305-246-6632.

Very truly yours, William J~fferson, Jr.

Vice President Turkey Point Nuclear Plant Attachment cc: Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant AokbI an FPL Group company

Attachment FITNESS FOR DUTY PROGRAM FPL Letter L-2007-33 PERFORMANCE DATA Page 1 of 2 PERSONNEL SUBJECT TO 10 CFR 26 FLORIDA POWER AND LIGHT 12/31/2006 Company Six (6) Month Ending TURKEY POINT PLANT Location JIM DENTON (305) 246-7171 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 MARIJUANA 100/15 /

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (%BAC) .04%

TESTING LICENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access 980 214 458 TOTAL: 1699 CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 139 0 0 0 706 TOTAL: 845 Post 0 0 2 0 1 0 For Cause Accident TOTAL: Observed 0 0 8 Behavior Random 263 1 59 0 129 0 TOTAL: 451 Follow-up 17 0 0 0 11 0 TOTAL: 28 6 0 0 0 9 Listedin Other:

  • 15 preaccess (4) 429 1 62 0 856 7 TOTAL

Attachment FITNESS FOR DUTY PROGRAM FPL Letter L-2007-33 PERFORMANCE DATA Page 2 of 2 PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending: 12/31/2006 Refusal CATEGORY: Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol to Test Licensee Employees 0 0 0 0 0 1 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 5 3 0 0 0 1 0 TOTAL 5 3 0 0 0 2 0 Total 10

  • Other: 15 retests observed, 8 due to dilute, all negative and 7 retests due to no temp, which 4 resulted in positives results.
    • 2 of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50 ng/ml) but did not exceed the DHHS/NRC cutoff level of (100 ng/ml). The remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. Two short term contractors were positive for marijuana and cocaine on their pre-access test.

FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified: None
2. What management actions have been taken or initiated? If any, explain: None
3. Notate any specimens that were adulterated and substance detected: None
4. 2006 Percent of Random Population Tested: Per ACX % tested was 53.2%