| title = Calvert Cliffs, Units 1 & 2 - Technical Specification Bases, B 3.2 Power Distribution Limits, Pages B 3.2.1-1 Through B 3.2.5-6
| title = Technical Specification Bases, B 3.2 Power Distribution Limits, Pages B 3.2.1-1 Through B 3.2.5-6
| author name =  
| author name =  
| author affiliation = Constellation Energy Group
| author affiliation = Constellation Energy Group
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LHR B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Linear Heat Rate (LHR)
{{#Wiki_filter:LHR B 3.2.1 B 3.2   POWER DISTRIBUTION LIMITS B 3.2.1   Linear Heat Rate (LHR)
BASES BACKGROUND        The purpose of this Limiting Condition for Operation (LCO) is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a loss of coolant accident (LOCA), loss of flow accident (LOFA), ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:
: a. Using CEAs to alter the axial power distribution;
: b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
: c. Correcting less than optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution satisfies this LCO. The limiting safety system settings (LSSS) and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that specified acceptable fuel design limits (SAFDLs) are not exceeded as a result of anticipated operational occurrences (AOOs), and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.
CALVERT CLIFFS - UNITS 1 & 2        B 3.2.1-1                        Revision 2


BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-1Revision 2BACKGROUNDThe purpose of this Limiting Condition for Operation (LCO)is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within
LHR B 3.2.1 BASES Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits on linear heat rate (LHR) and departure from nucleate boiling (DNB).
The limits on LHR, Total Planar Radial Peaking Factor
( F Txy ), Total Integrated Radial Peaking Factor ( F Tr ),
AZIMUTHAL POWER TILT (Tq), and AXIAL SHAPE INDEX (ASI) represent limits within which the LHR algorithms are valid.
These limits are obtained directly from the core reload analysis.
Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the axial power distribution (APD) trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LHR is within its limits. At high power, the detector alarms maintain the peak LHR below the LHR LCO limit based on the LOCA analysis only. At low power, the non-LOCA LHR LCO limits are more restrictive. Operation within the axial shape index limits of the excore DNB LCO assure that these non-LOCA LHR LCO limits will not be reached. The Excore Detector Monitoring System performs this function by continuously monitoring ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the Core Operating Limit Report (COLR).
In conjunction with the use of the Excore Detector Monitoring System and in establishing ASI limits, the following assumptions are made:
: a.      The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
: b.      The Tq restrictions of LCO 3.2.4 are satisfied; and CALVERT CLIFFS - UNITS 1 & 2          B 3.2.1-2                          Revision 14


the limits imposed by this LCO either limits or prevents
LHR B 3.2.1 BASES
: c. F Txy is within the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors and alarms that have been established for the individual incore detector segments, ensuring that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.
APPLICABLE        The fuel cladding must not sustain damage as a result of SAFETY ANALYSES  normal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:
: a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);
: b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
: c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SHUTDOWN MARGIN (SDM) with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in determining the power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum linear heat generation rate (LHGR) so that the peak cladding temperature does not exceed 2200°F CALVERT CLIFFS - UNITS 1 & 2        B 3.2.1-3                      Revision 14


potential fuel cladding failures that could breach the
LHR B 3.2.1 BASES (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
 
The LCOs governing LHR, ASI, and the Reactor Coolant System (RCS) ensure that these criteria are met as long as the core is operated within the ASI, F Txy , F Tr , and Tq limits specified in the COLR. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.
primary fission product barrier and release fission products
Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
 
Fuel cladding damage does not normally occur while the unit is operating at conditions outside the limits of these LCOs during normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial conditions outside the limits of these LCOs. The potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and can correspondingly increase local LHR.
to the reactor coolant in the event of a loss of coolant
The LHR satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.
 
LCO              The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limitation on the LHR ensures that, in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200°F. However, fuel cladding damage does not normally occur when outside the LCO limit if an accident does not occur.
accident (LOCA), loss of flow accident (LOFA), ejected control element assembly (CEA) accident, or other postulated
CALVERT CLIFFS - UNITS 1 & 2      B 3.2.1-4                            Revision 14
 
accident requiring termination by a Reactor Protective
 
System trip function. This LCO limits the amount of damage
 
to the fuel cladding during an accident by ensuring that the
 
plant is operating within acceptable bounding conditions at
 
the onset of a transient.
Methods of controlling the power distribution include:a.Using CEAs to alter the axial power distribution;b.Decreasing CEA insertion by boration, thereby improving the radial power distribution; andc.Correcting less than optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in
 
conjunction with other core operating parameters (e.g., CEA
 
insertion and alignment limits), the power distribution
 
satisfies this LCO. The limiting safety system settings (LSSS)and this LCO are based on the accident analyses (Reference 1 , Chapter 14
), so that specified acceptable fuel design limits (SAFDLs) are not exceeded as a result of anticipated operational occurrences (AOOs), and the limits
 
of acceptable consequences are not exceeded for other
 
postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant
 
factor in controlling the axial power distribution.
LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-2Revision 14 Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power
 
distributions. Operation within the design limits of power
 
distribution is accomplished by generating operating limits
 
on linear heat rate (LHR) and departure from nucleate
 
boiling (DNB).
The limits on LHR, Total Planar Radial Peaking Factor (xy T F), Total Integrated Radial Peaking Factor (r T F), AZIMUTHAL POWER TILT (T q), and AXIAL SHAPE INDEX (ASI) represent limits within which the LHR algorithms are valid.
 
These limits are obtained directly from the core reload analysis.Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the axial power distribution (APD)
 
trip will limit the allowed ASI during operation. The core
 
reload analysis verifies that ASI limits for the LHR and DNB
 
LCOs are not necessary below 20% power.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore
 
Detector Monitoring System, provides adequate monitoring of
 
the core power distribution and is capable of verifying that


the LHR is within its limits.
LHR B 3.2.1 BASES APPLICABILITY    In MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.
At high power, the detector alarms maintain the peak LHR below the LHR LCO limit based on the LOCA analysis only. At low power, the non-LOCA LHR LCO limits are more restrictive. Operation within the axial shape index limits of the excore DNB LCO assure that these non-LOCA LHR LCO limits will not be reached.
ACTIONS          A.1 With the LHR exceeding its limit, excessive fuel damage could occur following an accident. In this Condition, prompt action must be taken to restore the LHR to within the specified limits. One hour to restore the LHR to within its specified limits is reasonable and ensures that the core does not continue to operate in this Condition. The 1-hour Completion Time also allows the operator sufficient time for evaluating core conditions and for initiating proper corrective actions.
The Excore Detector Monitoring System performs this function by
B.1 If the LHR cannot be returned to within its specified limits, THERMAL POWER must be reduced. Since ASI limits for LHR are not required below 20% Rated Thermal Power (RTP),
then the actions of A.1 can be met by reducing power to
                  < 20% RTP. Reducing THERMAL POWER to < 20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative condition. This action is also consistent with the required actions for the SAFDL on DNB. The allowed Completion Time of 6 hours is reasonable, based on operating experience, to reach the applicable power level from full power MODE 1 conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE      A Note was added to the Surveillance Requirements (SRs) to REQUIREMENTS      require LHR to be determined by either the Excore Detector Monitoring System or the Incore Detector Monitoring System.
SR 3.2.1.1 The periodic SR to verify the value of F Txy ensures that the LHR remains within the range assumed in the analysis.
Determining the measured F Txy every 72 hours when the CALVERT CLIFFS - UNITS 1 & 2      B 3.2.1-5                        Revision 14


continuously monitoring ASI with the OPERABLE quadrant
LHR B 3.2.1 BASES excores are used to monitor LHR ensures the power distribution parameters are within limits when full core mapping is not being used.
Performance of the SR every 72 hours of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Txy and LHR are promptly detected.
The SR is modified by a Note that only requires the SR to be performed when the excores are being used to determine LHR.
This SR is not required when the LHR is being measured by the incores, which is a more accurate measure of Core Power Distributions.
SR 3.2.1.2 This SR requires verification that the ASI alarm setpoints are within the limits specified in the COLR. Performance of this SR ensures that the Excore Detector Monitoring System can accurately monitor the LHR, and provide alarms when LHR is not within limits. Therefore, this SR is only applicable when the Excore Detector Monitoring System is being used to determine the LHR. The F Txy value determined by SR 3.2.1.1 is used in the derivation of the ASI alarm setpoint specified in the COLR. The 31-day Frequency is appropriate for this SR because it is consistent with the requirements of SR 3.3.1.3 for calibration of the excore detectors using the incore detectors.
The SR is modified by a Note that states that the SR is only applicable when the Excore Detection Monitoring System is being used to determine LHR. The reason for the Note is that the excore detectors input neutron flux information into the ASI calculation.
SR 3.2.1.3 and SR 3.2.1.4 Continuous monitoring of the LHR is provided by the Incore Detector Monitoring System and the Excore Detector Monitoring System. Either of these two core power distribution monitoring systems provides adequate monitoring of the core power distribution and is capable of verifying that the LHR does not exceed its specified limits.
CALVERT CLIFFS - UNITS 1 & 2      B 3.2.1-6                        Revision 14


symmetric excore neutron flux detectors and verifying that
LHR B 3.2.1 BASES Performance of these SRs verifies that the Incore Detector Monitoring System can accurately monitor LHR. Therefore, they are only applicable when the Incore Detector Monitoring System is being used to determine the LHR.
A 31-day Frequency is consistent with the historical testing frequency of the incore detector monitoring system. The SRs are modified by two Notes. Note 1 allows the SRs to be performed only when the Incore Detector Monitoring System is being used to determine LHR. Note 2 states that the SRs are not required to be performed when THERMAL POWER is
                  < 20% RTP. The accuracy of the neutron flux information from the incore detectors is not reliable at THERMAL POWER
                  < 20% RTP.
REFERENCES        1. Updated Final Safety Analysis Report (UFSAR)
: 2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2      B 3.2.1-7                        Revision 14


the ASI is maintained within the allowable limits specified
F T
xy B 3.2.2 B 3.2  POWER DISTRIBUTION LIMITS Total Planar Radial Peaking Factor ( F xy )
T B 3.2.2 BASES BACKGROUND        The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO decreases or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected CEA accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:
: a. Using CEAs to alter the axial power distribution;
: b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
: c. Correcting off- optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power CALVERT CLIFFS - UNITS 1 & 2        B 3.2.2-1                        Revision 2


in the Core Operating Limit Report (COLR).
F T
In conjunction with the use of the Excore Detector Monitoring System and in establishing ASI limits, the
xy B 3.2.2 BASES distribution is accomplished by generating operating limits on the LHR and DNB.
The limits on LHR, F Txy , Total Integrated Radial Peaking Factor ( F Tr ), Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following assumptions are made:
: a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
: b. The Tq restrictions of LCO 3.2.4 are satisfied; and
: c. F Txy does not exceed the limits of this LCO.
The Incore Detector Monitoring System provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.
APPLICABLE        The fuel cladding must not sustain damage as a result of SAFETY ANALYSES  normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The Power Distribution and CEA Insertion and CALVERT CLIFFS - UNITS 1 & 2          B 3.2.2-2                        Revision 8


following assumptions are made:a.The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;b.The T q restrictions of LCO 3.2.4 are satisfied; and LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-3Revision 14 c.xy T F is within the limits of LCO 3.2.2.
F T
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors and alarms that
xy B 3.2.2 BASES Alignment LCOs preclude core power distributions that violate the following fuel design criteria:
: a. During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);
: b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
: c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck, fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This limiting is accomplished by maintaining the power distribution and reactor coolant conditions such that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and the uncertainties in the determination of power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200&deg;F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , F Tr , and Tq limits specified in the COLR. The latter are process variables that characterize the three dimensional power distribution of the reactor core.
Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.
CALVERT CLIFFS - UNITS 1 & 2            B 3.2.2-3                        Revision 14


have been established for the individual incore detector
F T
 
xy B 3.2.2 BASES Fuel cladding damage does not normally occur while at conditions outside the limits of these LCOs during normal operation. Fuel cladding damage could result, however, should an accident or AOO occur from initial conditions outside the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and correspondingly increased local LHR.
segments, ensuring that the peak LHRs are maintained within
F Txy satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.
 
LCO              The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limitation on LHR ensures that in the event of a LOCA the peak temperature of the fuel cladding does not exceed 2200&deg;F.
the limits specified in the COLR. The setpoints for these
APPLICABILITY    In MODE 1, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.
 
ACTIONS          A.1 The limitations on F Txy provided in the COLR ensure that the assumptions used in the analysis for establishing the LHR, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If F Txy exceeds its basic limitation ( F Txy > all rods out, full power limit),
alarms include allowances described in the COLR.APPLICABLEThe fuel cladding must not sustain damage as a result of SAFETY ANALYSESnormal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and
six hours is provided to restore F Txy to within limits. The combination of THERMAL POWER and F Txy must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6.
 
Six hours to return F Txy to within its limit is reasonable CALVERT CLIFFS - UNITS 1 & 2        B 3.2.2-4                        Revision 12
alignment LCOs preclude core power distributions that
 
violate the following fuel design criteria:a.During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);b.During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a
 
DNB condition;c.During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); andd.The control rods must be capable of shutting down the reactor with a minimum required SHUTDOWN MARGIN (SDM)
 
with the highest worth control rod stuck fully
 
withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited
 
to maintain the fuel design criteria (Reference 2). This is
 
accomplished by maintaining the power distribution and
 
reactor coolant conditions so that the peak LHR and DNB
 
parameters are within operating limits supported by accident
 
analyses (Reference 1, Chapter 14), with due regard for the
 
correlations between measured quantities, the power
 
distribution, and uncertainties in determining the power
 
distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum linear heat generation rate (LHGR) so that the peak cladding temperature does not exceed 2200&deg;F LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-4Revision 14 (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a
 
Zirconium-water reaction.
The LCOs governing LHR, ASI, and the Reactor Coolant System (RCS) ensure that these criteria are met as long as the core is operated within the ASI, xy T F , r T F , and T q limits specified in the COLR. The latter are process variables that characterize the three-dimensional power distribution
 
of the reactor core. Operation within the limits for these
 
variables ensures that their actual values are within the ranges used in the accident analyses.
Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the
 
allowed ASI during operation. The core reload analysis
 
verifies that ASI limits for the LHR and DNB LCOs are not
 
necessary below 20% power.
Fuel cladding damage does not normally occur while the unit is operating at conditions outside the limits of these LCOs
 
during normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial
 
conditions outside the limits of these LCOs. The potential
 
for fuel cladding damage exists because changes in the power
 
distribution can cause increased power peaking and can
 
correspondingly increase local LHR.
The LHR satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.LCOThe power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. The power
 
distribution LCO limits, except T q , are provided in the COLR. The limitation on the LHR ensures that, in the event
 
of a LOCA, the peak temperature of the fuel cladding does
 
not exceed 2200&deg;F. However, fuel cladding damage does not
 
normally occur when outside the LCO limit if an accident does not occur.
LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-5Revision 14APPLICABILITYIn MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient
 
THERMAL POWER to require a limit on the core power distribution.ACTIONSA.1 With the LHR exceeding its limit, excessive fuel damage could occur following an accident. In this Condition, prompt action must be taken to restore the LHR to within the
 
specified limits. One hour to restore the LHR to within its
 
specified limits is reasonable and ensures that the core
 
does not continue to operate in this Condition. The 1-hour Completion Time also allows the operator sufficient time for evaluating core conditions and for initiating proper
 
corrective actions.
B.1 If the LHR cannot be returned to within its specified limits, THERMAL POWER must be reduced. Since ASI limits for
 
LHR are not required below 20% Rated Thermal Power (RTP),
then the actions of A.1 can be met by reducing power to 20% RTP. Reducing THERMAL POWER to  20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative
 
condition. This action is also consistent with the required
 
actions for the SAFDL on DNB. The allowed Completion Time
 
of 6 hours is reasonable, based on operating experience, to
 
reach the applicable power level from full power MODE 1
 
conditions in an orderly manner and without challenging plant systems.SURVEILLANCEA Note was added to the Surveillance Requirements (SRs) toREQUIREMENTSrequire LHR to be determined by either the Excore Detector Monitoring System or the Incore Detector Monitoring System.
SR 3.2.1.1 The periodic SR to verify the value of xy T F ensures that the LHR remains within the range assumed in the analysis.
Determining the measured xy T F every 72 hours when the LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-6Revision 14 excores are used to monitor LHR ensures the power distribution parameters are within limits when full core
 
mapping is not being used.
Performance of the SR every 72 hours of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the xy T F and LHR are promptly detected.The SR is modified by a Note that only requires the SR to be performed when the excores are being used to determine LHR.
This SR is not required when the LHR is being measured by the incores, which is a more accurate measure of Core Power
 
Distributions.
SR 3.2.1.2 This SR requires verification that the ASI alarm setpoints are within the limits specified in the COLR. Performance of
 
this SR ensures that the Excore Detector Monitoring System
 
can accurately monitor the LHR, and provide alarms when LHR
 
is not within limits. Therefore, this SR is only applicable
 
when the Excore Detector Monitoring System is being used to determine the LHR. The xy T F value determined by SR 3.2.1.1 is used in the derivation of the ASI alarm setpoint specified in the COLR. The 31-day Frequency is appropriate
 
for this SR because it is consistent with the requirements
 
of SR 3.3.1.3 for calibration of the excore detectors using
 
the incore detectors.
The SR is modified by a Note that states that the SR is only applicable when the Excore Detection Monitoring System is being used to determine LHR. The reason for the Note is that the excore detectors input neutron flux information
 
into the ASI calculation.
SR 3.2.1.3 and SR 3.2.1.4 Continuous monitoring of the LHR is provided by the Incore Detector Monitoring System and the Excore Detector
 
Monitoring System. Either of these two core power
 
distribution monitoring systems provides adequate monitoring
 
of the core power distribution and is capable of verifying
 
that the LHR does not exceed its specified limits.
LHR B 3.2.1 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.1-7Revision 14 Performance of these SRs verifies that the Incore Detector Monitoring System can accurately monitor LHR. Therefore, they are only applicable when the Incore Detector Monitoring
 
System is being used to determine the LHR.
A 31-day Frequency is consistent with the historical testing frequency of the incore detector monitoring system. The SRs
 
are modified by two Notes. Note 1 allows the SRs to be
 
performed only when the Incore Detector Monitoring System is
 
being used to determine LHR. Note 2 states that the SRs are
 
not required to be performed when THERMAL POWER is
 
< 20% RTP. The accuracy of the neutron flux information
 
from the incore detectors is not reliable at THERMAL POWER
 
< 20% RTP.REFERENCES1.Updated Final Safety Analysis Report (UFSAR)2.10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" xy T F B 3.2.2 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.2  Total Planar Radial Peaking Factor (xy T F)BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-1Revision 2BACKGROUNDThe purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO
 
decreases or prevents potential fuel cladding failures that
 
could breach the primary fission product barrier and release
 
fission products to the reactor coolant in the event of a LOCA,LOFA, ejectedCEAaccident, or other postulated accident requiring termination by a Reactor Protective
 
System trip function. This LCO limits damage to the fuel
 
cladding during an accident by ensuring that the plant is
 
operating within acceptable bounding conditions at the onset
 
of a transient.
Methods of controlling the power distribution include:a.Using CEAs to alter the axial power distribution; b.Decreasing CEA insertion by boration, thereby improving the radial power distribution; andc.Correcting off
-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in
 
conjunction with other core operating parameters (e.g., CEA
 
insertion and alignment limits), the power distribution does not result in violation of this LCO. TheLSSSand this LCO are based on accident analyses (Reference 1 , Chapter 14
), so that SAFDLs are not exceeded as a result ofAOOsand the limits of acceptable consequences are not exceeded for other
 
postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant
 
factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power
 
distributions. Operation within the design limits of power xy T F B 3.2.2 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-2Revision 8 distribution is accomplished by generating operating limits on the LHR and DNB.
The limits on LHR, xy T F , Total Integrated Radial Peaking Factor (r T F), T q , and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore
 
Detector Monitoring System, provides adequate monitoring of
 
the core power distribution and is capable of verifying that
 
the LHR does not exceed its limits. The Excore Detector
 
Monitoring System performs this function by continuously
 
monitoring the ASI with the OPERABLE quadrant symmetric
 
excore neutron flux detectors and verifying that the ASI is
 
maintained within the allowable limits specified in the
 
COLR.In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the
 
following assumptions are made:a.The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;b.The T q restrictions of LCO 3.2.4 are satisfied; and c.xy T F does not exceed the limits of this LCO.
The Incore Detector Monitoring System provides a more direct measure of the peaking factors, and the alarms that have
 
been established for the individual incore detector segments
 
ensure that the peak LHRs are maintained within the limits
 
specified in the COLR. The setpoints for these alarms
 
include allowances described in the COLR.APPLICABLEThe fuel cladding must not sustain damage as a result of SAFETY ANALYSESnormal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The Power Distribution and CEA Insertion and xy T F B 3.2.2 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-3Revision 14 Alignment LCOs preclude core power distributions that violate the following fuel design criteria:a.During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);b.During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a
 
DNB condition;c.During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); andd.The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest
 
worth control rod stuck, fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited
 
to maintain the fuel design criteria (Reference 2). This
 
limiting is accomplished by maintaining the power
 
distribution and reactor coolant conditions such that the
 
peak LHR and DNB parameters are within operating limits
 
supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations between
 
measured quantities, the power distribution, and the
 
uncertainties in the determination of power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding
 
temperature does not exceed 2200&deg;F (Reference 2). High peak
 
cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, xy T F , r T F , and T q limits specified in the COLR. The latter are process variables that characterize the three dimensional power distribution of the reactor core.
 
Operation within the limits for these variables ensures that
 
their actual values are within the ranges used in the
 
accident analyses.
xy T F B 3.2.2 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-4Revision 12 Fuel cladding damage does not normally occur while at conditions outside the limits of these LCOs during normal
 
operation. Fuel cladding damage could result, however, should an accident or AOO occur from initial conditions
 
outside the limits of these LCOs. This potential for fuel
 
cladding damage exists because changes in the power
 
distribution can cause increased power peaking and
 
correspondingly increased local LHR.
xy T F satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.LCOThe power distribution LCO limits are based on correlations between power peaking and certain measured variables used as
 
inputs to the LHR and DNB ratio operating limits. The power
 
distribution LCO limits, except T q , are provided in the COLR. The limitation on LHR ensures that in the event of a
 
LOCA the peak temperature of the fuel cladding does not exceed 2200&deg;F.APPLICABILITYIn MODE 1, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient
 
THERMAL POWER to require a limit on the core power
 
distribution.ACTIONSA.1 The limitations on xy T F provided in the COLR ensure that the assumptions used in the analysis for establishing the LHR, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If xy T F exceeds its basic limitation (xy T F > all rods out, full power limit)
, six hours is provided to restore xy T F to within limits. The combination of THERMAL POWER and xy T F must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6.
Six hours to return xy T F to within its limit is reasonable xy T F B 3.2.2 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-5Revision 12 and is sufficiently short to minimize the time xy T F is not within limits.
B.1 If xy T F cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides reasonable assurance that the core is operating within its thermal limits and places the core in a
 
conservative condition. The allowed Completion Time of
 
6 hours is reasonable, based on operating experience, to
 
reach MODE 2 from full power conditions in an orderly manner
 
and without challenging plant systems.SURVEILLANCESR 3.2.2.1 REQUIREMENTS The periodic SR to determine the calculated xy T F ensures that xy T F remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured xy T F after each fuel loading prior to the reactor exceeding 70%


F T
xy B 3.2.2 BASES and is sufficiently short to minimize the time F Txy is not within limits.
B.1 If F Txy cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. The allowed Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 2 from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE      SR 3.2.2.1 REQUIREMENTS The periodic SR to determine the calculated F Txy ensures that F Txy remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured F Txy after each fuel loading prior to the reactor exceeding 70%
RTP ensures that the core is properly loaded.
RTP ensures that the core is properly loaded.
Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the xy T F are promptly detected.
Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Txy are promptly detected.
The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors
The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors are not reliable below 20% RTP.
 
The SR is modified by a Note that requires the incore detectors to be used to determine F Txy by using them to obtain a power distribution map with all full length CEAs above the long term steady state insertion limits, as specified in the COLR. This determination is limited to core planes between 15% and 85% of full core height inclusive and still exclude regions influenced by grid effects.
are not reliable below 20% RTP.
CALVERT CLIFFS - UNITS 1 & 2       B 3.2.2-5                       Revision 12
The SR is modified by a Note that requires the incore detectors to be used to determine xy T F by using them to obtain a power distribution map with all full length CEAs above the long term steady state insertion limits, as
 
specified in the COLR. This determination is limited to
 
core planes between 15% and 85% of full core height
 
inclusive and still exclude regions influenced by grid effects.
xy T F B 3.2.2 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.2-6Revision 12REFERENCES1.UFSAR2.10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" r T F B 3.2.3 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.3  Total Integrated Radial Peaking Factor (r T F)BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.3-1Revision 2BACKGROUNDThe purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO
 
either limits or prevents potential fuel cladding failures
 
that could breach the primary fission product barrier and
 
release fission products to the reactor coolant in the event
 
of a LOCA , LOFA , ejected control element assembly (CEA) accident, or other postulated accident requiring termination
 
by a Reactor Protective System trip function. This LCO
 
limits the amount of damage to the fuel cladding during an
 
accident by ensuring that the plant is operating within
 
acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:a.The use of CEAs to alter the axial power distribution; b.Decreasing CEA insertion by boration, thereby improving the radial power distribution; andc.Correcting off
-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA
 
insertion and alignment limits), the power distribution does not result in violation of this LCO. TheLSSSand this LCO are based on the accident analyses (Reference 1
, Chapter 14
), so that SAFDLs are not exceeded as a result of AOOs , and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant
 
factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power
 
distributions. Operation within the design limits of power r T F B 3.2.3 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.3-2Revision 8 distribution is accomplished by generating operating limits on the LHR and DNB.
The limits on LHR, xy T F , r T F , T q , and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore
 
Detector Monitoring System, provide adequate monitoring of
 
the core power distribution and are capable of verifying
 
that the LHR does not exceed its limits. The Excore
 
Detector Monitoring System performs this function by
 
continuously monitoring the ASI with the OPERABLE quadrant
 
symmetric excore neutron flux detectors and verifying that
 
the ASI is maintained within the allowable limits specified
 
in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the
 
following conditions are assumed:a.The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;b.The T q restrictions of LCO 3.2.4 are satisfied; and c.xy T F does not exceed the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms
 
established for the individual incore detector segments
 
ensure that the peak LHRs are maintained within the limits
 
specified in the COLR. The setpoints for these alarms include allowances described in the COLR.APPLICABLEThe fuel cladding must not sustain damage as a result ofSAFETY ANALYSESnormal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and
 
alignment LCOs preclude core power distributions that
 
violate the following fuel design criteria:a.During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);
r T F B 3.2.3 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.3-3Revision 14b.During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a
 
DNB condition;c.During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); andd.The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest
 
worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited
 
to maintain the fuel design criteria (Reference 2). This is
 
accomplished by maintaining the power distribution and
 
reactor coolant conditions so that the peak LHR and DNB
 
parameters are within operating limits supported by the
 
accident analyses (Reference 1, Chapter 14), with due regard
 
for the correlations between measured quantities, the power
 
distribution, and uncertainties in the determination of
 
power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding
 
temperature does not exceed 2200&deg;F (Reference 2). High peak
 
cladding temperatures are assumed to cause severe cladding
 
failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these
 
criteria are met as long as the core is operated within the ASI, xy T F , and r T F limits specified in the COLR, and within the T q limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these
 
variables ensures that their actual values are within the
 
range used in the accident analysis.
Fuel cladding damage does not normally occur while at conditions outside the limits of these LCOs during normal
 
operation. Fuel cladding damage could result, however, if
 
an accident or AOO occurs from initial conditions outside r T F B 3.2.3 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.3-4Revision 12 the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution
 
cause increased power peaking and correspondingly increased


local LHR.
F T
r T F satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.LCOThe LCO limits for power distribution are based on correlations between power peaking and measured variables
xy B 3.2.2 BASES REFERENCES        1. UFSAR
: 2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2       B 3.2.2-6                      Revision 12


used as inputs to LHR and DNB ratio operating limits. The
F T
r B 3.2.3 B 3.2  POWER DISTRIBUTION LIMITS Total Integrated Radial Peaking Factor ( F r )
T B 3.2.3 BASES BACKGROUND        The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:
: a. The use of CEAs to alter the axial power distribution;
: b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
: c. Correcting off-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power CALVERT CLIFFS - UNITS 1 & 2        B 3.2.3-1                        Revision 2


LCO limits for power distribution, except T q , are provided in the COLR. The limitation on the LHR ensures that, in the
F T
r B 3.2.3 BASES distribution is accomplished by generating operating limits on the LHR and DNB.
The limits on LHR, F Txy , F Tr , Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provide adequate monitoring of the core power distribution and are capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following conditions are assumed:
: a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
: b. The Tq restrictions of LCO 3.2.4 are satisfied; and
: c. F Txy does not exceed the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.
APPLICABLE        The fuel cladding must not sustain damage as a result of SAFETY ANALYSES  normal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:
: a. During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);
CALVERT CLIFFS - UNITS 1 & 2        B 3.2.3-2                            Revision 8


event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200&deg;F.APPLICABILITYIn MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient
F T
r B 3.2.3 BASES
: b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
: c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in the determination of power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200&deg;F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the range used in the accident analysis.
Fuel cladding damage does not normally      occur while at conditions outside the limits of these      LCOs during normal operation. Fuel cladding damage could      result, however, if an accident or AOO occurs from initial      conditions outside CALVERT CLIFFS - UNITS 1 & 2          B 3.2.3-3                        Revision 14


THERMAL POWER to require a limit on the core power
F T
r B 3.2.3 BASES the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution cause increased power peaking and correspondingly increased local LHR.
F Tr satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.
LCO              The LCO limits for power distribution are based on correlations between power peaking and measured variables used as inputs to LHR and DNB ratio operating limits. The LCO limits for power distribution, except Tq, are provided in the COLR. The limitation on the LHR ensures that, in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200&deg;F.
APPLICABILITY    In MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.
ACTIONS          A.1 The limitations on F Tr provided in the COLR ensure that the assumptions used in the analysis for establishing the ASI, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If F Tr exceeds its basic limitation ( F Tr > all rods out, full power limit),
6 hours is provided to restore F Tr to within limits. The combination of THERMAL POWER and F Tr must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6. Six hours to return F Tr to within its limits is reasonable and is sufficiently short to minimize the time F Tr is not within limits.
B.1 If F Tr cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides CALVERT CLIFFS - UNITS 1 & 2        B 3.2.3-4                        Revision 12


distribution.ACTIONSA.1 The limitations on r T F provided in the COLR ensure that the assumptions used in the analysis for establishing the ASI, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If r T F exceeds its basic limitation (r T F > all rods out, full power limit)
F T
, 6 hours is provided to restore r T F to within limits. The combination of THERMAL POWER and r T F must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6.
r B 3.2.3 BASES reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. The allowed Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 2 from full power conditions in an orderly manner and without challenging plant systems.
Six hours to return r T F to within its limits is reasonable and is sufficiently short to minimize the time r T F is not within limits.B.1 If r T F cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides r T F B 3.2.3 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.3-5Revision 12 reasonable assurance that the core is operating within its thermal limits and places the core in a conservative
SURVEILLANCE      SR 3.2.3.1 REQUIREMENTS The periodic SR to determine the calculated F Tr ensures that F Tr remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured F Tr once after each fuel loading prior to exceeding 70% RTP ensures that the core is properly loaded.
Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Tr are promptly detected.
The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors are not reliable below 20% RTP.
The SR is modified by a Note that requires the incore detectors to be used to determine F Tr by using them to obtain a power distribution map with all full length CEAs above the long-term steady state insertion limits, as specified in the COLR.
REFERENCES        1. UFSAR
: 2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2        B 3.2.3-5                        Revision 12


condition. The allowed Completion Time of 6 hours is
Tq B 3.2.4 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.4  AZIMUTHAL POWER TILT (Tq)
BASES BACKGROUND        The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:
: a. Using CEAs to alter the axial power distribution;
: b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
: c. Correcting off-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits for LHR and DNB.
CALVERT CLIFFS - UNITS 1 & 2        B 3.2.4-1                        Revision 2


reasonable, based on operating experience, to reach MODE 2
Tq B 3.2.4 BASES The limits on LHR, F Txy , F Tr . Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LCO limits are not exceeded. The Excore Detector Monitoring System performs this function by continuously monitoring ASI with OPERABLE quadrant symmetric excore neutron detectors and by verifying ASI is maintained within the limits specified in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following assumptions are made:
: a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
: b. The Tq restrictions of LCO 3.2.4 are satisfied; and
: c. F Txy does not exceed the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.
APPLICABLE        The fuel cladding must not sustain damage as a result of SAFETY ANALYSES  normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:
: a. During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);
: b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition; CALVERT CLIFFS - UNITS 1 & 2        B 3.2.4-2                           Revision 8


from full power conditions in an orderly manner and without challenging plant systems.SURVEILLANCESR 3.2.3.1 REQUIREMENTS The periodic SR to determine the calculated r T F ensures that r T F remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured r T F once after each fuel loading prior to exceeding 70% RTP ensures that the core is properly loaded.
Tq B 3.2.4 BASES
Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the r T F are promptly detected.
: c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This process is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analysis (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in determining the power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200&deg;F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the range used in the accident analyses.
Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during otherwise normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial conditions outside the limits of these LCOs. Changes in the power distribution cause increased power peaking and correspondingly increased local LHRs.
CALVERT CLIFFS - UNITS 1 & 2          B 3.2.4-3                        Revision 14


are not reliable below 20% RTP.
Tq B 3.2.4 BASES The Tq satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.
The SR is modified by a Note that requires the incore detectors to be used to determine r T F by using them to obtain a power distribution map with all full length CEAs above the long-term steady state insertion limits, as
LCO              The power distribution LCO limits are based on correlations between power peaking and the measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limits on LHR ensure that in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200&deg;F.
APPLICABILITY    In MODE 1 with THERMAL POWER > 50% RTP, Tq must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because THERMAL POWER is not sufficient to require a limit on Tq.
ACTIONS          A.1 and A.2 If the measured Tq is > 0.03 and < 0.10, the calculation of Tq may be nonconservative. Tq must be restored within 4 hours, or F Txy and F Tr must be determined to be within the limits of LCOs 3.2.2 and 3.2.3 within 4 hours, and determined to be within these limits every 8 hours thereafter, as long as Tq is out-of-limits. Four hours is sufficient time to allow the operator to reposition CEAs, and significant radial xenon redistribution cannot occur within this time. The 8 hour Completion Time ensures changes in F Txy and F Tr can be identified before the limits of LCOs 3.2.2 and 3.2.3, respectively, are exceeded.
B.1 With Tq > 0.10, it must be restored to &#xa3; 0.10 with 2 hours.
F Txy and F Tr must be verified to be within their specified limits to ensure that acceptable flux peaking factors are maintained. Operation may proceed for a total of 2 hours, after the Condition is entered, while attempts are made to restore Tq to within its limit.
If the tilt is generated due to a CEA misalignment, operating at &#xa3; 50% RTP allows for the recovery of the CEA.
Except as a result of CEA misalignment, Tq > 0.10 is not CALVERT CLIFFS - UNITS 1 & 2          B 3.2.4-4                        Revision 8


specified in the COLR.REFERENCES1.UFSAR2.10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" T q B 3.2.4 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.4  AZIMUTHAL POWER TILT (T q)BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.4-1Revision 2BACKGROUNDThe purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO
Tq B 3.2.4 BASES expected; if it occurs, continued operation of the reactor may be necessary to discover the cause of the tilt. If this procedure is followed, operation is restricted to only those conditions required to identify the cause of the tilt. It is necessary to account explicitly for power asymmetries because the radial power peaking factors used in core power distribution calculations are based on an untilted power distribution.
If Tq is not restored to within its limits, the reactor continues to operate with an axial power distribution mismatch. Continued operation in this configuration may induce an axial xenon oscillation that causes increased LHRs when the xenon redistributes. If Tq cannot be restored to within its limits within 2 hours, reactor power must be reduced.
C.1 If Required Actions and associated Completion Times of Condition A or B are not met, THERMAL POWER must be reduced to &#xa3; 50% RTP. This requirement provides conservative protection from increased peaking due to potential xenon redistribution and provides reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. Four hours is a reasonable time to reach 50% RTP in an orderly manner and without challenging plant systems.
SURVEILLANCE      SR 3.2.4.1 REQUIREMENTS Tq must be calculated at 12-hour intervals. Tq is determined using the incore and excore detectors. When one excore channel is inoperable and THERMAL POWER is > 75%
RTP, the incore detectors shall be used. The 12-hour Frequency prevents significant xenon redistribution between surveillance tests.
REFERENCES        1. UFSAR
: 2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2      B 3.2.4-5                        Revision 8


limits or prevents potential fuel cladding failures that
ASI B 3.2.5 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.5  AXIAL SHAPE INDEX (ASI)
BASES BACKGROUND        The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analysis. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:
: a. Using CEAs to alter the axial power distribution;
: b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
: c. Correcting off optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits on LHR and DNB.
CALVERT CLIFFS - UNITS 1 & 2        B 3.2.5-1                        Revision 2


could breach the primary fission product barrier and release
ASI B 3.2.5 BASES The limits on LHR, F Txy , F Tr , Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
 
fission products to the reactor coolant in the event of a
 
LOCA , LOFA , ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a
 
Reactor Protective System trip function. This LCO limits
 
the amount of damage to the fuel cladding during an accident
 
by ensuring that the plant is operating within acceptable
 
bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:a.Using CEAs to alter the axial power distribution; b.Decreasing CEA insertion by boration, thereby improving the radial power distribution; andc.Correcting off
-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in
 
conjunction with other core operating parameters (e.g., CEA
 
insertion and alignment limits), the power distribution does
 
not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1
, Chapter 14
), so that SAFDLs are not exceeded as a result of AOOs , and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant
 
factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power
 
distributions. Operation within the design limits of power
 
distribution is accomplished by generating operating limits forLHRandDNB
.
T q B 3.2.4 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.4-2Revision 8 The limits on LHR, xy T F , r T F. T q , and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore
 
Detector Monitoring System, provides adequate monitoring of
 
the core power distribution and is capable of verifying that
 
the LCO limits are not exceeded. The Excore Detector
 
Monitoring System performs this function by continuously
 
monitoring ASI with OPERABLE quadrant symmetric excore neutron detectors and by verifying ASI is maintained within the limits specified in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the
 
following assumptions are made:a.The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;b.The T q restrictions of LCO 3.2.4 are satisfied; and c.xy T F does not exceed the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms
 
that have been established for the individual incore
 
detector segments ensure that the peak LHRs are maintained
 
within the limits specified in the COLR. The setpoints for
 
these alarms include allowances described in the COLR.APPLICABLEThe fuel cladding must not sustain damage as a result of SAFETY ANALYSESnormal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and
 
alignment LCOs preclude core power distributions that
 
violate the following fuel design criteria:a.During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);b.During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a
 
DNB condition; T q B 3.2.4 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.4-3Revision 14c.During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); andd.The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest
 
worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited
 
to maintain the fuel design criteria (Reference 2). This
 
process is accomplished by maintaining the power
 
distribution and reactor coolant conditions so that the peak
 
LHR and DNB parameters are within operating limits supported
 
by the accident analysis (Reference 1, Chapter 14), with due
 
regard for the correlations between measured quantities, the
 
power distribution, and uncertainties in determining the
 
power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding
 
temperature does not exceed 2200&deg;F (Reference 2). High peak
 
cladding temperatures are assumed to cause severe cladding
 
failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these
 
criteria are met as long as the core is operated within the ASI, xy T F , and r T F limits specified in the COLR, and within the T q limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these
 
variables ensures that their actual values are within the
 
range used in the accident analyses.
Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during
 
otherwise normal operation. Fuel cladding damage could
 
result, however, if an accident or AOO occurs from initial
 
conditions outside the limits of these LCOs. Changes in the
 
power distribution cause increased power peaking and
 
correspondingly increased local LHRs.
T q B 3.2.4 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.4-4Revision 8 The T q satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.LCOThe power distribution LCO limits are based on correlations between power peaking and the measured variables used as inputs to the LHR and DNB ratio operating limits. The power
 
distribution LCO limits, except T q , are provided in the COLR. The limits on LHR ensure that in the event of a LOCA, the peak temperature of the fuel cladding does not exceed
 
2200&deg;F.APPLICABILITYIn MODE 1 with THERMAL POWER > 50% RTP, T q must be maintained within the limits assumed in the accident
 
analysis to ensure that fuel damage does not result
 
following an AOO. In other MODEs, this LCO does not apply
 
because THERMAL POWER is not sufficient to require a limit
 
on T q.ACTIONSA.1 and A.2 If the measured T q is > 0.03 and < 0.10, the calculation of T q may be nonconservative. T q must be restored within 4 hours, or xy T F and r T F must be determined to be within the limits of LCOs 3.2.2 and 3.2.3 within 4 hours, and
 
determined to be within these limits every 8 hours
 
thereafter, as long as T q is out-of-limits. Four hours is sufficient time to allow the operator to reposition CEAs, and significant radial xenon redistribution cannot occur within this time. The 8 hour Completion Time ensures changes in xy T F and r T F can be identified before the limits of LCOs 3.2.2 and 3.2.3, respectively, are exceeded.
B.1 With T q > 0.10, it must be restored to  0.10 with 2 hours.
xy T F and r T F must be verified to be within their specified limits to ensure that acceptable flux peaking factors are maintained. Operation may proceed for a total of 2 hours, after the Condition is entered, while attempts are made to
 
restore T q to within its limit.
If the tilt is generated due to a CEA misalignment, operating at  50% RTP allows for the recovery of the CEA.
Except as a result of CEA misalignment, T q > 0.10 is not T q B 3.2.4 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.4-5Revision 8 expected; if it occurs, continued operation of the reactor may be necessary to discover the cause of the tilt. If this
 
procedure is followed, operation is restricted to only those
 
conditions required to identify the cause of the tilt. It
 
is necessary to account explicitly for power asymmetries
 
because the radial power peaking factors used in core power
 
distribution calculations are based on an untilted power
 
distribution.
If T q is not restored to within its limits, the reactor continues to operate with an axial power distribution mismatch. Continued operation in this configuration may
 
induce an axial xenon oscillation that causes increased LHRs
 
when the xenon redistributes. If T q cannot be restored to within its limits within 2 hours, reactor power must be
 
reduced.C.1 If Required Actions and associated Completion Times of Condition A or B are not met, THERMAL POWER must be reduced to 50% RTP. This requirement provides conservative protection from increased peaking due to potential xenon redistribution and provides reasonable assurance that the
 
core is operating within its thermal limits and places the
 
core in a conservative condition. Four hours is a
 
reasonable time to reach 50% RTP in an orderly manner and
 
without challenging plant systems.SURVEILLANCESR 3.2.4.1 REQUIREMENTS T q must be calculated at 12-hour intervals. T q is determined using the incore and excore detectors. When one excore channel is inoperable and THERMAL POWER is  75%RTP, the incore detectors shall be used. The 12-hour Frequency prevents significant xenon redistribution between
 
surveillance tests.REFERENCES1.UFSAR2.10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" ASI B 3.2.5 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.5  AXIAL SHAPE INDEX (ASI)
 
BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-1Revision 2BACKGROUNDThe purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analysis. Operation within the limits imposed by this LCO
 
either limits or prevents potential fuel cladding failures
 
that could breach the primary fission product barrier and
 
release fission products to the reactor coolant in the event
 
of a LOCA , LOFA , ejected control element assembly (CEA) accident, or other postulated accident requiring termination
 
by a Reactor Protective System trip function. This LCO
 
limits the amount of damage to the fuel cladding during an
 
accident by ensuring that the plant is operating within
 
acceptable bounding conditions at the onset of a transient.
Methods of controlling the power distribution include:a.Using CEAs to alter the axial power distribution; b.Decreasing CEA insertion by boration, thereby improving the radial power distribution; andc.Correcting off optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.
The core power distribution is controlled so that, in
 
conjunction with other core operating parameters (e.g., CEA
 
insertion and alignment limits), the power distribution does
 
not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1
, Chapter 14
), so that SAFDLs are not exceeded as a result of AOOs , and the limits of acceptable consequences are not exceeded for other postulated accidents.
Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant
 
factor in controlling the axial power distribution.
Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power
 
distributions. Operation within the design limits of power
 
distribution is accomplished by generating operating limits onLHRandDNB
.
ASI B 3.2.5 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-2Revision 11 The limits on LHR, xy T F , r T F , T q , and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.
Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System and the Incore Detector Monitoring System, provide adequate
Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System and the Incore Detector Monitoring System, provide adequate monitoring of the core power distribution and are capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.
 
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following conditions are assumed:
monitoring of the core power distribution and are capable of
: a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
 
: b. The Tq restrictions of LCO 3.2.4 are satisfied; and
verifying that the LHR does not exceed its limits. The
: c. F Txy does not exceed the limits of LCO 3.2.2.
 
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHR is maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.
Excore Detector Monitoring System performs this function by
APPLICABLE        The fuel cladding must not sustain damage as a result of SAFETY ANALYSES  normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs prevent core power distributions from CALVERT CLIFFS - UNITS 1 & 2         B 3.2.5-2                           Revision 11
 
continuously monitoring the ASI with the OPERABLE quadrant
 
symmetric excore neutron flux detectors and verifying that
 
the ASI is maintained within the allowable limits specified
 
in the COLR.
In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the
 
following conditions are assumed:a.The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;b.The T q restrictions of LCO 3.2.4 are satisfied; and c.xy T F does not exceed the limits of LCO 3.2.2.
The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHR is maintained
 
within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.APPLICABLEThe fuel cladding must not sustain damage as a result ofSAFETY ANALYSESnormal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and
 
alignment LCOs prevent core power distributions from ASI B 3.2.5 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-3Revision 14 reaching levels that violate the following fuel design criteria:a.During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);b.During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a
 
DNB condition;c.During an ejected CEA accident, the energy input to the fuel must not exceed the acceptable limits (Reference 1, Section 14.13); andd.The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest
 
worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited
 
to maintain the fuel design criteria (Reference 2). This
 
limitation is accomplished by maintaining the power
 
distribution and reactor coolant conditions so that the peak
 
LHR and DNB parameters are within operating limits supported
 
by the accident analyses (Reference 1, Chapter 14), with due
 
regard for the correlations among measured quantities, the
 
power distribution, and uncertainties in the determination
 
of power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding
 
temperature does not exceed 2200&deg;F (Reference 2). High peak
 
cladding temperatures are assumed to cause severe cladding
 
failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these
 
criteria are met as long as the core is operated within the ASI, xy T F , and r T F limits specified in the COLR, and within the T q limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these
 
variables ensures that their actual values are within the
 
ranges used in the accident analyses.
ASI B 3.2.5 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-4Revision 11 Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during
 
normal operation. Fuel cladding damage results, however, when an accident or AOO occurs from initial conditions
 
outside the limits of these LCOs. This potential for fuel
 
cladding damage exists because changes in the power
 
distribution can cause increased power peaking and
 
correspondingly increased local LHRs.
The ASI satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.LCOThe power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. These
 
power distribution LCO limits, except T q , are provided in the COLR. The limitation on LHR ensures that in the event
 
of a LOCA, the peak temperature of the fuel cladding does
 
not exceed 2200&deg;F.
The limitation on ASI, along with the limitations of LCO 3.3.1, represents a conservative envelope of operating
 
conditions consistent with the assumptions that have been
 
analytically-demonstrated adequate for maintaining an
 
acceptable minimum DNB ratio throughout all AOOs. Of these, the loss of flow transient is the most limiting. Operation
 
of the core with conditions within the specified limits
 
ensures that an acceptable minimum margin from DNB
 
conditions is maintained in the event of any AOO, including a loss of flow transient.APPLICABILITYIn MODE 1 with THERMAL POWER > 20% RTP, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply
 
because THERMAL POWER is not sufficient to require a limit
 
on the core power distribution. Below 20% RTP, the incore detector accuracy is not reliable.
ASI B 3.2.5 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-5Revision 11ACTIONSA.1 Operating the core within ASI limits specified in the COLR and within the limits of LCO 3.3.1 ensures an acceptable
 
margin for DNB and for maintaining local power density in
 
the event of an AOO. Maintaining ASI within limits also
 
ensures that the limits of Reference 2 are not exceeded
 
during accidents. The Required Actions to restore ASI must
 
be completed within 2 hours to limit the duration the plant
 
is operated outside the initial conditions assumed in the
 
accident analyses. In addition, this Completion Time is
 
sufficiently short that the xenon distribution in the core
 
cannot change significantly.
B.1 If the ASI cannot be restored to within its specified limits, or ASI cannot be determined because of Excore
 
Detector Monitoring System inoperability, core power must be reduced. Reducing THERMAL POWER to  20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative
 
condition. Four hours is a reasonable amount of time, based
 
on operating experience, to reduce THERMAL POWER to 20% RTP in an orderly manner and without challenging plant systems.SURVEILLANCESR 3.2.5.1 REQUIREMENTS Verifying that the ASI is within the specified limits provides reasonable assurance that the core is not
 
approaching DNB conditions. A Frequency of 12 hours is
 
adequate for the operator to identify trends in conditions
 
that result in an approach to the ASI limits, because the


mechanisms that affect the ASI, such as xenon redistribution
ASI B 3.2.5 BASES reaching levels that violate the following fuel design criteria:
: a. During a LOCA, peak cladding temperature must not exceed 2200&deg;F (Reference 2);
: b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
: c. During an ejected CEA accident, the energy input to the fuel must not exceed the acceptable limits (Reference 1, Section 14.13); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).
The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This limitation is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations among measured quantities, the power distribution, and uncertainties in the determination of power distribution.
Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200&deg;F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.
The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.
CALVERT CLIFFS - UNITS 1 & 2          B 3.2.5-3                        Revision 14


or CEA drive mechanism malfunctions, cause the ASI to change
ASI B 3.2.5 BASES Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.
Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during normal operation. Fuel cladding damage results, however, when an accident or AOO occurs from initial conditions outside the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and correspondingly increased local LHRs.
The ASI satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.
LCO              The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. These power distribution LCO limits, except Tq, are provided in the COLR. The limitation on LHR ensures that in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200&deg;F.
The limitation on ASI, along with the limitations of LCO 3.3.1, represents a conservative envelope of operating conditions consistent with the assumptions that have been analytically-demonstrated adequate for maintaining an acceptable minimum DNB ratio throughout all AOOs. Of these, the loss of flow transient is the most limiting. Operation of the core with conditions within the specified limits ensures that an acceptable minimum margin from DNB conditions is maintained in the event of any AOO, including a loss of flow transient.
APPLICABILITY    In MODE 1 with THERMAL POWER > 20% RTP, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because THERMAL POWER is not sufficient to require a limit on the core power distribution. Below 20% RTP, the incore detector accuracy is not reliable.
CALVERT CLIFFS - UNITS 1 & 2      B 3.2.5-4                      Revision 11


slowly and should be discovered before the limits are
ASI B 3.2.5 BASES ACTIONS          A.1 Operating the core within ASI limits specified in the COLR and within the limits of LCO 3.3.1 ensures an acceptable margin for DNB and for maintaining local power density in the event of an AOO. Maintaining ASI within limits also ensures that the limits of Reference 2 are not exceeded during accidents. The Required Actions to restore ASI must be completed within 2 hours to limit the duration the plant is operated outside the initial conditions assumed in the accident analyses. In addition, this Completion Time is sufficiently short that the xenon distribution in the core cannot change significantly.
B.1 If the ASI cannot be restored to within its specified limits, or ASI cannot be determined because of Excore Detector Monitoring System inoperability, core power must be reduced. Reducing THERMAL POWER to &#xa3; 20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative condition. Four hours is a reasonable amount of time, based on operating experience, to reduce THERMAL POWER to
                  &#xa3; 20% RTP in an orderly manner and without challenging plant systems.
SURVEILLANCE      SR 3.2.5.1 REQUIREMENTS Verifying that the ASI is within the specified limits provides reasonable assurance that the core is not approaching DNB conditions. A Frequency of 12 hours is adequate for the operator to identify trends in conditions that result in an approach to the ASI limits, because the mechanisms that affect the ASI, such as xenon redistribution or CEA drive mechanism malfunctions, cause the ASI to change slowly and should be discovered before the limits are exceeded.
CALVERT CLIFFS - UNITS 1 & 2      B 3.2.5-5                      Revision 11


exceeded.
ASI B 3.2.5 BASES REFERENCES        1. UFSAR
ASI B 3.2.5 BASESCALVERT CLIFFS - UNITS 1 & 2B 3.2.5-6Revision 11REFERENCES1.UFSAR2.10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants"}}
: 2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2      B 3.2.5-6                      Revision 11}}

Latest revision as of 03:03, 23 November 2019

Technical Specification Bases, B 3.2 Power Distribution Limits, Pages B 3.2.1-1 Through B 3.2.5-6
ML072830147
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/05/2007
From:
Constellation Energy Group
To:
Office of Nuclear Reactor Regulation
References
Download: ML072830147 (29)


Text

LHR B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Linear Heat Rate (LHR)

BASES BACKGROUND The purpose of this Limiting Condition for Operation (LCO) is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a loss of coolant accident (LOCA), loss of flow accident (LOFA), ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.

Methods of controlling the power distribution include:

a. Using CEAs to alter the axial power distribution;
b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
c. Correcting less than optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.

The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution satisfies this LCO. The limiting safety system settings (LSSS) and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that specified acceptable fuel design limits (SAFDLs) are not exceeded as a result of anticipated operational occurrences (AOOs), and the limits of acceptable consequences are not exceeded for other postulated accidents.

Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-1 Revision 2

LHR B 3.2.1 BASES Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits on linear heat rate (LHR) and departure from nucleate boiling (DNB).

The limits on LHR, Total Planar Radial Peaking Factor

( F Txy ), Total Integrated Radial Peaking Factor ( F Tr ),

AZIMUTHAL POWER TILT (Tq), and AXIAL SHAPE INDEX (ASI) represent limits within which the LHR algorithms are valid.

These limits are obtained directly from the core reload analysis.

Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the axial power distribution (APD) trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.

Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LHR is within its limits. At high power, the detector alarms maintain the peak LHR below the LHR LCO limit based on the LOCA analysis only. At low power, the non-LOCA LHR LCO limits are more restrictive. Operation within the axial shape index limits of the excore DNB LCO assure that these non-LOCA LHR LCO limits will not be reached. The Excore Detector Monitoring System performs this function by continuously monitoring ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the Core Operating Limit Report (COLR).

In conjunction with the use of the Excore Detector Monitoring System and in establishing ASI limits, the following assumptions are made:

a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
b. The Tq restrictions of LCO 3.2.4 are satisfied; and CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-2 Revision 14

LHR B 3.2.1 BASES

c. F Txy is within the limits of LCO 3.2.2.

The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors and alarms that have been established for the individual incore detector segments, ensuring that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.

APPLICABLE The fuel cladding must not sustain damage as a result of SAFETY ANALYSES normal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:

a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);
b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
d. The control rods must be capable of shutting down the reactor with a minimum required SHUTDOWN MARGIN (SDM) with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).

The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in determining the power distribution.

Fuel cladding failure during a LOCA is limited by restricting the maximum linear heat generation rate (LHGR) so that the peak cladding temperature does not exceed 2200°F CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-3 Revision 14

LHR B 3.2.1 BASES (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.

The LCOs governing LHR, ASI, and the Reactor Coolant System (RCS) ensure that these criteria are met as long as the core is operated within the ASI, F Txy , F Tr , and Tq limits specified in the COLR. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.

Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.

Fuel cladding damage does not normally occur while the unit is operating at conditions outside the limits of these LCOs during normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial conditions outside the limits of these LCOs. The potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and can correspondingly increase local LHR.

The LHR satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.

LCO The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limitation on the LHR ensures that, in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200°F. However, fuel cladding damage does not normally occur when outside the LCO limit if an accident does not occur.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-4 Revision 14

LHR B 3.2.1 BASES APPLICABILITY In MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.

ACTIONS A.1 With the LHR exceeding its limit, excessive fuel damage could occur following an accident. In this Condition, prompt action must be taken to restore the LHR to within the specified limits. One hour to restore the LHR to within its specified limits is reasonable and ensures that the core does not continue to operate in this Condition. The 1-hour Completion Time also allows the operator sufficient time for evaluating core conditions and for initiating proper corrective actions.

B.1 If the LHR cannot be returned to within its specified limits, THERMAL POWER must be reduced. Since ASI limits for LHR are not required below 20% Rated Thermal Power (RTP),

then the actions of A.1 can be met by reducing power to

< 20% RTP. Reducing THERMAL POWER to < 20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative condition. This action is also consistent with the required actions for the SAFDL on DNB. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach the applicable power level from full power MODE 1 conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE A Note was added to the Surveillance Requirements (SRs) to REQUIREMENTS require LHR to be determined by either the Excore Detector Monitoring System or the Incore Detector Monitoring System.

SR 3.2.1.1 The periodic SR to verify the value of F Txy ensures that the LHR remains within the range assumed in the analysis.

Determining the measured F Txy every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-5 Revision 14

LHR B 3.2.1 BASES excores are used to monitor LHR ensures the power distribution parameters are within limits when full core mapping is not being used.

Performance of the SR every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Txy and LHR are promptly detected.

The SR is modified by a Note that only requires the SR to be performed when the excores are being used to determine LHR.

This SR is not required when the LHR is being measured by the incores, which is a more accurate measure of Core Power Distributions.

SR 3.2.1.2 This SR requires verification that the ASI alarm setpoints are within the limits specified in the COLR. Performance of this SR ensures that the Excore Detector Monitoring System can accurately monitor the LHR, and provide alarms when LHR is not within limits. Therefore, this SR is only applicable when the Excore Detector Monitoring System is being used to determine the LHR. The F Txy value determined by SR 3.2.1.1 is used in the derivation of the ASI alarm setpoint specified in the COLR. The 31-day Frequency is appropriate for this SR because it is consistent with the requirements of SR 3.3.1.3 for calibration of the excore detectors using the incore detectors.

The SR is modified by a Note that states that the SR is only applicable when the Excore Detection Monitoring System is being used to determine LHR. The reason for the Note is that the excore detectors input neutron flux information into the ASI calculation.

SR 3.2.1.3 and SR 3.2.1.4 Continuous monitoring of the LHR is provided by the Incore Detector Monitoring System and the Excore Detector Monitoring System. Either of these two core power distribution monitoring systems provides adequate monitoring of the core power distribution and is capable of verifying that the LHR does not exceed its specified limits.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-6 Revision 14

LHR B 3.2.1 BASES Performance of these SRs verifies that the Incore Detector Monitoring System can accurately monitor LHR. Therefore, they are only applicable when the Incore Detector Monitoring System is being used to determine the LHR.

A 31-day Frequency is consistent with the historical testing frequency of the incore detector monitoring system. The SRs are modified by two Notes. Note 1 allows the SRs to be performed only when the Incore Detector Monitoring System is being used to determine LHR. Note 2 states that the SRs are not required to be performed when THERMAL POWER is

< 20% RTP. The accuracy of the neutron flux information from the incore detectors is not reliable at THERMAL POWER

< 20% RTP.

REFERENCES 1. Updated Final Safety Analysis Report (UFSAR)

2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2 B 3.2.1-7 Revision 14

F T

xy B 3.2.2 B 3.2 POWER DISTRIBUTION LIMITS Total Planar Radial Peaking Factor ( F xy )

T B 3.2.2 BASES BACKGROUND The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO decreases or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected CEA accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.

Methods of controlling the power distribution include:

a. Using CEAs to alter the axial power distribution;
b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
c. Correcting off- optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.

The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs and the limits of acceptable consequences are not exceeded for other postulated accidents.

Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.

Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-1 Revision 2

F T

xy B 3.2.2 BASES distribution is accomplished by generating operating limits on the LHR and DNB.

The limits on LHR, F Txy , Total Integrated Radial Peaking Factor ( F Tr ), Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.

Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.

In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following assumptions are made:

a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
b. The Tq restrictions of LCO 3.2.4 are satisfied; and
c. F Txy does not exceed the limits of this LCO.

The Incore Detector Monitoring System provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.

APPLICABLE The fuel cladding must not sustain damage as a result of SAFETY ANALYSES normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The Power Distribution and CEA Insertion and CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-2 Revision 8

F T

xy B 3.2.2 BASES Alignment LCOs preclude core power distributions that violate the following fuel design criteria:

a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);
b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck, fully withdrawn (Reference 1, Appendix 1C, Criterion 29).

The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This limiting is accomplished by maintaining the power distribution and reactor coolant conditions such that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and the uncertainties in the determination of power distribution.

Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200°F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.

The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , F Tr , and Tq limits specified in the COLR. The latter are process variables that characterize the three dimensional power distribution of the reactor core.

Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-3 Revision 14

F T

xy B 3.2.2 BASES Fuel cladding damage does not normally occur while at conditions outside the limits of these LCOs during normal operation. Fuel cladding damage could result, however, should an accident or AOO occur from initial conditions outside the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and correspondingly increased local LHR.

F Txy satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.

LCO The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limitation on LHR ensures that in the event of a LOCA the peak temperature of the fuel cladding does not exceed 2200°F.

APPLICABILITY In MODE 1, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.

ACTIONS A.1 The limitations on F Txy provided in the COLR ensure that the assumptions used in the analysis for establishing the LHR, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If F Txy exceeds its basic limitation ( F Txy > all rods out, full power limit),

six hours is provided to restore F Txy to within limits. The combination of THERMAL POWER and F Txy must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6.

Six hours to return F Txy to within its limit is reasonable CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-4 Revision 12

F T

xy B 3.2.2 BASES and is sufficiently short to minimize the time F Txy is not within limits.

B.1 If F Txy cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach MODE 2 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.2.2.1 REQUIREMENTS The periodic SR to determine the calculated F Txy ensures that F Txy remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured F Txy after each fuel loading prior to the reactor exceeding 70%

RTP ensures that the core is properly loaded.

Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Txy are promptly detected.

The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors are not reliable below 20% RTP.

The SR is modified by a Note that requires the incore detectors to be used to determine F Txy by using them to obtain a power distribution map with all full length CEAs above the long term steady state insertion limits, as specified in the COLR. This determination is limited to core planes between 15% and 85% of full core height inclusive and still exclude regions influenced by grid effects.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-5 Revision 12

F T

xy B 3.2.2 BASES REFERENCES 1. UFSAR

2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2 B 3.2.2-6 Revision 12

F T

r B 3.2.3 B 3.2 POWER DISTRIBUTION LIMITS Total Integrated Radial Peaking Factor ( F r )

T B 3.2.3 BASES BACKGROUND The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.

Methods of controlling the power distribution include:

a. The use of CEAs to alter the axial power distribution;
b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
c. Correcting off-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.

The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.

Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.

Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power CALVERT CLIFFS - UNITS 1 & 2 B 3.2.3-1 Revision 2

F T

r B 3.2.3 BASES distribution is accomplished by generating operating limits on the LHR and DNB.

The limits on LHR, F Txy , F Tr , Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.

Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provide adequate monitoring of the core power distribution and are capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.

In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following conditions are assumed:

a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
b. The Tq restrictions of LCO 3.2.4 are satisfied; and
c. F Txy does not exceed the limits of LCO 3.2.2.

The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.

APPLICABLE The fuel cladding must not sustain damage as a result of SAFETY ANALYSES normal operation and AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:

a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.3-2 Revision 8

F T

r B 3.2.3 BASES

b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).

The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in the determination of power distribution.

Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200°F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.

The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the range used in the accident analysis.

Fuel cladding damage does not normally occur while at conditions outside the limits of these LCOs during normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial conditions outside CALVERT CLIFFS - UNITS 1 & 2 B 3.2.3-3 Revision 14

F T

r B 3.2.3 BASES the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution cause increased power peaking and correspondingly increased local LHR.

F Tr satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.

LCO The LCO limits for power distribution are based on correlations between power peaking and measured variables used as inputs to LHR and DNB ratio operating limits. The LCO limits for power distribution, except Tq, are provided in the COLR. The limitation on the LHR ensures that, in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200°F.

APPLICABILITY In MODE 1, power distribution must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because there is not sufficient THERMAL POWER to require a limit on the core power distribution.

ACTIONS A.1 The limitations on F Tr provided in the COLR ensure that the assumptions used in the analysis for establishing the ASI, LCO, and LSSS remain valid during operation at the various allowable CEA group insertion limits. If F Tr exceeds its basic limitation ( F Tr > all rods out, full power limit),

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is provided to restore F Tr to within limits. The combination of THERMAL POWER and F Tr must be brought to within the limits established in the COLR and the CEAs must be withdrawn to or above the long-term steady state insertions limits of Technical Specification 3.1.6. Six hours to return F Tr to within its limits is reasonable and is sufficiently short to minimize the time F Tr is not within limits.

B.1 If F Tr cannot be returned to within its limit, THERMAL POWER must be reduced to MODE 2. A change to MODE 2 provides CALVERT CLIFFS - UNITS 1 & 2 B 3.2.3-4 Revision 12

F T

r B 3.2.3 BASES reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach MODE 2 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.2.3.1 REQUIREMENTS The periodic SR to determine the calculated F Tr ensures that F Tr remains within the range assumed in the analysis throughout the fuel cycle. Determining the measured F Tr once after each fuel loading prior to exceeding 70% RTP ensures that the core is properly loaded.

Performance of the SR every 31 days of accumulated operation in MODE 1 provides reasonable assurance that unacceptable changes in the F Tr are promptly detected.

The power distribution map can only be obtained after THERMAL POWER exceeds 20% RTP because the incore detectors are not reliable below 20% RTP.

The SR is modified by a Note that requires the incore detectors to be used to determine F Tr by using them to obtain a power distribution map with all full length CEAs above the long-term steady state insertion limits, as specified in the COLR.

REFERENCES 1. UFSAR

2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2 B 3.2.3-5 Revision 12

Tq B 3.2.4 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.4 AZIMUTHAL POWER TILT (Tq)

BASES BACKGROUND The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analyses. Operation within the limits imposed by this LCO limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.

Methods of controlling the power distribution include:

a. Using CEAs to alter the axial power distribution;
b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
c. Correcting off-optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.

The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.

Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.

Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits for LHR and DNB.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.4-1 Revision 2

Tq B 3.2.4 BASES The limits on LHR, F Txy , F Tr . Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.

Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System or the Incore Detector Monitoring System, provides adequate monitoring of the core power distribution and is capable of verifying that the LCO limits are not exceeded. The Excore Detector Monitoring System performs this function by continuously monitoring ASI with OPERABLE quadrant symmetric excore neutron detectors and by verifying ASI is maintained within the limits specified in the COLR.

In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following assumptions are made:

a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
b. The Tq restrictions of LCO 3.2.4 are satisfied; and
c. F Txy does not exceed the limits of LCO 3.2.2.

The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHRs are maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.

APPLICABLE The fuel cladding must not sustain damage as a result of SAFETY ANALYSES normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs preclude core power distributions that violate the following fuel design criteria:

a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);
b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition; CALVERT CLIFFS - UNITS 1 & 2 B 3.2.4-2 Revision 8

Tq B 3.2.4 BASES

c. During an ejected CEA accident, the energy input to the fuel must not exceed the accepted limits (Reference 1, Section 14.13); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).

The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This process is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analysis (Reference 1, Chapter 14), with due regard for the correlations between measured quantities, the power distribution, and uncertainties in determining the power distribution.

Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200°F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.

The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the range used in the accident analyses.

Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during otherwise normal operation. Fuel cladding damage could result, however, if an accident or AOO occurs from initial conditions outside the limits of these LCOs. Changes in the power distribution cause increased power peaking and correspondingly increased local LHRs.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.4-3 Revision 14

Tq B 3.2.4 BASES The Tq satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.

LCO The power distribution LCO limits are based on correlations between power peaking and the measured variables used as inputs to the LHR and DNB ratio operating limits. The power distribution LCO limits, except Tq, are provided in the COLR. The limits on LHR ensure that in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200°F.

APPLICABILITY In MODE 1 with THERMAL POWER > 50% RTP, Tq must be maintained within the limits assumed in the accident analysis to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because THERMAL POWER is not sufficient to require a limit on Tq.

ACTIONS A.1 and A.2 If the measured Tq is > 0.03 and < 0.10, the calculation of Tq may be nonconservative. Tq must be restored within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or F Txy and F Tr must be determined to be within the limits of LCOs 3.2.2 and 3.2.3 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and determined to be within these limits every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, as long as Tq is out-of-limits. Four hours is sufficient time to allow the operator to reposition CEAs, and significant radial xenon redistribution cannot occur within this time. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time ensures changes in F Txy and F Tr can be identified before the limits of LCOs 3.2.2 and 3.2.3, respectively, are exceeded.

B.1 With Tq > 0.10, it must be restored to £ 0.10 with 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

F Txy and F Tr must be verified to be within their specified limits to ensure that acceptable flux peaking factors are maintained. Operation may proceed for a total of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, after the Condition is entered, while attempts are made to restore Tq to within its limit.

If the tilt is generated due to a CEA misalignment, operating at £ 50% RTP allows for the recovery of the CEA.

Except as a result of CEA misalignment, Tq > 0.10 is not CALVERT CLIFFS - UNITS 1 & 2 B 3.2.4-4 Revision 8

Tq B 3.2.4 BASES expected; if it occurs, continued operation of the reactor may be necessary to discover the cause of the tilt. If this procedure is followed, operation is restricted to only those conditions required to identify the cause of the tilt. It is necessary to account explicitly for power asymmetries because the radial power peaking factors used in core power distribution calculations are based on an untilted power distribution.

If Tq is not restored to within its limits, the reactor continues to operate with an axial power distribution mismatch. Continued operation in this configuration may induce an axial xenon oscillation that causes increased LHRs when the xenon redistributes. If Tq cannot be restored to within its limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, reactor power must be reduced.

C.1 If Required Actions and associated Completion Times of Condition A or B are not met, THERMAL POWER must be reduced to £ 50% RTP. This requirement provides conservative protection from increased peaking due to potential xenon redistribution and provides reasonable assurance that the core is operating within its thermal limits and places the core in a conservative condition. Four hours is a reasonable time to reach 50% RTP in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.2.4.1 REQUIREMENTS Tq must be calculated at 12-hour intervals. Tq is determined using the incore and excore detectors. When one excore channel is inoperable and THERMAL POWER is > 75%

RTP, the incore detectors shall be used. The 12-hour Frequency prevents significant xenon redistribution between surveillance tests.

REFERENCES 1. UFSAR

2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2 B 3.2.4-5 Revision 8

ASI B 3.2.5 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.5 AXIAL SHAPE INDEX (ASI)

BASES BACKGROUND The purpose of this LCO is to limit the core power distribution to the initial values assumed in the accident analysis. Operation within the limits imposed by this LCO either limits or prevents potential fuel cladding failures that could breach the primary fission product barrier and release fission products to the reactor coolant in the event of a LOCA, LOFA, ejected control element assembly (CEA) accident, or other postulated accident requiring termination by a Reactor Protective System trip function. This LCO limits the amount of damage to the fuel cladding during an accident by ensuring that the plant is operating within acceptable bounding conditions at the onset of a transient.

Methods of controlling the power distribution include:

a. Using CEAs to alter the axial power distribution;
b. Decreasing CEA insertion by boration, thereby improving the radial power distribution; and
c. Correcting off optimum conditions (e.g., a CEA drop or misoperation of the unit) that cause margin degradations.

The core power distribution is controlled so that, in conjunction with other core operating parameters (e.g., CEA insertion and alignment limits), the power distribution does not result in violation of this LCO. The LSSS and this LCO are based on the accident analyses (Reference 1, Chapter 14), so that SAFDLs are not exceeded as a result of AOOs, and the limits of acceptable consequences are not exceeded for other postulated accidents.

Limiting power distribution skewing over time also minimizes the xenon distribution skewing, which is a significant factor in controlling the axial power distribution.

Power distribution is a product of multiple parameters, various combinations of which may produce acceptable power distributions. Operation within the design limits of power distribution is accomplished by generating operating limits on LHR and DNB.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-1 Revision 2

ASI B 3.2.5 BASES The limits on LHR, F Txy , F Tr , Tq, and ASI represent limits within which the LHR algorithms are valid. These limits are obtained directly from the core reload analysis.

Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.

Either of the two core power distribution monitoring systems, the Excore Detector Monitoring System and the Incore Detector Monitoring System, provide adequate monitoring of the core power distribution and are capable of verifying that the LHR does not exceed its limits. The Excore Detector Monitoring System performs this function by continuously monitoring the ASI with the OPERABLE quadrant symmetric excore neutron flux detectors and verifying that the ASI is maintained within the allowable limits specified in the COLR.

In conjunction with the use of the Excore Detector Monitoring System and in establishing the ASI limits, the following conditions are assumed:

a. The CEA insertion limits of LCOs 3.1.5 and 3.1.6 are satisfied;
b. The Tq restrictions of LCO 3.2.4 are satisfied; and
c. F Txy does not exceed the limits of LCO 3.2.2.

The Incore Detector Monitoring System continuously provides a more direct measure of the peaking factors, and the alarms that have been established for the individual incore detector segments ensure that the peak LHR is maintained within the limits specified in the COLR. The setpoints for these alarms include allowances described in the COLR.

APPLICABLE The fuel cladding must not sustain damage as a result of SAFETY ANALYSES normal operation or AOOs (Reference 1, Appendix 1C, Criterion 6). The power distribution and CEA insertion and alignment LCOs prevent core power distributions from CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-2 Revision 11

ASI B 3.2.5 BASES reaching levels that violate the following fuel design criteria:

a. During a LOCA, peak cladding temperature must not exceed 2200°F (Reference 2);
b. During a LOFA, there must be at least 95% probability at the 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a DNB condition;
c. During an ejected CEA accident, the energy input to the fuel must not exceed the acceptable limits (Reference 1, Section 14.13); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Reference 1, Appendix 1C, Criterion 29).

The power density at any point in the core must be limited to maintain the fuel design criteria (Reference 2). This limitation is accomplished by maintaining the power distribution and reactor coolant conditions so that the peak LHR and DNB parameters are within operating limits supported by the accident analyses (Reference 1, Chapter 14), with due regard for the correlations among measured quantities, the power distribution, and uncertainties in the determination of power distribution.

Fuel cladding failure during a LOCA is limited by restricting the maximum LHGR so that the peak cladding temperature does not exceed 2200°F (Reference 2). High peak cladding temperatures are assumed to cause severe cladding failure by oxidation due to a Zirconium-water reaction.

The LCOs governing LHR, ASI, and the RCS ensure that these criteria are met as long as the core is operated within the ASI, F Txy , and F Tr limits specified in the COLR, and within the Tq limits. The latter are process variables that characterize the three-dimensional power distribution of the reactor core. Operation within the limits for these variables ensures that their actual values are within the ranges used in the accident analyses.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-3 Revision 14

ASI B 3.2.5 BASES Below 20% power, ASI limits for the LHR and DNB LCO are not required. At low powers, the APD trip will limit the allowed ASI during operation. The core reload analysis verifies that ASI limits for the LHR and DNB LCOs are not necessary below 20% power.

Fuel cladding damage does not normally occur while the reactor is operating at conditions outside these LCOs during normal operation. Fuel cladding damage results, however, when an accident or AOO occurs from initial conditions outside the limits of these LCOs. This potential for fuel cladding damage exists because changes in the power distribution can cause increased power peaking and correspondingly increased local LHRs.

The ASI satisfies 10 CFR 50.36(c)(2)(ii), Criterion 2.

LCO The power distribution LCO limits are based on correlations between power peaking and certain measured variables used as inputs to the LHR and DNB ratio operating limits. These power distribution LCO limits, except Tq, are provided in the COLR. The limitation on LHR ensures that in the event of a LOCA, the peak temperature of the fuel cladding does not exceed 2200°F.

The limitation on ASI, along with the limitations of LCO 3.3.1, represents a conservative envelope of operating conditions consistent with the assumptions that have been analytically-demonstrated adequate for maintaining an acceptable minimum DNB ratio throughout all AOOs. Of these, the loss of flow transient is the most limiting. Operation of the core with conditions within the specified limits ensures that an acceptable minimum margin from DNB conditions is maintained in the event of any AOO, including a loss of flow transient.

APPLICABILITY In MODE 1 with THERMAL POWER > 20% RTP, power distribution must be maintained within the limits assumed in the accident analyses to ensure that fuel damage does not result following an AOO. In other MODEs, this LCO does not apply because THERMAL POWER is not sufficient to require a limit on the core power distribution. Below 20% RTP, the incore detector accuracy is not reliable.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-4 Revision 11

ASI B 3.2.5 BASES ACTIONS A.1 Operating the core within ASI limits specified in the COLR and within the limits of LCO 3.3.1 ensures an acceptable margin for DNB and for maintaining local power density in the event of an AOO. Maintaining ASI within limits also ensures that the limits of Reference 2 are not exceeded during accidents. The Required Actions to restore ASI must be completed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to limit the duration the plant is operated outside the initial conditions assumed in the accident analyses. In addition, this Completion Time is sufficiently short that the xenon distribution in the core cannot change significantly.

B.1 If the ASI cannot be restored to within its specified limits, or ASI cannot be determined because of Excore Detector Monitoring System inoperability, core power must be reduced. Reducing THERMAL POWER to £ 20% RTP provides reasonable assurance that the core is operating farther from thermal limits and places the core in a conservative condition. Four hours is a reasonable amount of time, based on operating experience, to reduce THERMAL POWER to

£ 20% RTP in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.2.5.1 REQUIREMENTS Verifying that the ASI is within the specified limits provides reasonable assurance that the core is not approaching DNB conditions. A Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is adequate for the operator to identify trends in conditions that result in an approach to the ASI limits, because the mechanisms that affect the ASI, such as xenon redistribution or CEA drive mechanism malfunctions, cause the ASI to change slowly and should be discovered before the limits are exceeded.

CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-5 Revision 11

ASI B 3.2.5 BASES REFERENCES 1. UFSAR

2. 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Plants" CALVERT CLIFFS - UNITS 1 & 2 B 3.2.5-6 Revision 11