ML082340920: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML082340920 | | number = ML082340920 | ||
| issue date = 08/15/2008 | | issue date = 08/15/2008 | ||
| title = | | title = Tech Spec Page for Amendment 187 Emergency Diesel Generator Monthly Load Test Surveillance Requirement | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:AC Sources-Operating | {{#Wiki_filter:AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | ||
SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------- NOTES --------------- | |||
REQUIREMENTS (continued) | |||
SURVEILLANCE FREQUENCY SR 3.8.1.3-------------- | |||
NOTES --------------- | |||
: 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations. | : 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations. | ||
: 2. Momentary transients outside the load range do not invalidate this test.3. This Surveillance shall be conducted on only one DG at a time.4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.Verify each DG is synchronized and loaded and operates for > 60 minutes at a load: a. Unit 1; > 2500 kW; and b. Unit 2; >5100kW and_<5300 kW. | : 2. Momentary transients outside the load range do not invalidate this test. | ||
: 3. This Surveillance shall be conducted on only one DG at a time. | |||
: 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6. | |||
Verify each DG is synchronized and loaded and 31 days operates for > 60 minutes at a load: | |||
: a. Unit 1; > 2500 kW; and | |||
: b. Unit 2; >5100kW and_<5300 kW. | |||
SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 31 days day tank. | |||
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 31 days fuel oil from storage tank to the day tank. | |||
Prairie Island Unit I - Amendment No. 4-58 4-7-4187 Units I and 2 3.8.1-7 Unit 2 - Amendment No. 4-49 165}} |
Latest revision as of 14:44, 14 November 2019
ML082340920 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 08/15/2008 |
From: | Plant Licensing Branch III |
To: | |
Olshan L N, NRR/DORL, 415-1419 | |
Shared Package | |
ML081980111 | List: |
References | |
TAC MD6551 | |
Download: ML082340920 (1) | |
Text
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------- NOTES ---------------
- 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.
Verify each DG is synchronized and loaded and 31 days operates for > 60 minutes at a load:
- a. Unit 1; > 2500 kW; and
- b. Unit 2; >5100kW and_<5300 kW.
SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 31 days day tank.
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 31 days fuel oil from storage tank to the day tank.
Prairie Island Unit I - Amendment No. 4-58 4-7-4187 Units I and 2 3.8.1-7 Unit 2 - Amendment No. 4-49 165