ML082390633: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:O::::-,}.Constellation Energy" Nine Mile Point Nuclear Station August26,2008U.S.NuclearRegulatory CommissionWashington,D.C.20555-0001P.O.Box63Lycoming,NY13093 ATTENTION:
{{#Wiki_filter::O-,}. Constellation Energy
        " Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 August 26, 2008 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION:               Document Control Desk


==SUBJECT:==
==SUBJECT:==
DocumentControlDeskNineMilePointNuclearStationUnitNos.1&2;DocketNos.50-220and50-410FitnessforDuty Program PerformanceDataReport In accordancewiththe requirementssetforthin10CFR26.71(d),NineMilePointNuclearStation,LLChascompiledandis submitting the enclosed semiannualFitnessforDuty Program Performance DataReportcoveringtheperiodJanuary 1,2008throughJune30,2008.Shouldyouhaveanyquestions regarding the informationinthissubmittal,pleasecontactTerrySyrell, DirectorLicensingat(315)349-5219.
Nine Mile Point Nuclear Station Unit Nos. 1 & 2; Docket Nos. 50-220 and 50-410 Fitness for Duty Program Performance Data Report In accordance with the requirements set forth in 10 CFR 26.71(d), Nine Mile Point Nuclear Station, LLC has compiled and is submitting the enclosed semiannual Fitness for Duty Program Performance Data Report covering the period January 1,2008 through June 30, 2008.
;;;:;;::: fb;-WilliamC.Byrne Director Security  
Should you have any questions regarding the information in this submittal, please contact Terry Syrell, Director Licensing at (315) 349-5219.
                                                                  ;;;:;;::: fb;-
William C. Byrne Director Security


==Enclosure:==
==Enclosure:==
FitnessforDutyProgram PerformanceDataReportcc:NRCRegionalAdministrator,RegionINRCProject ManagerNRCSeniorResident Inspector ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORTNineMile Point Nuclear Station, LLC August26,2008 ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Personnel Subjectto10 CFR Part 26 CONSTELLA nON ENERGY 6/30/08 Company6MonthsEndingNineMilePointNuclearStation Brett Boismenu, FFD Specialist(315)349-7313 Contact Name Phone CUTOFFS: Screen/Confirmation (ng/ml)[X]AppendixAto10CFRPart26 Marijuana Amphetamines Cocaine Phencyclidine Opiates Alcohol (%BAC)Annual (Jan-Dec)Random testinz rates: at least 50%for employees and contractors.
Fitness for Duty Program Performance Data Report cc:     NRC Regional Administrator, Region I NRC Project Manager NRC Senior Resident Inspector
Long-term Short-term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 984 N/A*580######Categories TestedPositiveTestedPositiveTested Positive Pre-Access170 933 9 For Cause Post-accident 3 0 6 0 Observed 0 0 I 1 Behavior Random 251 01792 Follow-up 39 0950 Other**3 0 17 0 TOTAL3130 1231 12*********NineMilePointNuclearStationdoesnotdifferentiatebetweenlong-termandshort-termcontractors.Allcontractorswhohaveobtainedunescortedaccessareconsideredshort-term.Primarilyreferstotestsconductedforsamplesthatwerehydrated(diluted).Asecond(observed)sampleisconductedfollowingresultsindicatinglowspecificgravityand/orcreatinine.TheTotalnumber ofPositiveShort-termContractorPersonnelonthispagediffersfromthebreakdownonthenextpageandtheSituationDescriptionsduetoonecontractorrefusaltotest.
 
100 ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Breakdown of Confirmed Positive Tests for Specific Substances MarijuanaCocaineOpiates Amphe-Phency-AlcoholRefusalto Total tamines lidine Test Licensee Employees 0000 0 0 0 0 Long-Term Contractors
ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Nine Mile Point Nuclear Station, LLC August 26, 2008
*Short-Term Contractors5500 0 2 1 13***TOTAL55000 2 1 13***Fordetailsseenextpage.
 
****NineMilePoint NuclearStationdoesnot differentiate betweenlong-termandshort-term contractors.
ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Personnel Subject to 10 CFR Part 26 CONSTELLAnON ENERGY                                                   6/30/08 Company                                              6 Months Ending Nine Mile Point Nuclear Station Brett Boismenu, FFD Specialist                                     (315) 349-7313 Contact Name                                                 Phone CUTOFFS: Screen/Confirmation (ng/ml)                       [X] Appendix A to 10 CFR Part 26 Marijuana                         Amphetamines Cocaine                         Phencyclidine Opiates                       Alcohol (% BAC)
All contractors whohaveobtained unescortedaccessareconsideredshort-term.TheTotal number of Positive Short-term Contractor Personnel ,onthepreviouspage,differsfromtheTotalonthispageduetothe breakdownonthispageincludesarefusal.NineMilePoint Nuclear Station ,LLC(NMPNS)conductson-sitedrug screeningusingSyvaETS instrumentation
Annual (Jan-Dec) Random testinz rates: at least 50% for employees and contractors.
,buthaschosenNOTto temporarily suspend individualsunderthepro visions of§26.24(d).To monitorouraccuracyandintegrity,NMPNS participates in proficiency testing providedbytheCollege of American Pathologists (CAP).20f3 ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events January I-June30,2008 A.Situation Descriptions 1.One(1)ContractorwasconfirmedpositiveforAlcoholasaresult ofaForCausedrugandalcoholtest.2.Five(5)ContractorswereconfirmedpositiveforCocaineasaresult ofaccessdrugandalcoholtests.3.Four(4)ContractorswereconfirmedpositiveforMarijuanaasaresult ofaccessdrugandalcoholtests.4.One (1)ContractorwasconfirmedpositiveforMarijuanaasaresult ofaRandomdrugandalcoholtest.
Long-term                     Short-term Testing Results                     Licensee Employees       Contractor Personnel         Contractor Personnel Average Number with Unescorted Access                           984                       N/A*                         580
5.One (1)ContractortestedpositiveforAlcoholasaresult ofaRandomdrugandalcoholtest.6.One (1)ContractorRefusedtosubmittoaFollow-updrugandalcoholtest.
                                      #             #             #             #             #           #
B.ManagementActions(in Response to Situation Descriptions)Thefollowingactionsweretakenbymanagementasaresult oftheabovesituation descriptions:
Categories                         Tested      Positive      Tested        Positive        Tested      Positive Pre-Access                            17            0                                        933           9 For Cause   Post-accident             3           0                                           6           0 Observed 0           0                                           I           1 Behavior Random                               251           0                                        179            2 Follow-up                             39           0                                          95            0 Other**                               3           0                                         17           0 TOTAL                                313            0                                        1231         12***
1.UnescortedAccesswasimmediatelysuspendedandordenied
* Nine Mile Point Nuclear Station does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.
.2.SubstanceAbuseReferrals:Allindividualswereencouragedtoobtainasubstanceabuseevaluationtodeterminepropertreatmentandrehabilitation.3.Review ofworkwasperformedtodetermineiftherewereanyimpactsonqualityandsafety
**    Primarily refers to tests conducted for samples that were hydrated (diluted). A second (observed) sample is conducted following results indicating low specific gravity and/or creatinine.
.Noimpactsonqualityandsafetywereidentifiedbysupervision.C.NRC Reportable Events (Per lOCFR Part 26.73)Therewerenoeventsduringthisperformancedataperiodthatweredeterminedtobereportableper26.73.30f3}}
***  The Total number of Positive Short-term Contractor Personnel on this page differs from the breakdown on the next page and the Situation Descriptions due to one contractor refusal to test.
100
 
ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Breakdown of Confirmed Positive Tests for Specific Substances Amphe-     Phency-Marijuana      Cocaine    Opiates                              Alcohol    Refusal to        Total tamines     lidine Test Licensee Employees                 0           0           0           0            0          0          0              0 Long-Term Contractors
* Short-Term Contractors                5            5          0           0            0          2           1             13***
TOTAL                      5            5          0            0            0          2           1           13***
For details see next page.
* Nine Mile Point Nuclear Station does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.
***    The Total number of Positive Short-term Contractor Personnel , on the previous page, differs from the Total on this page due to the breakdown on this page includes a refusal.
Nine Mile Point Nuclear Station , LLC (NMPNS) conducts on-site drug screening using Syva ETS instrumentation, but has chosen NOT to temporarily suspend individuals under the provisions of §26.24(d). To monitor our accuracy and integrity, NMPNS participates in proficiency testing provided by the College of American Pathologists (CAP).
20f3
 
ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events January I-June 30, 2008 A. Situation Descriptions
: 1.     One (1) Contractor was confirmed positive for Alcohol as a result of a For Cause drug and alcohol test.
: 2.     Five (5) Contractors were confirmed positive for Cocaine as a result of Pre-access drug and alcohol tests.
: 3.       Four (4) Contractors were confirmed positive for Marijuana as a result of Pre-access drug and alcohol tests.
: 4.     One (1) Contractor was confirmed positive for Marijuana as a result of a Random drug and alcohol test.
: 5.     One (1) Contractor tested positive for Alcohol as a result of a Random drug and alcohol test.
: 6.     One (1) Contractor Refused to submit to a Follow-up drug and alcohol test.
B. Management Actions (in Response to Situation Descriptions)
The following actions were taken by management as a result of the above situation descriptions:
: 1.     Unescorted Access was immediately suspended and or denied.
: 2.       Substance Abuse Referrals:
All individuals were encouraged to obtain a substance abuse evaluation to determine proper treatment and rehabilitation.
: 3.       Review of work was performed to determine if there were any impacts on quality and safety. No impacts on quality and safety were identified by supervision.
C. NRC Reportable Events (Per 10CFR Part 26.73)
There were no events during this performance data period that were determined to be reportable per 26.73.
30f3}}

Revision as of 13:37, 14 November 2019

Fitness for Duty Program Performance Data Report
ML082390633
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 08/26/2008
From: Byrne W
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML082390633 (5)


Text

O-,}. Constellation Energy

" Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 August 26, 2008 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit Nos. 1 & 2; Docket Nos. 50-220 and 50-410 Fitness for Duty Program Performance Data Report In accordance with the requirements set forth in 10 CFR 26.71(d), Nine Mile Point Nuclear Station, LLC has compiled and is submitting the enclosed semiannual Fitness for Duty Program Performance Data Report covering the period January 1,2008 through June 30, 2008.

Should you have any questions regarding the information in this submittal, please contact Terry Syrell, Director Licensing at (315) 349-5219.

fb;-

William C. Byrne Director Security

Enclosure:

Fitness for Duty Program Performance Data Report cc: NRC Regional Administrator, Region I NRC Project Manager NRC Senior Resident Inspector

ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Nine Mile Point Nuclear Station, LLC August 26, 2008

ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Personnel Subject to 10 CFR Part 26 CONSTELLAnON ENERGY 6/30/08 Company 6 Months Ending Nine Mile Point Nuclear Station Brett Boismenu, FFD Specialist (315) 349-7313 Contact Name Phone CUTOFFS: Screen/Confirmation (ng/ml) [X] Appendix A to 10 CFR Part 26 Marijuana Amphetamines Cocaine Phencyclidine Opiates Alcohol (% BAC)

Annual (Jan-Dec) Random testinz rates: at least 50% for employees and contractors.

Long-term Short-term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 984 N/A* 580

  1. # # # # #

Categories Tested Positive Tested Positive Tested Positive Pre-Access 17 0 933 9 For Cause Post-accident 3 0 6 0 Observed 0 0 I 1 Behavior Random 251 0 179 2 Follow-up 39 0 95 0 Other** 3 0 17 0 TOTAL 313 0 1231 12***

  • Nine Mile Point Nuclear Station does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.
    • Primarily refers to tests conducted for samples that were hydrated (diluted). A second (observed) sample is conducted following results indicating low specific gravity and/or creatinine.
      • The Total number of Positive Short-term Contractor Personnel on this page differs from the breakdown on the next page and the Situation Descriptions due to one contractor refusal to test.

100

ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency-Marijuana Cocaine Opiates Alcohol Refusal to Total tamines lidine Test Licensee Employees 0 0 0 0 0 0 0 0 Long-Term Contractors

  • Short-Term Contractors 5 5 0 0 0 2 1 13***

TOTAL 5 5 0 0 0 2 1 13***

For details see next page.

  • Nine Mile Point Nuclear Station does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.
      • The Total number of Positive Short-term Contractor Personnel , on the previous page, differs from the Total on this page due to the breakdown on this page includes a refusal.

Nine Mile Point Nuclear Station , LLC (NMPNS) conducts on-site drug screening using Syva ETS instrumentation, but has chosen NOT to temporarily suspend individuals under the provisions of §26.24(d). To monitor our accuracy and integrity, NMPNS participates in proficiency testing provided by the College of American Pathologists (CAP).

20f3

ENCLOSURE FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Situation Descriptions, Management Actions, and NRC Reportable Events January I-June 30, 2008 A. Situation Descriptions

1. One (1) Contractor was confirmed positive for Alcohol as a result of a For Cause drug and alcohol test.
2. Five (5) Contractors were confirmed positive for Cocaine as a result of Pre-access drug and alcohol tests.
3. Four (4) Contractors were confirmed positive for Marijuana as a result of Pre-access drug and alcohol tests.
4. One (1) Contractor was confirmed positive for Marijuana as a result of a Random drug and alcohol test.
5. One (1) Contractor tested positive for Alcohol as a result of a Random drug and alcohol test.
6. One (1) Contractor Refused to submit to a Follow-up drug and alcohol test.

B. Management Actions (in Response to Situation Descriptions)

The following actions were taken by management as a result of the above situation descriptions:

1. Unescorted Access was immediately suspended and or denied.
2. Substance Abuse Referrals:

All individuals were encouraged to obtain a substance abuse evaluation to determine proper treatment and rehabilitation.

3. Review of work was performed to determine if there were any impacts on quality and safety. No impacts on quality and safety were identified by supervision.

C. NRC Reportable Events (Per 10CFR Part 26.73)

There were no events during this performance data period that were determined to be reportable per 26.73.

30f3