ML083020086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:December 1, 2008 MEMORANDUM TO: Biweekly Notice Coordinator S FROM:   John T. Buckley, Senior Project Manager/RA/   Decommissioning and Uranium Recovery       Licensing Directorate   Division of Waste Management       and Environmental Protection Office of Federal and State Materials       and Environmental Management Programs  
{{#Wiki_filter:December 1, 2008 MEMORANDUM TO: Biweekly Notice Coordinator S
FROM:                   John T. Buckley, Senior Project Manager/RA/
Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs


==SUBJECT:==
==SUBJECT:==
REQUEST FOR PUBLICATION IN BIWEEKLY FRN - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE NO. DR-10, DOCKET NO. 50-183  
REQUEST FOR PUBLICATION IN BIWEEKLY FRN - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE NO.
DR-10, DOCKET NO. 50-183 GE Hitachi Nuclear Energy (GEH), License No. DR-10, Docket No. 50-183, ESADA Vallecitos Experimental Superheat Reactor (EVESR)
Date of application for amendment: June 23, 2008 (ADAMS No. ML081780099), with supplements dated August 11, 2008 (ADAMS No. ML082260044), August 19, 2008 (ADAMS No. ML082350078), and October 9, 2008 (ADAMS No. ML082840704).
Brief description of amendment: The amendment revises the Technical Specifications (TSs) by:
(1) expanding the scope of principal activities that can be conducted under the license; and (2) removes unnecessary access control and locking requirements to areas below the 549-ft elevation of the EVESR containment, and control access to all areas within the EVESR containment in accordance with 10 CFR Part 20.
Date of issuance: December 1, 2008.
Effective date: As of the date of issuance, to be implemented within 30 days.
Amendment No.: 7 Facility Operating License No. DR-10: The amendment revises the TSs.
Date of initial notice in FEDERAL REGISTER: September 9, 2008 (73 FR 40631).
The letters dated August 11, 2008, August 19, 2008, and October 9, 2008, provided clarifying


GE Hitachi Nuclear Energy (GEH), License No. DR-10, Docket No. 50-183, ESADA Vallecitos Experimental Superheat Reactor (EVESR)
2 information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008.
Date of application for amendment:  June 23, 2008 (ADAMS No. ML081780099), with supplements dated August 11, 2008 (ADAMS No. ML082260044), August 19, 2008 (ADAMS No. ML082350078), and October 9, 2008 (ADAMS No. ML082840704).
No significant hazards consideration comments received: None.
Brief description of amendment:  The amendment revises the Technical Specifications (TSs) by:  (1) expanding the scope of principal activities that can be conducted under the license; and (2) removes unnecessary access control and locking requirements to areas below the 549-ft elevation of the EVESR containment, and control access to all areas within the EVESR containment in accordance with 10 CFR Part 20.
cc:                                        GE                    Vallecitos            List
Date of issuance:  December 1, 2008. Effective date:  As of the date of issuance, to be implemented within 30 days. Amendment No.:  7 Facility Operating License No. DR-10:  The amendment revises the TSs. Date of initial notice in FEDERAL REGISTER:  September 9, 2008 (73 FR 40631). The letters dated August 11, 2008, August 19, 2008, and October 9, 2008, provided clarifying 2  information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008. No significant hazards consideration comments received: None.  


cc:  GE Vallecitos List 2 information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008 No significant hazards consideration comments received: None.  
2 information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008 No significant hazards consideration comments received: None.
 
DISTRIBUTION:
DISTRIBUTION
DURLD r/f       RidsRgn4MailCenter ML083020086 OFFICE         DWMEP:PM       DWMEP:LA         DWMEP:BC       OGC             DWMEP:PM NAME           JBuckley       SMichonski       TSmith         JHull           JBuckley DATE             11/7 /08       11/ 7 /08           11/10 /08       11/12 /08   12/01/08 OFFICIAL RECORD COPY}}
: DURLD r/f RidsRgn4MailCenter ML083020086 OFFICE DWMEP:PM DWMEP:LA DWMEP:BC OGC DWMEP:PM NAME JBuckley SMichonski TSmith JHull JBuckley DATE 11/7 /08 11/ 7 /08     11/10 /08     11/12 /08   12/01/08 OFFICIAL RECORD COPY}}

Latest revision as of 12:43, 14 November 2019

GE Hitachi Nuclear Energy, Biweekly Notice Memo, Notice of Issuance of Amendment Revises Technical Specifications by: (1) Expanding Scope of Principal Activities Can Be Conducted Under License; & (2) Removes Unnecessary Access Control & Loc
ML083020086
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 12/01/2008
From: Buckley J
NRC/FSME/DWMEP/DURLD/RDB
To:
Division of Operating Reactor Licensing
Buckley, J TNRC/DWMEP, 415-6607
References
Download: ML083020086 (3)


Text

December 1, 2008 MEMORANDUM TO: Biweekly Notice Coordinator S

FROM: John T. Buckley, Senior Project Manager/RA/

Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FRN - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE NO.

DR-10, DOCKET NO. 50-183 GE Hitachi Nuclear Energy (GEH), License No. DR-10, Docket No. 50-183, ESADA Vallecitos Experimental Superheat Reactor (EVESR)

Date of application for amendment: June 23, 2008 (ADAMS No. ML081780099), with supplements dated August 11, 2008 (ADAMS No. ML082260044), August 19, 2008 (ADAMS No. ML082350078), and October 9, 2008 (ADAMS No. ML082840704).

Brief description of amendment: The amendment revises the Technical Specifications (TSs) by:

(1) expanding the scope of principal activities that can be conducted under the license; and (2) removes unnecessary access control and locking requirements to areas below the 549-ft elevation of the EVESR containment, and control access to all areas within the EVESR containment in accordance with 10 CFR Part 20.

Date of issuance: December 1, 2008.

Effective date: As of the date of issuance, to be implemented within 30 days.

Amendment No.: 7 Facility Operating License No. DR-10: The amendment revises the TSs.

Date of initial notice in FEDERAL REGISTER: September 9, 2008 (73 FR 40631).

The letters dated August 11, 2008, August 19, 2008, and October 9, 2008, provided clarifying

2 information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008.

No significant hazards consideration comments received: None.

cc: GE Vallecitos List

2 information that did not change the initial proposed no significant hazards consideration determination or expand the application beyond the scope of the original Federal Register notice. The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated December 1, 2008 No significant hazards consideration comments received: None.

DISTRIBUTION:

DURLD r/f RidsRgn4MailCenter ML083020086 OFFICE DWMEP:PM DWMEP:LA DWMEP:BC OGC DWMEP:PM NAME JBuckley SMichonski TSmith JHull JBuckley DATE 11/7 /08 11/ 7 /08 11/10 /08 11/12 /08 12/01/08 OFFICIAL RECORD COPY