ML091030520: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:No. 09-015 U. S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 13, 2009  
{{#Wiki_filter:No. 09-015 U. S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 13, 2009 Licensees:            Exelon Generation Company, LLC Facility:              Limerick Generating Station Units 1 & 2 Docket No.            50-352 & 50-353 Date and Time:        May 21, 2009 from 6:00 p.m. to 7:30 p.m.
Location:              Limerick Energy Information Center 218 Longview Road Royersford, PA 19468-1016 Purpose:              To discuss the NRCs assessment of the safety performance of Exelons Limerick Generation Station, Units 1 & 2 for calendar year 2008 and the role of the agency in ensuring safe plant operations.
Attendees:
NRC:          P. Krohn, Chief, Project Branch 4, Region I E. DiPaolo, Senior Resident Inspector, Limerick N. Sieller, Resident Inspector, Limerick A. Rosebrook, Senior Project Engineer, Branch 4 Exelon:      C. Mudrick, Site Vice President E. Callan, Plant Manager R. Kreider, Manager, Regulatory Assurance Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Exelonss performance at the Limerick Generating Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.


Licensees: Exelon Generation Company, LLC Facility:  Limerick Generating Station Units 1 & 2
2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:
http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Meeting Contact:      Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.
Approved by: /RA by Andrew A. Rosebrook Acting For/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:
C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing D. Helker, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township


Docket No. 50-352 & 50-353 Date and Time: May 21, 2009 from 6:00 p.m. to 7:30 p.m.
2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:
 
http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Location:  Limerick Energy Information Center  218 Longview Road  Royersford, PA 19468-1016 Purpose:  To discuss the NRC's assessment of the safety performance of Exelon's Limerick Generation Station, Units 1 & 2 for calendar year 2008 and the role of the agency in ensuring safe plant operations.
Meeting Contact:                     Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov
Attendees:  NRC:  P. Krohn, Chief, Project Branch 4, Region I E. DiPaolo, Senior Resident Inspector, Limerick    N. Sieller, Resident Inspector, Limerick A. Rosebrook, Senior Project Engineer, Branch 4 Exelon: C. Mudrick, Site Vice President    E. Callan, Plant Manager    R. Kreider, Manager, Regulatory Assurance
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.
 
Approved by: __/RA by Andrew A. Rosebrook Acting For/_
Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Exelon's's performance at the Limerick Generating Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (Via E-Mail):
2 The NRC's Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:   http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4    (610) 337-5120 E-mail: Paul.Krohn@nrc.gov
Executive Director for Operations, OEDO                                                                                 (RIDSEDOMAILCENTER)
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to  the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.
Deputy Executive Director for Reactor Programs, OEDO                                                                     (RIDSEDOMAILCENTER)
 
Director, Office of Nuclear Reactor Regulation, NRR                                                                       (RIDSNRROD)
Approved by:  /RA by Andrew A. Rosebrook Acting For/
Deputy Director, Office of Nuclear Reactor Regulation, NRR                                                               (RIDSNRROD)
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO                                       (RIDSNRRADRO)
 
Director, Division of Inspection and Regional Supprt, NRR/DIRS                                                           (RIDSNRRDIRS)
cc w/encl: C. Crane, President and Chief Operating Officer, Exelon Corporation  M. Pacilio, Chief Operating Officer, Exelon Nuclear C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing D. Helker, Licensing  B. Fewell, Associate General Counsel, Exelon  Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township
Director, Division of Operating Reactor Licensing, NRR/DORL                                                             (RIDSNRRDORL)
 
Project Directorate I-1 (PD1-2), NRR                                                                                     (RIDSNRRDORILpl 1-2)
2  The NRC's Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:  http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at:  www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4   (610) 337-5120 E-mail: Paul.Krohn@nrc.gov
Asst. General Counsel Materials Litigation and Enforcement, OGC                                                           (RIDSOGCMAILCENTER)
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.
S. Collins, RA                                             L. Pinkham, Resident OA                                R. Nelson, NRR M. Dapas, DRA                                             D. Roberts, DRS                                        H. Chernoff, NRR D. Lew, DRP                                               P. Wilson, DRS                                          RI Receptionist J. Clifford, DRP                                           D. Screnci, PAO                                        DRS Div Secretary P. Krohn, DRP                                             N. Sheehan, PAO                                        DRP Div Secretary R. Fuhrmeister, DRP                                       R. Barkley, ORA                                        DNMS Div Secretary A. Rosebrook, DRP                                          N. McNamara, SLO                                        G. Matakas, ORA E. Torres, DRP                                            D. Tifft, SLO                                           PMNS J. Bream, DRP                                              S. Campbell, RI, OEDO                                   ROPreports@nrc.gov E. DiPaolo, DRP, SRI                                      P. Bamford, PM, NRR                                     Region I Docket Room (with N. Sieller, DRP, RI                                        E. Miller, NRR, Backup                                  concurrences)
Approved by: __/RA by Andrew A. Rosebrook Acting For/
SUNSI REVIEW COMPLETE: _AAR___ (Reviewers Initials)
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (Via E-Mail): Executive Director for Operations, OEDO                                                                             (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO                                                     (RIDSEDOMAILCENTER)
DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 9 EOC\LM 2008 AAM MEETING NOTICE REV0.DOC After declaring this document An Official Agency Record it will be released to the Public.                                           ML091030520 To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy OFFICE               RI/DRP                                 RI/DRP NAME                 ARosebrook/AAR                         PKrohn./ AAR for DATE                 04/13/09                               04/13 /09 OFFICIAL RECORD COPY}}
Director, Office of Nuclear Reactor Regulation, NRR                                                           (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR                                               (RIDSNRROD) Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO       (RIDSNRRADRO) Director, Division of Inspection and Regional Supprt, NRR/DIRS                                         (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL                                           (RIDSNRRDORL) Project Directorate I-1 (PD1-2), NRR                                                                                     (RIDSNRRDORILpl 1-2) Asst. General Counsel Materials Litigation and Enforcement, OGC                                     (RIDSOGCMAILCENTER) S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP E. Torres, DRP  J. Bream, DRP E. DiPaolo, DRP, SRI N. Sieller, DRP, RI  L. Pinkham, Resident OA D. Roberts, DRS P. Wilson, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO S. Campbell, RI, OEDO P. Bamford, PM, NRR E. Miller, NRR, Backup R. Nelson, NRR H. Chernoff, NRR RI Receptionist DRS Div Secretary DRP Div Secretary DNMS Div Secretary G. Matakas, ORA PMNS ROPreports@nrc.gov Region I Docket Room (with concurrences)
SUNSI REVIEW COMPLETE: _AAR___   (Reviewer's Initials)
DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 9 EOC\LM 2008 AAM MEETING NOTICE REV0.DOC After declaring this document "An Official Agency Record" it will be released to the Public.     ML091030520 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP   NAME ARosebrook/AAR PKrohn./ AAR for   DATE 04/13/09 04/13 /09                                                                       OFFICIAL RECORD COPY}}

Revision as of 08:10, 14 November 2019

05/21/2009 Meeting Notice, Public Meeting Limerick 2008 Annual Assessment Meeting
ML091030520
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/13/2009
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
09-015
Download: ML091030520 (3)


Text

No.09-015 U. S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 13, 2009 Licensees: Exelon Generation Company, LLC Facility: Limerick Generating Station Units 1 & 2 Docket No. 50-352 & 50-353 Date and Time: May 21, 2009 from 6:00 p.m. to 7:30 p.m.

Location: Limerick Energy Information Center 218 Longview Road Royersford, PA 19468-1016 Purpose: To discuss the NRCs assessment of the safety performance of Exelons Limerick Generation Station, Units 1 & 2 for calendar year 2008 and the role of the agency in ensuring safe plant operations.

Attendees:

NRC: P. Krohn, Chief, Project Branch 4, Region I E. DiPaolo, Senior Resident Inspector, Limerick N. Sieller, Resident Inspector, Limerick A. Rosebrook, Senior Project Engineer, Branch 4 Exelon: C. Mudrick, Site Vice President E. Callan, Plant Manager R. Kreider, Manager, Regulatory Assurance Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Exelonss performance at the Limerick Generating Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.

2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:

http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.

Approved by: /RA by Andrew A. Rosebrook Acting For/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing D. Helker, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township

2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:

http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.

Approved by: __/RA by Andrew A. Rosebrook Acting For/_

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA L. Pinkham, Resident OA R. Nelson, NRR M. Dapas, DRA D. Roberts, DRS H. Chernoff, NRR D. Lew, DRP P. Wilson, DRS RI Receptionist J. Clifford, DRP D. Screnci, PAO DRS Div Secretary P. Krohn, DRP N. Sheehan, PAO DRP Div Secretary R. Fuhrmeister, DRP R. Barkley, ORA DNMS Div Secretary A. Rosebrook, DRP N. McNamara, SLO G. Matakas, ORA E. Torres, DRP D. Tifft, SLO PMNS J. Bream, DRP S. Campbell, RI, OEDO ROPreports@nrc.gov E. DiPaolo, DRP, SRI P. Bamford, PM, NRR Region I Docket Room (with N. Sieller, DRP, RI E. Miller, NRR, Backup concurrences)

SUNSI REVIEW COMPLETE: _AAR___ (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 9 EOC\LM 2008 AAM MEETING NOTICE REV0.DOC After declaring this document An Official Agency Record it will be released to the Public. ML091030520 To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR PKrohn./ AAR for DATE 04/13/09 04/13 /09 OFFICIAL RECORD COPY