ML091520329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO, SRO-U SYSTEM c TITLE:        OPEN PORV BLOCK VALVES CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO, SRO-U SYSTEM c TITLE: OPEN PORV BLOCK VALVES
RO, SRO-U SYSTEM c JOB PERFORMANCE MEASURE DATA PAGE Task:   Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03           Importance:       RO: 4.1         SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.
 
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.
CANDIDATE: _____________________________________________
Preferred Evaluation Location: Simulator       __X__       In Plant   _____
 
Preferred Evaluation Method:       Perform     __X__       Simulate   _____
EXAMINER: _____________________________________________
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008  JOB PERFORMANCE MEASURE DATA PAGE Task: Open PORV Block Valves  
 
Alternate Path: YES  
 
Facility JPM #: NEW  
 
K/A: 010A2.03   Importance: RO: 4.1   SRO: 4.2  
 
K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.  
 
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SOP-1B, Primary Coolant System - Cooldown  
SOP-1B, Primary Coolant System - Cooldown Validation Time:15 minutes         Time Critical:   NO Candidate: __________________________________________________
 
Time Start: ________         Time Finish:     ________
Validation Time: 15 minutes Time Critical: NO  
Performance Time:       ________ minutes Performance Rating:     SAT______         UNSAT ______
 
Comments:
Candidate: __________________________________________________  
Examiner: _______________________________                   Date:   ______________
 
Signature PALISADES NUCLEAR PLANT                   Page 2 of 13                           JULY 2008
Time Start: ________ Time Finish: ________  
 
Performance Time: ________ minutes  
 
Performance Rating: SAT______ UNSAT ______  
 
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3  525°F To Mode 4 Or Mode 5 Checklist, Rev. 28
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


RO, SRO-U SYSTEM c EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3  525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant has been taken off-line, with the reactor tripped.
The Plant has been taken off-line, with the reactor tripped.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs. PCS boron has been verified at Cold Shutdown concentration.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.  
PCS boron has been verified at Cold Shutdown concentration.
 
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist.  
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.
 
PALISADES NUCLEAR PLANT                     Page 3 of 13                             JULY 2008
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate GCL 9-1 GCL-9-1 located.
S  U Comment:  Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
 
Proc. Step TASK ELEMENT 2 STANDARD GradeGCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves. MO-1042A  MO-1043A SOP-1B, Att. 6 located
 
S  U Comment:  Evaluator provides the operator a working copy of SOP-1B, Attachment 6.


Proc. Step TASK ELEMENT 3 STANDARD Grade2.0a.1 ENSURE the following conditions: 1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.
RO, SRO-U SYSTEM c Proc. Step            TASK ELEMENT 1                                  STANDARD                  Grade Locate GCL 9-1                            GCL-9-1 located.
HS-1042B (HS-1043B) checked in CLOSE position.
n/a                                                                                            S U Comment:
S  U Comment:
Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
Proc. Step             TASK ELEMENT 2                                  STANDARD                 Grade OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.                          SOP-1B, Att. 6 located GCL 9-1, Sep              MO-1042A                                                                    S U 2.11 MO-1043A Comment:
Evaluator provides the operator a working copy of SOP-1B, Attachment 6.
Proc. Step            TASK ELEMENT 3                                  STANDARD                  Grade ENSURE the following conditions:
HS-1042B (HS-1043B) checked in CLOSE
: 1. HS-1042B (HS-1043B), PZR to          position.
2.0a.1                                                                                          S U Quench Tank T-73 in CLOSE position.
Comment:
PALISADES NUCLEAR PLANT                    Page 4 of 13                              JULY 2008


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade2.0a.2 ENSURE the following conditions: 2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.
RO, SRO-U SYSTEM c Proc. Step           TASK ELEMENT 4                                     STANDARD                 Grade ENSURE the following conditions:
MO-1042A (MO-1043A) checked closed.
: 2. MO-1042A (MO-1043A), Power Relief       MO-1042A (MO-1043A) checked closed.
S U Comment:
2.0a.2                                                                                              S U Valve Isolation closed.
Comment:
Proc. Step            TASK ELEMENT 5                                      STANDARD                  Grade ENSURE the following conditions:
PCS pressure checked between 2010 and 2100
: 3. PCS pressure control established:
2.0a.3                                                psia                                          S U SOP-1      2010 to 2100 psia Comment:
Proc. Step            TASK ELEMENT 6                                      STANDARD                  Grade HS-1042B (HS-1043B) placed to OPEN for PLACE HS-1042B (HS-1043B), PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN          AND THEN 2.0b    PLACE to CLOSE, leaving handswitch in                                                    S U HS-1042B (HS-1043B) placed to CLOSE, with CLOSE position when complete.
handswitch left in CLOSE position.
Comment:
NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 5 of 13                                JULY 2008


Proc. Step TASK ELEMENT 5 STANDARD Grade2.0a.3 ENSURE the following conditions: 3. PCS pressure control established: SOP-1      2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia  S U Comment:
RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 7                                          STANDARD               Grade OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:                         HS-1042A (HS-1043A) operated intermittently until red light lights.
Proc. Step TASK ELEMENT 6 STANDARD Grade2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 2.0c    5% open, green position indication lamp is                                                    S U also lighted at this point).
HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.
: 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
S U Comment: NOTE: Operator can do either "channel" first. Typically the left side valve operations (non-parentheses) are completed first.
Comment:
CRITICAL STEP
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
CRITICAL STEP Proc. Step              TASK ELEMENT 8                                          STANDARD              Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS MO-1042A (MO-1043A), PORV Isolation Valve pressure action limit is exceeded (SOP-1, closed.
1800 psia), THEN the following actions 1.0a.1                                                                                                  S U shall be taken:
: 1. CLOSE affected PORV Isolation Valve.
Comment:
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.
Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 6 of 13                                JULY 2008


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point). 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 9                                        STANDARD                     Grade Following alarms are acknowledged:
HS-1042A (HS-1043A) operated intermittently until red light lights.  
: 1. EK-1373, Operator Action: Refer to ONP-The following alarms annunciate with            18: Follow Up Action: Check Acoustic PORV opening:                                Monitor Panel for open valve; Check TIA-
: 1. EK-1373, SV AND/OR PORV OPEN,                 0106 discharge temperature; Refer to ONP-(Audible Acoustic Monitor alarm on            23.1.
back of Panel C-11A in alarm from FI-      2. EK-0743, Operator Action: Refer to ONP-n/a        1042B Accelerometer (#4) Hi noise).          23.1; Follow Up Action: Evaluate desired      S U
: 2. EK0743, Pressurizer PWR Operated              position of MO-1042A; Refer to LCOs; Refer Relief Valve Discharge HI Temp (TIA-          to ORM.
0106, Relief and Safety Valve              3. Acoustic Monitor Reset pushbutton pushed Discharge Temp, reads up-scale).              to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
Comment:
NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.
Operator should acknowledge and consult ARPs.
Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.
Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
Proc. Step            TASK ELEMENT 10                                      STANDARD                    Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1,    PCS pressure restored to band as directed by 1800 psia), THEN the following actions        CRS.
1.0a.2    shall be taken:                                                                                S U
: 2. RESTORE PCS pressure as directed by CRS.
Comment:
Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
CRITICAL STEP PALISADES NUCLEAR PLANT                        Page 7 of 13                                    JULY 2008


S U Comment: NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
RO, SRO-U SYSTEM c Proc. Step            TASK ELEMENT 11                                    STANDARD                      Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:                              Since PORV still indicates open, the operator 1.0a.3                                                                                                  S U will NOT perform this step.
CRITICAL STEP
: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time ..
Comment:
Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.
Proc. Step            TASK ELEMENT 12                                    STANDARD                      Grade ENSURE the following conditions:
(HS-1042B) HS-1043B checked in CLOSE
: 1. (HS-1042B) HS-1043B, PZR to              position.
2.0a.1                                                                                                  S U Quench Tank T-73 in CLOSE position.
Comment:
Proc. Step            TASK ELEMENT 13                                    STANDARD                      Grade ENSURE the following conditions:
: 2. (MO-1042A) MO-1043A, Power Relief        (MO-1042A) MO-1043A checked closed.
2.0a.2                                                                                                  S U Valve Isolation closed.
Comment:
PALISADES NUCLEAR PLANT                        Page 8 of 13                                    JULY 2008


Proc. Step TASK ELEMENT 8 STANDARD Grade1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 1. CLOSE affected PORV Isolation Valve.  
RO, SRO-U SYSTEM c Proc. Step           TASK ELEMENT 14                                      STANDARD                 Grade ENSURE the following conditions:
PCS pressure checked between 2010 and 2100
: 3. PCS pressure control established:
2.0a.3                                                psia                                          S U SOP-1     2010 to 2100 psia Comment:
NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
Proc. Step           TASK ELEMENT 15                                      STANDARD                  Grade (HS-1042B) HS-1043B placed to OPEN for PLACE (HS-1042B) HS-1043B, PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN          AND THEN 2.0b    PLACE to CLOSE, leaving handswitch in                                                    S U (HS-1042B) HS-1043B placed to CLOSE, with CLOSE position when complete.
handswitch left in CLOSE position.
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 9 of 13                                JULY 2008


MO-1042A (MO-1043A), PORV Isolation Valve closed.
RO, SRO-U SYSTEM c Proc. Step            TASK ELEMENT 16                                          STANDARD                  Grade OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
S  U Comment: NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened. Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
: 1. (MO-1042A) MO-1043A red position (HS-1042A) HS-1043A operated intermittently indication lamp lights (indicates valve is 2.0c                                                    until red light lights.                        S U 5% open, green position indication lamp is also lighted at this point).
CRITICAL STEP
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
Comment:
NOTE: PORV does not open and stays closed.
CRITICAL STEP Proc. Step            TASK ELEMENT 17                                          STANDARD                  Grade IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats,        Determines that this step does not apply.
2.0d    THEN repeat Step 2.0c.                                                                          S U Comment:
PALISADES NUCLEAR PLANT                          Page 10 of 13                                  JULY 2008


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Graden/a The following alarms annunciate with PORV opening: 1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise). 2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).
RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 18                                   STANDARD                     Grade WHEN the following conditions exist,
Following alarms are acknowledged: 1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1. 2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM. 3. Acoustic Monitor 'Reset" pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
: 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
S  U Comment:  NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure. Operator should acknowledge and consult ARPs. Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident. Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
(MO-1042A) MO-1043 A to the full open 2.0e    2. (PRV-1042B) PRV-1043B, Power                                                             S U position.
 
Operated Relief is closed.
Proc. Step TASK ELEMENT 10 STANDARD Grade1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 2. RESTORE PCS pressure as directed by CRS. PCS pressure restored to band as directed by CRS. S  U Comment:  Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.
CRITICAL STEP
Comment:
 
CRITICAL STEP Proc. Step             TASK ELEMENT 19                                   STANDARD                     Grade Repeat this attachment for remaining Operator asks if CRS wants this done.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time -..
2.0f    PORV Channel Isolation Valve.                                                                S U Comment:
Since PORV still indicates open, the operator will NOT perform this step. S  U Comment:  Evaluator Cue:  If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
 
Proc. Step             TASK ELEMENT 20                                   STANDARD                     Grade Notify the CRS that one PORV Block           CRS notified that one PORV Block Valve is n/a    Valve is open.                              open.                                           S U Comment:
NOTE:  The same sequence as above will be repeated, with the parentheses swapped for the other "channel". The following operation will not cause a PORV opening.
END OF TASK PALISADES NUCLEAR PLANT                       Page 11 of 13                                 JULY 2008
Proc. Step TASK ELEMENT 12 STANDARD Grade2.0a.1 ENSURE the following conditions: 1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.
(HS-1042B) HS-1043B checked in CLOSE position.
S  U Comment: 
 
Proc. Step TASK ELEMENT 13 STANDARD Grade2.0a.2 ENSURE the following conditions: 2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.
(MO-1042A) MO-1043A checked closed.
S  U Comment: 
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade2.0a.3 ENSURE the following conditions: 3. PCS pressure control established: SOP-1      2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia  S  U Comment:  NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
 
Proc. Step TASK ELEMENT 15 STANDARD Grade2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.
S  U Comment:
CRITICAL STEP
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed: 1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point). 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
(HS-1042A) HS-1043A operated intermittently until red light lights.
S  U Comment:  NOTE: PORV does not open and stays closed.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 17 STANDARD Grade2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
Determines that this step does not apply.
S U Comment: 
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade2.0e WHEN the following conditions exist, 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit). 2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed. THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.
(MO-1042A) MO-1043 A to the full open position. S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 19 STANDARD Grade2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.
Operator asks if CRS wants this done.
S U Comment: Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
 
Proc. Step TASK ELEMENT 20 STANDARD Graden/a Notify the CRS that one PORV Block Valve is open.
CRS notified that one PORV Block Valve is open. S U Comment:
 
END OF TASK  
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)


RO, SRO-U SYSTEM c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant has been taken off-line, with the reactor tripped.
The Plant has been taken off-line, with the reactor tripped.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs. PCS boron has been verified at Cold Shutdown concentration.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.  
PCS boron has been verified at Cold Shutdown concentration.
 
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist.  
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.
 
PALISADES NUCLEAR PLANT                 Page 12 of 13                       JULY 2008
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS
 
IC-69  MFPs tripped, P-8A, AFWP, inservice. NOP and NOT (2060#, 532 F)  Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)  Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)  Double charging and letdown inservice. Cover gas valved out to VCT, N 2 tag next to VCT vent switch
 
USE CAE or:


Location Description Delay Ramp Event Value Final Insert Time Malfunctions: (NONE)       RC 19 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 2                 Remotes: CV-1042B-R PORV Relief Valve Open Light ON 5 sec. ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec. ON Trigger 2 Overrides: (NONE)                       Triggers: Numbe r Event ActionDescription 1 ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3   4}}
RO, SRO-U SYSTEM c SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.
NOP and NOT (2060#, 532 F)
Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)
Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)
Double charging and letdown inservice.
Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:
Insert Location                     Description           Delay     Ramp Event     Value   Final Time Malfunctions:
(NONE)
RC 19     PORV Relief Valve Partially Lifts     5 sec.                             100   Trigger 1 RC 20     PORV Relief Valve Partially Lifts     5 sec.                             100   Trigger 2 Remotes:
CV-       PORV Relief Valve Open Light ON       5 sec.                             ON     Trigger 1 1042B-R CV-       PORV Relief Valve Open Light ON       5 sec.                             ON     Trigger 2 1043B-R Overrides:
(NONE)
Triggers:
Number Event                                   Action                  Description 1         ZLO2P(16).and..not.et_array(2) 2         ZLO2P(19).and..not.et_array(1)       set thkkarc20=1.0 3
4 PALISADES NUCLEAR PLANT                Page 13 of 13                          JULY 2008}}

Revision as of 05:13, 14 November 2019

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO, SRO-U System C, Title: Open PORV Block Valves
ML091520329
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520329 (13)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO, SRO-U SYSTEM c TITLE: OPEN PORV BLOCK VALVES CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

RO, SRO-U SYSTEM c JOB PERFORMANCE MEASURE DATA PAGE Task: Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03 Importance: RO: 4.1 SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.

Task Standard: At least one PORV in service per SOP-1B, Attachment 6.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-1B, Primary Coolant System - Cooldown Validation Time:15 minutes Time Critical: NO Candidate: __________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008

RO, SRO-U SYSTEM c EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 1 STANDARD Grade Locate GCL 9-1 GCL-9-1 located.

n/a S U Comment:

Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.

Proc. Step TASK ELEMENT 2 STANDARD Grade OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves. SOP-1B, Att. 6 located GCL 9-1, Sep MO-1042A S U 2.11 MO-1043A Comment:

Evaluator provides the operator a working copy of SOP-1B, Attachment 6.

Proc. Step TASK ELEMENT 3 STANDARD Grade ENSURE the following conditions:

HS-1042B (HS-1043B) checked in CLOSE

1. HS-1042B (HS-1043B), PZR to position.

2.0a.1 S U Quench Tank T-73 in CLOSE position.

Comment:

PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 4 STANDARD Grade ENSURE the following conditions:

2. MO-1042A (MO-1043A), Power Relief MO-1042A (MO-1043A) checked closed.

2.0a.2 S U Valve Isolation closed.

Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade ENSURE the following conditions:

PCS pressure checked between 2010 and 2100

3. PCS pressure control established:

2.0a.3 psia S U SOP-1 2010 to 2100 psia Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade HS-1042B (HS-1043B) placed to OPEN for PLACE HS-1042B (HS-1043B), PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN AND THEN 2.0b PLACE to CLOSE, leaving handswitch in S U HS-1042B (HS-1043B) placed to CLOSE, with CLOSE position when complete.

handswitch left in CLOSE position.

Comment:

NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 7 STANDARD Grade OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed: HS-1042A (HS-1043A) operated intermittently until red light lights.

1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 2.0c 5% open, green position indication lamp is S U also lighted at this point).
2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS MO-1042A (MO-1043A), PORV Isolation Valve pressure action limit is exceeded (SOP-1, closed.

1800 psia), THEN the following actions 1.0a.1 S U shall be taken:

1. CLOSE affected PORV Isolation Valve.

Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.

Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 9 STANDARD Grade Following alarms are acknowledged:

1. EK-1373, Operator Action: Refer to ONP-The following alarms annunciate with 18: Follow Up Action: Check Acoustic PORV opening: Monitor Panel for open valve; Check TIA-
1. EK-1373, SV AND/OR PORV OPEN, 0106 discharge temperature; Refer to ONP-(Audible Acoustic Monitor alarm on 23.1.

back of Panel C-11A in alarm from FI- 2. EK-0743, Operator Action: Refer to ONP-n/a 1042B Accelerometer (#4) Hi noise). 23.1; Follow Up Action: Evaluate desired S U

2. EK0743, Pressurizer PWR Operated position of MO-1042A; Refer to LCOs; Refer Relief Valve Discharge HI Temp (TIA- to ORM.

0106, Relief and Safety Valve 3. Acoustic Monitor Reset pushbutton pushed Discharge Temp, reads up-scale). to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).

Comment:

NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.

Operator should acknowledge and consult ARPs.

Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.

Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).

Proc. Step TASK ELEMENT 10 STANDARD Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, PCS pressure restored to band as directed by 1800 psia), THEN the following actions CRS.

1.0a.2 shall be taken: S U

2. RESTORE PCS pressure as directed by CRS.

Comment:

Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 11 STANDARD Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: Since PORV still indicates open, the operator 1.0a.3 S U will NOT perform this step.

3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time ..

Comment:

Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.

NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.

Proc. Step TASK ELEMENT 12 STANDARD Grade ENSURE the following conditions:

(HS-1042B) HS-1043B checked in CLOSE

1. (HS-1042B) HS-1043B, PZR to position.

2.0a.1 S U Quench Tank T-73 in CLOSE position.

Comment:

Proc. Step TASK ELEMENT 13 STANDARD Grade ENSURE the following conditions:

2. (MO-1042A) MO-1043A, Power Relief (MO-1042A) MO-1043A checked closed.

2.0a.2 S U Valve Isolation closed.

Comment:

PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 14 STANDARD Grade ENSURE the following conditions:

PCS pressure checked between 2010 and 2100

3. PCS pressure control established:

2.0a.3 psia S U SOP-1 2010 to 2100 psia Comment:

NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.

Proc. Step TASK ELEMENT 15 STANDARD Grade (HS-1042B) HS-1043B placed to OPEN for PLACE (HS-1042B) HS-1043B, PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN AND THEN 2.0b PLACE to CLOSE, leaving handswitch in S U (HS-1042B) HS-1043B placed to CLOSE, with CLOSE position when complete.

handswitch left in CLOSE position.

Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 16 STANDARD Grade OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:

1. (MO-1042A) MO-1043A red position (HS-1042A) HS-1043A operated intermittently indication lamp lights (indicates valve is 2.0c until red light lights. S U 5% open, green position indication lamp is also lighted at this point).
2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

Comment:

NOTE: PORV does not open and stays closed.

CRITICAL STEP Proc. Step TASK ELEMENT 17 STANDARD Grade IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, Determines that this step does not apply.

2.0d THEN repeat Step 2.0c. S U Comment:

PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008

RO, SRO-U SYSTEM c Proc. Step TASK ELEMENT 18 STANDARD Grade WHEN the following conditions exist,

1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).

(MO-1042A) MO-1043 A to the full open 2.0e 2. (PRV-1042B) PRV-1043B, Power S U position.

Operated Relief is closed.

THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.

Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 19 STANDARD Grade Repeat this attachment for remaining Operator asks if CRS wants this done.

2.0f PORV Channel Isolation Valve. S U Comment:

Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.

Proc. Step TASK ELEMENT 20 STANDARD Grade Notify the CRS that one PORV Block CRS notified that one PORV Block Valve is n/a Valve is open. open. S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008

RO, SRO-U SYSTEM c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008

RO, SRO-U SYSTEM c SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.

NOP and NOT (2060#, 532 F)

Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)

Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)

Double charging and letdown inservice.

Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:

Insert Location Description Delay Ramp Event Value Final Time Malfunctions:

(NONE)

RC 19 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 2 Remotes:

CV- PORV Relief Valve Open Light ON 5 sec. ON Trigger 1 1042B-R CV- PORV Relief Valve Open Light ON 5 sec. ON Trigger 2 1043B-R Overrides:

(NONE)

Triggers:

Number Event Action Description 1 ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3

4 PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008