ML092250361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:10 CFR 50.90 LA M A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06042-DCM/SAB/DLK August 03, 2009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.90 LA M                                 A subsidiaryof Pinnacle West CapitalCorporation Dwight C. Mims                                                     Mail Station 7605 Palo Verde Nuclear     Vice President                                   Tel. 623-393-5403   P. 0. Box 52034 Generating Station       Regulatory Affairs and Plant Improvement       Fax 623-393-6077   Phoenix, Arizona 85072-2034 102-06042-DCM/SAB/DLK August 03, 2009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" By letter no. 102-06011, dated May 28, 2009 (Agencywide Document Access and Management System [ADAMS] Accession No. ML091560229), Arizona Public Service Company (APS) submitted a request for an amendment to the Technical Specifications for PVNGS Units 1, 2, and 3 to delete portions of Technical Specifications superseded by 10 CFR Part 26, Subpart I. APS subsequently determined that a correction to the original License Amendment Request was necessary in Technical Specification 5.2.2.Specifically, a reference in Technical Specification section 5.2.2.b was corrected to reflect the re-numbering of section 5.2.2.f to section 5.2.2.e.APS is providing corrected marked-up Technical Specification pages (Attachment 1)and the retyped Technical Specification page (Attachment 2). This change is editorial and, therefore, the No Significant Hazards Consideration Determination provided in the original amendment request remains valid and is not changed by this correction.
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" By letter no. 102-06011, dated May 28, 2009 (Agencywide Document Access and Management System [ADAMS] Accession No. ML091560229), Arizona Public Service Company (APS) submitted a request for an amendment to the Technical Specifications for PVNGS Units 1, 2, and 3 to delete portions of Technical Specifications superseded by 10 CFR Part 26, Subpart I. APS subsequently determined that a correction to the original License Amendment Request was necessary in Technical Specification 5.2.2.
Specifically, a reference in Technical Specification section 5.2.2.b was corrected to reflect the re-numbering of section 5.2.2.f to section 5.2.2.e.
APS is providing corrected marked-up Technical Specification pages (Attachment 1) and the retyped Technical Specification page (Attachment 2). This change is editorial and, therefore, the No Significant Hazards Consideration Determination provided in the original amendment request remains valid and is not changed by this correction.
This letter contains no regulatory commitments.
This letter contains no regulatory commitments.
In accordance with the PVNGS Quality Assurance Program, the Plant Review Board and the Offsite Safety Review Committee have reviewed and concurred with this corrected amendment request. By copy of this letter, this submittal is being forwarded to the Arizona Radiation Regulatory Agency (ARRA) pursuant to 1OCFR 50.91(b)(1).
In accordance with the PVNGS Quality Assurance Program, the Plant Review Board and the Offsite Safety Review Committee have reviewed and concurred with this corrected amendment request. By copy of this letter, this submittal is being forwarded to the Arizona Radiation Regulatory Agency (ARRA) pursuant to 10CFR 50.91(b)(1).
14oo A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
14oo A member of the     STARS       (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon 0 Palo Verde 0 San Onofre
* Diablo Canyon 0 Palo Verde 0 San Onofre
* South Texas 0 Wolf Creek ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" Page 2 Should you need further information regarding this amendment request, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.I declare under penalty of perjury that the foregoing is true and correct.Executed on (Date)Sincerely, DMC/RAS/DLK/
* South Texas 0 Wolf Creek
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" Page 2 Should you need further information regarding this amendment request, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on (Date)
Sincerely, DMC/RAS/DLK/
Attachments:
Attachments:
1.2.Updated Marked-up Technical Specification Pages Retyped Technical Specification Page 5.2-2 cc: E. E. Collins Jr.J. R. Hall R. I. Treadway A. V. Godwin T. Morales NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS Arizona Radiation Regulatory Agency (ARRA)Arizona Radiation Regulatory Agency (ARRA)
: 1.             Updated Marked-up Technical Specification Pages
Attachment I Updated Marked-up Technical Specification Pages 5.2-2 5.2-3 Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m).
: 2.              Retyped Technical Specification Page 5.2-2 cc:     E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall         NRC NRR Project Manager R. I. Treadway     NRC Senior Resident Inspector for PVNGS A. V. Godwin        Arizona Radiation Regulatory Agency (ARRA)
Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.24 1 for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
T. Morales          Arizona Radiation Regulatory Agency (ARRA)
: c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The p'osition may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action-is taken to fill the required position.d. Administrative preGdures shall be developed and implemented to limit the working hours of unit, staff who perform safety ,elated functions (eag., licensed ADNs, licnsed URs, radiation protection techniGcians, auxiliary operators"-, and key maintenance persnnel).
 
The controls shall include guidelines on working hours that ensure adequate shift coverage shall be maintained without routine heavy use of overtime.A-ny deviation from the worktg hour guidelines A authorized in advance by personnel at the ire cor ve designees, in accordance with approved adm!instrativ procedures and with documentation of the basis for granting the deviatioen.
Attachment I Updated Marked-up Technical Specification Pages 5.2-2 5.2-3
Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by ths authorized individuals or designees to ensure that excessive hours have not been assigned.
 
Routine deviation fro h above guidelines is not authorized.(continued)
Organization 5.2 5.2   Organization 5.2.2       Unit Staff   (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.
PAIO VERDE UNITS 1.2.3 5.2-J AMFNOMFNT Nn ;;; 120 Organization 5.2 5.2 Organization 5.2.2 Unit Staff .(continued) de. The Operations Department Leader or Operations Supervisor shall hold an SRO license.'f. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet'the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.PALO VERDE UNITS 1.2.3 5.2-3 AMENDMENT NO. -144 120 Attachment 2 Retyped Technical Specification Page 5.2-2 Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m).
: b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m). Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.24 1 for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.e fora period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
: c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The p'osition may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action-is taken to fill the required position.
: c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The position may be vacant-for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.d. The Operations Department Leader or Operations Supervisor-shall hold an SRO license.e. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.PAIO VERDE UNITS 1.253 5.2-2 AMENDMENT NO.}}
: d. Administrative preGdures shall be developed and implemented to limit the working hours of unit, staff who perform safety ,elated functions (eag., licensed ADNs, licnsed URs, radiation protection techniGcians, auxiliary operators"-, and key maintenance persnnel).
The controls shall include guidelines on working hours that ensure adequate shift coverage shall be maintained without routine heavy use of overtime.
A-ny deviation from the worktg hour guidelines   A authorized in advance by personnel at the   ire   cor ve designees, in accordance with approved adm!instrativ procedures and with documentation of the basis for granting the deviatioen.
Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by ths authorized individuals or designees to ensure that excessive hours have not been assigned. Routine deviation fro       h above guidelines is not authorized.
(continued)
PAIO VERDE UNITS 1.2.3                 5.2-J           AMFNOMFNT Nn     ;;; 120
 
Organization 5.2 5.2   Organization 5.2.2       Unit Staff   .(continued) de. The Operations Department Leader or Operations Supervisor shall hold an SRO license.
            'f. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet'the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.
PALO VERDE UNITS 1.2.3                 5.2-3               AMENDMENT NO. -144 120
 
Attachment 2 Retyped Technical Specification Page 5.2-2
 
Organization 5.2 5.2   Organization 5.2.2       Unit Staff   (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.
: b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m). Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.e fora period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
: c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The position may be vacant-for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.
: d. The Operations Department Leader or Operations Supervisor-shall hold an SRO license.
: e. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.
PAIO VERDE UNITS 1.253                 5.2-2           AMENDMENT NO.}}

Revision as of 03:15, 14 November 2019

Correction to Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26
ML092250361
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/03/2009
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06042-DCM/SAB/DLK, TSTF-511, Rev 0
Download: ML092250361 (7)


Text

10 CFR 50.90 LA M A subsidiaryof Pinnacle West CapitalCorporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06042-DCM/SAB/DLK August 03, 2009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" By letter no. 102-06011, dated May 28, 2009 (Agencywide Document Access and Management System [ADAMS] Accession No. ML091560229), Arizona Public Service Company (APS) submitted a request for an amendment to the Technical Specifications for PVNGS Units 1, 2, and 3 to delete portions of Technical Specifications superseded by 10 CFR Part 26, Subpart I. APS subsequently determined that a correction to the original License Amendment Request was necessary in Technical Specification 5.2.2.

Specifically, a reference in Technical Specification section 5.2.2.b was corrected to reflect the re-numbering of section 5.2.2.f to section 5.2.2.e.

APS is providing corrected marked-up Technical Specification pages (Attachment 1) and the retyped Technical Specification page (Attachment 2). This change is editorial and, therefore, the No Significant Hazards Consideration Determination provided in the original amendment request remains valid and is not changed by this correction.

This letter contains no regulatory commitments.

In accordance with the PVNGS Quality Assurance Program, the Plant Review Board and the Offsite Safety Review Committee have reviewed and concurred with this corrected amendment request. By copy of this letter, this submittal is being forwarded to the Arizona Radiation Regulatory Agency (ARRA) pursuant to 10CFR 50.91(b)(1).

14oo A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon 0 Palo Verde 0 San Onofre

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Correction to Amendment Request for Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" Page 2 Should you need further information regarding this amendment request, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on (Date)

Sincerely, DMC/RAS/DLK/

Attachments:

1. Updated Marked-up Technical Specification Pages
2. Retyped Technical Specification Page 5.2-2 cc: E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall NRC NRR Project Manager R. I. Treadway NRC Senior Resident Inspector for PVNGS A. V. Godwin Arizona Radiation Regulatory Agency (ARRA)

T. Morales Arizona Radiation Regulatory Agency (ARRA)

Attachment I Updated Marked-up Technical Specification Pages 5.2-2 5.2-3

Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.

b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m). Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.24 1 for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The p'osition may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action-is taken to fill the required position.
d. Administrative preGdures shall be developed and implemented to limit the working hours of unit, staff who perform safety ,elated functions (eag., licensed ADNs, licnsed URs, radiation protection techniGcians, auxiliary operators"-, and key maintenance persnnel).

The controls shall include guidelines on working hours that ensure adequate shift coverage shall be maintained without routine heavy use of overtime.

A-ny deviation from the worktg hour guidelines A authorized in advance by personnel at the ire cor ve designees, in accordance with approved adm!instrativ procedures and with documentation of the basis for granting the deviatioen.

Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by ths authorized individuals or designees to ensure that excessive hours have not been assigned. Routine deviation fro h above guidelines is not authorized.

(continued)

PAIO VERDE UNITS 1.2.3 5.2-J AMFNOMFNT Nn  ;;; 120

Organization 5.2 5.2 Organization 5.2.2 Unit Staff .(continued) de. The Operations Department Leader or Operations Supervisor shall hold an SRO license.

'f. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet'the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

PALO VERDE UNITS 1.2.3 5.2-3 AMENDMENT NO. -144 120

Attachment 2 Retyped Technical Specification Page 5.2-2

Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2, 3, or 4.

b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m). Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.e fora period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The position may be vacant-for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.
d. The Operations Department Leader or Operations Supervisor-shall hold an SRO license.
e. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

PAIO VERDE UNITS 1.253 5.2-2 AMENDMENT NO.