ML101390117: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:O , £u_ VERMONT YANKEE BEDROCK JL DRINKING WATER WELL-OFFJNE ,tMONITORING WELL INSTALLED GROUNDWATER ELEVATION IN FEET (FEBRUARY 26, 2010)TITIUM ACTIVIY (pXX)(FEBRIUARY
{{#Wiki_filter:O     , £u_       VERMONT YANKEE BEDROCK JL       DRINKING WATER WELL
: 8. 2el0--.,.GPI MONITORING WELL INSTALLED NOVEMBER 2007 OTHER VERMONT YANKEE MONITORING WELL-Vt, 4$, N N NOTES: 1. GROUNDWATER CONTOURS AND FLOW DIRECTIONS INFERRED FROM GROUNDWATER ELEVATION MEASUREMENTS COLLECTED FROM WIDELY SPACED MONITORING WELLS ON FEBRUARY 20,2111. ACTUAL CONDITIONS MAY VARY.2. TRITIUM ACTIVITY LEVELS BASED ON GROUNDWATER SAMPLES COLLECTED BY OTHER AND ANALYZED BY VERMONT YANKEE BETWEEN8,2810.3. FLUCTUATIONS IN LOCAL GROUNDWATER ELEVATIONS MAY OCCUR OVER TIME DUE TO RAINFALL, SEASONAL CHANGES IN THE RATE OF EVAPOTRANSPIRATIONK RELEASE RATES FROM THE LOCAL DAM. AND OTHER VARIOUS FACTORS.4. THE LOCATIONS AND REFERENCE ELEVATIONS OF MONITORING WELLS AND DRINKING WATER WELLS WERE SURVEYED BY SOUTHERN VERMONT ENGINEERING OF BRATTEBORO VERMONT (EXCEPT GZ-20AND GZ-21, WHICH WE RE ESTIMATED PENDING FORMAL SURVEY).5. BASE PLAN, INCLUDING SITE TOPOGRAPHY, PROVIDED TO GZA IN ELECTRONIC FORMAT BY VERMONT YANKEE.*%/,/-.N N-F-'4-.0 50' 100' 200'SCALE IN FEET ENTERGY VERMONT YANKEE VERNON, VERMONT TRITIUM CONCENTRATION PLAN.. = /ENTERNGY VERMONT YANKEE-- ~, VERNON, VERMONT PRELIMINARY 1 PROGRESS PRINT 4/15/10 1 3}}
                                                                        -OFFJNE
                                                                        ,tMONITORING WELLINSTALLED GROUNDWATER     ELEVATION IN FEET (FEBRUARY 26, 2010)
TITIUM ACTIVIY (pXX)
(FEBRIUARY 8. 2el0-
                                                                      - .,.GPI MONITORING WELL INSTALLED NOVEMBER 2007 OTHER VERMONT YANKEE MONITORING     WELL
                        -Vt, 4$,                                                 NOTES:
: 1. GROUNDWATER CONTOURS             ANDFLOW N                                                DIRECTIONS INFERRED FROM N                                              GROUNDWATER       ELEVATION MEASUREMENTS COLLECTED           FROM WIDELY   SPACED MONITORING       WELLS ON FEBRUARY 20,2111. ACTUAL CONDITIONS MAYVARY.
: 2. TRITIUM   ACTIVITY   LEVELSBASEDON GROUNDWATER SAMPLES COLLECTED BYOTHER ANDANALYZED            BY VERMONT     YANKEE   BETWEEN FER*UARY8,2810.
: 3. FLUCTUATIONS       INLOCAL GROUNDWATER ELEVATIONS         MAY OCCUR OVER TIMEDUETO RAINFALL, SEASONAL CHANGES IN THERATEOF EVAPOTRANSPIRATIONK       RELEASE RATESFROM THE LOCALDAM.AND OTHER VARIOUS FACTORS.
: 4. THE LOCATIONS       ANDREFERENCE ELEVATIONS     OF MONITORING   WELLS ANDDRINKING      WATERWELLSWERE SURVEYED BYSOUTHERN VERMONT ENGINEERING     OF BRATTEBORO
                                        /,                      VERMONT(EXCEPT GZ-20AND GZ-21, WHICHWERE ESTIMATED         PENDING FORMAL   SURVEY).
                              *%      /
N  -.                      5. BASEPLAN,INCLUDING         SITE N                              TOPOGRAPHY, PROVIDED         TO GZAIN ELECTRONIC FORMAT       BYVERMONT YANKEE.
                    - F 0         50'       100'             200' SCALE IN FEET ENTERGY VERMONT YANKEE VERNON, VERMONT
                                            -'4-.
TRITIUM CONCENTRATION PLAN PRELIMINARY  1                                      ..
                                                        -- ~,=           /ENTERNGY     VERMONT VERNON, VERMONT YANKEE PROGRESS PRINT 4/15/10   1                                                                                   3}}

Latest revision as of 19:00, 13 November 2019

Entergy Vermont Yankee, Tritium Concentration Plan, Figure 3
ML101390117
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/15/2010
From:
GZA GeoEnvironmental
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2010-0209
Download: ML101390117 (1)


Text

O , £u_ VERMONT YANKEE BEDROCK JL DRINKING WATER WELL

-OFFJNE

,tMONITORING WELLINSTALLED GROUNDWATER ELEVATION IN FEET (FEBRUARY 26, 2010)

TITIUM ACTIVIY (pXX)

(FEBRIUARY 8. 2el0-

- .,.GPI MONITORING WELL INSTALLED NOVEMBER 2007 OTHER VERMONT YANKEE MONITORING WELL

-Vt, 4$, NOTES:

1. GROUNDWATER CONTOURS ANDFLOW N DIRECTIONS INFERRED FROM N GROUNDWATER ELEVATION MEASUREMENTS COLLECTED FROM WIDELY SPACED MONITORING WELLS ON FEBRUARY 20,2111. ACTUAL CONDITIONS MAYVARY.
2. TRITIUM ACTIVITY LEVELSBASEDON GROUNDWATER SAMPLES COLLECTED BYOTHER ANDANALYZED BY VERMONT YANKEE BETWEEN FER*UARY8,2810.
3. FLUCTUATIONS INLOCAL GROUNDWATER ELEVATIONS MAY OCCUR OVER TIMEDUETO RAINFALL, SEASONAL CHANGES IN THERATEOF EVAPOTRANSPIRATIONK RELEASE RATESFROM THE LOCALDAM.AND OTHER VARIOUS FACTORS.
4. THE LOCATIONS ANDREFERENCE ELEVATIONS OF MONITORING WELLS ANDDRINKING WATERWELLSWERE SURVEYED BYSOUTHERN VERMONT ENGINEERING OF BRATTEBORO

/, VERMONT(EXCEPT GZ-20AND GZ-21, WHICHWERE ESTIMATED PENDING FORMAL SURVEY).

  • % /

N -. 5. BASEPLAN,INCLUDING SITE N TOPOGRAPHY, PROVIDED TO GZAIN ELECTRONIC FORMAT BYVERMONT YANKEE.

- F 0 50' 100' 200' SCALE IN FEET ENTERGY VERMONT YANKEE VERNON, VERMONT

-'4-.

TRITIUM CONCENTRATION PLAN PRELIMINARY 1 ..

-- ~,= /ENTERNGY VERMONT VERNON, VERMONT YANKEE PROGRESS PRINT 4/15/10 1 3