ML101390117
Jump to navigation
Jump to search
| ML101390117 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 04/15/2010 |
| From: | GZA GeoEnvironmental |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2010-0209 | |
| Download: ML101390117 (1) | |
Text
O
, £u_
VERMONT YANKEE BEDROCK JL DRINKING WATER WELL
-OFFJNE
,tMONITORING WELL INSTALLED GROUNDWATER ELEVATION IN FEET (FEBRUARY 26, 2010)
TITIUM ACTIVIY (pXX)
(FEBRIUARY 8. 2el0-
-.,.GPI MONITORING WELL INSTALLED NOVEMBER 2007 OTHER VERMONT YANKEE MONITORING WELL
-Vt, 4$,
N N
NOTES:
- 1. GROUNDWATER CONTOURS AND FLOW DIRECTIONS INFERRED FROM GROUNDWATER ELEVATION MEASUREMENTS COLLECTED FROM WIDELY SPACED MONITORING WELLS ON FEBRUARY 20,2111. ACTUAL CONDITIONS MAY VARY.
- 2. TRITIUM ACTIVITY LEVELS BASED ON GROUNDWATER SAMPLES COLLECTED BY OTHER AND ANALYZED BY VERMONT YANKEE BETWEEN FER*UARY 8,2810.
- 3. FLUCTUATIONS IN LOCAL GROUNDWATER ELEVATIONS MAY OCCUR OVER TIME DUE TO RAINFALL, SEASONAL CHANGES IN THE RATE OF EVAPOTRANSPIRATIONK RELEASE RATES FROM THE LOCAL DAM. AND OTHER VARIOUS FACTORS.
- 4. THE LOCATIONS AND REFERENCE ELEVATIONS OF MONITORING WELLS AND DRINKING WATER WELLS WERE SURVEYED BY SOUTHERN VERMONT ENGINEERING OF BRATTEBORO VERMONT (EXCEPT GZ-20AND GZ-21, WHICH WE RE ESTIMATED PENDING FORMAL SURVEY).
/,
/
N N F
-'4-.
0 50' 100' 200' SCALE IN FEET ENTERGY VERMONT YANKEE VERNON, VERMONT TRITIUM CONCENTRATION PLAN
=
/ENTERNGY VERMONT YANKEE
-- ~,
- VERNON, VERMONT PRELIMINARY 1 PROGRESS PRINT 4/15/10 1
3