ML102740257: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/30/2010 | | issue date = 09/30/2010 | ||
| title = NFPA 805 Non-Pilot Workshop Preliminary Topics | | title = NFPA 805 Non-Pilot Workshop Preliminary Topics | ||
| author name = Weerakkody S | | author name = Weerakkody S | ||
| author affiliation = NRC/NRR/DRA | | author affiliation = NRC/NRR/DRA | ||
| addressee name = Butler J | | addressee name = Butler J | ||
Line 9: | Line 9: | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = Weerakkody S | | contact person = Weerakkody S, NRR/DRA, 415-2870 | ||
| package number = ML10240247 | | package number = ML10240247 | ||
| document type = Conference/Symposium/Workshop Paper | | document type = Conference/Symposium/Workshop Paper | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NFPA 805 Non-Pilot Workshop | {{#Wiki_filter:NFPA 805 Non-Pilot Workshop Potential Workshop Topics Monitoring program | ||
* What is the level of detail that a licensee must submit to NRC under Oath & Affirmation about licensees NFPA 805 Monitoring Program? | |||
Potential Workshop Topics | |||
Monitoring program | |||
* What is the level of detail that a licensee must submit to NRC under Oath & Affirmation about | |||
Enforcement discretion | Enforcement discretion | ||
* Please expand upon the various enforcement discretion scenarios. For example, what can a licensee expect if they submit their LAR after their enforcement discretion period ends? | * Please expand upon the various enforcement discretion scenarios. For example, what can a licensee expect if they submit their LAR after their enforcement discretion period ends? | ||
* If a licensee submits their LAR more than six months after the staff issues the SER, will the licensee receive enforcement discretion during the LAR review period? | * If a licensee submits their LAR more than six months after the staff issues the SER, will the licensee receive enforcement discretion during the LAR review period? | ||
PRA peer reviews | PRA peer reviews | ||
* The NRC performed audits of the pilots | * The NRC performed audits of the pilots PRAs. What level of review is the NRC expecting to do for non-pilots? | ||
* If the NRC determines that a | * If the NRC determines that a licensees peer review was deficient, or the findings improperly resolved, what will the NRC do? | ||
* How will the issue of peer reviews of then-incomplete | * How will the issue of peer reviews of then-incomplete PRAs be addressed (for example the recent peer review at Palisades the the NRC observed)? | ||
Safe and stable | Safe and stable | ||
* What is the | * What is the NRCs position regarding this issue? | ||
* What information is required by the NRC regarding this issue? | * What information is required by the NRC regarding this issue? | ||
* What level of detail is required? | * What level of detail is required? | ||
Acceptance review process (LIC-109) | Acceptance review process (LIC-109) | ||
* What is the role of the | * What is the role of the NRCs acceptance review process in the NFPA 805 LAR review effort? | ||
* Will the NRC be following this process for the non-pilots? | * Will the NRC be following this process for the non-pilots? | ||
LAR prioritization and sequencing | LAR prioritization and sequencing | ||
Line 41: | Line 36: | ||
* Will the reviews be sequenced (as for license renewal)? | * Will the reviews be sequenced (as for license renewal)? | ||
* If so, what will be the criteria for prioritization? | * If so, what will be the criteria for prioritization? | ||
RAI process and SharePoint technology | RAI process and SharePoint technology 9/29/2010 | ||
NFPA 805 Non-Pilot Workshop | |||
* The pilot plants used SharePoint to assist the RAI process. Should the non-pilots expect to do the same? | |||
License condition | License condition | ||
* What can non-pilot licensees expect to see in their license conditions? | * What can non-pilot licensees expect to see in their license conditions? | ||
Line 67: | Line 61: | ||
* How do the power uprate and license renewal processes interact with the LAR review/transition process? | * How do the power uprate and license renewal processes interact with the LAR review/transition process? | ||
PRA Model maintenance | PRA Model maintenance | ||
* What are the regulatory expectations with respect to PRA model maintenance? - Plant changes? - Method changes? - Data changes? | * What are the regulatory expectations with respect to PRA model maintenance? | ||
* What are the responsibilities of the licensee when new information leads to increases in CDF? | - Plant changes? | ||
- Method changes? | |||
- Data changes? | |||
* What are the responsibilities of the licensee when new information leads to increases in CDF? Decreases in CDF? | |||
9/29/2010}} |
Latest revision as of 13:32, 13 November 2019
ML102740257 | |
Person / Time | |
---|---|
Issue date: | 09/30/2010 |
From: | Sunil Weerakkody NRC/NRR/DRA |
To: | Butler J Nuclear Energy Institute |
Weerakkody S, NRR/DRA, 415-2870 | |
Shared Package | |
ML10240247 | List: |
References | |
Download: ML102740257 (2) | |
Text
NFPA 805 Non-Pilot Workshop Potential Workshop Topics Monitoring program
- What is the level of detail that a licensee must submit to NRC under Oath & Affirmation about licensees NFPA 805 Monitoring Program?
- Please expand upon the various enforcement discretion scenarios. For example, what can a licensee expect if they submit their LAR after their enforcement discretion period ends?
- If a licensee submits their LAR more than six months after the staff issues the SER, will the licensee receive enforcement discretion during the LAR review period?
PRA peer reviews
- The NRC performed audits of the pilots PRAs. What level of review is the NRC expecting to do for non-pilots?
- If the NRC determines that a licensees peer review was deficient, or the findings improperly resolved, what will the NRC do?
- How will the issue of peer reviews of then-incomplete PRAs be addressed (for example the recent peer review at Palisades the the NRC observed)?
Safe and stable
- What is the NRCs position regarding this issue?
- What information is required by the NRC regarding this issue?
- What level of detail is required?
Acceptance review process (LIC-109)
- What is the role of the NRCs acceptance review process in the NFPA 805 LAR review effort?
- Will the NRC be following this process for the non-pilots?
LAR prioritization and sequencing
- Will the reviews be sequenced (as for license renewal)?
- If so, what will be the criteria for prioritization?
RAI process and SharePoint technology 9/29/2010
NFPA 805 Non-Pilot Workshop
- The pilot plants used SharePoint to assist the RAI process. Should the non-pilots expect to do the same?
License condition
- What can non-pilot licensees expect to see in their license conditions?
- Will this be different from what is in the current version of Regulatory Guide 1.205?
Implementation items (post-SE)
- How will implementation items be handled for the non-pilots?
- How will these items be finally closed-out?
New information post-LAR-submittal
- How does the NRC intend to handle new information developed after a licensee has submitted their LAR?
- If there is the possibility of re-work, how will this be resolved?
Bounds of self approval
- What are the boundaries of the post-transition self-approval process?
- Are there some changes that must receive specific NRC approval?
Unanalyzed PRA methods
- How will the NRC handle novel or previously unanalyzed PRA methods?
Fire modeling in the fire risk evaluation performance-based approach
- What information needs to be submitted to the NRC regarding fire modeling when the fire risk evaluation approach?
- What level of detail is required?
Design changes during the LAR review period
- How should potentially unrelated plant changes be addressed during the LAR review period?
- How do the power uprate and license renewal processes interact with the LAR review/transition process?
PRA Model maintenance
- What are the regulatory expectations with respect to PRA model maintenance?
- Plant changes?
- Method changes?
- Data changes?
- What are the responsibilities of the licensee when new information leads to increases in CDF? Decreases in CDF?
9/29/2010