Line 3: Line 3:
| issue date = 10/08/2010
| issue date = 10/08/2010
| title = Kansas State University-Confirmatory Action Letter
| title = Kansas State University-Confirmatory Action Letter
| author name = Pederson C D
| author name = Pederson C
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Geuther J
| addressee name = Geuther J
Line 9: Line 9:
| docket = 05000188
| docket = 05000188
| license number = R-088
| license number = R-088
| contact person = Eads J H, NRR/ADRA/DPR/PROB, 415-1471
| contact person = Eads J, NRR/ADRA/DPR/PROB, 415-1471
| case reference number = NRR-10-001
| case reference number = NRR-10-001
| document type = Confirmatory Action Letter (CAL)
| document type = Confirmatory Action Letter (CAL)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:October 8, 2010  
{{#Wiki_filter:October 8, 2010 CAL No. NRR-10-001 Mr. Jeffery Geuther, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering 112 Ward Hall Kansas State University Manhattan, KS 66506-2500
 
CAL No. NRR-10-001  
 
Mr. Jeffery Geuther, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering 112 Ward Hall Kansas State University Manhattan, KS 66506-2500  


==SUBJECT:==
==SUBJECT:==
CONFIRMATORY ACTION LETTER
CONFIRMATORY ACTION LETTER


==Dear Mr. Geuther:==
==Dear Mr. Geuther:==


On September 24, 2010, the Kansas State University Research Reactor reported an event to the U. S. Nuclear Regulatory Commission (NRC) where circumstances surrounding the removal of an experiment from the reactor pool caused higher than expected dosimeter readings for personnel in the area, and unexpected changes in the restricted area dose rate in excess of 20 rem per hour. Based upon your reporting of the event, the NRC chartered a Special Inspection Team to independently assess your investigation of the causes of the event. Subsequently, on October 1, 2010, you submitted a "10-day" report describing the causes of the event and the corrective actions which you deemed necessary to minimize the possibility of a similar occurrence. Following the review of your report, in a teleconference on October 6, 2010, NRC staff identified needed clarifications to your corrective actions, and on October 7, 2010, you submitted a supplement to your "10 day" report.  
On September 24, 2010, the Kansas State University Research Reactor reported an event to the U. S. Nuclear Regulatory Commission (NRC) where circumstances surrounding the removal of an experiment from the reactor pool caused higher than expected dosimeter readings for personnel in the area, and unexpected changes in the restricted area dose rate in excess of 20 rem per hour. Based upon your reporting of the event, the NRC chartered a Special Inspection Team to independently assess your investigation of the causes of the event. Subsequently, on October 1, 2010, you submitted a 10-day report describing the causes of the event and the corrective actions which you deemed necessary to minimize the possibility of a similar occurrence. Following the review of your report, in a teleconference on October 6, 2010, NRC staff identified needed clarifications to your corrective actions, and on October 7, 2010, you submitted a supplement to your 10 day report.
 
Pursuant to your 10-day report which you later supplemented on October 7, 2010, it is our understanding that the corrective actions detailed in the report will be completed prior to restarting the reactor, except for the actions discussed in item 5, concerning the Reactor Safeguards Committee, which will be completed at your earliest opportunity. Following completion of all the corrective actions, you are required to provide the NRC with written confirmation of completed actions.
Pursuant to your "10-day" report which you later supplemented on October 7, 2010, it is our  
As we informed you in a telephone conversation on October 7, 2010, based on your corrective actions, the NRC has no objection to you restarting the Kansas State Reactor. The NRC will verify that you have completed the corrective actions in a subsequent inspection the week of October 11, 2010.
 
Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to provide written notification to the NRC immediately if your understanding differs from that set forth above. You are also required to provide written notification to the NRC if you intend to change, deviate, or not complete any of the documented commitments, prior to the change or deviation.
understanding that the corrective actions detailed in the report will be completed prior to restarting the reactor, except for the actions discussed in item 5, concerning the Reactor Safeguards Committee, which will be completed at your earliest opportunity. Following completion of all the corrective actions, you are required to provide the NRC with written confirmation of completed actions.  
Issuance of this Confirmatory Action Letter does not preclude issuance of an order formalizing the above commitments or requiring other actions on the part of the licensee; nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may
 
As we informed you in a telephone conversation on October 7, 2010, based on your corrective actions, the NRC has no objection to you restarting the Kansas State Reactor. The NRC will verify that you have completed the corrective actions in a subsequent inspection the week of October 11, 2010.  
 
Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to provide written notification to the NRC immediately if your understanding differs from that set forth above. You are also required to provide written notification to the NRC if you intend to change, deviate, or not complete any of the documented commitments, prior to the change or deviation.  
 
Issuance of this Confirmatory Action Letter does not preclude issuance of an order formalizing the above commitments or requiring other actions on the part of the licensee; nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may
 
have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
 
In accordance with 10 CFR 2.390 of the NRC
=s "Public inspections, exemptions, requests for withholding
@ a copy of this letter will be made available electronically for pub lic inspection in the NRC Public Document Room or from the NRC
=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions please contact Johnny Eads at 301-415-1471.
 
Sincerely,          /RA/ Cynthia D. Pederson, Acting Deputy Director Reactor Safety Programs Office of Nuclear Reactor Regulation
 
Docket No. 50-188 License No. R-88
 
cc:  Please see next page
 
Kansas State University Docket No. 50-188
 
cc:
 
Office of the Governor State of Kansas Topeka, KS  66612
 
Thomas A. Conley, RRPJ, CHP Section Chief Radiation and Asbestos Control KS Dept of Health & Environment 1000 SW Jackson, Suite 320 Topeka, KS 66612-1366 


Mayor of Manhattan P.O. Box 748 Manhattan, KS  66502
J. Geuther                                      have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
In accordance with 10 CFR 2.390 of the NRC=s Public inspections, exemptions, requests for withholding@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions please contact Johnny Eads at 301-415-1471.
Sincerely,
                                              /RA/
Cynthia D. Pederson, Acting Deputy Director Reactor Safety Programs Office of Nuclear Reactor Regulation Docket No. 50-188 License No. R-88 cc: Please see next page


Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611  
Kansas State University                      Docket No. 50-188 cc:
Office of the Governor State of Kansas Topeka, KS 66612 Thomas A. Conley, RRPJ, CHP Section Chief Radiation and Asbestos Control KS Dept of Health & Environment 1000 SW Jackson, Suite 320 Topeka, KS 66612-1366 Mayor of Manhattan P.O. Box 748 Manhattan, KS 66502 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611


ML102810019, Package No. ML102810078         Template No.: NRR-106 OFFICE PROB:PM PRPB:LA PRLB:PM PROB:BC DPR:DD NRR:ADD NAME PIsaac GLappert (EHylton for)  CMontgomery JEads TQuay CPederson DATE 10/08 /10 10/08/10 10/08/10 10/08 /10 10/08/10 10/08/10}}
ML102810019, Package No. ML102810078         Template No.: NRR-106 OFFICE   PROB:PM     PRPB:LA     PRLB:PM         PROB:BC   DPR:DD       NRR:ADD GLappert NAME       PIsaac     (EHylton     CMontgomery       JEads   TQuay       CPederson for)
DATE     10/08 /10   10/08/10     10/08/10         10/08 /10 10/08/10     10/08/10}}

Latest revision as of 13:22, 13 November 2019

Kansas State University-Confirmatory Action Letter
ML102810019
Person / Time
Site: Kansas State University
Issue date: 10/08/2010
From: Pederson C
Office of Nuclear Reactor Regulation
To: Geuther J
Kansas State University
Eads J, NRR/ADRA/DPR/PROB, 415-1471
References
NRR-10-001
Download: ML102810019 (4)


Text

October 8, 2010 CAL No. NRR-10-001 Mr. Jeffery Geuther, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering 112 Ward Hall Kansas State University Manhattan, KS 66506-2500

SUBJECT:

CONFIRMATORY ACTION LETTER

Dear Mr. Geuther:

On September 24, 2010, the Kansas State University Research Reactor reported an event to the U. S. Nuclear Regulatory Commission (NRC) where circumstances surrounding the removal of an experiment from the reactor pool caused higher than expected dosimeter readings for personnel in the area, and unexpected changes in the restricted area dose rate in excess of 20 rem per hour. Based upon your reporting of the event, the NRC chartered a Special Inspection Team to independently assess your investigation of the causes of the event. Subsequently, on October 1, 2010, you submitted a 10-day report describing the causes of the event and the corrective actions which you deemed necessary to minimize the possibility of a similar occurrence. Following the review of your report, in a teleconference on October 6, 2010, NRC staff identified needed clarifications to your corrective actions, and on October 7, 2010, you submitted a supplement to your 10 day report.

Pursuant to your 10-day report which you later supplemented on October 7, 2010, it is our understanding that the corrective actions detailed in the report will be completed prior to restarting the reactor, except for the actions discussed in item 5, concerning the Reactor Safeguards Committee, which will be completed at your earliest opportunity. Following completion of all the corrective actions, you are required to provide the NRC with written confirmation of completed actions.

As we informed you in a telephone conversation on October 7, 2010, based on your corrective actions, the NRC has no objection to you restarting the Kansas State Reactor. The NRC will verify that you have completed the corrective actions in a subsequent inspection the week of October 11, 2010.

Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to provide written notification to the NRC immediately if your understanding differs from that set forth above. You are also required to provide written notification to the NRC if you intend to change, deviate, or not complete any of the documented commitments, prior to the change or deviation.

Issuance of this Confirmatory Action Letter does not preclude issuance of an order formalizing the above commitments or requiring other actions on the part of the licensee; nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may

J. Geuther have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.

In accordance with 10 CFR 2.390 of the NRC=s Public inspections, exemptions, requests for withholding@ a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions please contact Johnny Eads at 301-415-1471.

Sincerely,

/RA/

Cynthia D. Pederson, Acting Deputy Director Reactor Safety Programs Office of Nuclear Reactor Regulation Docket No. 50-188 License No. R-88 cc: Please see next page

Kansas State University Docket No. 50-188 cc:

Office of the Governor State of Kansas Topeka, KS 66612 Thomas A. Conley, RRPJ, CHP Section Chief Radiation and Asbestos Control KS Dept of Health & Environment 1000 SW Jackson, Suite 320 Topeka, KS 66612-1366 Mayor of Manhattan P.O. Box 748 Manhattan, KS 66502 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

ML102810019, Package No. ML102810078 Template No.: NRR-106 OFFICE PROB:PM PRPB:LA PRLB:PM PROB:BC DPR:DD NRR:ADD GLappert NAME PIsaac (EHylton CMontgomery JEads TQuay CPederson for)

DATE 10/08 /10 10/08/10 10/08/10 10/08 /10 10/08/10 10/08/10