{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 22, 2010 Mr. Tom E. Tynan Vice President Vogtle
                -
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECTz PUBLIC MEETING
 
==SUMMARY==
1SFS1 PLANS VOGTLE ELECTRIC
                                                                  -
GENERATING PLANT DOCKET NOS.: 50-424 and 50-425
 
==Dear Mr. Tynan:==
 
This refers to the meeting conducted at your staffs request at the Region Il Office in Atlanta, Georgia, on December 15, 2010 at 1:30 p.m. The meetings purpose was to discuss plans to construct and operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant. Enclosed is a list of attendees and a copy of the slides presented at the meeting.
Vogtle representatives presented an overview of current spent fuel storage status and plans for long term spent fuel storage. The meeting did not result in specific action items or decisions.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room)Should you have any questions concerning this meeting, please contact me at (404) 997-4436.
Sincerely, IRA!
Mark E. Franke, Chief Engineering Branch 3 Division of Reactor Safety
 
==Enclosures:==
As Stated Docket Nos.: 50-424 50-425 License Nos.: NPF-68, NPF-81 cc w/encls: (See page 2)
 
SNOPCO                                  2 cc w/encl:                                E. G. Anners Division of Radiological Health            Licensing Engineer TN Dept. of Environment & Conservation      Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution B. D. McKinney, Jr.                        N. J. Stringfellow Regulatory Response Manager                Licensing Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution                Electronic Mail Distribution Hickox, T. Mark                            Paula Marino Vogtle Electric Generating Plant            Vice President Electronic Mail Distribution                Engineering Southern Nuclear Operating Company, Inc.
M. J. Ajluni                                Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Bob Masse Electronic Mail Distribution                Resident Manager Vogtle Electric Generating Plant Sandra Threatt, Manager                    Oglethorpe Power Corporation Nuclear Response and Emergency              Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management        Moanica Caston Department of Health and Environmental    Vice President and General Counsel Control                                    Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution T. D. Honeycutt                            S. C. Swanson Regulatory Response Supervisor            Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution              Electronic Mail Distribution Jeffrey T. Gasser                          Chris Clark Chief Nuclear Officer                      Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution L. Mike Stinson                            Lee Foley Vice President                            Manager of Contracts Generation Fleet Operations Support                  Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/encl contd  See page 3)
R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
SNOPCO                                  3 (cc w/encl contd)                        Arthur H. Domby, Esq.
F. Allen Barnes                          Troutman Sanders Director                                  Electronic Mail Distribution Environmental Protection Division Georgia Department of Natural Resources  Director Electronic Mail Distribution              Consumers Utility Counsel Division Govenors Office of Consumer Affairs Cynthia A. Sanders                        2 M. L. King, Jr. Drive Radioactive Materials Program Manager    Plaza Level East; Suite 356 Environmental Protection Division        Atlanta, GA 30334-4600 Georgia Department of Natural Resources Electronic Mail Distribution              Senior Resident Inspector U.S. Nuclear Regulatory Commission James A. Sommerville                      Vogtle Electric Generating Plant Program Coordination Branch Chief        U.S. NRC Environmental Protection Division        7821 River Road Georgia Department of Natural Resources  Waynesboro, GA 30830 Electronic Mail Distribution Susan E. Jenkins James C. Hardeman                        Director, Division of Waste Management Environmental Radiation Program Manager  Bureau of Land and Waste Management Environmental Protection Division        S.C. Department of Health and Georgia Department of Natural Resources  Environmental Control Electronic Mail Distribution              Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer Power Supply
                  -
Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution
 
MLI 03620570                            xLJ SUNSI REVIEW COMPLETE OFFICE            RII:DRS          RII:DRS SIGNATURE          RA              RA NAME              FLETCHER        FRANKE DATE                  12/22/2010      12/22/2010 E-MAIL COPY?        YES        NO  YES        NO  YES      NO  YES      NO  YES      NO  YES      NO  YES NO
 
LIST OF ATTENDEES Nuclear Regulatory Commission H. Christensen, Deputy Director, Division of Reactor Safety (DRS), Region II (Rh)
M. Franke, Branch Chief, Engineering Branch 3 (EB3), DRS, RH R. Carrion, Senior Reactor Inspector, EB3, DRS, RIl C. Fletcher, Senior Reactor Inspector, EB3, DRS, Ril Southern Nuclear Operating Company M. Ajiuni Licensing Director
            -
R. Bunt Engineering Supervisor Dry Spent Fuel Storage
        -                      -
J. Cash Project Manager Vogtle ISFSI
        -                -
D. Davis Engineering Supervisor Dry Cask Storage
 
R. Dedrickson Plant Manager, VogUe
                -
A. Wesley Vogtle Site Engineering Supervisor
              -
T. Sides Sr. Licensing Engineer
          -
Members of the Public Carlyn Greene, Director, Backend Publications, The Ux Consulting Company, LLC Enclosure 1
 
Vogtle Electric Generating Plant Overview of Plans for an Independent Spent Fuel Storage Installation Russ Dedrickson Plant Manager VEGP December 15, 2010 CD SOuTHERN COMPAN
 
3 Oo 0.
3 *Lo oI I
Co CD
_Co 00    0.
D)
CD CD Cl)
I CD 1\)
 
                                  -
Suthern Nuclear Dry Storage Experience
* OperationaI ISFS1 at Farley and Hatch
* Loaded industry-first HI-STAR in 2000
* Loaded industry-first HI-STORM in 2001
* 4 Casks Loaded 42 (HNP),1 2 (FNP)
* Used Fuel Loading Outages managed in house 3
 
if, V
CD
-
Cl)  71 C
0a  C I
CD 0) 00  Co m
0 D)
CD  -
CD CD
 
___ _
_      _
L()
C) o  *c a) 0)
I-            C 0
ctI h.  *j; O
ir  V) 0 a) I)
LL            C)
U C)
C U) 0.
 
Wet Storage
*Two pools interconnected via the Cask Loading Pit
*354 Total Cells
*Pools are at grade level 6
 
VEG? Spent Fuel pool Outage Use LocationS C
.2 1
U I wII WI a
II                                                    .    . a
* li i 0
2009D  2O.tO  201t1 2O12 2O3      2014 fl  2O5U 2016
 
Dry Storage Loading Plan Number of Casks Loaded by Year LJUnitl and Unit2 120 C)
.1o 100 0
a)
C) ouC 0                                                  0
-J                                                -J I.                                                Cl)
C)                                          OUC,)
0 C.)
Cl)
C.)
2 20 201                                  2035 8
 
Spent Fuel Characteristics Current pool inventory:
* 56% of assemblies are high burnup (exceed 45 GWD/MTU burnup)
Future core discharges:
* Average burnup 48 GWD/MTU
* Highest burnup 53 GWD/MTU 9
 
MPC 32 Loading Configuration Higher Dose Assemblies Lower Dose Assemblies Loaded as Shielding Minimal Gap Between Outer Assemblies 10
:2C.)
Co Cl)
Ca C)
 
Selected Cask Design
* Holtec Dry Cask Storage System Multi-Purpose Canister MPC-32 HI-STORM 100S Storage Overpack HI-TRAC 1 25D Transfer Overpack Vertical Cask Transporter Low Profile Transporter Forced Helium drying system Cask Transfer Facility 12
 
Vertical Cask Transporter
& Cask Transfer Facility I      L I
I I
I
                          ..1 13
      $
 
Proposed ISFSI Location and Design 14
 
C.)
0
-J    1.
Co Ii Co V
0)
Cl) 0 0.
0 0
I
 
CD Cl)
C-)
E
-
0 0
*Ct5
 
Major Modifications
* Auxiliary Building Modifications
* Itlaul Roads
* cask Transfer Facility
* lFSl Pad
* pent Fuel Cask Crane Trolley
 
>
0 F
C C)
Cl)
C) ci)
D LL I
C G) 0
 
SheduIe for Major Milestones 19
 
S Schedule Dsign work            201 0-2011 COnstruction            2011-2012 Ecuipment delivery      4 t h Qtr 2012 Dry Run                1 s t Qtr 2013 NFC Demonstration          Qtr 2013 1
s t Four Cask on Pad    3 rd  Qtr 2013 1 6H Cask on Pad        3rd Qtr 2016 20
 
Licensing Overview Terry Sides 1
Sr Licensing Engineer Southern Nuclear Operating Company 21
 
Licensing Overview
* ceneraI License Requirements
* Fart 50 Licensing Bases
* Fart 50/72 Modifications
* Frogram Changes
* Industry Participation/Operating Experience 22
 
General License iii CFR 72, Subpart K Requires:
* NRCapprovedcaskdesign
* Use in accordance with CoC
* Limited to fuel licensed to possess
* Cask design bounds reactor site parameters
* Evaluate direct radiation/effluents
* Evaluate impact on reactor plant
* Modification of existing programs
* Document in 72.212 Report 23
 
Part 50 Licensing Bases Spent Fuel Cask Crane:
* 125 Ton design capacity
* Single Failure Proof Crane    NUREG-0554
* Special lift devices  ANSI Ni 4.6-i 976
* Crane operators    ANSI B30.2-i 976 Inspected    ANSI B30.2-1 976
* Procedures    NUREG-0612 As a result, cask drop accident is not credible 24
 
I I
Part 50 Modifications Cask crane trolley replacement
* DCP/10 CFR 50.59
* No change to original Licensing/Design Bases
* 125 ton capacity
* NUREG-0554
* Existing bridge/structure qualified for 125 tons Cask drop accident remains not credible 25
 
Prt 50172 Modifications HauI Route
* CoC 1014, Appendix A, Section 5.5
* Completely within PA
                      -
* Cask Transporter ANSI N14.6/redundant drop protection
* Capable of stopping and holding load during DBE
* Fire/hazards review of route
* Address Part 50 impacts (e.g., underground conveyances, etc.)
26
 
Part 50172 Modifications Cask Transfer Facility CoC 1014, Appendix B, Section 3.5 External to Part 50 structures
* Near-grade transfer
* Cask transporter used for MPC transfer
* NUREG-0612, Section 5.1
* Redundant drop features
  .* Capable of stopping and holding load during DBE 27
 
GEneral License iG CFR 72, Subpart K Ue of existing Part 50 plans/programs:
* QAprogram
* Emergency Plan
* Radiation Protection Program
* Security Plan
* Training Program
* Corrective Action Program 28
 
C) cJ ci) ci)
Lii                I.
o                  E C
o            00 u_ a
            -      D c
: 0.                C)
I    Co                0    ci)
C.)
I o      CI) 0 Cl)
C C Cl)
CI) t        CO        ci) o.k 0
0
            -i--
                  .S
_j w
Cl)
    *_Cl)  Cl)              C) 4D I                        Cl)
>1 is                      C/)O.
C a..
0
 
Loading Procedure Demitrius Davis Dry Storage Engineering Supervisor Southern Nuclear Operating Company 30
 
0 CD CD
    -
0 2:
(0
    -o
    -
0 C)
CD 0
C
    -
CD C,)
 
==SUMMARY==
 
Mark Ajiuni Licensing Manager Southern Nuclear Operating Company SUTNEN COMPANY}}

Revision as of 06:03, 13 November 2019

12/15/10 Summary of Meeting with Vogtle Electric Generating Plant to Discuss Plans to Construct and Operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant
ML103620570
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/22/2010
From: Mark Franke
NRC/RGN-II/DRS/EB3
To: Tynan T
Southern Nuclear Operating Co
References
Download: ML103620570 (37)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 22, 2010 Mr. Tom E. Tynan Vice President Vogtle

-

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECTz PUBLIC MEETING

SUMMARY

1SFS1 PLANS VOGTLE ELECTRIC

-

GENERATING PLANT DOCKET NOS.: 50-424 and 50-425

Dear Mr. Tynan:

This refers to the meeting conducted at your staffs request at the Region Il Office in Atlanta, Georgia, on December 15, 2010 at 1:30 p.m. The meetings purpose was to discuss plans to construct and operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant. Enclosed is a list of attendees and a copy of the slides presented at the meeting.

Vogtle representatives presented an overview of current spent fuel storage status and plans for long term spent fuel storage. The meeting did not result in specific action items or decisions.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room)Should you have any questions concerning this meeting, please contact me at (404) 997-4436.

Sincerely, IRA!

Mark E. Franke, Chief Engineering Branch 3 Division of Reactor Safety

Enclosures:

As Stated Docket Nos.: 50-424 50-425 License Nos.: NPF-68, NPF-81 cc w/encls: (See page 2)

SNOPCO 2 cc w/encl: E. G. Anners Division of Radiological Health Licensing Engineer TN Dept. of Environment & Conservation Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution B. D. McKinney, Jr. N. J. Stringfellow Regulatory Response Manager Licensing Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution Hickox, T. Mark Paula Marino Vogtle Electric Generating Plant Vice President Electronic Mail Distribution Engineering Southern Nuclear Operating Company, Inc.

M. J. Ajluni Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Bob Masse Electronic Mail Distribution Resident Manager Vogtle Electric Generating Plant Sandra Threatt, Manager Oglethorpe Power Corporation Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Moanica Caston Department of Health and Environmental Vice President and General Counsel Control Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt S. C. Swanson Regulatory Response Supervisor Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Electronic Mail Distribution Jeffrey T. Gasser Chris Clark Chief Nuclear Officer Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution L. Mike Stinson Lee Foley Vice President Manager of Contracts Generation Fleet Operations Support Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/encl contd See page 3)

R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

SNOPCO 3 (cc w/encl contd) Arthur H. Domby, Esq.

F. Allen Barnes Troutman Sanders Director Electronic Mail Distribution Environmental Protection Division Georgia Department of Natural Resources Director Electronic Mail Distribution Consumers Utility Counsel Division Govenors Office of Consumer Affairs Cynthia A. Sanders 2 M. L. King, Jr. Drive Radioactive Materials Program Manager Plaza Level East; Suite 356 Environmental Protection Division Atlanta, GA 30334-4600 Georgia Department of Natural Resources Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission James A. Sommerville Vogtle Electric Generating Plant Program Coordination Branch Chief U.S. NRC Environmental Protection Division 7821 River Road Georgia Department of Natural Resources Waynesboro, GA 30830 Electronic Mail Distribution Susan E. Jenkins James C. Hardeman Director, Division of Waste Management Environmental Radiation Program Manager Bureau of Land and Waste Management Environmental Protection Division S.C. Department of Health and Georgia Department of Natural Resources Environmental Control Electronic Mail Distribution Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer Power Supply

-

Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution

MLI 03620570 xLJ SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME FLETCHER FRANKE DATE 12/22/2010 12/22/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

LIST OF ATTENDEES Nuclear Regulatory Commission H. Christensen, Deputy Director, Division of Reactor Safety (DRS), Region II (Rh)

M. Franke, Branch Chief, Engineering Branch 3 (EB3), DRS, RH R. Carrion, Senior Reactor Inspector, EB3, DRS, RIl C. Fletcher, Senior Reactor Inspector, EB3, DRS, Ril Southern Nuclear Operating Company M. Ajiuni Licensing Director

-

R. Bunt Engineering Supervisor Dry Spent Fuel Storage

- -

J. Cash Project Manager Vogtle ISFSI

- -

D. Davis Engineering Supervisor Dry Cask Storage

R. Dedrickson Plant Manager, VogUe

-

A. Wesley Vogtle Site Engineering Supervisor

-

T. Sides Sr. Licensing Engineer

-

Members of the Public Carlyn Greene, Director, Backend Publications, The Ux Consulting Company, LLC Enclosure 1

Vogtle Electric Generating Plant Overview of Plans for an Independent Spent Fuel Storage Installation Russ Dedrickson Plant Manager VEGP December 15, 2010 CD SOuTHERN COMPAN

3 Oo 0.

3 *Lo oI I

Co CD

_Co 00 0.

D)

CD CD Cl)

I CD 1\)

-

Suthern Nuclear Dry Storage Experience

  • OperationaI ISFS1 at Farley and Hatch
  • Loaded industry-first HI-STAR in 2000
  • Loaded industry-first HI-STORM in 2001
  • 4 Casks Loaded 42 (HNP),1 2 (FNP)
  • Used Fuel Loading Outages managed in house 3

if, V

CD

-

Cl) 71 C

0a C I

CD 0) 00 Co m

0 D)

CD -

CD CD

___ _

_ _

L()

C) o *c a) 0)

I- C 0

ctI h. *j; O

ir V) 0 a) I)

LL C)

U C)

C U) 0.

Wet Storage

  • Two pools interconnected via the Cask Loading Pit
  • 354 Total Cells
  • Pools are at grade level 6

VEG? Spent Fuel pool Outage Use LocationS C

.2 1

U I wII WI a

II . . a

  • li i 0

2009D 2O.tO 201t1 2O12 2O3 2014 fl 2O5U 2016

Dry Storage Loading Plan Number of Casks Loaded by Year LJUnitl and Unit2 120 C)

.1o 100 0

a)

C) ouC 0 0

-J -J I. Cl)

C) OUC,)

0 C.)

Cl)

C.)

2 20 201 2035 8

Spent Fuel Characteristics Current pool inventory:

  • 56% of assemblies are high burnup (exceed 45 GWD/MTU burnup)

Future core discharges:

  • Average burnup 48 GWD/MTU
  • Highest burnup 53 GWD/MTU 9

MPC 32 Loading Configuration Higher Dose Assemblies Lower Dose Assemblies Loaded as Shielding Minimal Gap Between Outer Assemblies 10

2C.)

Co Cl)

Ca C)

Selected Cask Design

  • Holtec Dry Cask Storage System Multi-Purpose Canister MPC-32 HI-STORM 100S Storage Overpack HI-TRAC 1 25D Transfer Overpack Vertical Cask Transporter Low Profile Transporter Forced Helium drying system Cask Transfer Facility 12

Vertical Cask Transporter

& Cask Transfer Facility I L I

I I

I

..1 13

$

Proposed ISFSI Location and Design 14

C.)

0

-J 1.

Co Ii Co V

0)

Cl) 0 0.

0 0

I

CD Cl)

C-)

E

-

0 0

  • Ct5

Major Modifications

  • Auxiliary Building Modifications
  • Itlaul Roads
  • cask Transfer Facility
  • lFSl Pad
  • pent Fuel Cask Crane Trolley

>

0 F

C C)

Cl)

C) ci)

D LL I

C G) 0

SheduIe for Major Milestones 19

S Schedule Dsign work 201 0-2011 COnstruction 2011-2012 Ecuipment delivery 4 t h Qtr 2012 Dry Run 1 s t Qtr 2013 NFC Demonstration Qtr 2013 1

s t Four Cask on Pad 3 rd Qtr 2013 1 6H Cask on Pad 3rd Qtr 2016 20

Licensing Overview Terry Sides 1

Sr Licensing Engineer Southern Nuclear Operating Company 21

Licensing Overview

  • ceneraI License Requirements
  • Fart 50 Licensing Bases
  • Fart 50/72 Modifications
  • Frogram Changes
  • Industry Participation/Operating Experience 22

General License iii CFR 72, Subpart K Requires:

  • NRCapprovedcaskdesign
  • Use in accordance with CoC
  • Limited to fuel licensed to possess
  • Cask design bounds reactor site parameters
  • Evaluate direct radiation/effluents
  • Evaluate impact on reactor plant
  • Modification of existing programs
  • Document in 72.212 Report 23

Part 50 Licensing Bases Spent Fuel Cask Crane:

  • 125 Ton design capacity
  • Special lift devices ANSI Ni 4.6-i 976
  • Procedures NUREG-0612 As a result, cask drop accident is not credible 24

I I

Part 50 Modifications Cask crane trolley replacement

  • DCP/10 CFR 50.59
  • No change to original Licensing/Design Bases
  • 125 ton capacity
  • Existing bridge/structure qualified for 125 tons Cask drop accident remains not credible 25

Prt 50172 Modifications HauI Route

  • CoC 1014, Appendix A, Section 5.5
  • Completely within PA

-

  • Cask Transporter ANSI N14.6/redundant drop protection
  • Capable of stopping and holding load during DBE
  • Fire/hazards review of route
  • Address Part 50 impacts (e.g., underground conveyances, etc.)

26

Part 50172 Modifications Cask Transfer Facility CoC 1014, Appendix B, Section 3.5 External to Part 50 structures

  • Near-grade transfer
  • Cask transporter used for MPC transfer
  • Redundant drop features

.* Capable of stopping and holding load during DBE 27

GEneral License iG CFR 72, Subpart K Ue of existing Part 50 plans/programs:

  • QAprogram
  • Radiation Protection Program
  • Security Plan
  • Training Program
  • Corrective Action Program 28

C) cJ ci) ci)

Lii I.

o E C

o 00 u_ a

- D c

0. C)

I Co 0 ci)

C.)

I o CI) 0 Cl)

C C Cl)

CI) t CO ci) o.k 0

0

-i--

.S

_j w

Cl)

  • _Cl) Cl) C) 4D I Cl)

>1 is C/)O.

C a..

0

Loading Procedure Demitrius Davis Dry Storage Engineering Supervisor Southern Nuclear Operating Company 30