Category:Report
MONTHYEARRA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 ML18103A0242018-04-10010 April 2018 Levy, Units 1 and 2, William States Lee, Units 1 and 2, Submittal of Schedule for Implementation of Operational Programs and Other License Conditions RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) ML18103A0262018-03-23023 March 2018 Westinghouse - 10 CFR 50.46 Acceptance Criteria for Emergency Core Cooling Systems for Light-water Nuclear Power Reactors, Submittal of Annual Report for the AP1000 Plant Design RA-17-0040, Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions)2017-08-15015 August 2017 Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-02-27027 February 2014 Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML13365A2912014-02-19019 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A0632014-01-24024 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 ML13267A2122013-09-30030 September 2013 Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13270A1762013-09-24024 September 2013 Redacted - Office of Nuclear Reactor Regulation (NRR) Reactor Systems Branch (Srxb) Support of Region II Inspection of H. B. Robinson Treatment of Voids in Systems That Are Important to Safety RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan ML12278A3992012-08-31031 August 2012 WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant ML1210707162012-05-17017 May 2012 Letter Report on the Evaluation of Cables from the HEAF Fire Event at the H.B. Robinson Steam Electric Plant ML12068A1332012-02-23023 February 2012 Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1128004502010-12-30030 December 2010 EPA 2010 Core Molding ML1128005042010-12-29029 December 2010 EPA 2010 Cleveland Water Supply, Facility Detail Report ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson 2024-06-28
[Table view] Category:Miscellaneous
MONTHYEARRA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 ML18103A0242018-04-10010 April 2018 Levy, Units 1 and 2, William States Lee, Units 1 and 2, Submittal of Schedule for Implementation of Operational Programs and Other License Conditions RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) ML18103A0262018-03-23023 March 2018 Westinghouse - 10 CFR 50.46 Acceptance Criteria for Emergency Core Cooling Systems for Light-water Nuclear Power Reactors, Submittal of Annual Report for the AP1000 Plant Design ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1128004502010-12-30030 December 2010 EPA 2010 Core Molding ML1128005042010-12-29029 December 2010 EPA 2010 Cleveland Water Supply, Facility Detail Report ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1128005132010-12-28028 December 2010 EPA 2010 Sc Distributors ML1128005152010-12-28028 December 2010 EPA 2010 Shelby Wwtf ML1128005002010-12-28028 December 2010 EPA 2010 National Textiles ML1128005162010-12-28028 December 2010 EPA 2010 Parr Steam Plant ML1128004472010-12-28028 December 2010 EPA 2010 Cna Holdings ML1128005122010-12-28028 December 2010 EPA 2010 Gaffney Wwtf Peoples Creek ML1128005062010-12-27027 December 2010 EPA 2010 Grover Compressor Station ML1128005052010-12-27027 December 2010 EPA 2010 Broad River Energy Center ML1128005012010-12-27027 December 2010 EPA 2010 Bommer Industries, Facility Detail Report ML1128004982010-12-27027 December 2010 EPA 2010 Milliken Magnolia ML1128004662010-12-27027 December 2010 EPA 2010 Linpac ML1128004512010-12-27027 December 2010 EPA 2010 Hanson Brick Blacksburg ML1128004442010-12-27027 December 2010 EPA 2010 Accurate Plating Inc ML1128004462010-12-27027 December 2010 EPA 2010 Bic Corporation ML1128005102010-12-27027 December 2010 EPA 2010 Cherokee County Co-Generation Plant ML1128005142010-12-27027 December 2010 EPA 2010 Sc Pipeline ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire2006-07-24024 July 2006 Groundwater Protection - Data Collection Questionnaire RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure2006-07-17017 July 2006 Request for Technical Specifications, Change Related to Containment Peak Pressure RA-05-0104, Transmittal of Core Operating Limits Report2005-10-10010 October 2005 Transmittal of Core Operating Limits Report ML0414602462004-05-19019 May 2004 Q Report for Period Ending 03/31/2004 ML0324716322003-08-22022 August 2003 Submittal of 10-Q Report 2021-08-25
[Table view] |