ML113570486: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 8  
{{#Wiki_filter:St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-1 Applicant Examiner JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 8


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP  NRC S-1     
JOB PERFORMANCE MEASURE Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM?     Yes Facility JPM #:     N/A K/A:     003 A2.01 / 3.5 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
 
Problems with RCP seals, especially rates of seal leak-off.
Applicant        Examiner JOB PERFORMANCE MEASURE JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 8  Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM? Yes Facility JPM #:
Duty Area(s):       N/A Task Information: N/A Task Standard:
N/A K/A: 003 A2.01 / 3.5 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Problems with RCP seals, especially rates of seal leak
-off. Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.
This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.
Evaluation Location:
Evaluation Location:                                                     Performance Level:
Performance Level:
Simulator       In Plant         Lab         Other                     Perform       Simulate     Discuss X                                                                       X
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==
* 2-0120034 Reactor Coolant Pump Validation Time: 10 minutes                                              Time Critical:      No Tools/Equipment/Procedures Needed:
* 2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 8


2-0120034 Reactor Coolant Pump Validation Time:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
1 0 minutes  Time Critical:
The task you are to perform is: Re-establish RCP bleedoff flow.
No  Tools/Equipment/Procedures Needed:
The performance level to be used for this JPM is PERFORM.
2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
This is not a time critical JPM.
None  Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 8  SPECIFIC DIRECTIONS:
The task you are to perform is:
Re-establish RCP bleedoff flow
. The performance level to be used for this JPM is PERFORM. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs: All simulator JPM steps, including communications, shall be performed for this JPM.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
The simulator will provide the cues as you perform this JPM.
Line 54: Line 48:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
, in accordance with 2
JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 8
-0120034 Reactor Coolant Pump.  


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 4 of 8  START TIME: __________
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: V2505 RCP Bleedoff Cntmt Isol. Is open.
2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A)     IF Controlled Bleedoff flow is Lost or Low, Then ENSURE:     FAULTED V2505 RCP Bleedoff Cntmt Isol. Is open.                             STEP
STANDARD: ATTEMPT to OPEN V2505 RCP Bleedoff Cntmt Isol.
_____ SAT STANDARD:       ATTEMPT to OPEN V2505 RCP Bleedoff Cntmt Isol.
EXAMINERS NOTE: V2505 will not open COMMENTS:
_____ UNSAT EXAMINERS NOTE: V2505 will not open COMMENTS:
STEP 2: (6.3.5.B) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE:
V2524 RCP Bleedoff Cntmt Isol. Is open.                              _____ SAT STANDARD:        VERIFIES V2524 RCP Bleedoff Cntmt Isol is open.                    _____ UNSAT EXAMINERS CUE:
COMMENTS:
JPM NRC S-1 Rev 0 Simulator Page 4 of 8


FAULTED STEP  _____ SAT  _____ UNSAT STEP 2: (6.3.5.B)    IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: V2524 RCP Bleedoff Cntmt Isol. Is open.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION                                                                         FAULTED STEP STEP 3 (6.3.5.1)         IF normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.
STANDARD: VERIFIES V25 24 RCP Bleedoff Cntmt Isol is open. EXAMINERS CUE:
_____ SAT STANDARD:       OPEN V2507 RCP Bleedoff Relief Stop Vlv. Recognize multiple seal failures and cavity leakage rising / alarm.                               _____ UNSAT EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP. One minute later Reactor Cavity leakage increases and cavity leakage alarm annunciates.
COMMENTS: 
 
_____ SAT
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 5 of 8    CONTINGENCY ACTION STEP 3 (6.3.5.1) IF normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.
STANDARD: OPEN V2507 RCP Bleedoff Relief Stop Vlv.
Recognize multiple seal failures and cavity leakage rising / alarm.
EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP. One minute later Reactor Cavity leakage increases and cavity leakage alarm annunciates.
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:
COMMENTS:
FAULTED STEP  _____ SAT  _____ UNSAT STEP 4: (6.3.7)           IF three seals have failed Then:   A. TRIP the Reactor STANDARD: TRIP the Reactor EXAMINERS CUE:
STEP 4: (6.3.7)       IF three seals have failed Then:                                   CRITICAL STEP A. TRIP the Reactor
 
_____ SAT STANDARD:       TRIP the Reactor
COMMENTS:
_____ UNSAT EXAMINERS CUE:
 
COMMENTS:
CRITICAL  STEP
STEP 5: (6.3.7)       IF three seals have failed Then:
_____ SAT
_____ SAT B. TRIP the Turbine
_____ UNSAT STEP 5: (6.3.7)         IF three seals have failed Then:                               B. TRIP the Turbine
_____ UNSAT STANDARD:       TRIP the Turbine EXAMINERS CUE:
 
STANDARD: TRIP the Turbine     EXAMINERS CUE:
 
COMMENTS:
COMMENTS:
_____ SAT 
JPM NRC S-1 Rev 0 Simulator Page 5 of 8


_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (6.3.7) Done  IF three seals have failed Then:                        CRITICAL STEP C. STOP the affected RCP(s)
_____ SAT STANDARD:      STOP the 2B1 RCP EXAMINERS CUE: The JPM is complete when the 2B1 RCP has been stopped.      _____ UNSAT COMMENTS:
END OF TASK STOP TIME: ____________
JPM NRC S-1 Rev 0 Simulator Page 6 of 8


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 6 of 8 STEP 6: (6.3.7) Done IF three seals have failed Then:                              C. STOP the affected RCP(s)
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
STANDARD: STOP the 2B1 RCP
 
EXAMINERS CUE:
The JPM is complete when the 2B1 RCP has been stopped.
 
COMMENTS:
END OF TASK CRITICAL  STEP  _____ SAT  _____ UNSAT STOP TIME: ____________
 
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-1 7 of 8    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
-0120034 Reactor Coolant Pump.  
NRC S-1 7 of 8


JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET NRC S-1 8 of 8  1. Restore IC
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
-1 2. Execute S-1 RCP.lsn Step 2B1 RCP seals fail will auto trigger.
: 1. Restore IC-1
: 2. Execute S-1 RCP.lsn Step 2B1 RCP seals fail will auto trigger.
NRC S-1 8 of 8


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE POWER TO 2B3 4.16KV BUS FROM OFFSITE  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE POWER TO 2B3 4.16KV BUS FROM OFFSITE - UNIT 2 NRC S-2 Applicant Examiner
- UNIT 2 NRC   S-2    


Applicant        Examiner JOB PERFORMANCE MEASURE NRC S-2 Simulator Page 2 of 10  Task: 07052015, RESTORE A 4160 V BUS NORMAL POWER SUPPLY 07052 140, RESPOND TO A LOSS OF OFF
JOB PERFORMANCE MEASURE Task:                 07052015, RESTORE A 4160 V BUS NORMAL POWER SUPPLY 07052140, RESPOND TO A LOSS OF OFF-SITE POWER Faulted JPM?           No Facility JPM #:       0821118 K/A:     062 A4.07 / 3.1 Ability to manually operate and/or monitor in the control room: synchronizing and paralleling of different ac supplies.
-SITE POWER Faulted JPM?
Duty Area(s):         N/A Task Information: N/A Task Standard:
N o  Facility JPM #:
0821118 K/A: 062 A4.07 / 3.1 Ability to manually operate and/or monitor in the control room:
synchronizing and paralleling of different ac supplies
. Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when offsite power has been restored to the 2B3 4.16KV bus.
This JPM is complete when offsite power has been restored to the 2B3 4.16KV bus.
Evaluation Location:
Evaluation Location:                                                   Performance Level:
Performance Level:
Simulator         In Plant       Lab         Other                   Perform       Simulate       Discuss X                                                                     X
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==


2-EOP-99, Appendix D Validation Time:
2-EOP-99, Appendix D Validation Time: 15 minutes                                             Time Critical:     No Tools/Equipment/Procedures Needed:
15 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-EOP-99, Appendix D Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
2-EOP-99, Appendix D Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None Radiological Protection and RWP Requirements:
None  
None NRC S-2 Simulator Page 2 of 10


JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC S-2 Simulator Page 3 of 10  SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
The task you are to perform is:       Restore Power to 2B3 4.16KV Bus From Offsite - Unit 2 The performance level to be used for this JPM is Perform.
Restore Power to 2B3 4.16KV Bus From Offsite  
This is not a time critical JPM.
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 152: Line 123:
Table 6, 2-EOP-99 has been completed.
Table 6, 2-EOP-99 has been completed.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.
-EOP-99, Appendix D. Offsite power is available.
NRC S-2 Simulator Page 3 of 10


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
  *Cues are to be used only if JPM performance is being simulated in the plan
STEP 1:       1. ENSURE Table 6, Vital Power Breaker Configuration (LOOP), has been completed for the electrical train(s) supplied by a Unit 2 EDG(s).
: t. NRC S-2 Simulator Page 4 of 10  START TIME: __________
_____ SAT STANDARD:     Student may VERIFY that Table 6 is COMPLETE.
STEP 1: 1. ENSURE Table 6, Vital Power Breaker Configuration (LOOP), has been completed for the electrical train(s) supplied by a Unit 2 EDG(s).
EXAMINERS CUE:                                                                   _____ UNSAT EVALUATORS NOTE: The student may want to verify Table 6.                 That is acceptable.
STANDARD: Student may VERIFY that Table 6 is COMPLETE. EXAMINER'S CUE:
EVALUATOR'S NOTE: The student may want to verify Table 6. That is acceptable.
COMMENTS:          _____ SAT  _____ UNSAT STEP 2: 2. INSERT sync plug and PLACE in the desired ST position. STANDARD: POSITION 2B S/U XFMR sync plug to ST
-2B2. EXAMINER'S CUE:
COMMENTS:
COMMENTS:
CRITICAL STEP _____ SAT   _____ UNSAT STEP 3: 3. To ENERGIZE the non-vital 4.16 KV bus, CLOSE the associated Startup Transformer breaker
STEP 2:      2. INSERT sync plug and PLACE in the desired ST position.                  CRITICAL STEP STANDARD:    POSITION 2B S/U XFMR sync plug to ST-2B2.
. STANDARD: POSITION breaker 20302 to the CLOSED position. EXAMINER'S CUE:
_____ SAT EXAMINERS CUE:
COMMENTS: 
COMMENTS:                                                                                _____ UNSAT STEP 3:       3. To ENERGIZE the non-vital 4.16 KV bus, CLOSE the associated             CRITICAL Startup Transformer breaker.                                               STEP STANDARD:     POSITION breaker 20302 to the CLOSED position.                             _____ SAT EXAMINERS CUE:
 
_____ UNSAT COMMENTS:
CRITICAL STEP
        *Cues are to be used only if JPM performance is being simulated in the plant.
_____ SAT  _____ UNSAT
NRC S-2 Simulator Page 4 of 10
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
  *Cues are to be used only if JPM performance is being simulated in the plan
: t. NRC S-2 Simulator Page 5 of 10    STEP 4: 4. CLOSE breaker 4.16 KV bus tie 2A2 -2A3 (2B2 - 2B3). STANDARD: POSITION breaker 20309 to the CLOSED position. EXAMINER'S CUE:
COMMENTS: 
 
CRITICAL STEP  _____ SAT   _____ UNSAT STEP 5: 5. ENSURE that the amber light is lit on the EDG governor control.
STANDARD: ENSURE Diesel governor control amber light is ON. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT  _____ UNSAT STEP 6: 6. INSERT sync plug and PLACE in the Tie position. STANDARD: 2B DG Breaker sync plug is POSITIONED to Tie-2B3. EXAMINER'S CUE:
COMMENTS:  
 
CRITICAL STEP  _____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
  *Cues are to be used only if JPM performance is being simulated in the plan
: t. NRC S-2 Simulator Page 6 of 10   STEP 7: 7. MATCH voltage using the EDG voltage control.
STANDARD: Adjusts Voltage control as necessary to ENSURE Voltage is POSITIONED to MATCH DG (running) to Grid (incoming) voltage.
EXAMINER'S CUE:    COMMENTS: 
 
CRITICAL STEP
_____ SAT  _____ UNSAT STEP 8: 8. Using EDG governor control, ADJUST sync hroscope to SLOW in the COUNTER CLOCKWISE direction.
STANDARD: Governor control POSITIONED until rotating SLOW in the COUNTER-CLOCKWISE direction.
EXAMINER'S CUE:    COMMENTS:        CRITICAL STEP  _____ SAT  _____ UNSAT STEP 9: 9. W hen the synchroscope is in the 12 O'CLOCK position, CLOSE breaker 4.16 KV bus tie 2A3-2A2 (2B3-2B2). STANDARD: Breaker 20411 is in the CLOSED position at 12 O'clock. EXAMINER'S CUE:
COMMENTS: 
 
CRITICAL STEP
_____ SAT  _____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4:      4. CLOSE breaker 4.16 KV bus tie 2A2 -2A3 (2B2 - 2B3).                  CRITICAL STEP STANDARD:    POSITION breaker 20309 to the CLOSED position.
  *Cues are to be used only if JPM performance is being simulated in the plan
_____ SAT EXAMINERS CUE:
: t. NRC S-2 Simulator Page 7 of 10   STEP 10: 10. PLACE EDG governor control to RAISE position UNTIL load is greater than 100 KW (50 amps) to avoid reverse power trip.
COMMENTS:                                                                              _____ UNSAT STEP 5:      5. ENSURE that the amber light is lit on the EDG governor control.
STANDARD: Governor control is HELD until load is >100 KW (50 amps) and then released. EXAMINER'S CUE:
STANDARD:    ENSURE Diesel governor control amber light is ON.                        _____ SAT EXAMINERS CUE:
COMMENTS: 
_____ UNSAT COMMENTS:
STEP 6:      6. INSERT sync plug and PLACE in the Tie position.                      CRITICAL STEP STANDARD:    2B DG Breaker sync plug is POSITIONED to Tie-2B3.
_____ SAT EXAMINERS CUE:
COMMENTS:                                                                              _____ UNSAT
        *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 5 of 10


CRITICAL STEP
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7:      7. MATCH voltage using the EDG voltage control.                          CRITICAL STEP STANDARD:    Adjusts Voltage control as necessary to ENSURE Voltage is POSITIONED to MATCH DG (running) to Grid (incoming) voltage.
_____ SAT   _____ UNSAT STEP 11: 11. ENSURE 2A (2B) EDG load is 100 KW (50 amps) and OPEN breaker DG 4.16 KV BREAKER.
_____ SAT EXAMINERS CUE:
STANDARD: ENSURE Governor control is POSITIONED to UNLOAD DG to 100 KW (50 amps), THEN open breaker 20401. EXAMINER'S CUE:     COMMENTS:
COMMENTS:                                                                              _____ UNSAT STEP 8:       8. Using EDG governor control, ADJUST synchroscope to SLOW in the        CRITICAL COUNTER CLOCKWISE direction.                                            STEP STANDARD:    Governor control POSITIONED until rotating SLOW in the COUNTER-          _____ SAT CLOCKWISE direction.
EXAMINERS CUE:                                                                _____ UNSAT COMMENTS:
STEP 9:      9. When the synchroscope is in the 12 OCLOCK position, CLOSE breaker CRITICAL 4.16 KV bus tie 2A3-2A2 (2B3-2B2).                                       STEP STANDARD:     Breaker 20411 is in the CLOSED position at 12 Oclock.                   _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
        *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 6 of 10


CRITICAL STEP
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10:      10. PLACE EDG governor control to RAISE position UNTIL load is greater  CRITICAL than 100 KW (50 amps) to avoid reverse power trip.                      STEP STANDARD:    Governor control is HELD until load is >100 KW (50 amps) and then        _____ SAT released.
_____ SAT   _____ UNSAT STEP 12: 12. REMOVE the sync plug.
EXAMINERS CUE:                                                                  _____ UNSAT COMMENTS:
STANDARD: Sync plug is REMOVED. EXAMINER'S CUE:     COMMENTS:           _____ SAT
STEP 11:      11. ENSURE 2A (2B) EDG load is 100 KW (50 amps) and OPEN breaker        CRITICAL DG 4.16 KV BREAKER.                                                      STEP STANDARD:    ENSURE Governor control is POSITIONED to UNLOAD DG to 100 KW (50 _____ SAT amps), THEN open breaker 20401.
_____ UNSAT
EXAMINERS CUE:                                                                  _____ UNSAT COMMENTS:
STEP 12:     12. REMOVE the sync plug.
STANDARD:     Sync plug is REMOVED.                                                   _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
        *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 7 of 10


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13:       13. ENSURE proper restart conditions by amber light indication on BOTH voltage regulator and governor controls.
  *Cues are to be used only if JPM performance is being simulated in the plan
_____ SAT STANDARD:     OBSERVES amber light illuminated on voltage regulator and governor controls.
: t. NRC S-2 Simulator Page 8 of 10  STEP 1 3: 1 3. ENSURE proper restart conditions by amber light indication on BOTH voltage regulator and governor controls.
_____ UNSAT EXAMINERS CUE:
STANDARD: OBSERVES amber light illuminated on voltage regulator and governor controls. EXAMINER'S CUE:
EXAMINERS NOTE: Applicant may have to raise governor control to obtain Amber light.
EXAMINERS NOTE: Applicant may have to raise governor control to obtain Amber light.
COMMENTS:
COMMENTS:
_____ SAT
STEP (done): 14. If no ESFAS start signal is present, Then STOP the EDG(s). (The EDG will cooldown at 450 rpm for 10 minutes and then stop)
_____ UNSAT STEP (done): 1 4. If no ESFAS start signal is present, T hen STOP the EDG(s). (The EDG   will cooldown at 450 rpm for 10 minutes and then stop)
_____ SAT STANDARD:     PLACES 2B EDG start / stop switch to the STOP position.
STANDARD: PLACES 2B EDG start / stop switch to the STOP position.
EXAMINERS CUE:                                                                _____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
        *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 8 of 10


EXAMINER'S CUE:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
COMMENTS:
END OF TASK
 
_____ SAT  _____ UNSAT STOP TIME:  __________
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-2 Simulator Page 9 of 10
: 1. RESTORE JPM IC-33.
: 1. RESTORE JPM IC-33.
: 2. NO lesson is needed for this JPM. 3. UNFREEZE the Simulator when the student is ready.
: 2. NO lesson is needed for this JPM.
: 3. UNFREEZE the Simulator when the student is ready.
NRC S-2 Simulator Page 9 of 10


JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-2 Page 10 of 10    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Loss of Offsite Power has occurred at Unit 2.
A Loss of Offsite Power has occurred at Unit 2.
Both EDGs were supplying the vital buses when offsite power was restored.
Both EDGs were supplying the vital buses when offsite power was restored.
Table 6 of 2
Table 6 of 2-EOP-99 has been completed.
-EOP-99 has been completed.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.
-EOP-99, Appendix D. Offsite power is available.
NRC S-2 Page 10 of 10


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 NRC S-3 Simulator Applicant Examiner
- UNIT 2 NRC S-3 Simulator  


Applicant        Examiner JOB PERFORMANCE MEASURE PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 2 of 10  Task: 07025090, Align S FP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)
JOB PERFORMANCE MEASURE Task:               07025090, Align SFP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)
Faulted JPM?
Faulted JPM?         Yes Facility JPM #:     0821117A K/A:                 072 A3.01 / 2.9 Ability to monitor automatic operation of the ARM system, including :
Yes Facility JPM #:
Changes in ventilation alignment.
0821117A K/A: 072 A3.01 / 2.9 Ability to monitor automatic operation of the ARM system, including : Changes in ventilation alignment.
Duty Area(s):       N/A Task Information: N/A Task Standard:
Duty Area(s
This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-AOP-26.02.
): N/A Task Information:
Evaluation Location:                                                  Performance Level:
N/A Task Standard:
Simulator        In Plant      Lab          Other                    Perform        Simulate        Discuss X                                                                    X


This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line
==References:==
-up has been verified including contingency actions in accordance with 2
-AOP-26.02. Evaluation Location:
Performance Level:
Simulator  In Plant  Lab  Other  Perform  Simulate  Discuss X        X     


==References:==
2-AOP-26.02, Area Radiation Monitors Validation Time: 10 minutes                                          Time Critical:          No Tools/Equipment/Procedures Needed:
2-AOP-26.02, Area Radiation Monitors Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 2 of 10


2-AOP-26.02, Area Radiation Monitors Validation Time:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
10 minutes Time Critical:
The task you are to perform is: Respond to High Radiation Alarm on Spent Fuel Monitors - Unit 2 The performance level to be used for this JPM is Perform.
No  Tools/Equipment/Procedures Needed:
This is not a time critical JPM.
2-AOP-26.02, "Area Radiation Monitors" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None  Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 3 of 10  SPECIFIC DIRECTIONS:
The task you are to perform is:   Respond to High Radiation Alarm on Spent Fuel Monitors  
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 285: Line 228:
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO.
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.
PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 3 of 10


The US has directed you to verify proper Fuel Handling Building ventilation line
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
*Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 4 of 10  START TIME: __________
4.2.4 Fuel Handling Building Radiation Monitor Alarm
4.2.4 Fuel Handling Building Radiation Monitor Alarm
: 4. IF more than one HIGH Alarm in a train actuated,   THEN VERIFY FHB ventilation transfer to SBVS as follows:
: 4. IF more than one HIGH Alarm in a train actuated, THEN VERIFY FHB ventilation transfer to SBVS as follows:
STEP 1(4.2.4.4):    A. VERIFY the following fans STOPPED:
STEP 1(4.2.4.4):    A. VERIFY the following fans STOPPED:
HVS-6, Fuel Pool Supply Fan.
* HVS-6, Fuel Pool Supply Fan.
HVS-7, Fuel Handling Bldg Supply Fan.
* HVS-7, Fuel Handling Bldg Supply Fan.
HVE-15, Fuel Handling Bldg Exhaust Fan.
* HVE-15, Fuel Handling Bldg Exhaust Fan.                           _____ SAT
HVE-16A, Fuel Pool Exhaust Fan HVE-16B, Fuel Pool Exhaust Fan HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6
* HVE-16A, Fuel Pool Exhaust Fan
/E-RAC) STANDARD: ENSURES Fans are OFF.                 EXAMINERS NOTE: Applicant must call SNPO to verify HVE
* HVE-16B, Fuel Pool Exhaust Fan
-17 is OFF   EXAMINER'S CUE:
* HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6/E-RAC)         _____ UNSAT STANDARD:       ENSURES Fans are OFF.
SNPO reports HVE
EXAMINERS NOTE: Applicant must call SNPO to verify HVE-17 is OFF EXAMINERS CUE: SNPO reports HVE-17 is STOPPED COMMENTS:
-17 is STOPPED COMMENTS:
STEP 2 (4.2.4.4):   B. VERIFY the following FHB dampers CLOSED:
_____ SAT  _____ UNSAT STEP 2 (4.2.4.4)
* D-33, Fuel Hdlg Bldg Inlet Damper
: B. VERI FY the following FHB dampers CLOSED:
* D-35, Fuel Hdlg Bldg Outlet Damper
D-33, Fuel Hdlg Bldg Inlet Damper D-35, Fuel Hdlg Bldg Outlet Damper D-29, Fuel Pool Inlet Damper D-31, Fuel Pool Outlet Damper D-34, Fuel Hdlg Bldg Inlet Damper D-36, Fuel Hdlg Bldg Outlet Damper   D-30, Fuel Pool Inlet Damper D-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers D-29 through D
* D-29, Fuel Pool Inlet Damper                                     _____ SAT
-36 are CLOSED by observation of Red light off, Green light on
* D-31, Fuel Pool Outlet Damper
. EXAMINER'S CUE:
* D-34, Fuel Hdlg Bldg Inlet Damper
* D-36, Fuel Hdlg Bldg Outlet Damper                               _____ UNSAT
* D-30, Fuel Pool Inlet Damper
* D-32, Fuel Pool Outlet Damper STANDARD:       VERIFY Dampers D-29 through D-36 are CLOSED by observation of Red light off, Green light on.
EXAMINERS CUE:
COMMENTS:
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 4 of 10


COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.2.4.4):  C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN.            FAULTED STEP STANDARD:        OBSERVE FCV-25-30 CLOSED.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: Faulted Step FCV-25-30 failed to auto OPEN.                  _____ UNSAT COMMENTS:
CONTINGENCY ACTION:                                                                    CRITICAL STEP STEP 4 (4.2.4.4):      C.1 OPEN FCV-25-30, Fuel Handling Emerg Vent Vlv.
_____ SAT STANDARD:        POSITION FCV-25-30 control switch to OPEN.
_____ UNSAT
        *EXAMINERS CUE:      FCV-25-30 indicates Green light OFF, Red Light ON.
X-4 Alarms as delta-P lowers.
COMMENTS:
STEP 5 (4.2.4.4):      D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED.            FAULTED STEP STANDARD:        OBSERVE FCV-25-32 OPEN.
EXAMINERS CUE:                                                                _____ SAT EVALUATORS NOTE: Faulted Step FCV-25-32 failed to auto CLOSE.
_____ UNSAT COMMENTS:
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 5 of 10


_____ SAT   _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION:                                                                    CRITICAL STEP STEP 6 (4.2.4.4):      D.1 CLOSE FCV-25-32, SBVS Isolation Valve.
_____ SAT STANDARD:        POSITION FCV-25-32 control switch to CLOSE.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 7 (4.2.4.4):      E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON.
STANDARD:        ENSURE HVE-6A is ON.
_____ SAT EXAMINERS CUE:
COMMENTS:                                                                              _____ UNSAT FAULTED STEP 8 (4.2.4.4):      F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv, OPEN.        STEP STANDARD:        OBSERVE FCV-25-31 CLOSED.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: Faulted Step FCV-25-31 failed to auto OPEN.                  _____ UNSAT COMMENTS:
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 6 of 10


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION:                                                                    CRITICAL STEP STEP 9 (4.2.4.4):     F.1 OPEN FCV-25-31, Fuel Handling Emerg Vent Vlv.
*Cues are to be used only if JPM performance is being simulated in the plant.
_____ SAT STANDARD:       POSITION FCV-25-31 control switch to OPEN.
NRC S-3 Simulator Page 5 of 10    STEP 3 (4.2.4.4)
EXAMINERS CUE:                                                                 _____ UNSAT COMMENTS:
: C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN.
FAULTED STEP 10 (4.2.4.4):     G. VERIFY FCV-25-33, SBVS Isolation Valve, is CLOSED.           STEP STANDARD:       OBSERVE FCV-25-33 OPEN.
STANDARD: OBSERVE FCV-25-30 CLOSED. EXAMINER'S CUE:
_____ SAT EXAMINERS CUE:
EVALUATOR'S NOTE:
EVALUATORS NOTE: Faulted Step FCV-25-33 failed to auto CLOSE.                 _____ UNSAT COMMENTS:
Faulted Step FCV-25-30 failed to auto OPEN.
CONTINGENCY ACTION:                                                                     CRITICAL STEP STEP 11 (4.2.4.4):     G.1 CLOSE FCV-25-33, SBVS Isolation Valve.
COMMENTS:     FAULTED STEP
_____ SAT STANDARD:       POSITION FCV-25-33 control switch to CLOSE.
_____ SAT  _____ UNSAT CONTINGENCY ACTION:
EXAMINERS CUE:                                                               _____ UNSAT EXAMNERS NOTE: Annunciator V-21, B SBVS INLET ISOL FCV-25-33 OVRLD/CLOSED Alarms.
STEP 4 (4.2.4.4)
: C.1 OPEN FCV-25-30, Fuel Handling Emerg Vent Vlv.
 
STANDARD: POSITION FCV-25-30 control switch to OPEN. *EXAMINER'S CUE:
FCV-25-30 indicates Green light OFF, Red Light ON.
X-4 Alarms as delta
-P lowers. COMMENTS:       CRITICAL STEP
_____ SAT  _____ UNSAT STEP 5 (4.2.4.4)
: D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED.
STANDARD: OBSERVE FCV-25-32 OPEN. EXAMINER'S CUE:
EVALUATOR'S NOTE:
Faulted Step FCV-25-32 failed to auto CLOSE.
COMMENTS:
COMMENTS:
FAULTED STEP   _____ SA T  _____ UNSAT
STEP 12 (4.2.4.4):     H. VERIFY HVE-6B, SBVS Exhaust Fan, is ON.
 
STANDARD:       ENSURE HVE-6B is ON.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
_____ SAT EXAMINERS CUE:       Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found.                                                  _____ UNSAT COMMENTS:
*Cues are to be used only if JPM performance is being simulated in the plant.
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 6 of 10    CONTINGENCY ACTION:
NRC S-3 Simulator Page 7 of 10
STEP  6 (4.2.4.4)
: D.1 CLOSE FCV-25-32, SBVS Isolation Valve.
STANDARD: POSITION FCV-25-32 control switch to CLOSE.
EXAMINER'S CUE:
COMMENTS:      CRITICAL STEP
_____ SAT  _____ UNSAT STEP 7 (4.2.4.4)
: E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6A is ON. EXAMINER'S CUE:
COMMENTS:    


_____ SAT  _____ UNSAT STEP 8 (4.2.4.4)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done):  NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4.
: F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv, OPEN.
FCV-25-30 and FCV-25-31 had to be manually opened, FCV-25-32 and FCV-25-33 had to be manually closed.                                       _____ SAT STANDARD:     NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED            _____ UNSAT and FCV-25-32 and FCV-25-33 had to be manually CLOSED.
STANDARD: OBSERVE FCV-25-31 CLOSED. EXAMINER'S CUE:  EVALUATOR'S NOTE:
EXAMINERS CUE:        US ACKNOWLEDGES.
Faulted Step FCV-25-31 failed to auto OPEN.
COMMENTS:
COMMENTS:
FAULTED STEP 
END OF TASK STOP TIME: __________
 
        *Cues are to be used only if JPM performance is being simulated in the plant.
_____ SAT 
NRC S-3 Simulator Page 8 of 10
 
_____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
*Cues are to be used only if JPM performance is being simulated in the plant.
: 1. RESTORE IC-1.
NRC S-3 Simulator Page 7 of 10    CONTINGENCY ACTION:
: 2. UNFREEZE the Simulator.
STEP 9 (4.2.4.4)
: F.1 OPEN FCV-25-31, Fuel Handling Emerg Vent Vlv.
STANDARD: POSITION FCV-25-31 control switch to OPEN. EXAMINER'S CUE:
COMMENTS:    CRITICAL STEP
_____ SAT  _____ UNSAT STEP 10 (4.2.4.4)
: G. VERIFY FCV-25-33, SBVS Isolation Valve, is CLOSED.
STANDARD: OBSERVE FCV-25-33 OPEN. EXAMINER'S CUE:
EVALUATOR'S NOTE:
Faulted Step FCV-25-33 failed to auto CLOSE.
COMMENTS:    FAULTED STEP
_____ SAT  _____ UNSAT CONTINGENCY ACTION:
STEP 11 (4.2.4.4)
: G.1 CLOSE FCV-25-33, SBVS Isolation Valve.
STANDARD: POSITION FCV-25-33 control switch to CLOSE. EXAMINER'S CUE:
EXAMNERS NOTE: Annunciator V-21 , B SBVS INLET ISOL FCV 33            OVRLD/CLOSED Alarms. COMMENTS:    CRITICAL STEP  _____ SAT  _____ UNSAT STEP 12 (4.2.4.4)
: H. VERIFY HVE-6B, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6B is ON. EXAMINER'S CUE:
Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found. COMMENTS: 
 
_____ SAT 
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
*Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 8 of 10    STEP (done):
FCV-25-30 and FCV 31 had to be manually opened, FCV 32 and FCV-25-33 had to be manually closed.
NOTIFY the US that the Fuel Handling Building ventilation line
-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4.
STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line
-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED and FCV-25-32 and FCV 33 had to be manually CLOSED. EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:    END OF TASK
 
_____ SAT  _____ UNSAT STOP TIME:  __________
 
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC S-3 Simulator Page 9 of 10  1. RESTORE IC-1. 2. UNFREEZE the Simulator.
: 3. SELECT the JPM Lesson File Folder.
: 3. SELECT the JPM Lesson File Folder.
: 4. OPEN and EXECUTE the lesson for S-3 SFP Rm.Lsn
: 4. OPEN and EXECUTE the lesson for S-3 SFP Rm.Lsn.
. 5. FREEZE the Simulator.
: 5. FREEZE the Simulator.
: 6. STORE a Temporary IC set if more than one student will be performing the JPM
: 6. STORE a Temporary IC set if more than one student will be performing the JPM.
. 7. The lesson will NOT need to be stopped and re
: 7. The lesson will NOT need to be stopped and re-executed for each student after restoring the IC.
-executed for each student after restoring the IC.
: 8. UNFREEZE the Simulator when the student is ready to begin.
: 8. UNFREEZE the Simulator when the student is ready to begin.
NRC S-3 Simulator Page 9 of 10


JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-3  (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is at 100% power.
Unit 2 is at 100% power.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO.
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line
The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.
-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.
NRC S-3
 
NRC JPM S-4 Rev 0 Simulator Page 1 of 10   


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV - UNIT 2 NRC S-4 Applicant Examiner NRC JPM S-4 Rev 0 Simulator Page 1 of 10
- UNIT 2 NRC S-4  


Applicant        Examiner JOB PERFORMANCE MEASURE NRC JPM S-4 Rev 0 Simulator Page 2 of 10  Task: Transfer Letdown Level Control to Alternate LCV Faulted JPM?
JOB PERFORMANCE MEASURE Task:               Transfer Letdown Level Control to Alternate LCV Faulted JPM?         No Facility JPM #:     0821040 K/A :           004 A2.22 / 3.2 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Mismatch of letdown and changing flows.
No Facility JPM #:
Duty Area(s):       N/A Task Information: N/A Task Standard:       This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
0821040 K/A : 004 A2.22 / 3.2 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Evaluation Location:                                                   Performance Level:
Mismatch of letdown and changing flows
Simulator       In Plant       Lab         Other                     Perform       Simulate       Discuss X                                                                       X
. Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==


2-NOP-02.02 "Charging and Letdown" Validation Time:
2-NOP-02.02 Charging and Letdown Validation Time: 15 minutes                                             Time Critical:       No Tools/Equipment/Procedures Needed:
15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-NOP-02.02 Charging and Letdown Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
2-NOP-02.02 "Charging and Letdown" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None Radiological Protection and RWP Requirements:
None NRC JPM S-4 Rev 0 Simulator Page 2 of 10
None


JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC JPM S-4 Rev 0 Simulator Page 3 of 10    SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
The task you are to perform is: Transfer Letdown Level Control to the Alternate Level Control Valve -
Transfer Letdown Level Control to the Alternate Level Control Valve  
Unit 2 The performance level to be used for this JPM is Perform.
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 461: Line 359:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.
-service letdown level control valve (LCV
-2110P) has begun to operate erratically
, indicating a problem with the valve control circuitry.
INITIATING CUES:
INITIATING CUES:
The US has directed you to place the alternate level control valve in service IAW 2
The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.
-NOP-02.02, "Charging and Letdown."
NRC JPM S-4 Rev 0 Simulator Page 3 of 10


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
*Cues are to be used only if JPM performance is being simulated in the plant.
2-NOP-02.02 Charging and Letdown Section 4.8 Swap Level control valves STEP 1 (4.8.1): IF in MODE 1 or 2, THEN PLACE V2520 ION EXCHANGER BYPASS               Critical Step VALVE, in BYPASS RESET to minimize reactivity effects of changing letdown temperature.                                                   _____ SAT STANDARD:       PLACE V2520 to Bypass Reset.
NRC JPM S-4 Simulator Page 4 of 10  START TIME: __________
_____ UNSAT EXAMINERS CUE:
2-NOP-02.02 Charging and Letdown Section 4.8 Swap Level control valves STEP 1 (4.8.1): IF in MODE 1 or 2, THEN PLACE V2520 ION EXCHANGER BYPASS VALVE, in BYPASS RESET to minimize reactivity effects of changing letdown temperature.
COMMENTS:
STANDARD: PLACE V2520 to Bypass Reset. EXAMINER'S CUE:
STEP 2 (4.8.2): Slowly REDUCE PIC-2201, LTDN PRESSURE, controller setpoint to 250 psig.                                                                   Critical Step STANDARD:       Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig.                   _____ SAT EXAMINERS CUE:
COMMENTS:       Critical Step
EXAMINERS NOTE: Annunciator M-5 Letdown Pressure High/Low is an               _____ UNSAT expected alarm.
_____ SAT  _____ UNSAT STEP 2 (4.8.2): Slowly REDUCE PIC-2201, LTDN PRESSURE, controller setpoint to 250 psig. STANDARD: Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig.
COMMENTS:
EXAMINER'S CUE:
STEP 3 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows:                                                                Critical Step A. Using the lower Manual controller knob, MATCH HIC-1110, LEVEL,      _____ SAT manual and auto controller output signals. .
EXAMINERS NOTE: Annunciator M
STANDARD:      PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST        _____ UNSAT HIC-1110 manual signal to MATCH auto EXAMINERS CUE:
-5 "Letdown Pressure High/Low" is an expected alarm.
COMMENTS:
COMMENTS:       Critical Step
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 4 of 10


_____ SAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows:                                                                 Critical Step B. SHIFT HIC-1110, LEVEL, controller to MANUAL.                         _____ SAT STANDARD:       PLACE HIC-1110 to MANUAL by DEPRESSING the Yellow M pushbutton
_____ UNSAT STEP 3 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: A. Using the lower Manual controller knob, MATCH HIC-1110, LEVEL, manual and auto controller output signals.
_____ UNSAT EXAMINERS CUE:
. STANDARD: PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 manual signal to MATCH auto    EXAMINER'S CUE:
COMMENTS:
COMMENTS:  
NOTE With only one Charging Pump running, dual indication may not be received on both        Critical Step Letdown Level Control valves
 
_____ SAT STEP 5 (4.8.4):         PLACE LEVEL CONTROL VALVE switch to BOTH.
Critical Step
STANDARD:       POSITION the Letdown Level selector switch to the BOTH position.        _____ UNSAT EXAMINERS CUE:
 
_____ SAT
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
*Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 5 of 10  STEP 4 (4.8.3): If in AUTO, Then PLACE HIC
-1110, LEVEL controller in MANUAL as follows:  B. SHIFT HIC-1110, LEVEL, controller to MANUAL.
STANDARD: PLACE HIC-1110 to MANUAL by DEPRESSING the Yellow 'M' pushbutton EXAMINER'S CUE:
COMMENTS:
COMMENTS:
Critical Step
STEP 6 (4.8.5): VERIFY a rise in letdown flow, as indicated on FIA-2202, FLOW.
 
STANDARD:       VERIFY increasing flow on FIA-2202                                      _____ SAT EXAMINERS CUE:
_____ SAT  _____ UNSAT NOTE With only one Charging Pump running, dual indication may not be received on both Letdown Level Control valves STEP 5 (4.8.4):             PLACE LEVEL CONTROL VALVE switch to BOTH.
_____ UNSAT COMMENTS:
STANDARD: POSITION the Letdown Level selector switch to the BOTH position. EXAMINER'S CUE:
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 5 of 10


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (4.8.6): POSITION LEVEL CONTROL VALVE switch to one of the following positions: (circle one)                                                      Critical Step LCV-2110P              LCV-2110Q
_____ SAT STANDARD:        POSITION Letdown Level Control valve selector switch to PCV-2110Q EXAMINERS CUE:                                                                      _____ UNSAT COMMENTS:
STEP 8 (4.8.7): PERFORM the following:
Critical Step A. ADJUST HIC-1110, LEVEL, controller for minimum flow.
_____ SAT STANDARD:      ADJUST to MINIMUM letdown flow as observed on FIA-2202 EXAMINERS CUE:                                                                      _____ UNSAT COMMENTS:
STEP 9 (4.8.7): PERFORM the following:
B. IF letdown flow is NOT 28-30 gpm, THEN REQUEST I&C to adjust LY-1110, Signal Limiter for Pressurizer Level control, per Section 5.8, Letdown _____ SAT Limiter Adjustment.
STANDARD:      Informs I&C of the current minimum letdown flow value and directs            _____ UNSAT them to adjust LY1110, Pressurizer Level control signal limiter.
EXAMINERS CUE:
EVALUATORS NOTE: On the Simulator the letdown flow is not exactly 28 gpm, direct the student to continue with the task after I&C is contacted. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
COMMENTS:
Critical Step
          *Cues are to be used only if JPM performance is being simulated in the plant.
_____ SAT  _____ UNSAT STEP 6 (4.8.5): VERIFY a rise in letdown flow, as indicated on FIA
NRC JPM S-4 Simulator Page 6 of 10
-2202, FLOW. STANDARD:    VERIFY increasing flow on FIA-2202  EXAMINER'S CUE:
COMMENTS: 


_____ SAT  _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:
 
_____ SAT A. Using upper BIAS control knob and previewing auto signal BALANCE HIC-1110, LEVEL, controller auto and manual output signals.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
_____ UNSAT STANDARD:     PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS knob.
*Cues are to be used only if JPM performance is being simulated in the plant.
EXAMINERS CUE:
NRC JPM S-4 Simulator Page 6 of 10   STEP 7 (4.8.6): POSITION LEVEL CONTROL VAL VE switch to one of the following positions: (circle one)
LCV-2110 P                    LCV-2110Q  STANDARD: POSITION Letdown Level Control valve selector switch to PCV-2 1 1 0Q  EXAMINER'S CUE:
COMMENTS:       Critical Step
 
_____ SAT   _____ UNSAT STEP 8 (4.8.7): PERFORM the following:
 
A. ADJUST HIC-1110, LEVEL, controller for minimum flow.
STANDARD: ADJUST to MINIMUM letdown flow as observed on FIA
-2202  EXAMINER'S CUE:
COMMENTS: 
 
Critical Step
_____ SAT  _____ UNSAT STEP 9 (4.8.7): PERFORM the following:
B. IF letdown flow is NOT 28-30 gpm, THEN REQUEST I&C to adjust LY-1110, Signal Limiter for Pressurizer Level control, per Section 5.8, Letdown Limiter Adjustment
. STANDARD: Informs I&C of the current minimum letdown flow value and directs them to adjust LY1110, Pressurizer Level control signal limiter
. EXAMINER'S CUE:
 
EVALUATOR'S NOTE:
On the Simulator the letdown flow is not exactly 28 gpm, direct the student to c ontinue with the task after I&C is contacted
. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT
STEP 11 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:                                                               Critical Step B. SHIFT HIC-1110, LEVEL controller to AUTO.                         _____ SAT STANDARD:     PLACE HIC-1110 in AUTO by DEPRESSING the White A pushbutton
 
_____ UNSAT EXAMINERS CUE:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
*Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 7 of 10  STEP 10 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the     following:
A. Using upper BIAS control knob and previewing auto signal BALANCE HIC-1110, LEVEL, controller auto and manual output signals
. STANDARD: PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS kno
: b. EXAMINER'S CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT STEP 11 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the     following:
STEP 12 (4.8.9): Slowly RAISE PIC-2201, PRESSURE, setpoint to 430 psig.
Critical Step STANDARD:        Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and      _____ SAT ENSURE that red needle follows and MATCHES the black needle EXAMINERS CUE:                                                                _____ UNSAT COMMENTS:
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 7 of 10


B. SHIFT HIC-1110, LEVEL controller to AUTO.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.8.10):      ADJUST HIC-1110, LEVEL, controller for a flow consistent with current plant conditions.
STANDARD: PLACE HIC-1110 in AUTO by DEPRESSING the White 'A' pushbutton EXAMINER'S CUE:
_____ SAT STANDARD:     ADJUST HIC-1110 to current plant conditions with the BIAS knob.
COMMENTS:      Critical Step
EXAMINERS CUE:                                                                 _____ UNSAT EVALUATORS NOTE: Adjustment is not needed if pressurizer level is at setpoint.
_____ SAT  _____ UNSAT STEP 12 (4.8.9): Slowly RAISE PIC-2201, PRESSURE, setpoint to 430 psig.
STANDARD: Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and ENSURE that red needle follows and MATCHES the black needle EXAMINER'S CUE:
COMMENTS:
COMMENTS:
Critical Step
STEP 14 (4.8.11):       When temperature on TIC-2224, BYPASS TEMPERATURE,               Critical Step returns to normal, THEN ENSURE V2520, ION EXCHANGER BYPASS VALVE is in AUTO.
_____ SAT  _____ UNSAT
_____ SAT STANDARD:     PLACES V2520 to AUTO.
 
EXAMINERS CUE:                                                                   _____ UNSAT COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
STEP (done):   NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV-2110Q and that I&C Department has been notified to adjust LY1110, Pressurizer Level control signal limiter. _____ SAT STANDARD:     NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-2110Q.                                                             _____ UNSAT EXAMINERS CUE:         US Acknowledges.
*Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 8 of 10  STEP 13 (4.8.10): ADJUST HIC
-1110, LEVEL, controller for a flow consistent wit h current plant conditions.
STANDARD: ADJUST HIC-1110 to current plant conditions with the BIAS knob.
EXAMINER'S CUE:
EVALUATO R'S NOTE:  Adjustment is not needed if pressurizer level is at setpoint. COMMENTS:
_____ SAT  _____ UNSAT STEP 14 (4.8.11): When temperature on TIC
-2224, BYPASS TEMPERATURE, returns to normal, THEN ENSURE V2520, ION EXCHANGER BYPASS VALVE is in AUTO. STANDARD: PLACES V2520 to AUTO.
EXAMINER'S CUE:
COMMENTS:     Critical Step
 
_____ SAT 
 
_____ UNSAT
 
STEP (done): NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV
-211 0Q and that I&C Department has been notified to adjust LY1110, Pressurizer Level control signal limiter.
STANDARD: NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-211 0 Q. EXAMINER'S CUE:
US Acknowledges.
COMMENTS:
COMMENTS:
END OF TASK
END OF TASK STOP TIME: __________
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 8 of 10


_____ SAT 
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
 
: 1. RESTORE IC-1.
_____ UNSAT
: 2. UNFREEZE the Simulator.
: 3. No Lesson is needed for this JPM.
NRC JPM S-4 Simulator Page 9 of 10


STOP TIME:  __________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC JPM S-4 Simulator Page 9 of 10    1. RESTORE IC-1. 2. UNFREEZE the Simulator.
: 3. No Lesson is needed for this JPM.
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC JPM S-4 Page 10 of 10  (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.
-service letdown level control valve (LCV
-2110P) has begun to operate erratically
, indicating a problem with the valve control circuitry.
INITIATING CUES:
INITIATING CUES:
You are the DRCO. The US has directed you to place the alternate level control valve in service IAW 2
You are the DRCO. The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.
-NOP-02.02, "Charging and Letdown."
NRC JPM S-4 Page 10 of 10


JPM NRC S-5 Rev 0 SIMULATOR Page 1 of 14  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A AND 2B SG USING 2C AFW PUMP NRC S-5 Applicant Examiner JPM NRC S-5 Rev 0 SIMULATOR Page 1 of 14


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A AND 2 B SG USING 2C AFW PUMP NRC S-5     
JOB PERFORMANCE MEASURE Task: Start the 2C AFW pump and feed the 2A and 2B SG.
 
Alternate Path JPM?     Yes Facility JPM #:     N/A K/A: 061 A2.04 / 3.4 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: pump failure or improper operation Duty Area(s):       N/A Task Information: N/A Task Standard:
Applicant        Examiner JOB PERFORMANCE MEASURE JPM NRC S-5 Rev 0 SIMULATOR Page 2 of 14  Task: Start the 2C AFW pump and feed the 2A and 2 B SG. Alternate Path JPM? Yes Facility JPM #:
This JPM is completed when the 2C AFW pump mechanical overspeed trip is reset and the 2C AFW pump is feeding the 2A and 2B SG at 200-220 gpm.
N/A K/A: 061 A2.04 / 3.4 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: pump failure or improper operation Duty Area(s):
Evaluation Location:                                                   Performance Level:
N/A Task Information:
Simulator       In Plant       Lab         Other                     Perform       Simulate       Discuss X                                                                     X
N/A Task Standard:
This JPM is completed when the 2C AFW pump mechanical overspeed trip is reset and the 2C AFW pump is feeding the 2A and 2 B SG at 200-220 gpm. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==
* 2-AOP-09.02 AUXILIARY FEEDWATER
* 2-NOP-09.02 AUXILIARY FEEDWATER
* Annunciator G-46 Validation Time: 15 minutes                                            Time Critical:      No Tools/Equipment/Procedures Needed:
* 2-AOP-09.02 AUXILIARY FEEDWATER.
* 2-NOP-09.02 AUXILIARY FEEDWATER
* Annunciator G-46 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-5 Rev 0 SIMULATOR Page 2 of 14


2-AOP-09.02 AUXILIARY FEEDWATER 2-NOP-09.02 AUXILIARY FEEDWATER Annunciator G
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
-46  Validation Time:
The task you are to perform is: Start the 2C AFW Pump and feed the 2A and 2B SG.
15 minutes  Time Critical:
The performance level to be used for this JPM is PERFORM.
No  Tools/Equipment/Procedures Needed:
This is not a time critical JPM.
2-AOP-09.02 AUXILIARY FEEDWATER
. 2-NOP-09.02 AUXILIARY FEEDWATE R  Annunciator G
-46  Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None  Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS JPM NRC S-5 Rev 0 SIMULATOR Page 3 of 14  SPECIFIC DIRECTIONS:
The task you are to perform is:
Start the 2C AFW Pump and feed the 2A and 2 B SG. The performance level to be used for this JPM is PERFORM. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you. SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
Line 628: Line 475:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
. 2 B AFW pump throttle valve MV 10 breaker tripped. The 2 A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2 B SG. INITIATING CUES:
INITIATING CUES:
The US directs you to start the 2C AFW using 2
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.
-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2 B SG.
JPM NRC S-5 Rev 0 SIMULATOR Page 3 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 4 of 14   START TIME:
__________
2-NOP-09.02 Auxiliary Feedwater STEP 1: (4.3.6) START the 2C Auxiliary Feedwater Pump


STANDARD: OPEN MV-08-12, SG 2B STM To AFW PP 2C
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
. AND/OR OPEN MV-08-13, SG 2A STM To AFW PP 2C.
2-NOP-09.02 Auxiliary Feedwater STEP 1: (4.3.6) START the 2C Auxiliary Feedwater Pump                                CRITICAL STEP
 
_____ SAT STANDARD:       OPEN MV-08-12, SG 2B STM To AFW PP 2C.
EXAMINERS NOTE: 2C AFW will trip on mechanical overspeed   COMMENTS:
AND/OR OPEN MV-08-13, SG 2A STM To AFW PP 2C.                               _____ UNSAT EXAMINERS NOTE: 2C AFW will trip on mechanical overspeed COMMENTS:
CRITICAL STEP
STEP 2: (4.3.7) VERIFY turbine speed is stable between 3700 and 3800 rpm AND the      FAULTED governor is NOT hunting / oscillating.                               STEP
_____ SAT  _____ UNSAT STEP 2: (4.3.7) VERIFY turbine speed is stable between 3700 and 3800 rpm AND the      governor is NOT hunting / oscillating.
_____ SAT STANDARD:       RECOGNIZE 2C AFW pump has tripped on mechanical overspeed. Refers to Annunciator summary for G-46
STANDARD: RECOGNIZE 2C AFW pump has tripped on mechanical overspeed.
_____ UNSAT EXAMINERS NOTE: Applicant should recognize mechanical overspeed by:
Refers to Annunciator summary for G
MV-08-3 in closed position AND annunciator G-46 LOCKED IN. (If this was a electrical overspeed, annunciator G-46 would have came in and then cleared).
-46 EXAMINERS NOTE: Applicant should recognize mechanical overspeed by:
MV-08-3 in closed position AND annunciator G
-46 LOCKED IN. (If this was a electrical overspeed, annunciator G
-46 would have came in and then cleared).
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:
COMMENTS:
FAULTED STEP
JPM NRC S-5 Rev 0 Simulator Page 4 of 14
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 5 of 14   STEP 3:          Refer to Annunciator summary for G
-46, 2C AFW Pump Turbine Failure/Trip/OVRLD/SS Isol.
STANDARD: RECOGNIZE directions from Annunciator summary If  2C AFW Pump Tripped, Then GO TO 2-AOP-09.02 AUXILIARY FEEDWATER
 
EXAMINERS CUE:


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3:        Refer to Annunciator summary for G-46, 2C AFW Pump Turbine Failure/Trip/OVRLD/SS Isol.                                                                _____ SAT STANDARD:          RECOGNIZE directions from Annunciator summary If 2C AFW Pump            _____ UNSAT Tripped, Then GO TO 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:
COMMENTS:
2-AOP-09.02 AUXILIARY FEEDWATER STEP 4: (4.2.5.1)      IF 2C AFW pump tripped due to mechanical or electrical overspeed    _____ SAT trip, THEN PERFORM Attachment 1, Resetting 2C AFW Pump Following Overspeed Trip.
_____ UNSAT STANDARD:      REFERS to Attachment 1 of 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT 2-AOP-09.02 AUXILIARY FEEDWATER STEP 4: (4.2.5.1)
2-AOP-09.02 AUXILIARY FEEDWATER                                   CRITICAL ATTACHMENT 1                                          STEP STEP 5: (1)     IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                _____ SAT A. CLOSE MV-08-12, SG 2B STM TO AFW PP 2C (RTGB-202)
IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM Attachment 1, Resetting 2C AFW Pump Following Overspeed Trip.
_____ UNSAT STANDARD:       CLOSE MV-08-12 SG 2B Steam to AFW PP 2C.
STANDARD: REFERS to Attachment 1 of  2
-AOP-09.02 AUXILIARY FEEDWATER
 
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT 2-AOP-09.02 AUXILIARY FEEDWATER ATTACHMENT 1 STEP 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
JPM NRC S-5 Rev 0 Simulator Page 5 of 14
A. CLOSE MV-08-12, SG 2B STM TO AFW PP 2C (RTGB
-202)
STANDARD: CLOSE  MV-08-12 SG 2B Ste am to AFW P P 2C.
EXAMINERS CUE:  COMMENTS:    CRITICAL  STEP  _____ SAT  _____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 6 of 14    STEP 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,   THEN PERFORM the following:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,     CRITICAL THEN PERFORM the following:                                                             STEP B. CLOSE MV-08-13, SG 2A STM TO AFW PP 2C (RTGB-202)                       _____ SAT STANDARD:   CLOSE MV-08-13 SG 2A Steam to AFW Pp 2C.
B. CLOSE MV-08-13, SG 2A STM TO AFW PP 2C (RTGB
_____ UNSAT EXAMINERS CUE:
-202) STANDARD: CLOSE MV-08-13 SG 2A Ste am to AFW Pp 2C
COMMENTS:
. EXAMINERS CUE:
STEP 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,      CRITICAL THEN PERFORM the following:                                                STEP
COMMENTS:
_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
(1) CLOSE MV-08-3, 2C PUMP (RTGB-202 - Key 78)                          _____ UNSAT STANDARD:    CLOSE MV-08-3, 2C PUMP using Key 78 EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 6 of 14


CRITICAL  STEP  _____ SAT  _____ UNSAT STEP 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,             CRITICAL THEN PERFORM the following:                                                         STEP
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
(1) CLOSE MV-08-3, 2C PUMP (RTGB
(2) If 2C AFW pump tripped due to mechanical overspeed trip,                 _____ UNSAT THEN PERFORM the following:
-202 - Key 78)  STANDARD:      CLOSE MV-08-3, 2C PUMP using Key 78 EXAMINERS CUE:
COMMENTS: 
 
CRITICAL  STEP
 
_____ SAT 
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 7 of 14  STEP 8 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(2) If 2C AFW pump tripped due to mechanical overspeed trip,               THEN PERFOR M the following:
: a. RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
: a. RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
STANDARD: CALL Field Operator to reset the mechanical overspeed linkage
STANDARD: CALL Field Operator to reset the mechanical overspeed linkage EXAMINERS CUE: Field Operator calls back and states mechanical linkage on MV-08-3 has been reset.
COMMENTS:
STEP 9 (1)  IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                        _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:                        _____ UNSAT (2) If 2C AFW pump tripped due to mechanical overspeed trip, THEN PERFORM the following:
: b. VERIFY top surface of trip tappet nut is in line with the line marked on the head lever to ensure full engagement.
STANDARD:    VERIFY with the field operator the proper trip tappet nut engagement .
EXAMINERS CUE: Field operator states the trip tappet nut is in line with the line marked on the head lever.
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 7 of 14


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,      CRITICAL THEN PERFORM the following:                                                STEP C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:                _____ SAT (3) PLACE MV-08-3, 2C PUMP (2C Auxiliar Feedwater Pump), in OPEN
_____ UNSAT STANDARD:    TURNS KEY 78 for MV-08-3 to the open position.
EXAMINERS CUE:
EXAMINERS CUE:
Field Operator calls back and states mechanical linkage on MV-08-3 has been reset.
COMMENTS:
COMMENTS:
STEP 11: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                 _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
 
_____ UNSAT (4) VERIFY MV-08-3, THROTTLE / TRIP VALVE FOR AFW PUMP 2C is OPEN.
CRITICAL  STEP
STANDARD:     OBSERVES MV-08-3 red light on green light off.
_____ SAT  _____ UNSAT STEP 9 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
EXAMINERS CUE:
 
COMMENTS:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
STEP 12: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                 _____ SAT D. IF 2C AFW pump is rotating, THEN perform the following:
(2)   If 2C AFW pump tripped due to mechanical overspeed trip,              THEN PERFORM the following:
_____ UNSAT STANDARD:    CALLS field operator to determine if 2C AFW pump is rotating EXAMINERS CUE: Field Operator reports back, 2C AFW pump is NOT rotating.
: b. VERIFY top surface of trip tappet nut is in line with the line marked on the head lever to ensure full engagement. STANDARD: VERIFY with the field operator the proper trip tappet nut engagement
COMMENTS:
. EXAMINERS CUE:
JPM NRC S-5 Rev 0 Simulator Page 8 of 14
Field operator states the trip tappet nut is in line with the line marked on the head lever.
COMMENTS:    
 
_____ SAT 
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 8 of 14  STEP 10: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
 
(3) PLACE MV-08-3, 2C PUMP (2C Auxiliar Feedwater Pump), in OPEN STANDARD: TURNS KEY 78 for MV-08-3 to the open position.


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                    _____ SAT E. PERFORM one of the following to drain oil from the underside of the governor main speed piston.                                                    _____ UNSAT (1) WAIT 3 minutes after the pump stops rotating OR (2) PERFORM the following:
: a. PLACE manual control knob on the side of the turbine governor in the FULLY COUNTER-CLOCKWISE idle speed position.
: b. RETURN manual control knob on the turbine governor to FULLY CLOCKWISE maximum speed position.
STANDARD:    DETERMINE time since pump stopped rotating. If >3 minutes step 2.a and 2.b not performed. If <3 minutes call field operator to perform step 2.a and 2.b EXAMINERS CUE: If field operator called, state step 2.a and 2.b has been performed.
If less than 3 minutes step E.(2) should be performed.
COMMENTS:
STEP 14: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                    _____ SAT F. ENSURE MV-09-11, PUMP 2C TO SG 2A is CLOSED (RTGB-202)
_____ UNSAT STANDARD:    VERIFIES MV-09-11 green light on, red light off.
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 9 of 14


COMMENTS: 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                               _____ SAT G. ENSURE MV-09-12, PUMP 2C TO SG 2B is CLOSED (RTGB-202)
 
_____ UNSAT STANDARD:     VERIFIES MV-09-12 green light on, red light off.
CRITICAL STEP
_____ SAT  _____ UNSAT STEP 11: (1)       IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
 
(4) VERIFY MV
-0 8-3, THROTTLE / TRIP VALVE FOR AFW PUMP 2C is OPEN. STANDARD: OBSERVES MV-08-3 red light on green light off.
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:      _____ SAT 
_____ UNSAT STEP 1 2: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
D. IF 2C AFW pump is rotating, THEN perform the following:
STANDARD: CALLS field operator to determine if 2C AFW pump is rotating EXAMINERS CUE:
Field Operator reports back, 2C AFW pump is NOT rotating.
COMMENTS: 
_____ SAT  _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 9 of 14  STEP 1 3: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
E. PERFORM one of the following to drain oil from the underside of the governor main speed piston.
(1) WAIT 3 minutes after the pump stops rotating OR (2) PERFORM the following:
: a. PLACE manual control knob on the side of the turbine governor in the FULLY COUNTER
-CLOCKWISE idle speed position.
: b. RETURN manual control knob on the turbine governor to FULLY CLOCKWISE maximum speed position.
STANDARD: DETERMINE time since pump stopped rotating. If >3 minutes step 2.a and 2.b not performed. If <3 minutes call field operator to perform step 2.a and 2.b EXAMINERS CUE:
If field operator called, state step 2.a and 2.b has been performed.
If less than 3 minutes step E.
(2) should be performed.
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT STEP 1 4: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
STEP 16: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,   CRITICAL THEN PERFORM the following:                                               STEP H. IF both Steam Generators are intact AND NOT faulted, THEN OPEN the    _____ SAT following valves simultaneously:
F. ENSURE MV-09-11, PUMP 2C TO SG 2A is CLOSED (RTGB-202) STANDARD: VERIFIES MV-09-11 green light on, red light off. EXAMINERS CUE:
(1) MV-08-13 SG 2A STM TO AFW PP 2C                            _____ UNSAT (2) MV-08-12 SG 2B STM TO AFW PP 2C STANDARD:     USING two handed operation open MV-08-13 MV-08-12 simultaneously and verifies valves open.
COMMENTS: 
 
_____ SAT 
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 10 of 14    STEP 1 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
G. ENSURE MV-09-12, PUMP 2C TO SG 2B is CLOSED (RTGB-202)    STANDARD: VERIFIES MV-09-12 green light on, red light off.
EXAMINERS CUE:
EXAMINERS CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT STEP 1 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
STEP 17: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                               _____ SAT I. IF either SG is faulted THE OPEN steam supply valve from the NON-FAULTED S/G                                            _____ UNSAT STANDARD:     DETERMINES step N/A EXAMINERS CUE:
H. IF both Steam Generators are intact AND NOT faulted, THEN OPEN the following valves simultaneously:
COMMENTS:
(1) MV-08-13 SG 2A STM TO AFW PP 2C (2) MV-08-12 SG 2B STM TO AFW PP 2C STANDARD: USING two handed operation open MV 13 MV-08-12 simultaneously and verifies valves open.
JPM NRC S-5 Rev 0 Simulator Page 10 of 14
EXAMINERS CU E:   COMMENTS:
CRITICAL STEP


_____ SAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 18: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,            CRITICAL THEN PERFORM the following:                                                    STEP J. IF flow is to be restored to 2A S/G THEN ENSURE SE-09-4, 2C PUMP            _____ SAT DISCH to 2A S/G is OPEN STANDARD:        OPENS SE-09-4                                                                _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 19: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,            CRITICAL THEN PERFORM the following:                                                    STEP K. IF flow is to be restored to 2B S/G THEN ENSURE SE-09-5, 2C PUMP            _____ SAT DISCH to 2B S/G is OPEN STANDARD:        OPENS SE-09-5                                                                _____ UNSAT EXAMINERS CUE:
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock when the feed ring is uncovered (level <33% NR).
Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
* If using Main Feedwater OR Condensate, As low as possible for the first 5 minutes OR until SG level has risen.
COMMENTS:
STEP 20: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:                                                    _____ SAT L. Throttle MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator.                                      _____ UNSAT STANDARD:        THROTTLES MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. Adjusts flow to 2A SG at 200 gpm to 220 gpm EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 11 of 14


_____ UNSAT STEP 1 7: (1)  IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 21: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip,    CRITICAL THEN PERFORM the following:                                               STEP
I. IF either SG is faulted THE OPEN steam supply valve from the NON
_____ SAT M. Throttle MV-09-12, PUMP 2C to S/G 2B to establish required flowrate to the 2B steam generator.
-FAULTED S/G STANDARD: DETERMINES step N/A    EXAMINERS CUE:
_____ UNSAT STANDARD:     THROTTLES MV-09-12, PUMP 2C to S/G 2B, to establish required flowrate to the 2B steam generator. Adjusts flow to 2B SG at 200 gpm to 220 gpm EXAMINERS CUE: Advise JPM is complete.
COMMENTS:        _____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 11 of 14  STEP 1 8: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
J. IF flow is to be restored to 2A S/G THEN ENSURE SE-09-4, 2C PUMP DISCH to 2A S/G is OPEN STANDARD: OPENS SE-09-4   EXAMINERS CUE:
COMMENTS:    CRITICAL STEP  _____ SAT  _____ UNSAT STEP 1 9: (1)  IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following
:  K. IF flow is to be restored to 2 B S/G THEN ENSURE SE 5, 2C PUMP DISCH to 2 B S/G is OPEN STANDARD: OPENS SE-09-5    EXAMINERS CUE:
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock when the feed ring is uncovered (level <33% NR). Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
If using Main Feedwater OR Condensate, 'As low as possible' for the first 5 minutes OR until SG level has risen.
COMMENTS:    CRITICAL STEP  _____ SAT   _____ UNSAT STEP 20: (1)  IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
L. Throttle MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate t o the 2A steam generator.
STANDARD: THROTTLES MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. Adjusts flow to 2A SG at 200 gpm to 220 gpm EXAMINERS CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT
END OF TASK STOP TIME: ____________
JPM NRC S-5 Rev 0 Simulator Page 12 of 14


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 12 of 14  STEP 21: (1)  IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
M. Throttle MV-09-1 2, PUMP 2C to S/G 2 B to establish required flowrate to the 2B steam generator.
STANDARD: THROTTLES MV-09-1 2, PUMP 2C to S/G 2 B, to establish required flowrate to the 2 B steam generator. Adjusts flow to 2B SG at 200 gpm to 220 gpm    EXAMINERS CUE:
Advise JPM is complete.
COMMENTS:    END OF TASK CRITICAL STEP
_____ SAT 
 
_____ UNSAT
 
STOP TIME: ____________
 
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET Page 13 of 14 NRC S-5    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV 10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
INITIATING CUES:
INITIATING CUES:
The US directs you to start the 2C AFW using 2
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.
-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.  
Page 13 of 14 NRC S-5


JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET Page 14 of 14 NRC S-5  1. Restore IC
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
-50 2. Execute S-5 AFW.Lsn NOTE: 'C' AFW Mechanical Overspeed will trigger automatically
: 1. Restore IC-50
: 3. Trigger reset 2C AFW overspeed when Field Operator called to reset.  
: 2. Execute S-5 AFW.Lsn NOTE: C AFW Mechanical Overspeed will trigger automatically
: 3. Trigger reset 2C AFW overspeed when Field Operator called to reset.
Page 14 of 14 NRC S-5


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ONCE
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ONCE-THROUGH COOLING - UNIT 2 NRC S-6 Simulator Applicant Examiner
-THROUGH COOLING  
- UNIT 2 NRC S-6   Simulator  


Applicant        Examiner JOB PERFORMANCE MEASURE NRC S-6 Simulator Page 2 of 17  Task: Establish Once
JOB PERFORMANCE MEASURE Task:               Establish Once-Through Cooling Faulted JPM?       Yes Facility JPM #:
-Through Cooling Faulted JPM?
K/A: 006 ECCS A4.02 / 4.0 Ability to manually operate and/or monitor in the control room: Valves Duty Area(s):       N/A Task Information: N/A Task Standard:
Yes Facility JPM #:
This JPM is complete when once-through cooling has been established, safety injection flow to the RCS has been verified and US has been informed that the task is complete.
K/A: 006 ECCS A4.02 / 4.0 Ability to manually operate and/or monitor in the control room: Valves Duty Area(s):
Evaluation Location:                                               Performance Level:
N/A Task Information:
Simulator       In Plant       Lab       Other                   Perform         Simulate       Discuss X                                                                 X
N/A Task Standard:
This JPM is complete when once-through cooling has been established
, safety injection flow to the RCS has been verified and US has been informed that the task is complete
. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==


2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Validation Time: 20 minutes                                       Time Critical:       No Tools/Equipment/Procedures Needed:
 
Validation Time:
20 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None Radiological Protection and RWP Requirements:
None  
None NRC S-6 Simulator Page 2 of 17


JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC S-6 Simulator Page 3 of 17  SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
The task you are to perform is: Establish Once-Through Cooling on Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
Establish Once
-Through Cooling on Unit 2 The performance level to be used for this JPM is Perform   This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 853: Line 621:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.
-through cooling will be established.
 
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.
-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal  
NRC S-6 Simulator Page 3 of 17
- HR-3, Success Path 3  
- Once-Through-Cooling, and verify SI flow IAW 2
-EOP-99, Figure 2.


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 4 of 17  START TIME: __________ 2-EOP-15, Functional Recovery, RCS & Core Heat Removal HR
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
-3, Success Path 3, Once
2-EOP-15, Functional Recovery, RCS & Core Heat Removal HR-3, Success Path 3, Once-Through-Cooling STEP 1 (4.6.1A):       DE-ENERGIZE ALL Pressurizer Heaters.                           CRITICAL STEP STANDARD:       POSITION all Pressurizer Heaters control switches to OFF.
-Through-Cooling STEP 1 (4.6.1A):         DE-ENERGIZE ALL Pressurizer Heaters.
_____ SAT EXAMINERS CUE:
STANDARD: POSITION all Pressurizer Heaters control switches to OFF. EXAMINER'S CUE:
EVALUATORS NOTE:                                                              _____ UNSAT COMMENTS:
EVALUATOR'S NOTE:
STEP 2 (4.6.1B):  If Main Condenser is available, Then PERFORM BOTH the following:  CRITICAL STEP
COMMENTS:
: 1. BLOCK MSIS
_____ SAT STANDARD:        DETERMINE that Main Condenser is AVAILABLE. When MSIS BLOCK permissive annunciates, block MSIS.                                  _____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE:         MSIS BLOCK will not be in at this time. Applicant will need to monitor plant conditions and be aware of block annunciator as SBCS valves and ADVs are opened.
COMMENTS:
NRC S-6 Simulator Page 4 of 17


CRITICAL STEP
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.6.1B):   If Main Condenser is available, Then PERFORM BOTH the following:   CRITICAL STEP
_____ SAT  _____ UNSAT STEP 2 (4.6.1B):    If Main Condenser is available, Then PERFORM BOTH the following:
: 1. BLOCK MSIS STANDARD: DETERMINE that Main Condenser is AVAILABLE. When MSIS BLOCK permissive annunciates, block MSIS.
EXAMINER'S CUE:
EXAMINERS NOTE:    MSIS BLOCK will not be in at this time. Applicant will need to monitor plant conditions and be aware of block annunciator as SBCS valves and ADV's are opened. COMMENTS:
CRITICA L STEP
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 5 of 17    STEP 3 (4.6.1B):
If Main Condenser is available, Then PERFORM BOTH the following:
: 2. ENSURE ALL Steam Bypass Valves are OPEN.
: 2. ENSURE ALL Steam Bypass Valves are OPEN.
STANDARD: POSITION SBCS controllers to manual and open all five SBCS valves EXAMINER'S CUE:               EXAMINERS NOTE: Although not procedurally driven, SBCS permissive switch should be taken to 'on' at this time. If this is not performed, the SBCS valves will close when SG pressure reaches 806 psia.  
_____ SAT STANDARD:       POSITION SBCS controllers to manual and open all five SBCS valves
_____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE: Although not procedurally driven, SBCS permissive switch should be taken to on at this time. If this is not performed, the SBCS valves will close when SG pressure reaches 806 psia.
COMMENTS:
STEP 4 (4.6.1.C)    ENSURE ALL available Atmospheric Dump Valves are OPEN.            CRITICAL STEP STANDARD:        POSITION all four ADVs to OPEN.
_____ SAT EXAMINERS CUE:
COMMENTS:                                                                              _____ UNSAT STEP 5 (4.6.1.D):      ENSURE ALL RCPs are STOPPED.
STANDARD:        DETERMINE that all RCPs are STOPPED.                                  _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
NRC S-6 Simulator Page 5 of 17


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.6.1.E):    ENSURE SIAS and CIAS are ACTUATED.                        CRITICAL STEP STANDARD:      DEPRESS the think pushbutton above each switch and POSITION SIAS Train A and Train B actuation switches to SIAS ON.
_____ SAT VERIFY SIAS and CIAS Trains A and B have ACTUATED.
EXAMINERS CUE:                                                          _____ UNSAT EVALUATORS NOTE: SIAS and CIAS may AUTO Actuate prior to MANUAL Actuation. If AUTO actuation has occurred, this is not a CRITICAL STEP.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 7 (4.6.1.F):    ENSURE BOTH of the following:
_____ SAT   _____ UNSAT
: 1. BOTH HPSI pumps are RUNNING.
.                                                                                _____ SAT STANDARD:        OBSERVE HPSI Pump 2A and 2B are running.
EXAMINERS CUE:                                                          _____ UNSAT COMMENTS:
NRC S-6 Simulator Page 6 of 17


STEP 4 (4.6.1.C)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (4.6.1.F):        ENSURE BOTH of the following:
ENSURE ALL available Atmospheric Dump Valves are OPEN.
: 2. ALL cold leg injection valves are OPEN.                               _____ SAT STANDARD:       OBSERVE that all cold leg injection valves are OPEN.                     _____ UNSAT EXAMINERS CUE:
STANDARD: POSITION all four ADVs to OPEN. EXAMINER'S CUE:
COMMENTS:
COMMENTS:
CRITICAL STEP _____ SAT   _____ UNSAT
STEP 9 (4.6.1.G):        ENSURE ALL available charging pumps are RUNNING.                CRITICAL STEP STANDARD:        POSITION all available charging pump control switches to START, if not already running.                                                  _____ SAT EXAMINERS CUE:
_____ UNSAT EVALUATORS NOTE: 2C Charging pump must be manually STARTED and is the critical step.
COMMENTS:
STEP 10 (4.6.1.H):        ENSURE BOTH PORV block valves are OPEN.                        FAULTED STEP STANDARD:        POSITION PORV block valve V1477 control switch to OPEN. Identifies breaker tripped on V1477                                                _____ SAT EXAMINERS CUE: If field operator called to reset breaker, wait until end of steps to call that breaker is reset.                    _____ UNSAT EXAMINERS NOTE: PORV block valve V1476 is already open. PORV block valve V1477 breaker will trip as soon as the switch is taken to open. Applicant may call the field operator at this time to reset breaker.
COMMENTS:
NRC S-6 Simulator Page 7 of 17


STEP 5 (4.6.1.D)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11(4.6.1.H.1): IF ONE PORV Block Valve is OPEN Then continue steps to initiate Once Through Cooling.
: ENSURE ALL RCPs are STOPPED.
_____ SAT STANDARD:        DETERMINES V1476 block valve is open and continues with procedure.
STANDARD: DETERMINE that all RCPs are STOPPED. EXAMINER'S CUE:
_____ UNSAT EXAMINERS CUE:
COMMENTS:
COMMENTS:
STEP 12 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.
: 1. ENSURE PORV control switches are in OFF.                       _____ SAT STANDARD:         VERIFY V1474 and V1475 control switches are in OFF.
_____ UNSAT EXAMINERS CUE:
EVALUATORS NOTE: Both PORV switches should already be in OFF.
COMMENTS:
NRC S-6 Simulator Page 8 of 17


_____ SAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.
_____ SAT
: 2. PULL at least TWO RPS Hi Pzr Press bistables.
STANDARD:        Unscrews and pulls at least two RPS Hi Pzr Press bistables .      _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 14 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, FAULTED and BOTH PORV block valves are open, Then OPEN BOTH PORVs.          STEP
: 3. VERIFY BOTH PORVS OPEN.
_____ SAT STANDARD:        Determine PORV V1475 and PORV V1474 did not open.
EXAMINERS CUE:                                                              _____ UNSAT EXAMINERS NOTE: PORV 1475 will NOT open until its block valve V1477 is open due to P of 50 psia across valve.
COMMENTS:
NRC S-6 Simulator Page 9 of 17


_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15 (4.6.1.I.1):    WHEN at least ONE HPSI pump is RUNNING with a cold leg CRITICAL flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM STEP the following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.
STANDARD:        CALL the field operator to determine the status of the Breaker for Block _____ UNSAT Valve V1477 (breaker 2-42002 (secondary isol.) and 2-42007 (Reg. Guide 1.63 Isol.) at 480V MCC 2B5) When breaker reset and block valve V1477 open, verifies PORV V1475 opens.
EXAMINERS CUE: Call as field operator and state breaker 2-42002 is in the tripped condition. Reset breaker when requested by Applicant.
EXAMINERS NOTE: There is no way to remotely open PORV V1474 if pulling RPS bistables did not open valve.
COMMENTS:
STEP 16 (4.6.1.I.1): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, CRITICAL and at least ONE PORV block valve is OPEN, Then PERFORM the STEP following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.
STANDARD:        OPEN PORV block valve V1477 when breaker 2-42001 is reset.              _____ UNSAT EXAMINERS CUE:
COMMENTS:
NRC S-6 Simulator Page 10 of 17


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 6 of 17   STEP 6 (4.6.1.E)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17 (4.6.1.J):      When once through cooling has been established, Then:                CRITICAL STEP
: ENSURE SIAS and CIAS are ACTUATED.
: 1. Close Atmosphere Dump Valves (ADVs).
STANDARD: DEPRESS the "think" pushbutton above each switch and POSITION SIAS Train A and Train B actuation switches to SIAS ON. VERIFY SIAS and CIAS Trains A and B have ACTUATED. EXAMINER'S CUE:
STANDARD:       POSITION both ADVs to CLOSE. If controller is AUTO / MANUAL, use _____ SAT pushbutton on controller and set to 0. If manual switches used hold switch to closed position until red light off and green light on.
EVALUATOR'S NOTE:
_____ UNSAT EXAMINERS CUE:
SIAS and CIAS may AUTO Actuate prior to MANUAL Actuation. If AUTO actuation has occurred, this is not a CRITICAL STEP.
COMMENTS:
COMMENTS:
STEP 18 (4.6.1.J):     When once through cooling has been established, Then:                CRITICAL STEP
 
: 2. Close Main Steam Isolation Valves.
CRITICAL STEP
STANDARD:       POSITION both MSIVs to CLOSE.                                               _____ SAT EXAMINERS CUE:                                                                        _____ UNSAT EVALUATORS NOTE:
_____ SAT  _____ UNSAT STEP 7 (4.6.1.F)
COMMENTS:
: ENSURE BOTH of the following
NRC S-6 Simulator Page 11 of 17
: 1. BOTH HPSI pumps are RUNNING.
. STANDARD: OBSERVE HPSI Pump 2A and 2B are running
. EXAMINER'S CUE:
COMMENTS:  
 
_____ SAT  _____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 7 of 17    STEP 8 (4.6.1.F): ENSURE BOTH of the following:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 19 (4.6.1.J):   When once through cooling has been established, Then:
: 2. ALL cold leg injection valves are OPEN.
: 3. Close Main Steam Isolation Bypass Valves.
STANDARD: OBSERVE that all cold leg injection valves are OPEN. EXAMINER'S CUE:
_____ SAT STANDARD:       DETERMINE that both MSIV Bypass Valves are CLOSED.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
COMMENTS:
_____ SAT 
STEP 20 (4.6.1.J):   When once through cooling has been established, Then:
 
: 4. Close Steam Generator Blowdown Isolation Valves.
_____ UNSAT STEP 9 (4.6.1.G): ENSURE ALL available charging pumps are RUNNING.
_____ SAT STANDARD:       DETERMINE that all 4 Blowdown Isolation Valves are CLOSED.
STANDARD: POSITION all available charging pump control switches to START, if not already running.
_____ UNSAT EXAMINERS CUE:
EXAMINER'S CUE:
EVALUATOR'S NOTE: 2C Charging pump must be manually STARTED and is the critical step
. COMMENTS: 
 
CRITICAL STEP
_____ SAT  _____ UNSAT
 
STEP 10 (4.6.1.H)
: ENSURE BOTH PORV block valves are OPEN.
STANDARD: POSITION PORV block valve V1477 control switch to OPEN. Identifies breaker tripped on V1477 EXAMINER'S CUE:
If field operator called to reset breaker, wait until end of steps to call that breaker is reset.
EXAMINERS NOTE: PORV block valve V1476 is already open. PORV block valve V1477 breaker will trip as soon as the switch is taken to open. Applicant may call the field operator at this time to reset breaker.
COMMENTS: 
 
FAULTED STEP  _____ SAT
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 8 of 17  STEP 11(4.6.1.H.1)
: IF ONE PORV Block Valve is OPEN Then continue steps to                      initiate Once Through Cooling.
STANDARD: DETERMINES V1476 block valve is open and continues with procedure.
EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT  _____ UNSAT STEP 12 (4.6.1.I):  WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath,  and BOTH PORV block valves are open, Then OPEN BOTH PORV s. 1. ENSURE PORV control switches are in OFF.
STANDARD: VERIFY V1474 and V1475 control switches are in OFF. EXAMINER'S CUE:
EVALUATOR'S NOTE:  Both PORV switches should already be in OFF.
COMMENTS:   
 
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 9 of 17    STEP 13 (4.6.1.I):  WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs. 2. PULL at least TWO RPS Hi Pzr Press bistables.
STANDARD: Unscrews and pulls at least two RPS Hi Pzr Press bistables
. EXAMINER'S CUE:
COMMENTS:
COMMENTS:
_____ SAT 
STEP 21 (4.6.1.J):   When once through cooling has been established, Then:
 
: 5. Verify Steam Generator Safety Valves are CLOSED.
_____ UNSAT STEP 1 4 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs. 3. VERIFY BOTH PORVS OPEN.
_____ SAT STANDARD:       DETERMINE from NPO report that all Steam Generator Safety Valves are CLOSED.
STANDARD: Determine PORV V1475 and PORV V1474 did not open
_____ UNSAT EXAMINERS CUE:        When contacted, the NPO reports that NO Steam Generator Safety Valves are open.
. EXAMINER'S CUE:
EXAMINERS NOTE: PORV 1475 will NOT open until it's block valve V1477 is open due to P of 50 psia across valve.
COMMENTS: 
 
FAULTED STEP  _____ SAT   _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 10 of 17  STEP 1 5 (4.6.1.I.1):
WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM the following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block Valve. STANDARD: CALL the field operator to determine the status of the Breaker for Block Valve V1477 (breaker 2
-42002 (secondary isol.) and 2
-42007 (Reg. Guide 1.63 Isol.)
at 480V MCC 2B5)
When breaker reset and block valve V1477 open, verifies PORV V1475 opens.
EXAMINER'S CUE: Call as field operator and state breaker 2
-4200 2 is in the tripped condition. Reset breaker when requested by Applicant. EXAMINERS NOTE: There is no way to remotely open PORV V1474 if pulling RPS bistables did not open valve.
COMMENTS:
COMMENTS:
CRITICAL STEP
NRC S-6 Simulator Page 12 of 17
_____ SAT  _____ UNSAT STEP 1 6 (4.6.1.I.1):
WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM th e following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block Valve. STANDARD: OPEN PORV block valve V1477 when breaker 2
-42001 is reset.
EXAMINER'S CUE:


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 22 (4.6.1.K);    If Steam Generator pressure approaches 985 psig (1000 psia),
Then OPERATE ADVs as necessary to maintain S/G pressure between 835 and 915 psig (850 and 930 psia).
_____ SAT STANDARD:        DETERMINE that both Steam Generator pressures are below 985 psig and are STABLE.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 23 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
_____ SAT  _____ UNSAT
_____ SAT A. ENSURE ALL available SI Pumps are RUNNING.
 
STANDARD:       DETERMINE that SI pumps are RUNNING.                                 _____ UNSAT EXAMINERS CUE:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 11 of 17  STEP 1 7 (4.6.1.J):
Whe n once through cooling has been established, Then: 1. Close Atmosphere Dump Valves (ADV's).
STANDARD: POSITION both ADV's to CLOSE. If controller is AUTO / MANUAL, use pushbutton on controller and set to '0'. If manual switches used hold switch to closed position until red light off and green light on.
EXAMINER'S CUE:
 
COMMENTS:        CRITICAL STEP
_____ SAT   _____ UNSAT STEP 1 8 (4.6.1.J):
When once through cooling has been established, Then:  2. Close Main Steam Isolation Valves.
STANDARD: POSITION both MSIVs to CLOSE. EXAMINER'S CUE:
EVALUATOR'S NOTE:
COMMENTS:
COMMENTS:
CRITICAL STEP
NRC S-6 Simulator Page 13 of 17
_____ SAT  _____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 12 of 17  STEP 1 9 (4.6.1.J):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 24 (4.6.2): Maximize SI Flow PERFORM ALL of the following:                                           _____ SAT B. VERIFY adequate SI flow. REFER TO Figure 2, Safety Injection Flow vs. RCS Pressure.                                                   _____ UNSAT STANDARD:       SUM safety injection flows and VERIFY total flow is to RIGHT of 2 Full Trains in Operation curve on Figure 2 in 2-EOP-99.
When once through cooling has been established, Then:  3. Close Main Steam Isolation Bypass Valves.
EXAMINERS CUE:
STANDARD: DETERMINE that both MSIV Bypass Valves are CLOSED. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT  _____ UNSAT STEP 20 (4.6.1.J):
When once through cooling has been established, Then:  4. Close Steam Generator Blowdown Isolation Valves.
STANDARD: DETERMINE that all 4 Blowdown Isolation Valves are CLOSED.
EXAMINER'S CUE:
COMMENTS:          _____ SAT  _____ UNSAT STEP 2 1 (4.6.1.J):
When once through cooling has been established, Then:  5. Verify Steam Generator Safety Valves are CLOSED.
STANDARD: DETERMINE from NPO report that all Steam Generator Safety Valves are CLOSED.
EXAMINER'S CUE:
When contacted, the NPO reports that NO Steam Generator Safety Valves are open.
COMMENTS: 
 
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 13 of 17  STEP 2 2 (4.6.1.K);  If Steam Generator pressure approaches 985 psig (1000 psia), Then OPERATE ADVs as necessary to maintain S/G pressure between 835 and 915 psig (850 and 930 psia).
STANDARD: DETERMINE that both Steam Generator pressures are below 985 psig and are STABLE. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT  _____ UNSAT STEP 2 3 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
A. ENSURE ALL available SI Pumps are RUNNING.
STANDARD: DETERMINE that SI pumps are RUNNING. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT
 
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 14 of 17  STEP 2 4 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
B. VERIFY adequate SI flow. REFER TO Figure 2, Safety Injection Flow vs. RCS Pressure.
STANDARD: SUM safety injection flows and VERIFY total flow is to RIGHT of "2 Full Train s in Operation" curve on Figure 2 in 2
-EOP-99. EXAMINER'S CUE:
COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT STEP 2 5 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
STEP 25 (4.6.2): Maximize SI Flow PERFORM ALL of the following:                                           _____ SAT C. ENSURE ALL available Charging Pumps are RUNNING.
C. ENSURE ALL available Charging Pumps are RUNNING.
_____ UNSAT STANDARD:       VERIFY all available charging pumps are RUNNING.
STANDARD: VERIFY all available charging pumps are RUNNING. EXAMINER'S CUE:
EXAMINERS CUE:
COMMENTS:   
 
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 15 of 17    STEP (done):
NOTIFY the US that the task is COMPLETE.
STANDARD: NOTIFY the US that once
-through-cooling has been ESTABLISHED IAW EOP-15, RCS and Core Heat Removal
- HR-3, Success Path 3. Through PORV V1475 only.
EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:
COMMENTS:
END OF TASK
NRC S-6 Simulator Page 14 of 17


_____ SAT   _____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the task is COMPLETE.
STANDARD:    NOTIFY the US that once-through-cooling has been ESTABLISHED IAW EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3. _____ SAT Through PORV V1475 only.
EXAMINERS CUE:    US ACKNOWLEDGES.                                _____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
NRC S-6 Simulator Page 15 of 17


JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC S-6 Page 16 of 17    1. RESTORE IC-2 5 from the JPM IC Set Group.
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
: 2. DO NOT UNFREEZE the Simulator. 3. SELECT JPM Lesson File Folder.
: 1. RESTORE IC-25 from the JPM IC Set Group.
: 2. DO NOT UNFREEZE the Simulator.
: 3. SELECT JPM Lesson File Folder.
: 4. SELECT Lesson S-6, OTC.Lsn and EXECUTE the Lesson.
: 4. SELECT Lesson S-6, OTC.Lsn and EXECUTE the Lesson.
: 5. UNFREEZE the Simulator
: 5. UNFREEZE the Simulator
: 6. Make a Temporary STOREPOINT if more than one student will perform the JPM.
: 6. Make a Temporary STOREPOINT if more than one student will perform the JPM.
: 7. The lesson does NOT need to be stopped and re
: 7. The lesson does NOT need to be stopped and re-executed for subsequent students.
-executed for subsequent students.
: 8. UNFREEZE the Simulator when the student is ready.
: 8. UNFREEZE the Simulator when the student is ready.
NRC S-6 Page 16 of 17


JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-6    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.
-through cooling will be established.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal  
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.
- HR-3, Success Path 3  
NRC S-6
- Once-Through-Cooling, and verify SI flow IAW 2
-EOP-99, Figure 2.


JPM S-7 SIMULATOR Page 1 of 12      St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM EMERGENCY BORATION NRC S-7
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM EMERGENCY BORATION NRC S-7 Applicant Examiner JPM S-7 SIMULATOR Page 1 of 12


Applicant        Examiner JPM S-7 SIMULATOR Page 2 of 12    JOB PERFORMANCE MEASURE ST LUCIE NUCLEAR PLANT Task: Emergency Borate Faulted JPM?
JOB PERFORMANCE MEASURE ST LUCIE NUCLEAR PLANT Task: Emergency Borate Faulted JPM?           Yes Facility JPM #:
Ye s  Facility JPM #:
K/A: 004 A2.14 / 3.8 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency boration Duty Area(s):     N/A Task Information:     N/A Task Standard:
K/A: 004 A2.14 / 3.8 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Evaluation Location:                                                   Performance Level:
Emergency boration Duty Area(s):
Simulator     In Plant         Lab         Other                     Perform       Simulate       Discuss X                                                                     X
N/A Task Information:
N/A Task Standard:
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X       X    


==References:==
==References:==


Validation Time:
Validation Time:                     10 minutes                               Time Critical:     No Tools/Equipment/Procedures Needed:
10 minutes Time Critical:
2-EOP-01 Standard Post Trip Actions 2-AOP-02.2 Emergency Boration Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
No Tools/Equipment/Procedures Needed:
None Radiological Protection and RWP Requirements:
2-EOP-01 "Standard Post Trip Actions" 2-AOP-02.2 "Emergency Boration" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task. None Radiological Protection and RWP Requirements:
None JPM S-7 SIMULATOR Page 2 of 12
None  
 
JPM S-7 SIMULATOR Page 3 of 12 Read to Candidate Directions to candidate for In
-Plant or Control Room JPMs:
I will explain the initial conditions and state the task to be performed. All in
-plant or control room JPM steps, including any communications, shall be simulated for this JPM. Under no circumstances, unless directed by the examiner, are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.


Read to Candidate Directions to candidate for In-Plant or Control Room JPMs:
I will explain the initial conditions and state the task to be performed. All in-plant or control room JPM steps, including any communications, shall be simulated for this JPM. Under no circumstances, unless directed by the examiner, are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Directions to candidate for Simulator JPMs:
Directions to candidate for Simulator JPMs:
I will explain the initial conditions and state the task to be performed. All simulator JPM steps, including any communications, shall be performed for this JPM. You are to operate any plant equipment that is necessary for the completion of this JPM. The simulator will provide the cues as you perform this JPM.
I will explain the initial conditions and state the task to be performed. All simulator JPM steps, including any communications, shall be performed for this JPM. You are to operate any plant equipment that is necessary for the completion of this JPM. The simulator will provide the cues as you perform this JPM.
Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Initial Conditions:
Initial Conditions:
 
A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.
A reactor trip on Unit 2 has just occurred following a 45
-day run at 100% power.
Initiating Cues:
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.
JPM S-7 SIMULATOR Page 3 of 12


You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, 'Standard Post Trip Action s' Reactivity Control Safety Function.
START TIME: __________
 
JPM S-7 SIMULATOR Page 4 of 12  START TIME: __________
: 1. DETERMINE Reactivity Control acceptance criteria are met:
: 1. DETERMINE Reactivity Control acceptance criteria are met:
STEP 1 (1A): Reactor power is lowering STANDARD: VERIFY reactor power LOWERING using redundant Nuclear Instrumentation EXAMINER'S CUE:
STEP 1 (1A): Reactor power is lowering STANDARD:   VERIFY reactor power LOWERING using redundant Nuclear Instrumentation       _____ SAT EXAMINERS CUE:
EVALUATOR NOTE:
_____ UNSAT EVALUATOR NOTE:       During this scenario, an instructor should play the part of the Desk RCO and keep the annunciators acknowledged to allow the candidate to focus on the task at hand COMMENTS:
During this scenario, an instructor should play the part of the Desk RCO and keep the annunciators acknowledged to allow the candidate to focus on the task at hand COMMENTS:    
STEP 2 (1B): Verify Startup Rate is negative.
STANDARD:    VERIFY Startup Rate is NEGATIVE using redundant Nuclear Instrumentation indications                                                                  _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
STEP 3 (1C): VERIFY ALL CEAs are fully inserted..
STANDARD:    Using Core Mimic, ADS CRT, and CEDS Control Panel, DETERMINE that CEAs 37, and 45 are FULLY WITHDRAWN                                              _____ SAT EXAMINERS CUE:                                                                    _____ UNSAT COMMENTS:
JPM S-7 SIMULATOR Page 4 of 12


_____ SAT
STEP 4.1(1.C.1): Contingency Actions INITIATE Emergency Boration to achieve adequate SDM.
_____ SAT STANDARD:      ENTER 2-AOP-02.02, Emergency Boration
_____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE:          Applicant may elect to perform steps from memory. If so, when lineup is complete he should refer to the procedure to verify proper lineup.
COMMENTS:
2-AOP-02.02 EMERGENCY BORATION STEP 5 (4.2.1): VERIFY at least one charging pump is running with control switch in START
_____ SAT STANDARD:      OBSERVES at least one charging pump running with 44 gpm flow and switch position in RUN.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 6 (4.2.2): VERIFY the MAKEUP MODE SELECTOR switch is in MANUAL.
STANDARD:      OBSERVES Makeup Mode Selector Switch to MANUAL
_____ SAT EXAMINERS CUE:
COMMENTS:                                                                                _____ UNSAT STEP 7 (4.2.3): VERIFY V2525, BORON LOAD CONTROL VALVE is CLOSED.
STANDARD:      OBSERVES V2525 is CLOSED
_____ SAT EXAMINERS CUE:
COMMENTS:                                                                                _____ UNSAT JPM S-7 SIMULATOR Page 5 of 12


_____ UNSAT STEP 2 (1B): Verify Startup Rate is negative.
STEP 8 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
STANDARD: VERIFY Startup Rate is NEGATIVE using redundant Nuclear Instrumentation indications EXAMINER'S CUE:
A. Start at least one of the following:                             _____ SAT
COMMENTS:  
* 2A (BORIC ACID PUMP)
 
* 2B (BORIC ACID PUMP)                                    _____ UNSAT STANDARD:       POSITION 2A or 2B BAM Pump control switch to RUN EXAMINERS CUE:
_____ SAT
EVALUATOR NOTE:           Since the procedure doesnt specify which pump to run, either one is acceptable. Optimally, however, the candidate should start the pump associated with the Tech Spec designated BAM tank COMMENTS:
_____ UNSAT STEP 3 (1C): VERIFY ALL CEA's are fully inserted..
STEP 9 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
STANDARD: Using Core Mimic, ADS CRT, and CEDS Control Panel, DETERMINE that CEAs 37, and 45 are FULLY WITHDRAWN
B. IF 2A BORIC ACID PUMP was started, THEN CLOSE V2650, TANK 2A      _____ SAT RECIRC VALVE.
 
STANDARD:       POSITION V2650 control switch to CLOSE if 2A BORIC ACID PUMP was        _____ UNSAT started.
EXAMINER'S CUE:
EXAMINERS CUE:
COMMENTS: 
COMMENTS:
 
STEP 10 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
_____ SAT 
_____ SAT C. IF 2B BORIC ACID PUMP was started, THEN CLOSE V2651, TANK 2B RECIRC VALVE.
 
_____ UNSAT STANDARD:       POSITION V2651 control switch to CLOSE if 2B BORIC ACID PUMP was started EXAMINERS CUE:
_____ UNSAT
COMMENTS:
 
JPM S-7 SIMULATOR Page 6 of 12
JPM S-7 SIMULATOR Page 5 of 12    STEP 4.1(1.C.1): Contingency Actions                          INITIATE Emergency Boration to achieve adequate SDM
. STANDARD: ENTER 2-AOP-02.02, 'Emergency Boration' EXAMINER'S CUE:
EXAMINERS NOTE:     Applicant may elect to perform steps from memory. If so, when lineup is complete he should refer to the procedure to verify proper lineup.
COMMENTS:    
 
_____ SAT
_____ UNSAT 2-AOP-02.02 EMERGENCY BORATION STEP 5 (4.2.1): VERIFY at least one charging pump is running with control switch in START STANDARD: OBSERVES at least one charging pump running with 44 gpm flow and switch position in RUN
. EXAMINER'S CUE:
COMMENTS:
 
_____ SAT
_____ UNSAT STEP 6 (4.2.2): VERIFY the MAKEUP MODE SELECTOR switch is in MANUAL.
STANDARD: OBSERVES Makeup Mode Selector Switch to MANUAL  EXAMINER'S CUE:
COMMENTS:  
 
_____ SAT
_____ UNSAT STEP 7 (4.2.3): VERIFY V2525, BORON LOAD CONTROL VALVE is CLOSED.
STANDARD: OBSERVES V2525 is CLOSED  EXAMINER'S CUE:
COMMENTS:
 
_____ SAT
_____ UNSAT


JPM S-7 SIMULATOR Page 6 of 12    STEP 8 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE: A. Start at least one of the following:
STEP 11 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY       FAULTED BORATE:                                                               STEP D. OPEN V2514 EMERGENCY BORATE.
2A (BORIC ACID PUMP) 2B (BORIC ACID PUMP)
_____ SAT STANDARD:       POSITION V2514 control switch to OPEN and OBSERVE that valve does NOT open.
STANDARD: POSITION 2A or 2B BAM Pump control switch to RUN  EXAMINER'S CUE:
_____ UNSAT EXAMINERS CUE:
EVALUATOR NOTE:
EVALUATOR NOTE:
Since the procedure doesn't specify which pump to run, either one is acceptable. Optimally, however, the candidate should start the pump associated with the Tech Spec designated BAM tank COMMENTS:       _____ SAT
COMMENTS:
STEP 12 (4.1): Contingency Actions
_____ SAT STANDARD:      GO TO Section 4.2 Step 5 EXAMINERS CUE:                                                                  _____ UNSAT COMMENTS:
STEP 13 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following:
A. STOP the running BORIC ACID PUMPS                                    _____ SAT STANDARD:      POSITIONS the control switch for the 2A and 2B BORIC ACID PUMPS to the STOP position
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 14 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following: FAULTED STEP B. OPEN V2508 VALVE (BA Gravity Feed B)
STANDARD:      POSITION V2508 VALVE (BA Gravity Feed B) to OPEN and observes the      _____ SAT valve does not open.
EXAMINERS CUE:                                                                  _____ UNSAT COMMENTS:
JPM S-7 SIMULATOR Page 7 of 12


_____ UNSAT STEP 9 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:                                 B. IF 2A BORIC ACID PUMP was started, THEN CLOSE V2650, TANK 2A RECIRC VALVE
STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following      FAULTED STEP C. OPEN V2509 VALVE (BA Gravity Feed A)
. STANDARD: POSITION V2650 control switch to CLOSE if 2A BORIC ACID PUMP was started. EXAMINER'S CUE:
_____ SAT STANDARD:       POSITION V2509 VALVE (BA Gravity Feed A) to OPEN and observes the valve does not open.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following D. CLOSE V2501, VCT OUTLET VALVE.                                         _____ SAT STANDARD:       GO TO Section 4.2 Step 6 prior to closing V2501 EXAMINERS CUE:                                                                       _____ UNSAT EXAMINERS NOTE:          If applicant closes V2501 at this time the Charging pumps will trip within a few seconds due to low suction pressure. Applicant should NOT close V2501 at this time.
COMMENTS:
COMMENTS:
_____ SAT
STEP 16 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:
_____ UNSAT  STEP 10 (4.2.4)
A. OPEN V2504, REFUEL WATER TO CHARGING PUMPS                            _____ SAT STANDARD:       POSITION V2504 to OPEN
: PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
_____ UNSAT EXAMINERS CUE:
C. IF 2B BORIC ACID PUMP was started, THEN CLOSE V2651, TANK 2B          RECIRC VALVE.
COMMENTS:
STANDARD: POSITION V2651 control switch to CLOSE if 2B BORIC ACID PUMP was started  EXAMINER'S CUE:
JPM S-7 SIMULATOR Page 8 of 12
COMMENTS:  


_____ SAT 
STEP 17 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:
 
B. ENSURE V2501, VCT Outlet Valve Closed
_____ UNSAT
_____ SAT STANDARD:     POSITION V2501 to CLOSE.
 
EXAMINERS CUE:                                                                     _____ UNSAT COMMENTS:
JPM S-7 SIMULATOR Page 7 of 12  STEP 11 (4.2.4)
STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
: PERFORM the following to Emergency Borate using V2514, EMERGENCY      BORATE:                                   D. OPEN V2514 EMERGENCY BORATE
C. CLOSE V2508, BA GRAVITY FEED B                                          _____ SAT STANDARD:     POSITION V2508 to CLOSE or determines valve did not open from previous _____ UNSAT step.
. STANDARD: POSITION V2514 control switch to OPEN and OBSERVE that valve does NOT open. EXAMINER'S CUE:
EXAMINERS CUE:
EVALUATOR NOTE:
COMMENTS:
COMMENTS:    FAULTED  STEP
STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
_____ SAT 
D. CLOSE V2509 BA GRAVITY FEED A                                          _____ SAT STANDARD:     POSITION V2509 to CLOSE or determines valve did not open from previous _____ UNSAT step.
 
EXAMINERS CUE:
_____ UNSAT STEP 12 (4.1): Contingency Actions STANDARD: GO TO Section 4.2 Step 5 EXAMINER'S CUE:
COMMENTS:  
 
_____ SAT 
 
_____ UNSAT STEP 13 (4.2.5)
: IF unable to Emergency Borate using V2514, THEN PERFORM the following:
 
A. STOP the running BORIC ACID PUMPS STANDARD: POSITIONS the control switch for the 2A and 2B BORIC ACID PUMPS to the STOP position EXAMINER'S CUE:
COMMENTS:    
 
_____ SAT 
 
_____ UNSAT STEP 14 (4.2.5)
: IF unable to Emergency Borate using V2514, THEN PERFORM the following:
B. OPEN V2508 VALVE (BA Gravity Feed B)
STANDARD: POSITION V250 8 VALVE (BA Gravity Feed B) to OPEN and observes the valve does not open.
EXAMINER'S CUE:
COMMENTS:
COMMENTS:
FAULTED  STEP
JPM S-7 SIMULATOR Page 9 of 12
_____ SA T
_____ UNSAT


JPM S-7 SIMULATOR Page 8 of 12  STEP 15 (4.2.5)
STEP 20 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
: IF unable to Emergency Borate using V2514, THEN PERFORM the following C. OPEN V2509 VALVE (BA Gravity Feed A)
E. CLOSE V2514 EMERGENCY BORATE                                            _____ SAT STANDARD:     POSITION V2514 to CLOSE or determines valve did not open from previous _____ UNSAT step.
STANDARD: POSITION V250 9 VALVE (BA Gravity Feed A) to OPEN and observes the valve does not open. EXAMINER'S CUE:
EXAMINERS CUE:
COMMENTS:    FAULTED  STEP
_____ SAT 
 
_____ UNSAT STEP 15 (4.2.5)
: IF unable to Emergency Borate using V2514, THEN PERFORM the following
 
D. CLOSE V2501, VCT OUTLET VALVE.
STANDARD: GO TO Section 4.2 Step 6 prior to closing V2501 EXAMINER'S CUE:
EXAMINERS NOTE:
If applicant closes V2501 at this time the Charging pumps will trip within a few seconds due to low suction pressure. Applicant should NOT close V2501 at this time.
COMMENTS: 
 
_____ SAT 
 
_____ UNSAT STEP 1 6 (4.2.6):   IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
A. OPEN V2504, REFUEL WATER TO CHARGING PUMPS STANDARD: POSITION V2504 to OPEN EXAMINER'S CUE:
COMMENTS: 
 
CRITICAL STEP
_____ SAT
 
_____ UNSAT
 
JPM S-7 SIMULATOR Page 9 of 12    STEP 17  (4.2.6):
IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
B. ENSURE V2501, VCT Outlet Valve Closed STANDARD: POSITION V2501 to CLOSE.
EXAMINER'S CUE:
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP (done):  Notify US that task is complete.
_____ SAT 
STANDARD:     NOTIFY ANPS that Reactivity Control has been verified and is being met with contingencies, emergency boration is in progress via RWT to suction of _____ SAT charging pumps.
 
EXAMINERS CUE:           US ACKNOWLEDGES. THIS JPM IS COMPLETE.                   _____ UNSAT COMMENTS:
_____ UNSAT STEP 1 8  (4.2.6):  IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
END OF TASK STOP TIME: __________
 
JPM S-7 SIMULATOR Page 10 of 12
C. CLOSE V2508, BA GRAVITY FEED B
 
STANDARD: POSITION V2508 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT
_____ UNSAT STEP 1 8 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following
:
D. CLOSE V2509 BA GRAVITY FEED A STANDARD: POSITION V2509 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT 
 
_____ UNSAT
 
JPM S-7 SIMULATOR Page 10 of 12    STEP 20 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following
:
E. CLOSE V2514 EMERGENCY BORATE STANDARD: POSITION V2514 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS: 
 
_____ SAT
_____ UNSAT STEP (done):
Notify US that task is complete.
STANDARD: NOTIFY ANPS that Reactivity Control has been verified and is being met with contingencies
, emergency boration is in progress via RWT to suction of charging pumps.
EXAMINER'S CUE:
US ACKNOWLEDGES. THIS JPM IS COMPLETE.
COMMENTS:
 
END OF TASK
 
_____ SAT
_____ UNSAT STOP TIME: __________


S-7 Page 11 of 12  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
Initial Conditions:
A reactor trip on Unit 2 has just occurred following a 45
A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.
-day run at 100% power.
 
Initiating Cues:
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.
S-7 Page 11 of 12


You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, 'Standard Post Trip Actions' Reactivity Control Safety Function.
SIMULATOR JPM SETUP
S-7 Page 12 of 12  SIMULATOR JPM SETUP
: 1. RESTORE IC-1, 100% power, MOL.
: 1. RESTORE IC-1, 100% power, MOL.
: 2. UNFREEZE simulator.
: 2. UNFREEZE simulator.
: 3. SELECT CONFIGURE and CHANGE to JPM. 4. SELECT Lesson S-7 EB Lesson and START the lesson.
: 3. SELECT CONFIGURE and CHANGE to JPM.
: 5. TRIGGER the step to stick out 2CEAs and fail V2514, V2509 and V2508 fail closed
: 4. SELECT Lesson S-7 EB Lesson and START the lesson.
. 6. TRIGGER the step for reactor trip. The simulator will automatically freeze after 10 seconds.
: 5. TRIGGER the step to stick out 2CEAs and fail V2514, V2509 and V2508 fail closed.
: 6. TRIGGER the step for reactor trip. The simulator will automatically freeze after 10 seconds.
: 7. MAKE a SNAPSHOT if more than one student will be performing the JPM.
: 7. MAKE a SNAPSHOT if more than one student will be performing the JPM.
: 8. FREEZE simulator until student is ready. The audible alarms will be reinstated when the simulator is placed in RUN.
: 8. FREEZE simulator until student is ready. The audible alarms will be reinstated when the simulator is placed in RUN.
S-7 Page 12 of 12


NRC C-1 Unit 1 Control Room Page 1 of 6   
Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.
 
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PUMP ECCS AREA SUMPS TO RDT POST LOCA -
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PUMP ECCS AREA SUMPS TO RDT POST LOCA  
UNIT 1 NRC C-1 Unit 1 Control Room Applicant Examiner NRC C-1 Unit 1 Control Room Page 1 of 6
- UNIT 1 NRC C-1 Unit 1 Control Room
 
Applicant         Examiner         Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.


JOB PERFORMANCE MEASURE NRC C-1 Unit 1 Control Room Page 2 of 6  Task: 07006020, Pump ECCS Area Sumps to the Containment (Pump ECCS Area Sumps to the Reactor Drain Tank post LOCA  
JOB PERFORMANCE MEASURE Task:               07006020, Pump ECCS Area Sumps to the Containment (Pump ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1).
- Unit 1). Faulted JPM?
Faulted JPM?       No Facility JPM #:     0821089 K/A Rating(s):     A.04.02, (4.1) ECCS: Ability to manually operate and/or monitor in the control room:
No Facility JPM #:
Valves Duty Area(s):       N/A Task Information: N/A Task Standard:
0821089 K/A Rating(s):
A.0 4.0 2, (4.1) ECCS: Ability to manually operate and/or monitor in the control room: Valves Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when the US is notified that the ECCS Area Sumps are aligned to the Reactor Drain Tank.
This JPM is complete when the US is notified that the ECCS Area Sumps are aligned to the Reactor Drain Tank.
Evaluation Location:
Evaluation Location:                                               Performance Level:
Performance Level:
Simulator       In Plant       Lab       Other                     Perform       Simulate         Discuss X                                                                   X
Simulator In Plant Lab Other Perform Simulate Discuss   X       X  


==References:==
==References:==


1-EOP-03, "Loss of Coolant Accident
1-EOP-03, Loss of Coolant Accident Validation Time: 5 minutes                                         Time Critical:       No Tools/Equipment/Procedures Needed:
Validation Time:
1-EOP-03, Loss of Coolant Accident, (Step 40)
5 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
1-EOP-03, "Loss of Coolant Accident
", (Step 40)
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None Radiological Protection and RWP Requirements:
None  
None NRC C-1 Unit 1 Control Room Page 2 of 6


JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC C-1 Unit 1 Control Room Page 3 of 6    SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
The task you are to perform is:
Align ECCS Area Sumps to the Reactor Drain Tank post LOCA  
Align ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1.
- Unit 1. The performance level to be used for this JPM is Simulate This is not a time critical JPM.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 1,340: Line 944:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
 
Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.
Unit 1 has experienced a LOCA. RAS has occurred and all normal post
-trip power is available.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.
-EOP-03, "Loss of Coolant Accident."
NRC C-1 Unit 1 Control Room Page 3 of 6


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
  *Cues are to be used only if JPM performance is being simulated in the plant.
1-EOP-03, Loss of Coolant Accident Step 40 Align ECCS Sumps to RDT If RAS is present, Then ALIGN the ECCS sumps to the reactor drain tank by performing ALL of the following:
NRC C-1 Unit 1 Control Room Page 4 of 6  START TIME: __________
STEP 1 (40.A): PLACE the ECCS Area Leakage System control switch, located on CRAC       CRITICAL panel, to the RDT POSITION.                                             STEP STANDARD:       POSITION the ECCS Area Leakage System control switch to RDT.             _____ SAT EXAMINERS CUE:         ECCS Area Leakage System control switch indicates RDT                                                     _____ UNSAT COMMENTS:
1-EOP-03, "Loss of Coolant Accident" Step 4 0 Align ECCS Sumps to RDT I f RAS is present, Then ALIGN the ECCS sumps to the reactor drain tank by performing ALL of the following:
STEP 2 (40.B): VERIFY ALL of the following:
STEP 1 (40.A): PLACE the ECCS Area Leakage System control switch, located on CRAC panel, to the RDT POSITION. STANDARD: POSITION the ECCS Area Leakage System control switch to RDT. EXAMINER'S CUE:
ECCS Area Leakage System control switch indicates RDT COMMENTS:
 
CRITICAL STEP
_____ SAT  _____ UNSAT STEP 2 (40.B): VERIFY ALL of the following:
: 1. HCV-06-9, RDT Pump Suction, CLOSES
: 1. HCV-06-9, RDT Pump Suction, CLOSES
_____ SAT
: 2. HCV-06-7, Sump Pump to EDT, CLOSES
: 2. HCV-06-7, Sump Pump to EDT, CLOSES
: 3. HCV-06-8, Sump Pump to RDT, OPENS STANDARD: VERIFY HCV-06-9 and HCV-06-7 are CLOSED and HCV-06-8 is OPEN. EXAMINER'S CUE:
: 3. HCV-06-8, Sump Pump to RDT, OPENS                                     _____ UNSAT STANDARD:       VERIFY HCV-06-9 and HCV-06-7 are CLOSED and HCV-06-8 is OPEN.
HCV-06-9 indicates Green light ON, Red light OFF
EXAMINERS CUE:         HCV-06-9 indicates Green light ON, Red light OFF, HCV-06-7 indicates Green light ON, Red light OFF, HCV-06-8 indicates Green light OFF, Red light ON COMMENTS:
, HCV-06-7 indicates Green light ON, Red light OFF
          *Cues are to be used only if JPM performance is being simulated in the plant.
, HCV-06-8 indicates Green light OFF, Red light ON COMMENTS:    
NRC C-1 Unit 1 Control Room Page 4 of 6


_____ SAT  _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (40.C): PERFORM BOTH of the following on RTGB 105:                               CRITICAL STEP
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
  *Cues are to be used only if JPM performance is being simulated in the plant.
NRC C-1 Unit 1 Control Room Page 5 of 6  STEP 3 (40.C): PERFORM BOTH of the following on RTGB 105:
: 1. PLACE V6301, Rx Drn Tk Cntmt Isol, to RESET and then to OPEN.
: 1. PLACE V6301, Rx Drn Tk Cntmt Isol, to RESET and then to OPEN.
STANDARD: POSITION V6301 control switch to RESET, then to OPEN. EXAMINER'S CUE:
_____ SAT STANDARD:     POSITION V6301 control switch to RESET, then to OPEN.
V6301 indicates Green light OFF, Red light ON COMMENTS:     CRITICAL STEP
EXAMINERS CUE:       V6301 indicates Green light OFF, Red light ON             _____ UNSAT COMMENTS:
_____ SAT  _____ UNSAT STEP 4 (40.C): PERFORM BOTH of the following on RTGB 105:
STEP 4 (40.C): PERFORM BOTH of the following on RTGB 105:                               CRITICAL STEP
: 2. PLACE V6302, Rx Drain Tank Cntmt Isolation, to RESET and THEN to OPEN. STANDARD: POSITION V6302 control switch to RESET, then to OPEN. EXAMINER'S CUE:
: 2. PLACE V6302, Rx Drain Tank Cntmt Isolation, to RESET and THEN to OPEN.                                                       _____ SAT STANDARD:     POSITION V6302 control switch to RESET, then to OPEN.
V6302 indicates Green light OFF, Red light ON COMMENTS:   CRITICAL STEP  _____ SAT  _____ UNSAT STEP 5: VERIFY Annunciator Y
_____ UNSAT EXAMINERS CUE:       V6302 indicates Green light OFF, Red light ON COMMENTS:
-19, ECCS Pump Room Leakage Valves Misaligned, is LIT. STANDARD: VERIFY Annunciator Y
STEP 5:       VERIFY Annunciator Y-19, ECCS Pump Room Leakage Valves Misaligned, is LIT.
-19 is LIT. EXAMINER'S CUE:
STANDARD:     VERIFY Annunciator Y-19 is LIT.                                           _____ SAT EXAMINERS CUE:       Annunciator Y-19 is LIT
Annunciator Y
_____ UNSAT COMMENTS:
-19 is LIT COMMENTS:
STEP (done):   NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
_____ SAT  _____ UNSAT STEP (done):
STANDARD:     NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
_____ SAT EXAMINERS CUE:       Unit Supervisor ACKNOWLEDGES COMMENTS:                                                                               _____ UNSAT END OF TASK STOP TIME: __________
STANDARD: NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
          *Cues are to be used only if JPM performance is being simulated in the plant.
EXAMINER'S CUE
NRC C-1 Unit 1 Control Room Page 5 of 6
: Unit Supervisor ACKNOWLEDGES COMMENTS:     END OF TASK


_____ SAT  _____ UNSAT STOP TIME:  __________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
 
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET Page 6 of 6 NRC C-1    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 has experienced a LOCA. RAS has occurred and all normal post
Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.
-trip power is available.
INITIATING CUES:
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.
Page 6 of 6 NRC C-1


You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Applicant Examiner NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 1 of 9
-EOP-03, "Loss of Coolant Accident."


NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 1 of 9 
Job Performance Measure NRC P-1 Task Number:          03105050 and 07009055 Task Title:          Align AFW System in Response to Component Malfunction/Failure Faulted JPM:              Yes        No Facility JPM #        N/A K/A                  Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: K4.01 Water sources and priority of use 4.1 Duty Areas:          N/A Task Information:    N/A Task Standard:        N/A Evaluation Location                                          Performance Level Simulator              In Plant                Perform        Simulate        Discuss Lab Other


St. Lucie Nuclear Plant Operations Training  JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Applicant        Examiner Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 2 of 9 Task Number: 03105050 and 07009055 Task Title:
==References:==
Align AFW System in Response to Component Malfunction/Failure Faulted JPM:
* 1-AOP-09.02, Auxiliary Feedwater Validation Time:   15 Minutes                     Time Critical       Yes           No Tools/Equipment/Procedures Needed:
Yes  No Facility JPM #
* Standard Personal Protective Equipment
N/A K/A  Knowledge of AFW design feature(s) and/or interlock(s) which provide for the followi ng: K4.01 Water sources and priority of use 4.1 Duty Areas:
* Flashlight
N/A Task Information:
* Radio
N/A Task Standard:
* Watch Stander Key Ring for Locked Valves
N/A  Evaluation Location Performance Level Simulator  In Plant  Perform  Simulat e  Discuss  Lab    Other        References
* 1-AOP-09.02, Auxiliary Feedwater Specific Safety Concerns, PPE and Hazards associated with the task:
1-A OP-09.02, "Auxiliary Feedwater" Validation Time:
* None.
15 Minutes Time Critical Yes No Tools/Equipment/Procedures Needed:
Radiological Protection and RWP Requirements:
Standard Personal Protective Equipment Flashlight Radio Watch Stander Key Ring for Locked Valves 1-A OP-09.02, "Auxiliary Feedwater" Specific Safety Concerns, PPE and Hazards associated with the task:
* None NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 2 of 9
None. Radiological Protection and RWP Requirements:
 
None Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 3 of 9 Specific Directions:
Job Performance Measure NRC P-1 Specific Directions:
The Task you are to perform is
* The Task you are to perform is:     Align Unit 2 CST to Supply 1C AFW Pump
: Align Unit 2 CST to Supply 1C AFW Pump The performance level to be used for this JPM is Perform or Simulate. (Circle the performance level being used for this implementation of the JPM.)
* The performance level to be used for this JPM is Perform or Simulate.
This Is Not a time critical JPM.
(Circle the performance level being used for this implementation of the JPM.)
During the performance of the task, I will tell you which steps to simulate or discuss.
* This Is Not a time critical JPM.
I will provide you with the appropriate cues for steps that are simulated or discussed.
* During the performance of the task, I will tell you which steps to simulate or discuss.
You may use any approved reference materials normally available in the execution of this task, including logs
* I will provide you with the appropriate cues for steps that are simulated or discussed.
. Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
* You may use any approved reference materials normally available in the execution of this task, including logs.
* Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Initial Conditions:
Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.4.
-A OP-09.02, "Auxiliary Feedwater
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 3 of 9
," Attachment 5 , Steps 1.A through 1.D, and 1.F.1 through 1.
F.4.  


Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 4 of 9 PERFORMANCE CHECKLIST Start Time:
Job Performance Measure NRC P-1 PERFORMANCE CHECKLIST Start Time:
1-A OP-09.02, "Auxiliary Feedwater
1-AOP-09.02, Auxiliary Feedwater, Attachment 5 Notify Unit 2 Control Room.
," Attachment 5 STEP 1(1.A). Notify Unit 2 Control Room.
STEP 1(1.A).
NOTIFY Unit 2 Control Room that Unit 2 CST will be Standard:
ALIGNED to supply the 1C AFW Pump.                              _____ Sat
_____ Unsat Examiners    Unit 2 Control Room ACKNOWLEDGES Cue:
NOTE Comments:
In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (196) must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.
CAUTION
* During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units.
* In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
* Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech.
Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Attachment 5 Step 1.C.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 4 of 9


_____ Sat
Job Performance Measure NRC P-1 STEP 2 (1.B). ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
_____ Unsat Standard: NOTIFY Unit 2 Control Room that Unit 2 CST will be ALIGNED to supply the 1C AFW Pump.
Standard:     ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.          _____ Sat All Unit 1 Auxiliary Feedwater pumps are OFF.                 _____ Unsat Examiners Cue:
Examiner's Cue: Unit 2 Control Room ACKNOWLEDGES Comments: NOTE In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (19'6") must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.
Comments:
CAUTION  During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units. In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
At the Unit 2 CST, PERFORM one of the following to            Critical Step STEP 3 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps:
Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech. Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Attachment 5 Step 1.C.
: 1. IF the Unit 2 CST level is greater than 40 feet, THEN      _____ Sat OPEN V12803, CST INLET TO / FROM UNIT 1 ISOL.
(CST/23/N-6/E-21)                                              _____ Unsat Standard:    UNLOCK and POSITION V12803 to OPEN (counterclockwise) and then RELOCK.
Examiners    V12803 is fully counter clockwise and LOCKED.
Cue:
Initiating Cue gives Unit 2 CST level as 43 Feet. Valve Comments:
does not have to be re-locked to meet the Critical Step.
At the Unit 2 CST, PERFORM one of the following to STEP 4 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps:                                                        _____ Sat
: 2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following:                            _____ Unsat
* OPEN V12801, 2C AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
* OPEN V12802, 2A/2B AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
Determined to be NA, due to initiating cue.
Standard:
Examiners    Initiating Cue gives Unit 2 CST level as 43 Feet.
Cue:
Comments:
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 5 of 9


Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 5 of 9  STEP 2 (1.B). ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
Job Performance Measure NRC P-1 OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL.                Critical Step STEP 5. (1.D)
_____ Sat
(CST/24/N-685/E-1191)
_____ Unsat Standard: ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
Standard:    UNLOCK and POSITION V12805 fully counter                  _____ Sat clockwise.
Examiner's Cue: All Unit 1 Auxiliary Feedwater pumps are OFF.
_____ Unsat V12805 is Fully counter clockwise Examiners Cue:
Comments:   STEP 3 (1.C) At the Unit 2 CST, PERFORM one of the following to establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: 1. IF the Unit 2 CST level is greater than 40 feet, THEN OPEN V12803, CST INLET TO / FROM UNIT 1 ISOL.
Comments:    Valve does not have to be re-locked to meet the Critical Step.
(CST/23/N-6/E-21) Critical Step
To supply 1C AFW pump, PERFORM the following:            Critical Step STEP 6. (1.F)
(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N-9/E-19)
_____ Sat Standard:    UNLOCK and POSITION V12506 fully clockwise.              _____ Unsat Examiners    V12506 is fully clockwise.
Cue:
Comments:     Valve does not have to be re-locked to meet the Critical Step.
To supply 1C AFW pump, PERFORM the following:             Critical Step STEP 7 (1.F).
(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N-13/E-24)
_____ Sat Standard:    UNLOCK and POSITION V12175 fully counter clockwise.                                                _____ Unsat Examiners    V12175 is fully counter clockwise.
Cue:
Comments:    Valve does not have to be re-locked to meet the Critical Step.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 6 of 9


_____ Sat
Job Performance Measure NRC P-1 To supply 1C AFW pump, PERFORM the following:
_____ Unsat Standard: UNLOCK and POSITION V12803 t o OPEN (counterclockwise) and then RELOCK. Examiner's Cue: V12803 is fully counter clockwise and LOCKED.
STEP 8 (1.F).
Comments: Initiating Cue gives Unit 2 CST level as 43 Feet. Valve does not have to be re
_____ Sat (3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, instrument isolation valve is OPEN. (TRSL/27/N-T3/W-
-locked to meet the Critical Step.
_____ Unsat TA)
STEP 4 (1.C) At the Unit 2 CST, PERFORM one of the following to establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: 2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following:
Standard:     POSITION Pl-12-18C instrument isolation to fully counter clockwise.
OPEN V12801, 2C AFW PUMP SUCT TO / FROM UNIT 1 ISOL.
Examiners    PI-12-18C instrument isolation valve is fully counter Cue:         clockwise.
(CST/23/N-14/E-20) OPEN V12802, 2A/2B AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
_____ Sat
_____ Unsat Standard: Determined to be NA, due to initiating cue.
Examiner's Cue: Initiating Cue gives Unit 2 CST level as 43 Feet.
Comments:
Comments:
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 6 of 9 STEP 5. (1.D) OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL.
To supply 1C AFW pump, PERFORM the following:
(CST/24/N-685/E-1191) Critical Step
STEP 9 (1.F).
(4) VERIFY greater than 3 psig suction pressure on PI                                                                          _____ Sat 18C, 1C AFW PUMP SUCTION PRESSURE.
_____ Unsat Standard:    VERIFY GREATER THAN 3 psig on PI-12-18C.
Examiners    PI-12-18C INDICATES 15 psig.
Cue:
Comments:
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 7 of 9


_____ Sat
Job Performance Measure NRC P-1 STEP 10 (1.F). IF feeding S/Gs with 1C Auxiliary Feedwater Pump, THEN PERFORM the following                                     Critical Step (5) CLOSE V09399, 1C AFW PUMP RECIRC ISOL                      _____ Sat (TRSL/23/N-T3/W-TA)
_____ Unsat Standard: UNLOCK and POSITION V12805 fully counter clockwise. Examiner's Cue: V12805 is Fully counter clockwise Comments: Valve does not have to be re
_____ Unsat Standard:     POSITION V09399 to the fully clockwise position.
-locked to meet the Critical Step. STEP 6. (1.F) To supply 1C AFW pump, PERFORM the following:
Examiners    V09399 is fully clockwise.
(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N
Cue:
-9/E-19)  Critical Step
 
_____ Sat
_____ Uns at Standard: UNLOCK and POSITION V12506 fully clockwise
. Examiner's Cue: V12506 is fully clockwise.
Comments: Valve does not have to be re
-locked to meet the Critical Step. STEP 7 (1.F). To supply 1C AFW pump, PERFORM the following:
(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N
-13/E-24) Critical Step
 
_____ Sat
_____ Unsat Standard: UNLOCK and POSITION V12175 fully counter clockwise. Examiner's Cue:  V12175 is fully counter clockwise
. Comments: Valve does not have to be re
-locked to meet the Critical Step.
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 7 of 9 STEP 8 (1.F). To supply 1C AFW pump, PERFORM the following:
(3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, instrument isolation valve is OPEN. (TRSL/27/N
-T3/W-TA)   _____ Sat
_____ Un sat Standard: POSITION Pl-12-18C instrument isolation to fully counter clockwise
. Examiner's Cue: PI-12-18C instrument isolation valve is fully counter clockwise.
Comments:  STEP 9 (1.F). To supply 1C AFW pump, PERFORM the following:
 
(4) VERIFY greater than 3 psig suction pressure on PI 18C, 1C AFW PUMP SUCTION PRESSURE.
 
_____ Sat
_____ Unsat Standard: VERIFY GREATER THAN 3 psig on PI 18C. Examiner's Cue: PI-12-18C INDICATES 15 psig.
Comments:
Comments:
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 8 of 9  STEP 10 (1.F).
STEP 6.        Notify Unit 1 Unit Supervisor that the task is complete.
IF feeding S/Gs with 1C Auxiliary Feedwater Pump, THEN PERFORM the following (5) CLOSE V09399, 1C AFW PUMP RECIRC ISOL (TRSL/23/N
_____ Sat Standard:      NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is lined up to take a suction on the Unit 2 CST IAW 1-AOP-        _____ Unsat 09.02, Auxiliary Feedwater.
-T3/W-TA)  Critical Step
Examiners    Unit 1 Unit Supervisor ACKNOWLEDGES.
_____ Sat
Cue:
_____ Unsat Standard: POSITION V09399 to the fully clockwise position. Examiner's Cue: V09399 is fully clockwise.
Comments:     If candidate continues onward, then inform him This JPM is complete.
Comments:
END OF TASK Stop Time:
STEP 6. Notify Unit 1 Unit Supervisor that the task is complete.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 8 of 9


_____ Sat
Job Performance Measure NRC P-1 CANDIDATE CUE SHEET Initial Conditions:
_____ Unsat Standard: NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is lined up to take a suction on the Unit 2 CST IAW 1
-A OP-09.02, "Auxiliary Feedwater".
Examiner's Cue: Unit 1 Unit Supervisor ACKNOWLEDGES.
Comments: If candidate continues onward, then inform him "This JPM is complete."
END OF TASK St op Time:
Job Performance Measure NRC P-1 NRC P-1 Page 9 of 9      CANDIDATE CUE SHEET Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, "Auxiliary Feedwater," Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.5.
: 5.
NRC P-1 Page 9 of 9
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11   


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION - UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-2 Applicant Examiner NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11
- UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-2


Applicant        Examiner NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11   
Task:               Hydrogen Purge System Operation - Unit 1 Faulted JPM?         No Facility JPM #:     0821098 K/A Rating(s): 028 A2.02 / 3.5 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: LOCA condition and related concern over hydrogen Duty Area(s):       N/A Task Information: N/A Task Standard:
 
Task: Hydrogen Purge System Operation  
- Unit 1 Faulted JPM?
No Facility JPM #:
0821098 K/A Rating(s):
028 A2.02 / 3.5 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations:
LOCA condition and related concern over hydrogen Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
Evaluation Location:
Evaluation Location:                                                   Performance Level:
Performance Level:
Simulator       In Plant       Lab       Other                       Perform     Simulate           Discuss X                                                                     X
Simulator In Plant Lab Other Perform Simulate Discuss   X       X  


==References:==
==References:==
* 1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time: 20 minutes                                            Time Critical:        No Tools/Equipment/Procedures Needed:
* 1-EOP-99, Appendix N, Hydrogen Purge System Operation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
RWP Required NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11


1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
20 minutes Time Critical:
The task you are to perform is:       Hydrogen Purge System Operation - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
No  Tools/Equipment/Procedures Needed:
1-EOP-99, Appendix N, Hydrogen Purge System Operation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None  Radiological Protection and RWP Requirements:
RWP Required
 
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11    SPECIFIC DIRECTIONS:
The task you are to perform is:
Hydrogen Purge System Operation  
- Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 1,543: Line 1,123:
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.
-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE
NOTE TO EXAMINER:
-7B. NOTE TO EXAMINER:
Initiating cue identifies student as SNPO. No key will be required due to cues provided in steps 9 and 10.
Initiating cue identifies student as SNPO. No key will be required due to cues provided in steps 9 and 10.    
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11  START TIME: __________
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
Operate the Containment Hydrogen Purge System as follows:
Operate the Containment Hydrogen Purge System as follows:
STEP 1 (1): ENSURE ONE RAB Main Exhaust Fan, HVE
STEP 1 (1):   ENSURE ONE RAB Main Exhaust Fan, HVE-10A (B), is RUNNING, if available.
-10A (B), is RUNNING, if available.
_____ SAT STANDARD:      ENSURE HVE-10A or HVE-10B is RUNNING
_____ UNSAT EXAMINERS CUE:          HVE-10B is RUNNING (from initiating cue)
COMMENTS:
STEP 2 (2) :  VERIFY the following valves are LOCKED CLOSED:
V25015, Pen.58 to HVE-7A / 7B Gate - Filter Bypass                    _____ SAT STANDARD:      VERIFY V25015 is LOCKED CLOSED                                    _____ UNSAT EXAMINERS CUE:          V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
STEP 3 (2) :  VERIFY the following valves are LOCKED CLOSED:
_____ SAT V-25-16, Pen. 58 to HVE-7A / 7B Gate - Filter Bypass STANDARD:      VERIFY V-25-16 is LOCKED CLOSED                                  _____ UNSAT EXAMINERS CUE:          V-25-16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11


STANDARD: ENSURE HVE-10A or HVE
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (3) :   CLOSE FCV-25-9, Pen-57 to HVE-7 Intake                                 CRITICAL STEP STANDARD:       DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED.                                                       _____ SAT EXAMINERS CUE:         FCV-25-9 MECHANICAL POINTER INDICATES 0.
-10B is RUNNING EXAMINER'S CUE:
Light indication is GREEN                               _____ UNSAT EVALUATORS NOTE: The pushbutton for FCV-25-9 is located inside Junction Box B1117 on the column south west of FCV-25-9.
HVE-10B is RUNNING (from initiating cue)
The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENT S:          _____ SAT  _____ UNSAT STEP 2 (2) : VERIFY the following valves are LOCKED CLOSED:
COMMENTS:
V25015, Pen.58 to HVE
STEP 5 (4) :   UNLOCK and OPEN the following valves:                                   CRITICAL STEP V25013, Pen. 57 to HVE-7A / 7B Gate Suction
-7A / 7B Gate
_____ SAT STANDARD:       UNLOCK and OPEN V25013
- Filter Bypass STANDARD: VERIFY V25015 is LOCKED CLOSED EXAMINER'S CUE:
_____ UNSAT EXAMINERS CUE:         V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11
EVALUATOR'S NOTE:
Penetration 58 is between filter train and containment wall COMMENTS:
_____ SAT 
 
_____ UNSAT STEP 3 (2) : VERIFY the following valves are LOCKED CLOSED:
 
V-25-16, Pen. 58 to HVE
-7A / 7B Gate
- Filter Bypass  STANDARD: VERIFY V-25-16 is LOCKED CLOSED EXAMINER'S CUE:      V 16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATOR'S NOTE:
Penetration 58 is between filter train and containment wall COMMENTS:
_____ SAT  _____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11  STEP 4 (3) : CLOSE FCV-25-9, Pen-57 to HVE-7 Intake   STANDARD: DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED. EXAMINER'S CUE:
FCV-25-9 MECHANICAL POINTER INDICATES '0'
. Light indication is GREEN EVALUATOR'S NOTE: The pushbutton for FCV 9 is located inside             Junction Box B1117 on the column south west of FCV-25-9. The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENTS:    
 
CRITICAL STEP
_____ SAT  _____ UNSAT STEP 5 (4) : UNLOCK and OPEN the following valves:
V25013, Pen. 57 to HVE
-7A / 7B Gate Suction STANDARD: UNLOCK and OPEN V25013   EXAMINER'S CUE:
V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED   EVALUATOR'S NOTE:
Penetration 57 is between filter train and containment wall COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11   STEP 6  (4) : UNLOCK and OPEN the following valves:
V-25-14, Pen. 57 to HVE
-7A / 7B Gate Suction STANDARD: UNLOCK and OPEN V-25-14  EXAMINER'S CUE:      V 14 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
Penetration 57 is between filter train and containment wall  COMMENTS:   
 
CRITICAL STEP  _____ SAT  _____ UNSAT STEP 7 (5): VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.
STANDARD: VERIFY V-25-18 is CLOSED  EXAMINER'S CUE:      V 18 handwheel ROTATED CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
V-25-18 is located next to V 17 in overhead COMMENTS: 


_____ SAT   _____ UNSAT STEP 8 (6): OPEN V-25-17, "HVE-7A/7B Disch. Gate to Vent Stack.STANDARD: POSITION V-25-17 to OPEN EXAMINER'S CUE:     V 17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4) :  UNLOCK and OPEN the following valves:                                    CRITICAL STEP V-25-14, Pen. 57 to HVE-7A / 7B Gate Suction
Valve is above HVE
_____ SAT STANDARD:      UNLOCK and OPEN V-25-14 EXAMINERS CUE:        V-25-14 handwheel UNLOCKED and ROTATED                  _____ UNSAT COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
-6B COMMENTS:
STEP 7 (5):    VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.
CRITICAL STEP
STANDARD:      VERIFY V-25-18 is CLOSED                                                _____ SAT EXAMINERS CUE:        V-25-18 handwheel ROTATED CLOCKWISE until hard stop REACHED                                          _____ UNSAT EVALUATORS NOTE: V-25-18 is located next to V-25-17 in overhead COMMENTS:
_____ SAT  _____ UNSAT
STEP 8 (6):     OPEN V-25-17, HVE-7A/7B Disch. Gate to Vent Stack.                   CRITICAL STEP STANDARD:       POSITION V-25-17 to OPEN
_____ SAT EXAMINERS CUE:         V-25-17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED
_____ UNSAT EVALUATORS NOTE: Valve is above HVE-6B COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11  STEP 9 (7): UNLOCK and OPEN the following valves:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (7):   UNLOCK and OPEN the following valves:                                       CRITICAL STEP (location V25011, Makeup Air Before Pen. 56 Gate (19.5 Elev.)                          of valve)
V25011, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:       UNLOCK and OPEN V25011                                                     _____ SAT EXAMINERS CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other               _____ UNSAT operator.
STANDARD: UNLOCK and OPEN V25011   EXAMINER'S CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other operator. EVALUATOR'S NOTE:
EVALUATORS NOTE: Question the Applicant where the valve is located.
Question the Applicant where the valve is located.
(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
(Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
COMMENTS:
CRITICAL STEP (location of valve)  _____ SAT  _____ UNSAT STEP 1 0 (7) : UNLOCK and OPEN the following valves:
STEP 10 (7) : UNLOCK and OPEN the following valves:                                       CRITICAL STEP (location V-25-12, Makeup Air Before Pen. 56 Gate (19.5 Elev.)                          of valve)
V-25-12, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:       UNLOCK and OPEN V-25-12                                                   _____ SAT EXAMINERS CUE:         When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPENED by an               _____ UNSAT other operator.
STANDARD: UNLOCK and OPEN V-25-12 EXAMINER'S CUE:
EVALUATORS NOTE: Question the Applicant where the valve is located.
When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPEN ED by an other operator.
(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
EVALUATOR'S NOTE:
Question the Applicant where the valve is located. (Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
COMMENTS:
CRITICAL STEP (locatio n of valve)  _____ SAT  _____ UNSAT
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11         STEP 1 1 (8): ENSURE FCV 10, HVS-4 Plenum to HVE
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE                                                  CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed            STEP and approximately 10% open.
-7 Intake, is THROTTLED OPEN.
_____ SAT STEP 11 (8): ENSURE FCV-25-10, HVS-4 Plenum to HVE-7 Intake, is THROTTLED OPEN.                                                                           _____ UNSAT STANDARD:     POSITION FCV-25-10 to THROTTLED OPEN.
STANDARD: POSITION FCV-25-10 to THROTTLED OPEN
EXAMINERS CUE:         FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
. EXAMINER'S CUE:
EVALUATORS NOTE: Control panel is located on column near north end of the 6A filter train COMMENTS:
FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
STEP 12 (9): START ONE Hydrogen Purge Fan.                                                   CRITICAL STEP HVE-7A OR                                                                           _____ SAT HVE-7B STANDARD:     DEPRESS START pushbutton for HVE-7B, (from initiating cue)                     _____ UNSAT EXAMINERS CUE:         HVE-7B RED light ON, GREEN light OFF.
EVALUATOR'S NOTE:
EVALUATORS NOTE: Control panel is located on column next to fans COMMENTS:
Control panel is located on column near north end of the 6A filter train COMMENTS:     CRITICAL STEP _____ SAT  _____ UNSAT STEP 1 2 (9): START ONE Hydrogen Purge Fan.
STEP 13 (10): THROTTLE OPEN FCV-25-9, Pen-57 to HVE-7 Intake, to obtain between               CRITICAL 90 and 100 CFM on FR-25-1, Local Flow Recorder                                 STEP STANDARD:     DEPRESS (and hold) THE OPEN PUSHBUTTON until the desired                       _____ SAT flowrate of between 90 and 100cfm is obtained.
HVE-7A OR HVE-7B STANDARD: DEPRESS START pushbutton for HVE-7B, (from initiating cue)
EXAMINERS CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1                           _____ UNSAT INDICATES approximately 95cfm COMMENTS:
EXAMINER'S CUE:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11
HVE-7 B  RED light ON, GREEN light OFF
.
EVALUATOR'S NOTE:
Control panel is located on column next to fans COMMENTS:       CRITICAL STEP _____ SAT  _____ UNSAT STEP 1 3 (10): THROTTLE OPEN FCV 9, Pen-57 to H VE-7 Intake, to obtain between 90 and 100 CFM on FR 1, Local Flow Recorder STANDARD: DEPRESS (and hold) THE OPEN PUSHBUTTON until the desired flowrate of between 90 and 100cfm is obtained.
EXAMINER'S CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 INDICATES approximately 95cfm COMMENTS:     CRITICAL STEP  _____ SAT
_____ UNSAT NOTE Hydrogen Purge Fans will not operate if FCV 10 position is between full closed and approximately 10% open.


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11    
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE
* High charcoal temperatures are postulated to occur only as a result of restricted air        _____ SAT flows rates less than 55 cfm.
* Iodine desorption occurs at approximately 300&deg;F and charcoal ignition at                      _____ UNSAT approximately 640&deg;F STEP 14 (11): MONITOR the following on TR-25-2 in the Control Room
* Channel 1, Before Hydrogen Purge Charcoal Absorber (TE-25-18)
* Channel 2, Hydrogen Purge Charcoal Absorber (TE-25-19)
* Channel 3, Hydrogen Purge Charcoal Absorber (TE-25-20)
* Channel 4, After Hydrogen Purge Charcoal Absorber (TE-25-21)
STANDARD:        REQUEST Control Room Monitor the above points on TR-25-2 EXAMINERS CUE:          Control Room is MONITORING Channels 1, 2, 3 & 4.
COMMENTS:
NOTE                                                  CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed and            STEP approximately 10% open.
_____ SAT STEP 15 (12):    ADJUST FCV-25-10 to maintain charcoal absorber temperature below alarm set point on TR-25-2 (RTGB-106).                                          _____ UNSAT STANDARD:        OPEN FCV-25-10 as necessary to MAINTAIN temperature <190&deg;F EXAMINERS CUE:          Control Room informs you that TR-25-2 is Indicating 190&deg;F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190&deg;F.
If asked, Alarm Setpoint is 190&deg;F.
EXAMINERS CUE:          Open Pushbutton DEPRESSED momentarily, Control Informs you that TR-25-2 is INDICATING 175&deg;F and Stable EVALUATORS NOTE: Located on the east side of the filter train, Indications by local TE: TI-25-HVE-7-1 and TI-25-HVE-7-2 COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11


STEP 1 4 (11): MONITOR the following on TR 2 in the Control Room Channel 1, Before Hydrogen Purge Charcoal Absorber (TE 18)  Channel 2, Hydrogen Purge Charcoal Absorber (TE 19)  Channel 3, Hydrogen Purge Charcoal Absorber (TE 20)  Channel 4, After Hydrogen Purge Charcoal Absorber (TE 21)  STANDARD: REQUEST Control Room Monitor the above points on TR-25-2  EXAMINER'S CUE:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16 (13): Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation.
Control Room is MONITORING Channels 1, 2, 3 & 4
_____ SAT STANDARD:     REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINERS CUE:       Control Room Informs you that they will Monitor Plant     _____ UNSAT Vent Radiation levels, and containment hydrogen concentration.
. COMMENTS: 
COMMENTS:
 
END OF TASK STOP TIME: __________
_____ SAT
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11
_____ UNSAT
 
STEP 1 5 (12): ADJUST FCV 10 to maintain charcoal absorber temperature below alarm set point on TR 2 (RTGB-106). STANDARD: OPEN FCV-25-10 as necessary to MAINTAIN temperature <190 F  EXAMINER'S CUE:
Control Room informs you that TR 2 is Indicating 190F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190 F. If asked, Alarm Setpoint is 190 F. EXAMINER'S CUE:
Open Pushbutton DEPRESSED momentarily, Control Informs you that TR 2 is INDICATING 175F and Stable  EVALUATOR'S NOTE:
Located on the east side of the filter train, Indications by local TE: TI HVE-7-1 and TI-25-HVE-7-2  COMMENTS:     
 
CRITICAL STEP  _____ SAT
_____ UNSAT NOTE Hydrogen Purge Fans will not operate if FCV 10 position is between full closed and approximately 10% open.
NOTE High charcoal temperatures are postulated to occur only as a result of restricted air flows rates less than 55 cf
: m. Iodine desorption occurs at approximately 300&deg;F and charcoal ignition at approximately 640&deg;F
 
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11  STEP 16 (1 3): Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation
. STANDARD: REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINER'S CUE:     Control Room Informs you that they will Monitor Plant Vent Radiation levels, and containment hydrogen concentration.
COMMENTS:       END OF TASK
_____ SAT
_____ UNSAT STOP TIME: __________


JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC P-2 Page 11 of 11    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.
-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE
NRC P-2 Page 11 of 11
-7B.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 1 of 9   


St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DROPPED OR MISALIGNED CEA ABNORMAL OPERATIONS , PERFORM MANIPULATIONS OUTSIDE THE CONTROL ROOM  
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DROPPED OR MISALIGNED CEA ABNORMAL OPERATIONS, PERFORM MANIPULATIONS OUTSIDE THE CONTROL ROOM
- UNIT 1 NRC P-3 Cable Spreading Room Unit 1
                        - UNIT 1 NRC P-3 Cable Spreading Room Unit 1 Applicant Examiner NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 1 of 9


Applicant        Examiner JOB PERFORMANCE MEASURE NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 2 of 9  Task: CEA AOP, Perform Manipulations Outside the Control Room  
JOB PERFORMANCE MEASURE Task:               CEA AOP, Perform Manipulations Outside the Control Room - Unit 1 Faulted JPM?         Yes Facility JPM #:     0821111 K/A:     001 K6.11 / 2.9 Knowledge of the effect of a loss or malfunction on the following CRDS components: Location and operation of CRDS fault detection (trouble alarms) and reset system, including rod control annunciator.
- Unit 1 Faulted JPM?
Duty Area(s):       N/A Task Information: N/A Task Standard:
Yes Facility JPM #:
JPM is complete when IC/OPS notified CEA 62 power has been restored.
0821111 K/A: 001 K6.11 / 2.9 Knowledge of the effect of a loss or malfunction on the following CRDS components:
Evaluation Location:                                                   Performance Level:
Location and operation of CRDS fault detection (trouble alarms) and reset system, including rod control annunciator. Duty Area(s):
Simulator       In Plant     Lab         Other                     Perform         Simulate   Discuss X                                                                   X
N/A Task Information:
N/A Task Standard:
JPM is complete when IC/OPS notified CEA 62 power has been restored
. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss   X       X  


==References:==
==References:==


1-AOP-66.01 "Dropped or Misaligned CEA Abnormal Operations
1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations.
". Validation Time:
Validation Time: 20 minutes                                           Time Critical:       No Tools/Equipment/Procedures Needed:
20 minutes Time Critical:
1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations, Attachment 5.
No Tools/Equipment/Procedures Needed:
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
1-AOP-66.01 "Dropped or Misaligned CEA Abnormal Operations", Attachment
None Radiological Protection and RWP Requirements:
: 5. Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 2 of 9
None Radiological Protection and RWP Requirements:
 
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 3 of 9   SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
The task you are to perform is:
CEA ONOP, Perform Manipulations Outside the Control Room  
CEA ONOP, Perform Manipulations Outside the Control Room - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
- Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
I will provide you with the appropriate cues for steps that are simulated or discussed.
Line 1,703: Line 1,236:
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life. The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Unit 1 was at 100% power late in core life.
 
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations", Attachment 5, Section 3.0, "Troubleshooting Actions for Inoperable CEA(S)".
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 3 of 9


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
  *Cues are to be used only if JPM performance is being simulated in the plant.
ATTACHMENT 5 Section 3.0 STEP 1: (3.0.1) INSPECT affected CEDM power supplies as follows:                         FAULTED (CPP cabinets, cable spreading room)                                     STEP A. VERIFY red CIRCUIT BREAKER CLOSED light is ON.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 4 of 9  START TIME: __________
_____ SAT STANDARD:       VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.
ATTACHMENT 5 Section 3.0   STEP 1: (3.0.1) INSPECT affected CEDM power supplies as follows
_____ UNSAT EXAMINERS CUE: RED CIRCUIT BREAKER CLOSED LIGHT IS EXTINGUISHED, NOT ILLUMINATED.
: (CPP cabinets, cable spreading room)
COMMENTS:
A. VERIFY red CIRCUIT BREAKER CLOSED light is ON.
STEP 2: (3.0.1) INSPECT affected CEDM power supplies as follows:                         CRITICAL (CPP cabinets, cable spreading room)                                     STEP B. IF red CIRCUIT BREAKER CLOSED light is OFF AND affected           _____ SAT CEA has been dropped, THEN OPEN and CLOSE affected CEA CIRCUIT BREAKER. (behind the affected CEAs control panel door)                                                           _____ UNSAT STANDARD:       OPEN CEA 62s control panel door, and POSITION the circuit breaker to OFF, then POSITION the breaker to ON.
STANDARD: VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED
VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.
. EXAMINER'S CUE:
EXAMINERS CUE: When positioned, the breaker is OFF.
RED "CIRCUIT BREAKER CLOSED" LIGHT IS EXTINGUISHED, NOT ILLUMINATED
When positioned, the breaker is ON.
. COMMENTS:
If asked, the red CIRCUIT BREAKER CLOSED light is ILLUMINATED.
FAULTED STEP  _____ SAT  _____ UNSAT STEP 2: (3.0.1) INSPECT affected CEDM power supplies as follows
COMMENTS:
: (CPP cabinets, cable spreading room)
          *Cues are to be used only if JPM performance is being simulated in the plant.
B. IF red CIRCUIT BREAKER CLOSED light is OFF AND affected CEA has been dropped, THEN OPEN and CLOSE affected CEA CIRCUIT BREAKER
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 4 of 9
. (behind the affected CEA's control panel door)   STANDARD: OPEN CEA 62's control panel door, and POSITION the circuit breaker to OFF, then POSITION the breaker to ON. VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED
.
EXAMINER'S CUE:
When positioned, the breaker is OFF
. When positioned, the breaker is ON.
If asked, the red CIRCUIT BREAKER CLOSED light is ILLUMINATED
. COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (3.0.1) INSPECT affected CEDM power supplies as follows:
  *Cues are to be used only if JPM performance is being simulated in the plant.
(CPP cabinets, cable spreading room)
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 5 of 9    STEP 3: (3.0.1) INSPECT affected CEDM power supplies as follows
_____ SAT C. VERIFY white CIRCUIT BREAKER OPEN light is OFF.
(CPP cabinets, cable spreading room)
_____ UNSAT STANDARD:       VERIFY the white CIRCUIT BREAKER OPEN light is NOT ILLUMINATED.
C. VERIFY white CIRCUIT BREAKER OPEN light is OFF
EXAMINERS CUE: WHITE CIRCUIT BREAKER OPEN LIGHT IS NOT ILLUMINATED.
. STANDARD: VERIFY the white CIRCUIT BREAKER OPEN light is NOT ILLUMINATED
COMMENTS:
. EXAMINER'S CUE:
STEP 4:(3.0.1) INSPECT affected CEDM power supplies as follows:
WHITE "CIRCUIT BREAKER OPEN" LIGHT IS NOT ILLUMINATED
. COMMENTS:
_____ SAT  _____ UNSAT STEP 4:(3.0.1) INSPECT affected CEDM power supplies as follows:
(CPP cabinets, cable spreading room)
(CPP cabinets, cable spreading room)
D. On the affected ACTM, VERIFY green POWER LED is ON
D. On the affected ACTM, VERIFY green POWER LED is ON.               _____ SAT STANDARD:       OBSERVE GREEN Power On LED on the Coil Power Programmer timer module ILLUMINATED.                                                     _____ UNSAT EXAMINERS CUE: GREEN POWER ON LED IS ILLUMINATED.
. STANDARD: OBSERVE GREEN "Power On" LED on the Coil Power Programmer timer module ILLUMINATED
COMMENTS:
. EXAMINER'S CUE:
STEP 5:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on                   FAULTED rear of CPP cabinets for alarms as follows:                               STEP A. VERIFY red power supply alarm lights are OFF. (two lights per CEA on rear of CPP cabinets)                                     _____ SAT STANDARD:       VERIFY the two red power supply lights for CEA 62 are EXTINGUISHED
GREEN "POWER ON LED" IS ILLUMINATED
_____ UNSAT EXAMINERS CUE: THE TWO POWER SUPPLY LIGHTS FOR CEA 62 ARE ILLUMINATED, ON.
. COMMENTS:
COMMENTS:
_____ SAT  _____ UNSAT STEP 5:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows
          *Cues are to be used only if JPM performance is being simulated in the plant.
: A. VERIFY red power supply alarm lights are OFF
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 5 of 9
. (two lights per CEA on rear of CPP cabinets
) STANDARD:     VERIFY the two red power supply lights for CEA 62 are EXTINGUISHED EXAMINER'S CUE: THE TWO POWER SUPPLY LIGHTS FOR CEA 62 ARE ILLUMINATED, ON
. COMMENTS:
FAULTED STEP
_____ SAT  _____ UNSAT


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
  *Cues are to be used only if JPM performance is being simulated in the plant.
_____ SAT B. IF any power supply alarm lights are ON, THEN RESET them as follows:
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 6 of 9    STEP 6:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
: 1) RECORD lights that are ON.                                 _____ UNSAT STANDARD:       RECORDS the two red power supply lights for CEA 62 are ON EXAMINERS CUE: NONE.
B. IF any power supply alarm lights are ON, THEN RESET them as follows: 1) RECORD lights that are ON.
COMMENTS:
STANDARD:     RECORDS the two red power supply lights for CEA 62 are ON EXAMINER'S CUE: NONE. COMMENTS:       _____ SAT  _____ UNSAT STEP 7:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
STEP 7:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on                   CRITICAL rear of CPP cabinets for alarms as follows:                                 STEP B. IF any power supply alarm lights are ON, THEN RESET them as         _____ SAT follows:
B. IF any power supply alarm lights are ON, THEN RESET them as follows: 2) PRESS lights that are ON to reset them to OFF condition.
: 2) PRESS lights that are ON to reset them to OFF condition.
STANDARD:     DEPRESS the two red power supply lights for CEA 62.
_____ UNSAT STANDARD:       DEPRESS the two red power supply lights for CEA 62.
EXAMINER'S CUE: BOTH RED POWER SUPPLY LIGHTS ARE EXTINGUISHED
EXAMINERS CUE: BOTH RED POWER SUPPLY LIGHTS ARE EXTINGUISHED.
. COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 8:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
_____ SAT  _____ UNSAT STEP 8:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
C. TEST power supply alarm light bulbs on affected CEA as follows:
: 1) PRESS pushbutton for affected CEA on side of CEDM 15 V TRANSIENT MONITOR SYSTEM assembly to latch             _____ UNSAT alarm lights ON for bulb-check.
: 1) PRESS pushbutton for affected CEA on side of CEDM 15 V TRANSIENT MONITOR SYSTEM assembly to latch alarm lights ON for bulb
STANDARD:       DEPRESS the button on the side of the Transient Monitor System that corresponds to CEA 62, and VERIFY the two red power supply alarm lights are ILLUMINATED.
-check. STANDARD:     DEPRESS the button on the side of the Transient Monitor System that corresponds to CEA 62, and VERIFY the two red power supply alarm lights are ILLUMINATED
EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE ILLUMINATED.
. EXAMINER'S CUE: THE TWO RED LIGHTS FOR CEA 62 ARE ILLUMINATED
COMMENTS:
. COMMENTS:     _____ SAT 
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 6 of 9


_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
 
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
  *Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 7 of 9    STEP 9:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
C. TEST power supply alarm light bulbs on affected CEA as follows:
: 2) RESET alarm lights to OFF condition by pressing them.
: 2) RESET alarm lights to OFF condition by pressing them.
STANDARD:     DEPRESS the two red alarm lights for CEA 62, and VERIFY the two red power supply alarm lights are EXTINGUISHED
_____ UNSAT STANDARD:       DEPRESS the two red alarm lights for CEA 62, and VERIFY the two red power supply alarm lights are EXTINGUISHED.
. EXAMINER'S CUE: THE TWO RED LIGHTS FOR CEA 62 ARE EXTINGUISHED
EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE EXTINGUISHED.
. COMMENTS:
COMMENTS:
_____ SAT 
STEP 10:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
 
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
_____ UNSAT STEP 10:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
: 3) IF alarm lights are still ON after being reset, THEN NOTIFY I&C.                                                   _____ UNSAT STANDARD:       DETERMINE step is N/A.
C. TEST power supply alarm light bulbs on affected CEA as follows:
EXAMINERS CUE: NONE.
: 3) IF alarm lights are still ON after being reset, THEN NOTIFY I&C.
COMMENTS:
STANDARD:     DETERMINE step is N/A.
STEP 11:(3.0.3) ENSURE HVA-4 and HVA-5 Cable Spreading Room A/C units are running.
EXAMINER'S CUE: NONE. COMMENTS:       _____ SAT  _____ UNSAT STEP 1 1:(3.0.3) ENSURE HVA-4 and HVA-5 Cable Spreading Room A/C units are running
STANDARD:       VERIFY HVA-4 and HVA-5 Cable Spreading Room A/C units are running.           _____ SAT EXAMINERS CUE: HVA-4 and HVA-5 Cable Spreading Room A/C units are running.                                                       _____ UNSAT COMMENTS:
. STANDARD:     VERIFY HVA-4 and HVA-5 Cable Spreading Room A/C units are running.
          *Cues are to be used only if JPM performance is being simulated in the plant.
EXAMINER'S CUE: HVA-4 and HVA-5 Cable Spreading Room A/C units are running. COMMENTS:  
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 7 of 9


_____ SAT   _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12:(3.0.4) VERIFY cooling fans for CPP cabinet sections 3 through 18 are RUNNING.
STANDARD:        VERIFY either visually or by presence of air flow that the fans in sections 3 _____ SAT through 18 are running.
EXAMINERS CUE: FANS IN SECTION 3 THROUGH 18 ARE RUNNING.                              _____ UNSAT COMMENTS:
STEP 13:(3.0.5) EXAMINE CEAPDS and CEDS and CPP cabinets for abnormal conditions.
STANDARD:        VERIFY no abnormal conditions on the cabinets by visual observations and      _____ SAT comparing known normal indications to possible abnormal indications.
EXAMINERS CUE: NO ABNORMAL CONDITIONS APPEAR TO EXIST.                                _____ UNSAT COMMENTS:
STEP 14(3.0.6) NOTIFY I&C of any problems found.
STANDARD:        REPORT red CIRCUIT BREAKER ON light and power supply alarm light problems to I&C via telephone.                                                _____ SAT EXAMINERS CUE: I&C ACKNOWLEDGES.
_____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
          *Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 8 of 9


JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
  *Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 8 of 9    STEP 1 2:(3.0.4) VERIFY cooling fans for CPP cabinet sections 3 through 18 are RUNNING.
STANDARD:      VERIFY either visually or by presence of air flow that the fans in sections 3 through 18 are runni ng. EXAMINER'S CUE: FANS IN SECTION 3 THROUGH 18 ARE RUNNING
. COMMENTS:
_____ SAT  _____ UNSAT STEP 1 3:(3.0.5) EXAMINE CEAPDS and CEDS and CPP cabinets for abnormal conditions.
STANDARD:      VERIFY no abnormal conditions on the cabinets by visual observations and comparing known normal indications to possible abnormal indications
. EXAMINER'S CUE: NO ABNORMAL CONDITIONS APPEAR TO EXIST
. COMMENTS:
_____ SAT
_____ UNSAT STEP 1 4(3.0.6) NOTIFY I&C of any problems fou n d. STANDARD:      REPORT red CIRCUIT BREAKER ON light and power supply alarm light problems to I&C via telephone.
EXAMINER'S CUE: I&C ACKNOWLEDGES
. COMMENTS:
END OF TASK
_____ SAT  _____ UNSAT
 
STOP TIME:  __________
 
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC P-3 Page 9 of 9    (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life.
Unit 1 was at 100% power late in core life.
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations", Attachment 5, Section 3.0, "Troubleshooting Actions for Inoperable CEA(S)".
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).
.}}
      .
NRC P-3 Page 9 of 9}}

Revision as of 11:18, 12 November 2019

Initial Exam 2011-302 Draft Sim/In-Plant JPMs
ML113570486
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/21/2011
From:
Florida Power & Light Co
To:
NRC/RGN-II
References
05-335/11-302, 05-389/11-302 JPM NRC S-1, Rev. 0
Download: ML113570486 (116)


Text

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-1 Applicant Examiner JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 8

JOB PERFORMANCE MEASURE Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM? Yes Facility JPM #: N/A K/A: 003 A2.01 / 3.5 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

Problems with RCP seals, especially rates of seal leak-off.

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-0120034 Reactor Coolant Pump Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:
  • 2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Re-establish RCP bleedoff flow.

The performance level to be used for this JPM is PERFORM.

This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The Unit is at 100%. RCP controlled bleedoff flow has been lost.

INITIATING CUES:

The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.

JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: FAULTED V2505 RCP Bleedoff Cntmt Isol. Is open. STEP

_____ SAT STANDARD: ATTEMPT to OPEN V2505 RCP Bleedoff Cntmt Isol.

_____ UNSAT EXAMINERS NOTE: V2505 will not open COMMENTS:

STEP 2: (6.3.5.B) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE:

V2524 RCP Bleedoff Cntmt Isol. Is open. _____ SAT STANDARD: VERIFIES V2524 RCP Bleedoff Cntmt Isol is open. _____ UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 4 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION FAULTED STEP STEP 3 (6.3.5.1) IF normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.

_____ SAT STANDARD: OPEN V2507 RCP Bleedoff Relief Stop Vlv. Recognize multiple seal failures and cavity leakage rising / alarm. _____ UNSAT EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP. One minute later Reactor Cavity leakage increases and cavity leakage alarm annunciates.

EXAMINERS CUE:

COMMENTS:

STEP 4: (6.3.7) IF three seals have failed Then: CRITICAL STEP A. TRIP the Reactor

_____ SAT STANDARD: TRIP the Reactor

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 5: (6.3.7) IF three seals have failed Then:

_____ SAT B. TRIP the Turbine

_____ UNSAT STANDARD: TRIP the Turbine EXAMINERS CUE:

COMMENTS:

JPM NRC S-1 Rev 0 Simulator Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (6.3.7) Done IF three seals have failed Then: CRITICAL STEP C. STOP the affected RCP(s)

_____ SAT STANDARD: STOP the 2B1 RCP EXAMINERS CUE: The JPM is complete when the 2B1 RCP has been stopped. _____ UNSAT COMMENTS:

END OF TASK STOP TIME: ____________

JPM NRC S-1 Rev 0 Simulator Page 6 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The Unit is at 100%. RCP controlled bleedoff flow has been lost.

INITIATING CUES:

The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.

NRC S-1 7 of 8

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET

1. Restore IC-1
2. Execute S-1 RCP.lsn Step 2B1 RCP seals fail will auto trigger.

NRC S-1 8 of 8

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE POWER TO 2B3 4.16KV BUS FROM OFFSITE - UNIT 2 NRC S-2 Applicant Examiner

JOB PERFORMANCE MEASURE Task: 07052015, RESTORE A 4160 V BUS NORMAL POWER SUPPLY 07052140, RESPOND TO A LOSS OF OFF-SITE POWER Faulted JPM? No Facility JPM #: 0821118 K/A: 062 A4.07 / 3.1 Ability to manually operate and/or monitor in the control room: synchronizing and paralleling of different ac supplies.

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when offsite power has been restored to the 2B3 4.16KV bus.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-EOP-99, Appendix D Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:

2-EOP-99, Appendix D Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None NRC S-2 Simulator Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Restore Power to 2B3 4.16KV Bus From Offsite - Unit 2 The performance level to be used for this JPM is Perform.

This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

A Loss of Offsite Power has occurred at Unit 2.

Both EDGs were supplying the vital buses when offsite power was restored.

Table 6, 2-EOP-99 has been completed.

INITIATING CUES:

You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.

NRC S-2 Simulator Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

STEP 1: 1. ENSURE Table 6, Vital Power Breaker Configuration (LOOP), has been completed for the electrical train(s) supplied by a Unit 2 EDG(s).

_____ SAT STANDARD: Student may VERIFY that Table 6 is COMPLETE.

EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: The student may want to verify Table 6. That is acceptable.

COMMENTS:

STEP 2: 2. INSERT sync plug and PLACE in the desired ST position. CRITICAL STEP STANDARD: POSITION 2B S/U XFMR sync plug to ST-2B2.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT STEP 3: 3. To ENERGIZE the non-vital 4.16 KV bus, CLOSE the associated CRITICAL Startup Transformer breaker. STEP STANDARD: POSITION breaker 20302 to the CLOSED position. _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-2 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: 4. CLOSE breaker 4.16 KV bus tie 2A2 -2A3 (2B2 - 2B3). CRITICAL STEP STANDARD: POSITION breaker 20309 to the CLOSED position.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT STEP 5: 5. ENSURE that the amber light is lit on the EDG governor control.

STANDARD: ENSURE Diesel governor control amber light is ON. _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

STEP 6: 6. INSERT sync plug and PLACE in the Tie position. CRITICAL STEP STANDARD: 2B DG Breaker sync plug is POSITIONED to Tie-2B3.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-2 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7: 7. MATCH voltage using the EDG voltage control. CRITICAL STEP STANDARD: Adjusts Voltage control as necessary to ENSURE Voltage is POSITIONED to MATCH DG (running) to Grid (incoming) voltage.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT STEP 8: 8. Using EDG governor control, ADJUST synchroscope to SLOW in the CRITICAL COUNTER CLOCKWISE direction. STEP STANDARD: Governor control POSITIONED until rotating SLOW in the COUNTER- _____ SAT CLOCKWISE direction.

EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 9: 9. When the synchroscope is in the 12 OCLOCK position, CLOSE breaker CRITICAL 4.16 KV bus tie 2A3-2A2 (2B3-2B2). STEP STANDARD: Breaker 20411 is in the CLOSED position at 12 Oclock. _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-2 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: 10. PLACE EDG governor control to RAISE position UNTIL load is greater CRITICAL than 100 KW (50 amps) to avoid reverse power trip. STEP STANDARD: Governor control is HELD until load is >100 KW (50 amps) and then _____ SAT released.

EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 11: 11. ENSURE 2A (2B) EDG load is 100 KW (50 amps) and OPEN breaker CRITICAL DG 4.16 KV BREAKER. STEP STANDARD: ENSURE Governor control is POSITIONED to UNLOAD DG to 100 KW (50 _____ SAT amps), THEN open breaker 20401.

EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 12: 12. REMOVE the sync plug.

STANDARD: Sync plug is REMOVED. _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-2 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: 13. ENSURE proper restart conditions by amber light indication on BOTH voltage regulator and governor controls.

_____ SAT STANDARD: OBSERVES amber light illuminated on voltage regulator and governor controls.

_____ UNSAT EXAMINERS CUE:

EXAMINERS NOTE: Applicant may have to raise governor control to obtain Amber light.

COMMENTS:

STEP (done): 14. If no ESFAS start signal is present, Then STOP the EDG(s). (The EDG will cooldown at 450 rpm for 10 minutes and then stop)

_____ SAT STANDARD: PLACES 2B EDG start / stop switch to the STOP position.

EXAMINERS CUE: _____ UNSAT COMMENTS:

END OF TASK STOP TIME: __________

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-2 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST

1. RESTORE JPM IC-33.
2. NO lesson is needed for this JPM.
3. UNFREEZE the Simulator when the student is ready.

NRC S-2 Simulator Page 9 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

A Loss of Offsite Power has occurred at Unit 2.

Both EDGs were supplying the vital buses when offsite power was restored.

Table 6 of 2-EOP-99 has been completed.

INITIATING CUES:

You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.

NRC S-2 Page 10 of 10

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 NRC S-3 Simulator Applicant Examiner

JOB PERFORMANCE MEASURE Task: 07025090, Align SFP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)

Faulted JPM? Yes Facility JPM #: 0821117A K/A: 072 A3.01 / 2.9 Ability to monitor automatic operation of the ARM system, including :

Changes in ventilation alignment.

Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-AOP-26.02.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-AOP-26.02, Area Radiation Monitors Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:

2-AOP-26.02, Area Radiation Monitors Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Respond to High Radiation Alarm on Spent Fuel Monitors - Unit 2 The performance level to be used for this JPM is Perform.

This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is at 100% power.

Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.

2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO.

The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.

PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

4.2.4 Fuel Handling Building Radiation Monitor Alarm

4. IF more than one HIGH Alarm in a train actuated, THEN VERIFY FHB ventilation transfer to SBVS as follows:

STEP 1(4.2.4.4): A. VERIFY the following fans STOPPED:

  • HVS-6, Fuel Pool Supply Fan.
  • HVS-7, Fuel Handling Bldg Supply Fan.
  • HVE-15, Fuel Handling Bldg Exhaust Fan. _____ SAT
  • HVE-16A, Fuel Pool Exhaust Fan
  • HVE-16B, Fuel Pool Exhaust Fan
  • HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6/E-RAC) _____ UNSAT STANDARD: ENSURES Fans are OFF.

EXAMINERS NOTE: Applicant must call SNPO to verify HVE-17 is OFF EXAMINERS CUE: SNPO reports HVE-17 is STOPPED COMMENTS:

STEP 2 (4.2.4.4): B. VERIFY the following FHB dampers CLOSED:

  • D-33, Fuel Hdlg Bldg Inlet Damper
  • D-35, Fuel Hdlg Bldg Outlet Damper
  • D-34, Fuel Hdlg Bldg Inlet Damper
  • D-36, Fuel Hdlg Bldg Outlet Damper _____ UNSAT
  • D-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers D-29 through D-36 are CLOSED by observation of Red light off, Green light on.

EXAMINERS CUE:

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-3 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.2.4.4): C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN. FAULTED STEP STANDARD: OBSERVE FCV-25-30 CLOSED.

_____ SAT EXAMINERS CUE:

EVALUATORS NOTE: Faulted Step FCV-25-30 failed to auto OPEN. _____ UNSAT COMMENTS:

CONTINGENCY ACTION: CRITICAL STEP STEP 4 (4.2.4.4): C.1 OPEN FCV-25-30, Fuel Handling Emerg Vent Vlv.

_____ SAT STANDARD: POSITION FCV-25-30 control switch to OPEN.

_____ UNSAT

  • EXAMINERS CUE: FCV-25-30 indicates Green light OFF, Red Light ON.

X-4 Alarms as delta-P lowers.

COMMENTS:

STEP 5 (4.2.4.4): D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED. FAULTED STEP STANDARD: OBSERVE FCV-25-32 OPEN.

EXAMINERS CUE: _____ SAT EVALUATORS NOTE: Faulted Step FCV-25-32 failed to auto CLOSE.

_____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-3 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP STEP 6 (4.2.4.4): D.1 CLOSE FCV-25-32, SBVS Isolation Valve.

_____ SAT STANDARD: POSITION FCV-25-32 control switch to CLOSE.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 7 (4.2.4.4): E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON.

STANDARD: ENSURE HVE-6A is ON.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT FAULTED STEP 8 (4.2.4.4): F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv, OPEN. STEP STANDARD: OBSERVE FCV-25-31 CLOSED.

_____ SAT EXAMINERS CUE:

EVALUATORS NOTE: Faulted Step FCV-25-31 failed to auto OPEN. _____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-3 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP STEP 9 (4.2.4.4): F.1 OPEN FCV-25-31, Fuel Handling Emerg Vent Vlv.

_____ SAT STANDARD: POSITION FCV-25-31 control switch to OPEN.

EXAMINERS CUE: _____ UNSAT COMMENTS:

FAULTED STEP 10 (4.2.4.4): G. VERIFY FCV-25-33, SBVS Isolation Valve, is CLOSED. STEP STANDARD: OBSERVE FCV-25-33 OPEN.

_____ SAT EXAMINERS CUE:

EVALUATORS NOTE: Faulted Step FCV-25-33 failed to auto CLOSE. _____ UNSAT COMMENTS:

CONTINGENCY ACTION: CRITICAL STEP STEP 11 (4.2.4.4): G.1 CLOSE FCV-25-33, SBVS Isolation Valve.

_____ SAT STANDARD: POSITION FCV-25-33 control switch to CLOSE.

EXAMINERS CUE: _____ UNSAT EXAMNERS NOTE: Annunciator V-21, B SBVS INLET ISOL FCV-25-33 OVRLD/CLOSED Alarms.

COMMENTS:

STEP 12 (4.2.4.4): H. VERIFY HVE-6B, SBVS Exhaust Fan, is ON.

STANDARD: ENSURE HVE-6B is ON.

_____ SAT EXAMINERS CUE: Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found. _____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-3 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4.

FCV-25-30 and FCV-25-31 had to be manually opened, FCV-25-32 and FCV-25-33 had to be manually closed. _____ SAT STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED _____ UNSAT and FCV-25-32 and FCV-25-33 had to be manually CLOSED.

EXAMINERS CUE: US ACKNOWLEDGES.

COMMENTS:

END OF TASK STOP TIME: __________

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC S-3 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1.
2. UNFREEZE the Simulator.
3. SELECT the JPM Lesson File Folder.
4. OPEN and EXECUTE the lesson for S-3 SFP Rm.Lsn.
5. FREEZE the Simulator.
6. STORE a Temporary IC set if more than one student will be performing the JPM.
7. The lesson will NOT need to be stopped and re-executed for each student after restoring the IC.
8. UNFREEZE the Simulator when the student is ready to begin.

NRC S-3 Simulator Page 9 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is at 100% power.

Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.

2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO.

The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.

NRC S-3

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV - UNIT 2 NRC S-4 Applicant Examiner NRC JPM S-4 Rev 0 Simulator Page 1 of 10

JOB PERFORMANCE MEASURE Task: Transfer Letdown Level Control to Alternate LCV Faulted JPM? No Facility JPM #: 0821040 K/A : 004 A2.22 / 3.2 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Mismatch of letdown and changing flows.

Duty Area(s): N/A Task Information: N/A Task Standard: This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-NOP-02.02 Charging and Letdown Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:

2-NOP-02.02 Charging and Letdown Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None NRC JPM S-4 Rev 0 Simulator Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Transfer Letdown Level Control to the Alternate Level Control Valve -

Unit 2 The performance level to be used for this JPM is Perform.

This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.

INITIATING CUES:

The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.

NRC JPM S-4 Rev 0 Simulator Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

2-NOP-02.02 Charging and Letdown Section 4.8 Swap Level control valves STEP 1 (4.8.1): IF in MODE 1 or 2, THEN PLACE V2520 ION EXCHANGER BYPASS Critical Step VALVE, in BYPASS RESET to minimize reactivity effects of changing letdown temperature. _____ SAT STANDARD: PLACE V2520 to Bypass Reset.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 2 (4.8.2): Slowly REDUCE PIC-2201, LTDN PRESSURE, controller setpoint to 250 psig. Critical Step STANDARD: Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig. _____ SAT EXAMINERS CUE:

EXAMINERS NOTE: Annunciator M-5 Letdown Pressure High/Low is an _____ UNSAT expected alarm.

COMMENTS:

STEP 3 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: Critical Step A. Using the lower Manual controller knob, MATCH HIC-1110, LEVEL, _____ SAT manual and auto controller output signals. .

STANDARD: PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST _____ UNSAT HIC-1110 manual signal to MATCH auto EXAMINERS CUE:

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-4 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: Critical Step B. SHIFT HIC-1110, LEVEL, controller to MANUAL. _____ SAT STANDARD: PLACE HIC-1110 to MANUAL by DEPRESSING the Yellow M pushbutton

_____ UNSAT EXAMINERS CUE:

COMMENTS:

NOTE With only one Charging Pump running, dual indication may not be received on both Critical Step Letdown Level Control valves

_____ SAT STEP 5 (4.8.4): PLACE LEVEL CONTROL VALVE switch to BOTH.

STANDARD: POSITION the Letdown Level selector switch to the BOTH position. _____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 6 (4.8.5): VERIFY a rise in letdown flow, as indicated on FIA-2202, FLOW.

STANDARD: VERIFY increasing flow on FIA-2202 _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-4 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (4.8.6): POSITION LEVEL CONTROL VALVE switch to one of the following positions: (circle one) Critical Step LCV-2110P LCV-2110Q

_____ SAT STANDARD: POSITION Letdown Level Control valve selector switch to PCV-2110Q EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 8 (4.8.7): PERFORM the following:

Critical Step A. ADJUST HIC-1110, LEVEL, controller for minimum flow.

_____ SAT STANDARD: ADJUST to MINIMUM letdown flow as observed on FIA-2202 EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 9 (4.8.7): PERFORM the following:

B. IF letdown flow is NOT 28-30 gpm, THEN REQUEST I&C to adjust LY-1110, Signal Limiter for Pressurizer Level control, per Section 5.8, Letdown _____ SAT Limiter Adjustment.

STANDARD: Informs I&C of the current minimum letdown flow value and directs _____ UNSAT them to adjust LY1110, Pressurizer Level control signal limiter.

EXAMINERS CUE:

EVALUATORS NOTE: On the Simulator the letdown flow is not exactly 28 gpm, direct the student to continue with the task after I&C is contacted. The procedure does not require waiting for I&C to complete the task.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-4 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:

_____ SAT A. Using upper BIAS control knob and previewing auto signal BALANCE HIC-1110, LEVEL, controller auto and manual output signals.

_____ UNSAT STANDARD: PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS knob.

EXAMINERS CUE:

COMMENTS:

STEP 11 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following: Critical Step B. SHIFT HIC-1110, LEVEL controller to AUTO. _____ SAT STANDARD: PLACE HIC-1110 in AUTO by DEPRESSING the White A pushbutton

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 12 (4.8.9): Slowly RAISE PIC-2201, PRESSURE, setpoint to 430 psig.

Critical Step STANDARD: Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and _____ SAT ENSURE that red needle follows and MATCHES the black needle EXAMINERS CUE: _____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-4 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.8.10): ADJUST HIC-1110, LEVEL, controller for a flow consistent with current plant conditions.

_____ SAT STANDARD: ADJUST HIC-1110 to current plant conditions with the BIAS knob.

EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: Adjustment is not needed if pressurizer level is at setpoint.

COMMENTS:

STEP 14 (4.8.11): When temperature on TIC-2224, BYPASS TEMPERATURE, Critical Step returns to normal, THEN ENSURE V2520, ION EXCHANGER BYPASS VALVE is in AUTO.

_____ SAT STANDARD: PLACES V2520 to AUTO.

EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP (done): NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV-2110Q and that I&C Department has been notified to adjust LY1110, Pressurizer Level control signal limiter. _____ SAT STANDARD: NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-2110Q. _____ UNSAT EXAMINERS CUE: US Acknowledges.

COMMENTS:

END OF TASK STOP TIME: __________

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-4 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1.
2. UNFREEZE the Simulator.
3. No Lesson is needed for this JPM.

NRC JPM S-4 Simulator Page 9 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.

INITIATING CUES:

You are the DRCO. The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.

NRC JPM S-4 Page 10 of 10

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A AND 2B SG USING 2C AFW PUMP NRC S-5 Applicant Examiner JPM NRC S-5 Rev 0 SIMULATOR Page 1 of 14

JOB PERFORMANCE MEASURE Task: Start the 2C AFW pump and feed the 2A and 2B SG.

Alternate Path JPM? Yes Facility JPM #: N/A K/A: 061 A2.04 / 3.4 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: pump failure or improper operation Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is completed when the 2C AFW pump mechanical overspeed trip is reset and the 2C AFW pump is feeding the 2A and 2B SG at 200-220 gpm.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • Annunciator G-46 Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
  • Annunciator G-46 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None JPM NRC S-5 Rev 0 SIMULATOR Page 2 of 14

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Start the 2C AFW Pump and feed the 2A and 2B SG.

The performance level to be used for this JPM is PERFORM.

This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.

INITIATING CUES:

The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.

JPM NRC S-5 Rev 0 SIMULATOR Page 3 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

2-NOP-09.02 Auxiliary Feedwater STEP 1: (4.3.6) START the 2C Auxiliary Feedwater Pump CRITICAL STEP

_____ SAT STANDARD: OPEN MV-08-12, SG 2B STM To AFW PP 2C.

AND/OR OPEN MV-08-13, SG 2A STM To AFW PP 2C. _____ UNSAT EXAMINERS NOTE: 2C AFW will trip on mechanical overspeed COMMENTS:

STEP 2: (4.3.7) VERIFY turbine speed is stable between 3700 and 3800 rpm AND the FAULTED governor is NOT hunting / oscillating. STEP

_____ SAT STANDARD: RECOGNIZE 2C AFW pump has tripped on mechanical overspeed. Refers to Annunciator summary for G-46

_____ UNSAT EXAMINERS NOTE: Applicant should recognize mechanical overspeed by:

MV-08-3 in closed position AND annunciator G-46 LOCKED IN. (If this was a electrical overspeed, annunciator G-46 would have came in and then cleared).

EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 4 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: Refer to Annunciator summary for G-46, 2C AFW Pump Turbine Failure/Trip/OVRLD/SS Isol. _____ SAT STANDARD: RECOGNIZE directions from Annunciator summary If 2C AFW Pump _____ UNSAT Tripped, Then GO TO 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:

COMMENTS:

2-AOP-09.02 AUXILIARY FEEDWATER STEP 4: (4.2.5.1) IF 2C AFW pump tripped due to mechanical or electrical overspeed _____ SAT trip, THEN PERFORM Attachment 1, Resetting 2C AFW Pump Following Overspeed Trip.

_____ UNSAT STANDARD: REFERS to Attachment 1 of 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:

COMMENTS:

2-AOP-09.02 AUXILIARY FEEDWATER CRITICAL ATTACHMENT 1 STEP STEP 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT A. CLOSE MV-08-12, SG 2B STM TO AFW PP 2C (RTGB-202)

_____ UNSAT STANDARD: CLOSE MV-08-12 SG 2B Steam to AFW PP 2C.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 5 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP B. CLOSE MV-08-13, SG 2A STM TO AFW PP 2C (RTGB-202) _____ SAT STANDARD: CLOSE MV-08-13 SG 2A Steam to AFW Pp 2C.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP

_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:

(1) CLOSE MV-08-3, 2C PUMP (RTGB-202 - Key 78) _____ UNSAT STANDARD: CLOSE MV-08-3, 2C PUMP using Key 78 EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 6 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP

_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:

(2) If 2C AFW pump tripped due to mechanical overspeed trip, _____ UNSAT THEN PERFORM the following:

a. RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.

STANDARD: CALL Field Operator to reset the mechanical overspeed linkage EXAMINERS CUE: Field Operator calls back and states mechanical linkage on MV-08-3 has been reset.

COMMENTS:

STEP 9 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP: _____ UNSAT (2) If 2C AFW pump tripped due to mechanical overspeed trip, THEN PERFORM the following:

b. VERIFY top surface of trip tappet nut is in line with the line marked on the head lever to ensure full engagement.

STANDARD: VERIFY with the field operator the proper trip tappet nut engagement .

EXAMINERS CUE: Field operator states the trip tappet nut is in line with the line marked on the head lever.

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 7 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP: _____ SAT (3) PLACE MV-08-3, 2C PUMP (2C Auxiliar Feedwater Pump), in OPEN

_____ UNSAT STANDARD: TURNS KEY 78 for MV-08-3 to the open position.

EXAMINERS CUE:

COMMENTS:

STEP 11: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:

_____ UNSAT (4) VERIFY MV-08-3, THROTTLE / TRIP VALVE FOR AFW PUMP 2C is OPEN.

STANDARD: OBSERVES MV-08-3 red light on green light off.

EXAMINERS CUE:

COMMENTS:

STEP 12: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT D. IF 2C AFW pump is rotating, THEN perform the following:

_____ UNSAT STANDARD: CALLS field operator to determine if 2C AFW pump is rotating EXAMINERS CUE: Field Operator reports back, 2C AFW pump is NOT rotating.

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 8 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT E. PERFORM one of the following to drain oil from the underside of the governor main speed piston. _____ UNSAT (1) WAIT 3 minutes after the pump stops rotating OR (2) PERFORM the following:

a. PLACE manual control knob on the side of the turbine governor in the FULLY COUNTER-CLOCKWISE idle speed position.
b. RETURN manual control knob on the turbine governor to FULLY CLOCKWISE maximum speed position.

STANDARD: DETERMINE time since pump stopped rotating. If >3 minutes step 2.a and 2.b not performed. If <3 minutes call field operator to perform step 2.a and 2.b EXAMINERS CUE: If field operator called, state step 2.a and 2.b has been performed.

If less than 3 minutes step E.(2) should be performed.

COMMENTS:

STEP 14: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT F. ENSURE MV-09-11, PUMP 2C TO SG 2A is CLOSED (RTGB-202)

_____ UNSAT STANDARD: VERIFIES MV-09-11 green light on, red light off.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 9 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT G. ENSURE MV-09-12, PUMP 2C TO SG 2B is CLOSED (RTGB-202)

_____ UNSAT STANDARD: VERIFIES MV-09-12 green light on, red light off.

EXAMINERS CUE:

COMMENTS:

STEP 16: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP H. IF both Steam Generators are intact AND NOT faulted, THEN OPEN the _____ SAT following valves simultaneously:

(1) MV-08-13 SG 2A STM TO AFW PP 2C _____ UNSAT (2) MV-08-12 SG 2B STM TO AFW PP 2C STANDARD: USING two handed operation open MV-08-13 MV-08-12 simultaneously and verifies valves open.

EXAMINERS CUE:

COMMENTS:

STEP 17: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT I. IF either SG is faulted THE OPEN steam supply valve from the NON-FAULTED S/G _____ UNSAT STANDARD: DETERMINES step N/A EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 10 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 18: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP J. IF flow is to be restored to 2A S/G THEN ENSURE SE-09-4, 2C PUMP _____ SAT DISCH to 2A S/G is OPEN STANDARD: OPENS SE-09-4 _____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 19: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP K. IF flow is to be restored to 2B S/G THEN ENSURE SE-09-5, 2C PUMP _____ SAT DISCH to 2B S/G is OPEN STANDARD: OPENS SE-09-5 _____ UNSAT EXAMINERS CUE:

CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock when the feed ring is uncovered (level <33% NR).

Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:

  • If using Main Feedwater OR Condensate, As low as possible for the first 5 minutes OR until SG level has risen.

COMMENTS:

STEP 20: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT L. Throttle MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. _____ UNSAT STANDARD: THROTTLES MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. Adjusts flow to 2A SG at 200 gpm to 220 gpm EXAMINERS CUE:

COMMENTS:

JPM NRC S-5 Rev 0 Simulator Page 11 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 21: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP

_____ SAT M. Throttle MV-09-12, PUMP 2C to S/G 2B to establish required flowrate to the 2B steam generator.

_____ UNSAT STANDARD: THROTTLES MV-09-12, PUMP 2C to S/G 2B, to establish required flowrate to the 2B steam generator. Adjusts flow to 2B SG at 200 gpm to 220 gpm EXAMINERS CUE: Advise JPM is complete.

COMMENTS:

END OF TASK STOP TIME: ____________

JPM NRC S-5 Rev 0 Simulator Page 12 of 14

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.

INITIATING CUES:

The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.

Page 13 of 14 NRC S-5

JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET

1. Restore IC-50
2. Execute S-5 AFW.Lsn NOTE: C AFW Mechanical Overspeed will trigger automatically
3. Trigger reset 2C AFW overspeed when Field Operator called to reset.

Page 14 of 14 NRC S-5

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ONCE-THROUGH COOLING - UNIT 2 NRC S-6 Simulator Applicant Examiner

JOB PERFORMANCE MEASURE Task: Establish Once-Through Cooling Faulted JPM? Yes Facility JPM #:

K/A: 006 ECCS A4.02 / 4.0 Ability to manually operate and/or monitor in the control room: Valves Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when once-through cooling has been established, safety injection flow to the RCS has been verified and US has been informed that the task is complete.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:

2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None NRC S-6 Simulator Page 2 of 17

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Establish Once-Through Cooling on Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

You are to operate any plant equipment that is necessary for the completion of this JPM.

The simulator will provide the cues as you perform this JPM.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.

INITIATING CUES:

You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.

NRC S-6 Simulator Page 3 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

2-EOP-15, Functional Recovery, RCS & Core Heat Removal HR-3, Success Path 3, Once-Through-Cooling STEP 1 (4.6.1A): DE-ENERGIZE ALL Pressurizer Heaters. CRITICAL STEP STANDARD: POSITION all Pressurizer Heaters control switches to OFF.

_____ SAT EXAMINERS CUE:

EVALUATORS NOTE: _____ UNSAT COMMENTS:

STEP 2 (4.6.1B): If Main Condenser is available, Then PERFORM BOTH the following: CRITICAL STEP

1. BLOCK MSIS

_____ SAT STANDARD: DETERMINE that Main Condenser is AVAILABLE. When MSIS BLOCK permissive annunciates, block MSIS. _____ UNSAT EXAMINERS CUE:

EXAMINERS NOTE: MSIS BLOCK will not be in at this time. Applicant will need to monitor plant conditions and be aware of block annunciator as SBCS valves and ADVs are opened.

COMMENTS:

NRC S-6 Simulator Page 4 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.6.1B): If Main Condenser is available, Then PERFORM BOTH the following: CRITICAL STEP

2. ENSURE ALL Steam Bypass Valves are OPEN.

_____ SAT STANDARD: POSITION SBCS controllers to manual and open all five SBCS valves

_____ UNSAT EXAMINERS CUE:

EXAMINERS NOTE: Although not procedurally driven, SBCS permissive switch should be taken to on at this time. If this is not performed, the SBCS valves will close when SG pressure reaches 806 psia.

COMMENTS:

STEP 4 (4.6.1.C) ENSURE ALL available Atmospheric Dump Valves are OPEN. CRITICAL STEP STANDARD: POSITION all four ADVs to OPEN.

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT STEP 5 (4.6.1.D): ENSURE ALL RCPs are STOPPED.

STANDARD: DETERMINE that all RCPs are STOPPED. _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

NRC S-6 Simulator Page 5 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.6.1.E): ENSURE SIAS and CIAS are ACTUATED. CRITICAL STEP STANDARD: DEPRESS the think pushbutton above each switch and POSITION SIAS Train A and Train B actuation switches to SIAS ON.

_____ SAT VERIFY SIAS and CIAS Trains A and B have ACTUATED.

EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: SIAS and CIAS may AUTO Actuate prior to MANUAL Actuation. If AUTO actuation has occurred, this is not a CRITICAL STEP.

COMMENTS:

STEP 7 (4.6.1.F): ENSURE BOTH of the following:

1. BOTH HPSI pumps are RUNNING.

. _____ SAT STANDARD: OBSERVE HPSI Pump 2A and 2B are running.

EXAMINERS CUE: _____ UNSAT COMMENTS:

NRC S-6 Simulator Page 6 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (4.6.1.F): ENSURE BOTH of the following:

2. ALL cold leg injection valves are OPEN. _____ SAT STANDARD: OBSERVE that all cold leg injection valves are OPEN. _____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 9 (4.6.1.G): ENSURE ALL available charging pumps are RUNNING. CRITICAL STEP STANDARD: POSITION all available charging pump control switches to START, if not already running. _____ SAT EXAMINERS CUE:

_____ UNSAT EVALUATORS NOTE: 2C Charging pump must be manually STARTED and is the critical step.

COMMENTS:

STEP 10 (4.6.1.H): ENSURE BOTH PORV block valves are OPEN. FAULTED STEP STANDARD: POSITION PORV block valve V1477 control switch to OPEN. Identifies breaker tripped on V1477 _____ SAT EXAMINERS CUE: If field operator called to reset breaker, wait until end of steps to call that breaker is reset. _____ UNSAT EXAMINERS NOTE: PORV block valve V1476 is already open. PORV block valve V1477 breaker will trip as soon as the switch is taken to open. Applicant may call the field operator at this time to reset breaker.

COMMENTS:

NRC S-6 Simulator Page 7 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11(4.6.1.H.1): IF ONE PORV Block Valve is OPEN Then continue steps to initiate Once Through Cooling.

_____ SAT STANDARD: DETERMINES V1476 block valve is open and continues with procedure.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 12 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.

1. ENSURE PORV control switches are in OFF. _____ SAT STANDARD: VERIFY V1474 and V1475 control switches are in OFF.

_____ UNSAT EXAMINERS CUE:

EVALUATORS NOTE: Both PORV switches should already be in OFF.

COMMENTS:

NRC S-6 Simulator Page 8 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.

_____ SAT

2. PULL at least TWO RPS Hi Pzr Press bistables.

STANDARD: Unscrews and pulls at least two RPS Hi Pzr Press bistables . _____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 14 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, FAULTED and BOTH PORV block valves are open, Then OPEN BOTH PORVs. STEP

3. VERIFY BOTH PORVS OPEN.

_____ SAT STANDARD: Determine PORV V1475 and PORV V1474 did not open.

EXAMINERS CUE: _____ UNSAT EXAMINERS NOTE: PORV 1475 will NOT open until its block valve V1477 is open due to P of 50 psia across valve.

COMMENTS:

NRC S-6 Simulator Page 9 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15 (4.6.1.I.1): WHEN at least ONE HPSI pump is RUNNING with a cold leg CRITICAL flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM STEP the following:

D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.

STANDARD: CALL the field operator to determine the status of the Breaker for Block _____ UNSAT Valve V1477 (breaker 2-42002 (secondary isol.) and 2-42007 (Reg. Guide 1.63 Isol.) at 480V MCC 2B5) When breaker reset and block valve V1477 open, verifies PORV V1475 opens.

EXAMINERS CUE: Call as field operator and state breaker 2-42002 is in the tripped condition. Reset breaker when requested by Applicant.

EXAMINERS NOTE: There is no way to remotely open PORV V1474 if pulling RPS bistables did not open valve.

COMMENTS:

STEP 16 (4.6.1.I.1): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, CRITICAL and at least ONE PORV block valve is OPEN, Then PERFORM the STEP following:

D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.

STANDARD: OPEN PORV block valve V1477 when breaker 2-42001 is reset. _____ UNSAT EXAMINERS CUE:

COMMENTS:

NRC S-6 Simulator Page 10 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17 (4.6.1.J): When once through cooling has been established, Then: CRITICAL STEP

1. Close Atmosphere Dump Valves (ADVs).

STANDARD: POSITION both ADVs to CLOSE. If controller is AUTO / MANUAL, use _____ SAT pushbutton on controller and set to 0. If manual switches used hold switch to closed position until red light off and green light on.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 18 (4.6.1.J): When once through cooling has been established, Then: CRITICAL STEP

2. Close Main Steam Isolation Valves.

STANDARD: POSITION both MSIVs to CLOSE. _____ SAT EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE:

COMMENTS:

NRC S-6 Simulator Page 11 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 19 (4.6.1.J): When once through cooling has been established, Then:

3. Close Main Steam Isolation Bypass Valves.

_____ SAT STANDARD: DETERMINE that both MSIV Bypass Valves are CLOSED.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 20 (4.6.1.J): When once through cooling has been established, Then:

4. Close Steam Generator Blowdown Isolation Valves.

_____ SAT STANDARD: DETERMINE that all 4 Blowdown Isolation Valves are CLOSED.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 21 (4.6.1.J): When once through cooling has been established, Then:

5. Verify Steam Generator Safety Valves are CLOSED.

_____ SAT STANDARD: DETERMINE from NPO report that all Steam Generator Safety Valves are CLOSED.

_____ UNSAT EXAMINERS CUE: When contacted, the NPO reports that NO Steam Generator Safety Valves are open.

COMMENTS:

NRC S-6 Simulator Page 12 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 22 (4.6.1.K); If Steam Generator pressure approaches 985 psig (1000 psia),

Then OPERATE ADVs as necessary to maintain S/G pressure between 835 and 915 psig (850 and 930 psia).

_____ SAT STANDARD: DETERMINE that both Steam Generator pressures are below 985 psig and are STABLE.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 23 (4.6.2): Maximize SI Flow PERFORM ALL of the following:

_____ SAT A. ENSURE ALL available SI Pumps are RUNNING.

STANDARD: DETERMINE that SI pumps are RUNNING. _____ UNSAT EXAMINERS CUE:

COMMENTS:

NRC S-6 Simulator Page 13 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 24 (4.6.2): Maximize SI Flow PERFORM ALL of the following: _____ SAT B. VERIFY adequate SI flow. REFER TO Figure 2, Safety Injection Flow vs. RCS Pressure. _____ UNSAT STANDARD: SUM safety injection flows and VERIFY total flow is to RIGHT of 2 Full Trains in Operation curve on Figure 2 in 2-EOP-99.

EXAMINERS CUE:

COMMENTS:

STEP 25 (4.6.2): Maximize SI Flow PERFORM ALL of the following: _____ SAT C. ENSURE ALL available Charging Pumps are RUNNING.

_____ UNSAT STANDARD: VERIFY all available charging pumps are RUNNING.

EXAMINERS CUE:

COMMENTS:

NRC S-6 Simulator Page 14 of 17

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the task is COMPLETE.

STANDARD: NOTIFY the US that once-through-cooling has been ESTABLISHED IAW EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3. _____ SAT Through PORV V1475 only.

EXAMINERS CUE: US ACKNOWLEDGES. _____ UNSAT COMMENTS:

END OF TASK STOP TIME: __________

NRC S-6 Simulator Page 15 of 17

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-25 from the JPM IC Set Group.
2. DO NOT UNFREEZE the Simulator.
3. SELECT JPM Lesson File Folder.
4. SELECT Lesson S-6, OTC.Lsn and EXECUTE the Lesson.
5. UNFREEZE the Simulator
6. Make a Temporary STOREPOINT if more than one student will perform the JPM.
7. The lesson does NOT need to be stopped and re-executed for subsequent students.
8. UNFREEZE the Simulator when the student is ready.

NRC S-6 Page 16 of 17

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.

INITIATING CUES:

You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.

NRC S-6

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM EMERGENCY BORATION NRC S-7 Applicant Examiner JPM S-7 SIMULATOR Page 1 of 12

JOB PERFORMANCE MEASURE ST LUCIE NUCLEAR PLANT Task: Emergency Borate Faulted JPM? Yes Facility JPM #:

K/A: 004 A2.14 / 3.8 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency boration Duty Area(s): N/A Task Information: N/A Task Standard:

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:

2-EOP-01 Standard Post Trip Actions 2-AOP-02.2 Emergency Boration Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None JPM S-7 SIMULATOR Page 2 of 12

Read to Candidate Directions to candidate for In-Plant or Control Room JPMs:

I will explain the initial conditions and state the task to be performed. All in-plant or control room JPM steps, including any communications, shall be simulated for this JPM. Under no circumstances, unless directed by the examiner, are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.

Directions to candidate for Simulator JPMs:

I will explain the initial conditions and state the task to be performed. All simulator JPM steps, including any communications, shall be performed for this JPM. You are to operate any plant equipment that is necessary for the completion of this JPM. The simulator will provide the cues as you perform this JPM.

Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.

Initial Conditions:

A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.

Initiating Cues:

You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.

JPM S-7 SIMULATOR Page 3 of 12

START TIME: __________

1. DETERMINE Reactivity Control acceptance criteria are met:

STEP 1 (1A): Reactor power is lowering STANDARD: VERIFY reactor power LOWERING using redundant Nuclear Instrumentation _____ SAT EXAMINERS CUE:

_____ UNSAT EVALUATOR NOTE: During this scenario, an instructor should play the part of the Desk RCO and keep the annunciators acknowledged to allow the candidate to focus on the task at hand COMMENTS:

STEP 2 (1B): Verify Startup Rate is negative.

STANDARD: VERIFY Startup Rate is NEGATIVE using redundant Nuclear Instrumentation indications _____ SAT EXAMINERS CUE:

_____ UNSAT COMMENTS:

STEP 3 (1C): VERIFY ALL CEAs are fully inserted..

STANDARD: Using Core Mimic, ADS CRT, and CEDS Control Panel, DETERMINE that CEAs 37, and 45 are FULLY WITHDRAWN _____ SAT EXAMINERS CUE: _____ UNSAT COMMENTS:

JPM S-7 SIMULATOR Page 4 of 12

STEP 4.1(1.C.1): Contingency Actions INITIATE Emergency Boration to achieve adequate SDM.

_____ SAT STANDARD: ENTER 2-AOP-02.02, Emergency Boration

_____ UNSAT EXAMINERS CUE:

EXAMINERS NOTE: Applicant may elect to perform steps from memory. If so, when lineup is complete he should refer to the procedure to verify proper lineup.

COMMENTS:

2-AOP-02.02 EMERGENCY BORATION STEP 5 (4.2.1): VERIFY at least one charging pump is running with control switch in START

_____ SAT STANDARD: OBSERVES at least one charging pump running with 44 gpm flow and switch position in RUN.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 6 (4.2.2): VERIFY the MAKEUP MODE SELECTOR switch is in MANUAL.

STANDARD: OBSERVES Makeup Mode Selector Switch to MANUAL

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT STEP 7 (4.2.3): VERIFY V2525, BORON LOAD CONTROL VALVE is CLOSED.

STANDARD: OBSERVES V2525 is CLOSED

_____ SAT EXAMINERS CUE:

COMMENTS: _____ UNSAT JPM S-7 SIMULATOR Page 5 of 12

STEP 8 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:

A. Start at least one of the following: _____ SAT

  • 2B (BORIC ACID PUMP) _____ UNSAT STANDARD: POSITION 2A or 2B BAM Pump control switch to RUN EXAMINERS CUE:

EVALUATOR NOTE: Since the procedure doesnt specify which pump to run, either one is acceptable. Optimally, however, the candidate should start the pump associated with the Tech Spec designated BAM tank COMMENTS:

STEP 9 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:

B. IF 2A BORIC ACID PUMP was started, THEN CLOSE V2650, TANK 2A _____ SAT RECIRC VALVE.

STANDARD: POSITION V2650 control switch to CLOSE if 2A BORIC ACID PUMP was _____ UNSAT started.

EXAMINERS CUE:

COMMENTS:

STEP 10 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:

_____ SAT C. IF 2B BORIC ACID PUMP was started, THEN CLOSE V2651, TANK 2B RECIRC VALVE.

_____ UNSAT STANDARD: POSITION V2651 control switch to CLOSE if 2B BORIC ACID PUMP was started EXAMINERS CUE:

COMMENTS:

JPM S-7 SIMULATOR Page 6 of 12

STEP 11 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY FAULTED BORATE: STEP D. OPEN V2514 EMERGENCY BORATE.

_____ SAT STANDARD: POSITION V2514 control switch to OPEN and OBSERVE that valve does NOT open.

_____ UNSAT EXAMINERS CUE:

EVALUATOR NOTE:

COMMENTS:

STEP 12 (4.1): Contingency Actions

_____ SAT STANDARD: GO TO Section 4.2 Step 5 EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 13 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following:

A. STOP the running BORIC ACID PUMPS _____ SAT STANDARD: POSITIONS the control switch for the 2A and 2B BORIC ACID PUMPS to the STOP position

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 14 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following: FAULTED STEP B. OPEN V2508 VALVE (BA Gravity Feed B)

STANDARD: POSITION V2508 VALVE (BA Gravity Feed B) to OPEN and observes the _____ SAT valve does not open.

EXAMINERS CUE: _____ UNSAT COMMENTS:

JPM S-7 SIMULATOR Page 7 of 12

STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following FAULTED STEP C. OPEN V2509 VALVE (BA Gravity Feed A)

_____ SAT STANDARD: POSITION V2509 VALVE (BA Gravity Feed A) to OPEN and observes the valve does not open.

_____ UNSAT EXAMINERS CUE:

COMMENTS:

STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following D. CLOSE V2501, VCT OUTLET VALVE. _____ SAT STANDARD: GO TO Section 4.2 Step 6 prior to closing V2501 EXAMINERS CUE: _____ UNSAT EXAMINERS NOTE: If applicant closes V2501 at this time the Charging pumps will trip within a few seconds due to low suction pressure. Applicant should NOT close V2501 at this time.

COMMENTS:

STEP 16 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:

A. OPEN V2504, REFUEL WATER TO CHARGING PUMPS _____ SAT STANDARD: POSITION V2504 to OPEN

_____ UNSAT EXAMINERS CUE:

COMMENTS:

JPM S-7 SIMULATOR Page 8 of 12

STEP 17 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:

B. ENSURE V2501, VCT Outlet Valve Closed

_____ SAT STANDARD: POSITION V2501 to CLOSE.

EXAMINERS CUE: _____ UNSAT COMMENTS:

STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:

C. CLOSE V2508, BA GRAVITY FEED B _____ SAT STANDARD: POSITION V2508 to CLOSE or determines valve did not open from previous _____ UNSAT step.

EXAMINERS CUE:

COMMENTS:

STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:

D. CLOSE V2509 BA GRAVITY FEED A _____ SAT STANDARD: POSITION V2509 to CLOSE or determines valve did not open from previous _____ UNSAT step.

EXAMINERS CUE:

COMMENTS:

JPM S-7 SIMULATOR Page 9 of 12

STEP 20 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:

E. CLOSE V2514 EMERGENCY BORATE _____ SAT STANDARD: POSITION V2514 to CLOSE or determines valve did not open from previous _____ UNSAT step.

EXAMINERS CUE:

COMMENTS:

STEP (done): Notify US that task is complete.

STANDARD: NOTIFY ANPS that Reactivity Control has been verified and is being met with contingencies, emergency boration is in progress via RWT to suction of _____ SAT charging pumps.

EXAMINERS CUE: US ACKNOWLEDGES. THIS JPM IS COMPLETE. _____ UNSAT COMMENTS:

END OF TASK STOP TIME: __________

JPM S-7 SIMULATOR Page 10 of 12

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

Initial Conditions:

A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.

Initiating Cues:

You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.

S-7 Page 11 of 12

SIMULATOR JPM SETUP

1. RESTORE IC-1, 100% power, MOL.
2. UNFREEZE simulator.
3. SELECT CONFIGURE and CHANGE to JPM.
4. SELECT Lesson S-7 EB Lesson and START the lesson.
5. TRIGGER the step to stick out 2CEAs and fail V2514, V2509 and V2508 fail closed.
6. TRIGGER the step for reactor trip. The simulator will automatically freeze after 10 seconds.
7. MAKE a SNAPSHOT if more than one student will be performing the JPM.
8. FREEZE simulator until student is ready. The audible alarms will be reinstated when the simulator is placed in RUN.

S-7 Page 12 of 12

Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PUMP ECCS AREA SUMPS TO RDT POST LOCA -

UNIT 1 NRC C-1 Unit 1 Control Room Applicant Examiner NRC C-1 Unit 1 Control Room Page 1 of 6

JOB PERFORMANCE MEASURE Task: 07006020, Pump ECCS Area Sumps to the Containment (Pump ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1).

Faulted JPM? No Facility JPM #: 0821089 K/A Rating(s): A.04.02, (4.1) ECCS: Ability to manually operate and/or monitor in the control room:

Valves Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US is notified that the ECCS Area Sumps are aligned to the Reactor Drain Tank.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

1-EOP-03, Loss of Coolant Accident Validation Time: 5 minutes Time Critical: No Tools/Equipment/Procedures Needed:

1-EOP-03, Loss of Coolant Accident, (Step 40)

Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None NRC C-1 Unit 1 Control Room Page 2 of 6

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is:

Align ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1.

The performance level to be used for this JPM is Simulate This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.

INITIATING CUES:

You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.

NRC C-1 Unit 1 Control Room Page 3 of 6

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

1-EOP-03, Loss of Coolant Accident Step 40 Align ECCS Sumps to RDT If RAS is present, Then ALIGN the ECCS sumps to the reactor drain tank by performing ALL of the following:

STEP 1 (40.A): PLACE the ECCS Area Leakage System control switch, located on CRAC CRITICAL panel, to the RDT POSITION. STEP STANDARD: POSITION the ECCS Area Leakage System control switch to RDT. _____ SAT EXAMINERS CUE: ECCS Area Leakage System control switch indicates RDT _____ UNSAT COMMENTS:

STEP 2 (40.B): VERIFY ALL of the following:

1. HCV-06-9, RDT Pump Suction, CLOSES

_____ SAT

2. HCV-06-7, Sump Pump to EDT, CLOSES
3. HCV-06-8, Sump Pump to RDT, OPENS _____ UNSAT STANDARD: VERIFY HCV-06-9 and HCV-06-7 are CLOSED and HCV-06-8 is OPEN.

EXAMINERS CUE: HCV-06-9 indicates Green light ON, Red light OFF, HCV-06-7 indicates Green light ON, Red light OFF, HCV-06-8 indicates Green light OFF, Red light ON COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC C-1 Unit 1 Control Room Page 4 of 6

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (40.C): PERFORM BOTH of the following on RTGB 105: CRITICAL STEP

1. PLACE V6301, Rx Drn Tk Cntmt Isol, to RESET and then to OPEN.

_____ SAT STANDARD: POSITION V6301 control switch to RESET, then to OPEN.

EXAMINERS CUE: V6301 indicates Green light OFF, Red light ON _____ UNSAT COMMENTS:

STEP 4 (40.C): PERFORM BOTH of the following on RTGB 105: CRITICAL STEP

2. PLACE V6302, Rx Drain Tank Cntmt Isolation, to RESET and THEN to OPEN. _____ SAT STANDARD: POSITION V6302 control switch to RESET, then to OPEN.

_____ UNSAT EXAMINERS CUE: V6302 indicates Green light OFF, Red light ON COMMENTS:

STEP 5: VERIFY Annunciator Y-19, ECCS Pump Room Leakage Valves Misaligned, is LIT.

STANDARD: VERIFY Annunciator Y-19 is LIT. _____ SAT EXAMINERS CUE: Annunciator Y-19 is LIT

_____ UNSAT COMMENTS:

STEP (done): NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.

STANDARD: NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.

_____ SAT EXAMINERS CUE: Unit Supervisor ACKNOWLEDGES COMMENTS: _____ UNSAT END OF TASK STOP TIME: __________

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC C-1 Unit 1 Control Room Page 5 of 6

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.

INITIATING CUES:

You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.

Page 6 of 6 NRC C-1

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Applicant Examiner NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 1 of 9

Job Performance Measure NRC P-1 Task Number: 03105050 and 07009055 Task Title: Align AFW System in Response to Component Malfunction/Failure Faulted JPM: Yes No Facility JPM # N/A K/A Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: K4.01 Water sources and priority of use 4.1 Duty Areas: N/A Task Information: N/A Task Standard: N/A Evaluation Location Performance Level Simulator In Plant Perform Simulate Discuss Lab Other

References:

  • 1-AOP-09.02, Auxiliary Feedwater Validation Time: 15 Minutes Time Critical Yes No Tools/Equipment/Procedures Needed:
  • Standard Personal Protective Equipment
  • Flashlight
  • Radio
  • Watch Stander Key Ring for Locked Valves
  • None.

Radiological Protection and RWP Requirements:

  • None NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 2 of 9

Job Performance Measure NRC P-1 Specific Directions:

  • The Task you are to perform is: Align Unit 2 CST to Supply 1C AFW Pump
  • The performance level to be used for this JPM is Perform or Simulate.

(Circle the performance level being used for this implementation of the JPM.)

  • This Is Not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

Initial Conditions:

Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.

Initiating Cues:

You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.4.

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 3 of 9

Job Performance Measure NRC P-1 PERFORMANCE CHECKLIST Start Time:

1-AOP-09.02, Auxiliary Feedwater, Attachment 5 Notify Unit 2 Control Room.

STEP 1(1.A).

NOTIFY Unit 2 Control Room that Unit 2 CST will be Standard:

ALIGNED to supply the 1C AFW Pump. _____ Sat

_____ Unsat Examiners Unit 2 Control Room ACKNOWLEDGES Cue:

NOTE Comments:

In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (196) must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.

CAUTION

  • During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units.
  • In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
  • Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech.

Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Attachment 5 Step 1.C.

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 4 of 9

Job Performance Measure NRC P-1 STEP 2 (1.B). ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.

Standard: ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF. _____ Sat All Unit 1 Auxiliary Feedwater pumps are OFF. _____ Unsat Examiners Cue:

Comments:

At the Unit 2 CST, PERFORM one of the following to Critical Step STEP 3 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps:

1. IF the Unit 2 CST level is greater than 40 feet, THEN _____ Sat OPEN V12803, CST INLET TO / FROM UNIT 1 ISOL.

(CST/23/N-6/E-21) _____ Unsat Standard: UNLOCK and POSITION V12803 to OPEN (counterclockwise) and then RELOCK.

Examiners V12803 is fully counter clockwise and LOCKED.

Cue:

Initiating Cue gives Unit 2 CST level as 43 Feet. Valve Comments:

does not have to be re-locked to meet the Critical Step.

At the Unit 2 CST, PERFORM one of the following to STEP 4 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: _____ Sat

2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following: _____ Unsat
  • OPEN V12801, 2C AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
  • OPEN V12802, 2A/2B AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)

Determined to be NA, due to initiating cue.

Standard:

Examiners Initiating Cue gives Unit 2 CST level as 43 Feet.

Cue:

Comments:

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 5 of 9

Job Performance Measure NRC P-1 OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL. Critical Step STEP 5. (1.D)

(CST/24/N-685/E-1191)

Standard: UNLOCK and POSITION V12805 fully counter _____ Sat clockwise.

_____ Unsat V12805 is Fully counter clockwise Examiners Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

To supply 1C AFW pump, PERFORM the following: Critical Step STEP 6. (1.F)

(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N-9/E-19)

_____ Sat Standard: UNLOCK and POSITION V12506 fully clockwise. _____ Unsat Examiners V12506 is fully clockwise.

Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

To supply 1C AFW pump, PERFORM the following: Critical Step STEP 7 (1.F).

(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N-13/E-24)

_____ Sat Standard: UNLOCK and POSITION V12175 fully counter clockwise. _____ Unsat Examiners V12175 is fully counter clockwise.

Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 6 of 9

Job Performance Measure NRC P-1 Tosupply 1C AFW pump, PERFORM the following:

STEP 8 (1.F).

_____ Sat (3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, instrument isolation valve is OPEN. (TRSL/27/N-T3/W-

_____ Unsat TA)

Standard: POSITION Pl-12-18C instrument isolation to fully counter clockwise.

Examiners PI-12-18C instrument isolation valve is fully counter Cue: clockwise.

Comments:

To supply 1C AFW pump, PERFORM the following:

STEP 9 (1.F).

(4) VERIFY greater than 3 psig suction pressure on PI _____ Sat 18C, 1C AFW PUMP SUCTION PRESSURE.

_____ Unsat Standard: VERIFY GREATER THAN 3 psig on PI-12-18C.

Examiners PI-12-18C INDICATES 15 psig.

Cue:

Comments:

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 7 of 9

Job Performance Measure NRC P-1 STEP 10 (1.F). IF feeding S/Gs with 1C Auxiliary Feedwater Pump, THEN PERFORM the following Critical Step (5) CLOSE V09399, 1C AFW PUMP RECIRC ISOL _____ Sat (TRSL/23/N-T3/W-TA)

_____ Unsat Standard: POSITION V09399 to the fully clockwise position.

Examiners V09399 is fully clockwise.

Cue:

Comments:

STEP 6. Notify Unit 1 Unit Supervisor that the task is complete.

_____ Sat Standard: NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is lined up to take a suction on the Unit 2 CST IAW 1-AOP- _____ Unsat 09.02, Auxiliary Feedwater.

Examiners Unit 1 Unit Supervisor ACKNOWLEDGES.

Cue:

Comments: If candidate continues onward, then inform him This JPM is complete.

END OF TASK Stop Time:

NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 8 of 9

Job Performance Measure NRC P-1 CANDIDATE CUE SHEET Initial Conditions:

Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.

Initiating Cues:

You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.5.

NRC P-1 Page 9 of 9

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION - UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-2 Applicant Examiner NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11

Task: Hydrogen Purge System Operation - Unit 1 Faulted JPM? No Facility JPM #: 0821098 K/A Rating(s): 028 A2.02 / 3.5 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: LOCA condition and related concern over hydrogen Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:
  • 1-EOP-99, Appendix N, Hydrogen Purge System Operation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

RWP Required NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Hydrogen Purge System Operation - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.

INITIATING CUES:

You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.

NOTE TO EXAMINER:

Initiating cue identifies student as SNPO. No key will be required due to cues provided in steps 9 and 10.

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

Operate the Containment Hydrogen Purge System as follows:

STEP 1 (1): ENSURE ONE RAB Main Exhaust Fan, HVE-10A (B), is RUNNING, if available.

_____ SAT STANDARD: ENSURE HVE-10A or HVE-10B is RUNNING

_____ UNSAT EXAMINERS CUE: HVE-10B is RUNNING (from initiating cue)

COMMENTS:

STEP 2 (2) : VERIFY the following valves are LOCKED CLOSED:

V25015, Pen.58 to HVE-7A / 7B Gate - Filter Bypass _____ SAT STANDARD: VERIFY V25015 is LOCKED CLOSED _____ UNSAT EXAMINERS CUE: V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.

EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:

STEP 3 (2) : VERIFY the following valves are LOCKED CLOSED:

_____ SAT V-25-16, Pen. 58 to HVE-7A / 7B Gate - Filter Bypass STANDARD: VERIFY V-25-16 is LOCKED CLOSED _____ UNSAT EXAMINERS CUE: V-25-16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (3) : CLOSE FCV-25-9, Pen-57 to HVE-7 Intake CRITICAL STEP STANDARD: DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED. _____ SAT EXAMINERS CUE: FCV-25-9 MECHANICAL POINTER INDICATES 0.

Light indication is GREEN _____ UNSAT EVALUATORS NOTE: The pushbutton for FCV-25-9 is located inside Junction Box B1117 on the column south west of FCV-25-9.

The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.

COMMENTS:

STEP 5 (4) : UNLOCK and OPEN the following valves: CRITICAL STEP V25013, Pen. 57 to HVE-7A / 7B Gate Suction

_____ SAT STANDARD: UNLOCK and OPEN V25013

_____ UNSAT EXAMINERS CUE: V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4) : UNLOCK and OPEN the following valves: CRITICAL STEP V-25-14, Pen. 57 to HVE-7A / 7B Gate Suction

_____ SAT STANDARD: UNLOCK and OPEN V-25-14 EXAMINERS CUE: V-25-14 handwheel UNLOCKED and ROTATED _____ UNSAT COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:

STEP 7 (5): VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.

STANDARD: VERIFY V-25-18 is CLOSED _____ SAT EXAMINERS CUE: V-25-18 handwheel ROTATED CLOCKWISE until hard stop REACHED _____ UNSAT EVALUATORS NOTE: V-25-18 is located next to V-25-17 in overhead COMMENTS:

STEP 8 (6): OPEN V-25-17, HVE-7A/7B Disch. Gate to Vent Stack. CRITICAL STEP STANDARD: POSITION V-25-17 to OPEN

_____ SAT EXAMINERS CUE: V-25-17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED

_____ UNSAT EVALUATORS NOTE: Valve is above HVE-6B COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (7): UNLOCK and OPEN the following valves: CRITICAL STEP (location V25011, Makeup Air Before Pen. 56 Gate (19.5 Elev.) of valve)

STANDARD: UNLOCK and OPEN V25011 _____ SAT EXAMINERS CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other _____ UNSAT operator.

EVALUATORS NOTE: Question the Applicant where the valve is located.

(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.

COMMENTS:

STEP 10 (7) : UNLOCK and OPEN the following valves: CRITICAL STEP (location V-25-12, Makeup Air Before Pen. 56 Gate (19.5 Elev.) of valve)

STANDARD: UNLOCK and OPEN V-25-12 _____ SAT EXAMINERS CUE: When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPENED by an _____ UNSAT other operator.

EVALUATORS NOTE: Question the Applicant where the valve is located.

(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.

COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed STEP and approximately 10% open.

_____ SAT STEP 11 (8): ENSURE FCV-25-10, HVS-4 Plenum to HVE-7 Intake, is THROTTLED OPEN. _____ UNSAT STANDARD: POSITION FCV-25-10 to THROTTLED OPEN.

EXAMINERS CUE: FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.

EVALUATORS NOTE: Control panel is located on column near north end of the 6A filter train COMMENTS:

STEP 12 (9): START ONE Hydrogen Purge Fan. CRITICAL STEP HVE-7A OR _____ SAT HVE-7B STANDARD: DEPRESS START pushbutton for HVE-7B, (from initiating cue) _____ UNSAT EXAMINERS CUE: HVE-7B RED light ON, GREEN light OFF.

EVALUATORS NOTE: Control panel is located on column next to fans COMMENTS:

STEP 13 (10): THROTTLE OPEN FCV-25-9, Pen-57 to HVE-7 Intake, to obtain between CRITICAL 90 and 100 CFM on FR-25-1, Local Flow Recorder STEP STANDARD: DEPRESS (and hold) THE OPEN PUSHBUTTON until the desired _____ SAT flowrate of between 90 and 100cfm is obtained.

EXAMINERS CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 _____ UNSAT INDICATES approximately 95cfm COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE

  • High charcoal temperatures are postulated to occur only as a result of restricted air _____ SAT flows rates less than 55 cfm.
  • Iodine desorption occurs at approximately 300°F and charcoal ignition at _____ UNSAT approximately 640°F STEP 14 (11): MONITOR the following on TR-25-2 in the Control Room
  • Channel 1, Before Hydrogen Purge Charcoal Absorber (TE-25-18)
  • Channel 2, Hydrogen Purge Charcoal Absorber (TE-25-19)
  • Channel 3, Hydrogen Purge Charcoal Absorber (TE-25-20)
  • Channel 4, After Hydrogen Purge Charcoal Absorber (TE-25-21)

STANDARD: REQUEST Control Room Monitor the above points on TR-25-2 EXAMINERS CUE: Control Room is MONITORING Channels 1, 2, 3 & 4.

COMMENTS:

NOTE CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed and STEP approximately 10% open.

_____ SAT STEP 15 (12): ADJUST FCV-25-10 to maintain charcoal absorber temperature below alarm set point on TR-25-2 (RTGB-106). _____ UNSAT STANDARD: OPEN FCV-25-10 as necessary to MAINTAIN temperature <190°F EXAMINERS CUE: Control Room informs you that TR-25-2 is Indicating 190°F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190°F.

If asked, Alarm Setpoint is 190°F.

EXAMINERS CUE: Open Pushbutton DEPRESSED momentarily, Control Informs you that TR-25-2 is INDICATING 175°F and Stable EVALUATORS NOTE: Located on the east side of the filter train, Indications by local TE: TI-25-HVE-7-1 and TI-25-HVE-7-2 COMMENTS:

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16 (13): Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation.

_____ SAT STANDARD: REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINERS CUE: Control Room Informs you that they will Monitor Plant _____ UNSAT Vent Radiation levels, and containment hydrogen concentration.

COMMENTS:

END OF TASK STOP TIME: __________

NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.

INITIATING CUES:

You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.

NRC P-2 Page 11 of 11

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DROPPED OR MISALIGNED CEA ABNORMAL OPERATIONS, PERFORM MANIPULATIONS OUTSIDE THE CONTROL ROOM

- UNIT 1 NRC P-3 Cable Spreading Room Unit 1 Applicant Examiner NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 1 of 9

JOB PERFORMANCE MEASURE Task: CEA AOP, Perform Manipulations Outside the Control Room - Unit 1 Faulted JPM? Yes Facility JPM #: 0821111 K/A: 001 K6.11 / 2.9 Knowledge of the effect of a loss or malfunction on the following CRDS components: Location and operation of CRDS fault detection (trouble alarms) and reset system, including rod control annunciator.

Duty Area(s): N/A Task Information: N/A Task Standard:

JPM is complete when IC/OPS notified CEA 62 power has been restored.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations.

Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:

1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations, Attachment 5.

Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 2 of 9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is:

CEA ONOP, Perform Manipulations Outside the Control Room - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

I will provide you with the appropriate cues for steps that are simulated or discussed.

You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 was at 100% power late in core life.

The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.

Reactor and turbine power were matched.

All attempts from the control room to operate CEA 62 have failed.

INITIATING CUES:

The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 3 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________

ATTACHMENT 5 Section 3.0 STEP 1: (3.0.1) INSPECT affected CEDM power supplies as follows: FAULTED (CPP cabinets, cable spreading room) STEP A. VERIFY red CIRCUIT BREAKER CLOSED light is ON.

_____ SAT STANDARD: VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.

_____ UNSAT EXAMINERS CUE: RED CIRCUIT BREAKER CLOSED LIGHT IS EXTINGUISHED, NOT ILLUMINATED.

COMMENTS:

STEP 2: (3.0.1) INSPECT affected CEDM power supplies as follows: CRITICAL (CPP cabinets, cable spreading room) STEP B. IF red CIRCUIT BREAKER CLOSED light is OFF AND affected _____ SAT CEA has been dropped, THEN OPEN and CLOSE affected CEA CIRCUIT BREAKER. (behind the affected CEAs control panel door) _____ UNSAT STANDARD: OPEN CEA 62s control panel door, and POSITION the circuit breaker to OFF, then POSITION the breaker to ON.

VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.

EXAMINERS CUE: When positioned, the breaker is OFF.

When positioned, the breaker is ON.

If asked, the red CIRCUIT BREAKER CLOSED light is ILLUMINATED.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 4 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (3.0.1) INSPECT affected CEDM power supplies as follows:

(CPP cabinets, cable spreading room)

_____ SAT C. VERIFY white CIRCUIT BREAKER OPEN light is OFF.

_____ UNSAT STANDARD: VERIFY the white CIRCUIT BREAKER OPEN light is NOT ILLUMINATED.

EXAMINERS CUE: WHITE CIRCUIT BREAKER OPEN LIGHT IS NOT ILLUMINATED.

COMMENTS:

STEP 4:(3.0.1) INSPECT affected CEDM power supplies as follows:

(CPP cabinets, cable spreading room)

D. On the affected ACTM, VERIFY green POWER LED is ON. _____ SAT STANDARD: OBSERVE GREEN Power On LED on the Coil Power Programmer timer module ILLUMINATED. _____ UNSAT EXAMINERS CUE: GREEN POWER ON LED IS ILLUMINATED.

COMMENTS:

STEP 5:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on FAULTED rear of CPP cabinets for alarms as follows: STEP A. VERIFY red power supply alarm lights are OFF. (two lights per CEA on rear of CPP cabinets) _____ SAT STANDARD: VERIFY the two red power supply lights for CEA 62 are EXTINGUISHED

_____ UNSAT EXAMINERS CUE: THE TWO POWER SUPPLY LIGHTS FOR CEA 62 ARE ILLUMINATED, ON.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 5 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:

_____ SAT B. IF any power supply alarm lights are ON, THEN RESET them as follows:

1) RECORD lights that are ON. _____ UNSAT STANDARD: RECORDS the two red power supply lights for CEA 62 are ON EXAMINERS CUE: NONE.

COMMENTS:

STEP 7:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on CRITICAL rear of CPP cabinets for alarms as follows: STEP B. IF any power supply alarm lights are ON, THEN RESET them as _____ SAT follows:

2) PRESS lights that are ON to reset them to OFF condition.

_____ UNSAT STANDARD: DEPRESS the two red power supply lights for CEA 62.

EXAMINERS CUE: BOTH RED POWER SUPPLY LIGHTS ARE EXTINGUISHED.

COMMENTS:

STEP 8:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:

_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:

1) PRESS pushbutton for affected CEA on side of CEDM 15 V TRANSIENT MONITOR SYSTEM assembly to latch _____ UNSAT alarm lights ON for bulb-check.

STANDARD: DEPRESS the button on the side of the Transient Monitor System that corresponds to CEA 62, and VERIFY the two red power supply alarm lights are ILLUMINATED.

EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE ILLUMINATED.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 6 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:

_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:

2) RESET alarm lights to OFF condition by pressing them.

_____ UNSAT STANDARD: DEPRESS the two red alarm lights for CEA 62, and VERIFY the two red power supply alarm lights are EXTINGUISHED.

EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE EXTINGUISHED.

COMMENTS:

STEP 10:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:

_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:

3) IF alarm lights are still ON after being reset, THEN NOTIFY I&C. _____ UNSAT STANDARD: DETERMINE step is N/A.

EXAMINERS CUE: NONE.

COMMENTS:

STEP 11:(3.0.3) ENSURE HVA-4 and HVA-5 Cable Spreading Room A/C units are running.

STANDARD: VERIFY HVA-4 and HVA-5 Cable Spreading Room A/C units are running. _____ SAT EXAMINERS CUE: HVA-4 and HVA-5 Cable Spreading Room A/C units are running. _____ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 7 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12:(3.0.4) VERIFY cooling fans for CPP cabinet sections 3 through 18 are RUNNING.

STANDARD: VERIFY either visually or by presence of air flow that the fans in sections 3 _____ SAT through 18 are running.

EXAMINERS CUE: FANS IN SECTION 3 THROUGH 18 ARE RUNNING. _____ UNSAT COMMENTS:

STEP 13:(3.0.5) EXAMINE CEAPDS and CEDS and CPP cabinets for abnormal conditions.

STANDARD: VERIFY no abnormal conditions on the cabinets by visual observations and _____ SAT comparing known normal indications to possible abnormal indications.

EXAMINERS CUE: NO ABNORMAL CONDITIONS APPEAR TO EXIST. _____ UNSAT COMMENTS:

STEP 14(3.0.6) NOTIFY I&C of any problems found.

STANDARD: REPORT red CIRCUIT BREAKER ON light and power supply alarm light problems to I&C via telephone. _____ SAT EXAMINERS CUE: I&C ACKNOWLEDGES.

_____ UNSAT COMMENTS:

END OF TASK STOP TIME: __________

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 8 of 9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 was at 100% power late in core life.

The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.

Reactor and turbine power were matched.

All attempts from the control room to operate CEA 62 have failed.

INITIATING CUES:

The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).

.

NRC P-3 Page 9 of 9