{{#Wiki_filter:Communication Plan for the State-of-the-Art Reactor Consequences Analyses (DRAFT -Revision 3)Overview The State-of-the-Art Reactor Consequences Analyses (SOARCA) research project is a U.S.Nuclear Regulatory Commission (NRC) initiative to develop realistic estimates of the potential health effects to the public from a nuclear power plant accident where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences.
{{#Wiki_filter:Communication Plan for the State-of-the-Art Reactor Consequences Analyses (DRAFT - Revision 3)
The project also evaluated and improved, as appropriate, methods and models for realistically evaluating the plant response during such severe accidents, including public evacuation and sheltering.
Overview The State-of-the-Art Reactor Consequences Analyses (SOARCA) research project is a U.S.
NRC performed this study to calculate realistic information about possibilities for how severe accidents at nuclear power plants could be mitigated and the harm to the public could be prevented or minimized.
Nuclear Regulatory Commission (NRC) initiative to develop realistic estimates of the potential health effects to the public from a nuclear power plant accident where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences. The project also evaluated and improved, as appropriate, methods and models for realistically evaluating the plant response during such severe accidents, including public evacuation and sheltering. NRC performed this study to calculate realistic information about possibilities for how severe accidents at nuclear power plants could be mitigated and the harm to the public could be prevented or minimized.
The first phase of SOARCA analyzed examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). The first phase has been completed and a summary of the results was provided to the Commission.
The first phase of SOARCA analyzed examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). The first phase has been completed and a summary of the results was provided to the Commission. The staff is now developing a draft NUREG for peer review. Upon completion of the independent external peer-review, the staff will incorporate the peer-review comments and release the results of SOARCA in the form of a technical report (NUREG) and a risk communication information booklet (NUREG/BR).
The staff is now developing a draft NUREG for peer review. Upon completion of the independent external peer-review, the staff will incorporate the peer-review comments and release the results of SOARCA in the form of a technical report (NUREG) and a risk communication information booklet (NUREG/BR).
NRC will then consider whether analyses are needed for other reactor types and sites.
NRC will then consider whether analyses are needed for other reactor types and sites.Goals The goal of SOARCA is to determine best estimates of the offsite radiological consequences for severe accidents at U.S. operating reactors using a methodology based on state-of-the-art analytical tools and to present those results using risk communication techniques to achieve informed public understanding of the important factors. These factors include the extent and value of defense-in-depth features of plant design and operation as well as mitigation strategies that are employed to reduce risk. As a result, SOARCA will replace outdated analyses such as d NUREG/CR-2239, "Technical Guidance for Siting Criteria Development," dated November f 1982,------------0=11--thea-al-ss--------
Goals The goal of SOARCA is to determine best estimates of the offsite radiological consequences for severe accidents at U.S. operating reactors using a methodology based on state-of-the-art analytical tools and to present those results using risk communication techniques to achieve informed public understanding of the important factors. These factors include the extent and value of defense-in-depth features of plant design and operation as well as mitigation strategies that are employed to reduce risk. As a result, SOARCA will replace outdated analyses such as     d NUREG/CR-2239, "Technical Guidance for Siting Criteria Development," dated November                 f 1982,------------0=11--thea-al-ss--------                                                                   t
t Background To develop information that will help in its regulatory mission to protect the public, NRC has performed several research studies to understand probabilities and potential consequences of severe accidents at nuclear plants. Because limited realistic information was available for these historical studies, they were based on conservative assumptions about how the plants would sie il vrb fly=Iyzo OF11FI LIS E Si AL ItPRATIO" behave. These publicly available estimates have, at times, been misinterpreted and misused.To improve public understanding, the SOARCA project seeks to produce more realistic and likely estimates.
 
Over the past 25 years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment.
===Background===
That research has significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents.
To develop information that will help in its regulatory mission to protect the public, NRC has performed several research studies to understand probabilities and potential consequences of severe accidents at nuclear plants. Because limited realistic information was available for these historical studies, they were based on conservative assumptions about how the plants would sie vrbilfly=Iyz
During that same time, reactor owners have improved plant designs, emergency procedures, maintenance programs, and operator training, all of which have enhanced plant safety. Plant owners and local governments also have refined and improved emergency preparedness measures to further protect the public in the event of a severe accident.
 
The SOARCA team applied this accumulated research and incorporated plant enhancements to achieve a more realistic evaluation of consequences from severe nuclear accidents.
OF11FI     LIS E                     Si     AL ItPRATIO" behave. These publicly available estimates have, at times, been misinterpreted and misused.
The results of this research will become the foundation for communicating aspects of severe accidents and updating information from older research studies.The NRC staff used state-of-the-art information and computer modeling tools to develop best estimates of accident progression and, for scenarios in which accidents proceed to core damage, what radioactive material could potentially be released into the environment.
To improve public understanding, the SOARCA project seeks to produce more realistic and likely estimates.
The staff then assessed those releases to realistically estimate the potential consequence to the public.The staff considered the following in these new analyses: 1 .Design-specific reactor accident sequence progression, taking into account the plant's current design configuration.
Over the past 25 years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment. That research has significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents.
: 2. Design-specific potential containment failure timing, location, and size.3. Site-specific emergency planning assumptions, including evacuation and sheltering.
During that same time, reactor owners have improved plant designs, emergency procedures, maintenance programs, and operator training, all of which have enhanced plant safety. Plant owners and local governments also have refined and improved emergency preparedness measures to further protect the public in the event of a severe accident. The SOARCA team applied this accumulated research and incorporated plant enhancements to achieve a more realistic evaluation of consequences from severe nuclear accidents. The results of this research will become the foundation for communicating aspects of severe accidents and updating information from older research studies.
: 4. Credit for operator actions based on emergency operating procedures, severe accident management guidelines, and post-9/11 and other mitigation measures that were in place at the time of the assessment.
The NRC staff used state-of-the-art information and computer modeling tools to develop best estimates of accident progression and, for scenarios in which accidents proceed to core damage, what radioactive material could potentially be released into the environment. The staff then assessed those releases to realistically estimate the potential consequence to the public.
: 5. Site-specific meteorological conditions and updated population data.The agency could learn more by rigorously and realistically quantifying a relatively few important events. The project set technical criteria to determine which scenarios were important and focused its resources accordingly.
The staff considered the following in these new analyses:
The project team included scenarios having an estimated core damage frequency of 106 per reactor year (one in a million) or greater. Also, bypass scenarios having an estimated core damage frequency of 1Q-7 per reactor year or greater were included.L ONL-S TIVE I NL R As noted above, the accident analysis for each scenario included credit for operator mitigation actions. Also, to quantify the benefits of the mitigation measures and to provide a basis for comparison to past analyses of unmitigated severe accident scenarios, these same scenarios were analyzed in the SOARCA project assuming the event proceeded as unmitigated, leading ultimately to an offsite release.An independent, external peer-review committee will examine the approach and underlying assumptions and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art.
: 1.       Design-specific reactor accident sequence progression, taking into account the plant's current design configuration.
Key Messages General Messages* In carrying out its mission to protect public health and safety, NRC performs research to determine the risk of commercial nuclear power plant operation to the public. The SOARCA research project realistically estimates the potential consequences to the public given the best possible understanding of accident phenomena and plant performance under accident conditions." The results of this project indicate reactor safety has improved over the years as a result of efforts by industry to improve plant design and operation and by NRC to develop improved regulations to enhance safety.* Both mitigated and unmitigated cases predict that no early fatalities will occur and average individual latent cancer fatality risks are very low for the unmitigated scenarios examined." Our analyses indicate that potential radiation releases would occur several hours later than earlier thought, and they would be substantially smaller; as a result, offsite consequences from severe accidents at nuclear power plants would be smaller than previously predicted." The results of this consequence analysis provide the public, NRC, and other government agencies with a more realistic picture and a better understanding of potential consequences in the unlikely event of an accident.Additional Key Messages for the Scientific Community Information developed from years of research has been incorporated into the tools that NRC uses to evaluate potential accidents.
: 2.       Design-specific potential containment failure timing, location, and size.
These tools are the SPAR, MELCOR, and MACCS2 computer codes. These codes were used to select the scenarios, to model FFICIA E ON -NSITI IN NAL IN ATI IC I ý !!! ýNILYý- ITIV NLFO AT4N--*~ -4 nuclear power plant systems and operator responses to severe accident conditions, and to produce a best estimate of consequences to the public.This study focuses on those accidents estimated to have a one in a million chance per year or greater of core damage (a core damage frequency of approximately equal to or greater than 10-6 per reactor year). SPAR models will be used to identify those potential scenarios that will be further evaluated.
: 3.       Site-specific emergency planning assumptions, including evacuation and sheltering.
In addition, the project placed emphasis on sequences that may be a little less likely to occur but with the potential for more severe consequences.
: 4.       Credit for operator actions based on emergency operating procedures, severe accident management guidelines, and post-9/11 and other mitigation measures that were in place at the time of the assessment.
Containment bypass events have the potential for more severe consequences and, therefore, those bypass sequences estimated to have a 1 in 10 million chance per year or greater to result in core damage (a core damage frequency equal to or greater than 10.7 per reactor year)were included within the scope of SOARCA. The project teams used the SPAR models to identify the included potential bypass scenarios.
: 5.       Site-specific meteorological conditions and updated population data.
* Plant-specific MELCOR analyses reflected design-specific features.
The agency could learn more by rigorously and realistically quantifying a relatively few important events. The project set technical criteria to determine which scenarios were important and focused its resources accordingly. The project team included scenarios having an estimated core damage frequency of 106 per reactor year (one in a million) or greater. Also, bypass scenarios having an estimated core damage frequency of 1Q-7 per reactor year or greater were included.
MELCOR code modeled the nuclear power plant behavior, the progression of the accident, and the radioactive material released into the environment.
L       ONL-S       TIVE I       NL         R
This includes the timing of fuel damage, component failures, and releases to the environment.
 
* Structural analyses determined the expected containment performance during accidents." MACCS2 calculations used site-specific actions, emergency planning, weather data, population data, and evacuation times (including sheltering) to estimate consequences such as early fatalities and latent cancer injuries.Communication Team The'communication team includes the following members and will be responsible for facilitating communication activities for the SOARCA project: S .Team Manager: Jimi Yerokun, Office of Nuclear Regulatory Research* Team Members: Terry Brock, Office of Nuclear Regulatory Research* Charles Tinkler, Office of Nuclear Regulatory Research* Richard Guzman, Office of Nuclear Reactor Regulation
As noted above, the accident analysis for each scenario included credit for operator mitigation actions. Also, to quantify the benefits of the mitigation measures and to provide a basis for comparison to past analyses of unmitigated severe accident scenarios, these same scenarios were analyzed in the SOARCA project assuming the event proceeded as unmitigated, leading ultimately to an offsite release.
* Scott Burnell, Office of Public Affairs* Susan Bagley, Office of the Executive Director for Operations
An independent, external peer-review committee will examine the approach and underlying assumptions and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art.
* David Decker, Office of Congressional Affairs As the project progresses, it is expected that other NRC staff members will participate in communication activities, as needed.* FF U ON SE ITIVE INT L INF M ON Audiences External Stakeholders include: " General public* Public interest groups* Media* Congress* Licensees* Nuclear industry.organizations (e.g., Nuclear Energy Institute, Institute of Nuclear Power Operations, Electric Power Research Institute)
Key Messages General Messages
* Department of Homeland Security and other Federal and State agencies* State regulators and Agreement States* International groups Internal Stakeholders include: " The Commission" Advisory Committee on Reactor Safeguards (ACRS)" NRC staff Fl Y -S II TERN I RMAT 0 AL US LY -S IImWEfk,1NFOFw tQ Communication Tools The following tools will be used to communicate with external stakeholders:
* In carrying out its mission to protect public health and safety, NRC performs research to determine the risk of commercial nuclear power plant operation to the public. The SOARCA research project realistically estimates the potential consequences to the public given the best possible understanding of accident phenomena and plant performance under accident conditions.
Public Website Questions and Answers Fact Sheet Information booklet Public Meetings Press Releases Technical Reports External Briefings Internal Briefings Information about project will be placed on the external website.This contains information that highlights aspects of the project that audience members may inquire about. These questions and answers are given at the end of this Communication Plan.A fact sheet will be prepared to provide the public with an overview of the project.A summary of the SOARCA project will be presented in a separate NUREG/CR booklet using plain language and applying risk communication techniques.
"       The results of this project indicate reactor safety has improved over the years as a result of efforts by industry to improve plant design and operation and by NRC to develop improved regulations to enhance safety.
This booklet is a tool to enable NRC and its stakeholders to develop a common understanding about risk. It will be issued after the peer review is completed.
* Both mitigated and unmitigated cases predict that no early fatalities will occur and average individual latent cancer fatality risks are very low for the unmitigated scenarios examined.
Meetings will be held to publicly share information at key phases of the project.A press release will be issued after the peer review is completed and at other times as appropriate.
"       Our analyses indicate that potential radiation releases would occur several hours later than earlier thought, and they would be substantially smaller; as a result, offsite consequences from severe accidents at nuclear power plants would be smaller than previously predicted.
Press releases will be coordinated with the Office of Public Affairs.Technical information about the process and results will be documented in a NUREG and will be made publicly available through the Agencywide Documents Access and Management System (ADAMS) and the NRC's external website. This NUREG is being developed and will be issued after the peer review is completed.
"       The results of this consequence analysis provide the public, NRC, and other government agencies with a more realistic picture and a better understanding of potential consequences in the unlikely event of an accident.
Briefings will be provided to Congressional and State stakeholders as requested.
Additional Key Messages for the Scientific Community Information developed from years of research has been incorporated into the tools that NRC uses to evaluate potential accidents. These tools are the SPAR, MELCOR, and MACCS2 computer codes. These codes were used to select the scenarios, to model FFICIA       E ON     -NSITI       IN     NAL IN       ATI
Prior to releasing the results, the SOARCA staff will hold briefings for technical staff in NRC Regional offices and other interested NRC staff to help prepare them to communicate about the results.F LU -SENS R INF MILESTONES OF COMMUNICATION ACTIVITIES COMMUNICATION ACTIVITIES RESPONSIBILITY DATE Semi-annual TA brief T. Brock ongoing Quarterly DEDO brief T. Brock ongoing Meeting with ACRS SOARCA Team July 2009 Independent Peer Review of documents starts -issue SOARCA Team/OPA July 2009 press release I _I Steering Committee meeting T. Brock September 2009 Public release of SOARCA results for Peach Bottom and Surry -The following activities are planned to engage stakeholders to promote a common understanding of the SOARCA results.Public website update SOARCA Team Early 2010 Briefings on results to Regional and HQ staff prior to T. Brock Early 2010 public release (nonpublic meeting) T._Brockarly_201 Briefings on results to participating licensees T. Brock Early 2010 All-Agreement States and Non-Agreement States T. BrockIFSMEIDILR Early 2010 letter Press release to coincide with the release of the T. BrockIOPA Early 2010 SOARCA results Chairman holds press briefing T. Brock/OPA Early 2010 Public release of NUREG and the NUREG/BR SOARCA Team/SNL/information booklet OPA Early 2010 Public Workshop SOARCA Team/SNL Early 2010 Regulatory Information Conference (RIC) SOARCA Team March 2010 Presentations on final results Evaluation and Monitoring The communication plan continues to be updated to reflect key ideas being communicated to stakeholders and key decision points in the project's progress.
 
Communication from these venues will be reflected in responses to key questions and ideas during the project's progress.7 N N I E R NTIW NKL AOR~
IC I ý!!!ýNILYý-       ITIV       NLFO           AT4N--
F LAý k E01 _18 _E'P''l i1:4R I At M _\Questions and Answers What is the State-of-the-Art Reactor Consequences Analyses (SOARCA) project?SOARCA is a research project that develops realistic estimates of the potential public health effects from a nuclear power plant accident, where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences.
                          *~                     -4 nuclear power plant systems and operator responses to severe accident conditions, and to produce a best estimate of consequences to the public.
The project also evaluates and improves, as appropriate, methods and models for realistically evaluating both the plant response during such severe accidents, including evacuation and sheltering and the potential public risk.Why is the U.S. Nuclear Regulatory Commission (NRC) performing this study?NRC is doing this study to develop the most realistic evaluations possible for the potential consequences of severe nuclear accidents.
This study focuses on those accidents estimated to have a one in a million chance per year or greater of core damage (a core damage frequency of approximately equal to or greater than 10-6 per reactor year). SPAR models will be used to identify those potential scenarios that will be further evaluated.
Over the years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment.
In addition, the project placed emphasis on sequences that may be a little less likely to occur but with the potential for more severe consequences. Containment bypass events have the potential for more severe consequences and, therefore, those bypass sequences estimated to have a 1 in 10 million chance per year or greater to result in core damage (a core damage frequency equal to or greater than 10.7 per reactor year) were included within the scope of SOARCA. The project teams used the SPAR models to identify the included potential bypass scenarios.
The results have significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents.
* Plant-specific MELCOR analyses reflected design-specific features. MELCOR code modeled the nuclear power plant behavior, the progression of the accident, and the radioactive material released into the environment. This includes the timing of fuel damage, component failures, and releases to the environment.
Also, plant owners have improved the plant design, emergency procedures, maintenance programs, and operator training, all of which have improved plant safety. Emergency preparedness measures also have been refined and improved to further protect the public in the highly unlikely event of a severe accident.Combining all of this new information and analysis will improve the realism of accident consequence evaluations.
* Structural analyses determined the expected containment performance during accidents.
How will this study be different from earlier studies?The SOARCA project will:* Use an improved understanding of source terms and severe accident phenomenology.
"     MACCS2 calculations used site-specific actions, emergency planning, weather data, population data, and evacuation times (including sheltering) to estimate consequences such as early fatalities and latent cancer injuries.
Communication Team The'communication team includes the following members and will be responsible for facilitating communication activities for the SOARCA project:
S   .Team Manager: Jimi Yerokun, Office of Nuclear Regulatory Research
* Team Members: Terry Brock, Office of Nuclear Regulatory Research
* Charles Tinkler, Office of Nuclear Regulatory Research
* Richard Guzman, Office of Nuclear Reactor Regulation
* Scott Burnell, Office of Public Affairs
* Susan Bagley, Office of the Executive Director for Operations
* David Decker, Office of Congressional Affairs As the project progresses, it is expected that other NRC staff members will participate in communication activities, as needed.
* FF           U   ON     SE     ITIVE INT     L INF   M     ON
 
Audiences External Stakeholders include:
"       General public
* Public interest groups
* Media
* Congress
* Licensees
* Nuclear industry.organizations (e.g., Nuclear Energy Institute, Institute of Nuclear Power Operations, Electric Power Research Institute)
* Department of Homeland Security and other Federal and State agencies
* State regulators and Agreement States
* International groups Internal Stakeholders include:
"       The Commission
"       Advisory Committee on Reactor Safeguards (ACRS)
"       NRC staff Fl             Y -S     II       TERN     I     RMAT
 
0       AL US       LY -S                         IImWEfk,1NFOFw tQ Communication Tools The following tools will be used to communicate with external stakeholders:
Public Website               Information about project will be placed on the external website.
Questions and Answers        This contains information that highlights aspects of the project that audience members may inquire about. These questions and answers are given at the end of this Communication Plan.
Fact Sheet                    A fact sheet will be prepared to provide the public with an overview of the project.
Information booklet          A summary of the SOARCA project will be presented in a separate NUREG/CR booklet using plain language and applying risk communication techniques. This booklet is a tool to enable NRC and its stakeholders to develop a common understanding about risk. It will be issued after the peer review is completed.
Public Meetings              Meetings will be held to publicly share information at key phases of the project.
Press Releases                A press release will be issued after the peer review is completed and at other times as appropriate. Press releases will be coordinated with the Office of Public Affairs.
Technical Reports            Technical information about the process and results will be documented in a NUREG and will be made publicly available through the Agencywide Documents Access and Management System (ADAMS) and the NRC's external website. This NUREG is being developed and will be issued after the peer review is completed.
External Briefings            Briefings will be provided to Congressional and State stakeholders as requested.
Internal Briefings            Prior to releasing the results, the SOARCA staff will hold briefings for technical staff in NRC Regional offices and other interested NRC staff to help prepare them to communicate about the results.
F LU             -SENS               R     INF
 
MILESTONES OF COMMUNICATION ACTIVITIES COMMUNICATION ACTIVITIES                         RESPONSIBILITY             DATE Semi-annual TA brief                                             T. Brock             ongoing Quarterly DEDO brief                                             T. Brock             ongoing Meeting with ACRS                                             SOARCA Team             July 2009 Independent Peer Review of documents starts - issue       SOARCA Team/OPA           July 2009 press release                                           I       _I Steering Committee meeting                                       T. Brock         September 2009 Public release of SOARCA results for Peach Bottom and Surry - The following activities are planned to engage stakeholders to promote a common understanding of the SOARCA results.
Public website update                                         SOARCA Team           Early 2010 Briefings on results to Regional and HQ staff prior to           T. Brock           Early 2010 public release (nonpublic meeting)                               T._Brockarly_201 Briefings on results to participating licensees                   T. Brock           Early 2010 All-Agreement States and Non-Agreement States             T. BrockIFSMEIDILR       Early 2010 letter Press release to coincide with the release of the             T. BrockIOPA         Early 2010 SOARCA results Chairman holds press briefing                                 T. Brock/OPA         Early 2010 Public release of NUREG and the NUREG/BR                   SOARCA Team/SNL/
information booklet                                                 OPA             Early 2010 Public Workshop                                           SOARCA Team/SNL           Early 2010 Regulatory Information Conference (RIC)                       SOARCA Team           March 2010 Presentations on final results Evaluation and Monitoring The communication plan continues to be updated to reflect key ideas being communicated to stakeholders and key decision points in the project's progress. Communication from these venues will be reflected in responses to key questions and ideas during the project's progress.
7 N       N     I   E     R     NTIW       NKL         AOR~
 
F LAýk E01                 _18_E'P''l i1:4R       I       At M _\
Questions and Answers What is the State-of-the-Art Reactor Consequences Analyses (SOARCA) project?
SOARCA is a research project that develops realistic estimates of the potential public health effects from a nuclear power plant accident, where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences. The project also evaluates and improves, as appropriate, methods and models for realistically evaluating both the plant response during such severe accidents, including evacuation and sheltering and the potential public risk.
Why is the U.S. Nuclear Regulatory Commission (NRC) performing this study?
NRC is doing this study to develop the most realistic evaluations possible for the potential consequences of severe nuclear accidents. Over the years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment. The results have significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents. Also, plant owners have improved the plant design, emergency procedures, maintenance programs, and operator training, all of which have improved plant safety. Emergency preparedness measures also have been refined and improved to further protect the public in the highly unlikely event of a severe accident.
Combining all of this new information and analysis will improve the realism of accident consequence evaluations.
How will this study be different from earlier studies?
The SOARCA project will:
* Use an improved understanding of source terms and severe accident phenomenology.
* Credit the use of severe accident mitigation strategies and procedures.
* Credit the use of severe accident mitigation strategies and procedures.
* Use updated emergency preparedness modeling.* Account for plant improvements.
* Use updated emergency preparedness modeling.
* Use modern computer resources and advanced software to yield more accurate results.In addition, the SOARCA project is designed to be a more realistic estimate.
* Account for plant improvements.
Some of the earlier studies also were designed to be best estimates; however, because they were limited by the available knowledge of accident phenomenology, these older studies were conservative (particularly the very improbable severe accidents).
* Use modern computer resources and advanced software to yield more accurate results.
The SOARCA project will provide the latest basis from which the public and decisionmakers can assess the consequences of severe reactor accidents.-FIC 0 -S IV TERN I MAT A ._PRCIAL UAE NLY ITIV AL 1 TIO"9-What are the potential uses of the SOARCA study?The overarching purpose of this study is to provide more realistic information about potential nuclear power plant consequences to the public and other stakeholders, including Federal, State, and local authorities.
In addition, the SOARCA project is designed to be a more realistic estimate. Some of the earlier studies also were designed to be best estimates; however, because they were limited by the available knowledge of accident phenomenology, these older studies were conservative (particularly the very improbable severe accidents). The SOARCA project will provide the latest basis from which the public and decisionmakers can assess the consequences of severe reactor accidents.
This study also will increase understanding of the value of defense-in-depth features of plant design and operation, including the use of mitigative strategies.
0     -S
                                        -FIC    IV     TERN       I     MAT
 
A.
_PRCIAL UAE     NLY           ITIV           AL 1           TIO "9-What are the potential uses of the SOARCA study?
The overarching purpose of this study is to provide more realistic information about potential nuclear power plant consequences to the public and other stakeholders, including Federal, State, and local authorities. This study also will increase understanding of the value of defense-in-depth features of plant design and operation, including the use of mitigative strategies.
What consequence measures are being estimated?
What consequence measures are being estimated?
This study assesses the health effects of a potential radiation release to the general public.State-of-the-art analytical models estimate the individual risk of prompt fatality and latent cancer fatality that could occur in the remote event that a severe reactor accident occurs.Prompt fatalities are those resulting from exposure to very high doses of radiation as the result of a release. These fatalities occur soon after exposure (days to months). Latent cancer fatalities are those resulting from the long-term effect of radiation exposure.
This study assesses the health effects of a potential radiation release to the general public.
The estimates of public health effects in this new study realistically account for the emergency planning measures in place at each reactor site, unlike some of the past studies that used generic assumptions.
State-of-the-art analytical models estimate the individual risk of prompt fatality and latent cancer fatality that could occur in the remote event that a severe reactor accident occurs.
Which plants are participating in the SOARCA project?The first phase of SOARCA analyzes examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). After the first phase has been completed, NRC will consider whether analyses are needed for other reactor types and sites.Does this study consider new reactors that may be built?No. New reactor designs and containments are not part of the project. The project analyzes existing reactors.Are terrorist acts, such as aircraft impacts, being analyzed as part of SOARCA?No. The focus of this study is on accident scenarios-not terrorist-related ones-that could potentially lead to a radiological release into the environment.
Prompt fatalities are those resulting from exposure to very high doses of radiation as the result of a release. These fatalities occur soon after exposure (days to months). Latent cancer fatalities are those resulting from the long-term effect of radiation exposure. The estimates of public health effects in this new study realistically account for the emergency planning measures in place at each reactor site, unlike some of the past studies that used generic assumptions.
NRC addresses security-related events in separate, non-public analysis.Are accidents at spent fuel pools considered in this study?No. This study does not consider spent fuel pools. The project is focused on evaluating the severe and very unlikely reactor core accidents that may occur quickly at operating power reactors.OKICl LY -IN NA O IAL IV I INFgR TON Why are the fatality numbers different from the results predicted by earlier research?NRC is providing the most realistic, most accurate estimates possible.
Which plants are participating in the SOARCA project?
When NRC published previous studies, the available analytical methods and data about nuclear plant operation were cruder and the results were therefore conservative.
The first phase of SOARCA analyzes examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). After the first phase has been completed, NRC will consider whether analyses are needed for other reactor types and sites.
Since then, NRC and the industry have improved safety and mitigation measures in the plants. In addition, NRC has improved methods to calculate consequences.
Does this study consider new reactors that may be built?
Therefore, the SOARCA project is an update to the previous research based on all the information known today.How much different would the numbers be if NRC did the calculations the same way they were done in the past?The purpose of the SOARCA project is somewhat different from the calculations done in the past because this project is a "best estimate" consequences analysis.
No. New reactor designs and containments are not part of the project. The project analyzes existing reactors.
In addition, NRC's knowledge, computational capabilities, and modeling methodologies are better now than in the past. A detailed report (available through Agencywide Documents Access and Management System [ADAMS]) will describe the justifications for the changes in both input values and calculation methods-regardless of their impact on the final number.Why does NRC report individual latent cancer fatality risk and not total cancer fatalities?
Are terrorist acts, such as aircraft impacts, being analyzed as part of SOARCA?
Reporting the latent cancer fatality risk promotes better understanding and meaning to individuals.
No. The focus of this study is on accident scenarios-not terrorist-related ones-that could potentially lead to a radiological release into the environment. NRC addresses security-related events in separate, non-public analysis.
Cancer fatality risk provides easier comparison to other kinds of cancers and context to what the accident scenarios mean to individuals.
Are accidents at spent fuel pools considered in this study?
In addition, this method better represents the risk due to proximity to the site. The focus on individuals from far away to close to the plant shows the increase in risk due to the postulated severe accident.
No. This study does not consider spent fuel pools. The project is focused on evaluating the severe and very unlikely reactor core accidents that may occur quickly at operating power reactors.
The Environmental Protection Agency and others also commonly use cancer fatality risk as a way to report consequence.
OKICl               LY -             IN     NA       O
If I live within one of the reported distances in the results of SOARCA, how do I interpret my specific risk relative to the average value reported?The human health risks calculated in SOARCA are very small. To interpret the average individual cancer risk results from SOARCA, it is helpful to compare to the NRC safety goal for cancer risk of 2 in 1 million per year. The average individual cancer risks calculated in SOARCA within the 10-mile emergency planning zone are all in the 1 in a billion to 1 in a 100 billion per year range. The average individual risk numbers decrease the further the distance out from the plant (e.g., 50 and 100 miles). The SOARCA cancer risk values are all significantly smaller than the NRC-established safety goal of no significant additional risk to life and health.FFICI U NLY -S INTE ORMA N Is this study being reviewed by outside experts?Yes. In addition to the peer review afforded by NRC's Advisory Committee on Reactor Safeguards, an independent external peer review of scientific and technical experts will assess the methodological approach, underlying assumptions, and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art.
 
This peer review is a common practice in research and will show both the strengths and weaknesses of the research project. NRC will continue to use the methods shown to be strengths of the research project, and the experts' comments on the weaknesses will help improve future research projects.IC U N -TV R M}}
IAL                     IV     I         INFgR     TON Why are the fatality numbers different from the results predicted by earlier research?
NRC is providing the most realistic, most accurate estimates possible. When NRC published previous studies, the available analytical methods and data about nuclear plant operation were cruder and the results were therefore conservative. Since then, NRC and the industry have improved safety and mitigation measures in the plants. In addition, NRC has improved methods to calculate consequences. Therefore, the SOARCA project is an update to the previous research based on all the information known today.
How much different would the numbers be if NRC did the calculations the same way they were done in the past?
The purpose of the SOARCA project is somewhat different from the calculations done in the past because this project is a "best estimate" consequences analysis. In addition, NRC's knowledge, computational capabilities, and modeling methodologies are better now than in the past. A detailed report (available through Agencywide Documents Access and Management System [ADAMS]) will describe the justifications for the changes in both input values and calculation methods-regardless of their impact on the final number.
Why does NRC report individual latent cancer fatality risk and not total cancer fatalities?
Reporting the latent cancer fatality risk promotes better understanding and meaning to individuals. Cancer fatality risk provides easier comparison to other kinds of cancers and context to what the accident scenarios mean to individuals. In addition, this method better represents the risk due to proximity to the site. The focus on individuals from far away to close to the plant shows the increase in risk due to the postulated severe accident. The Environmental Protection Agency and others also commonly use cancer fatality risk as a way to report consequence.
If I live within one of the reported distances in the results of SOARCA, how do I interpret my specific risk relative to the average value reported?
The human health risks calculated in SOARCA are very small. To interpret the average individual cancer risk results from SOARCA, it is helpful to compare to the NRC safety goal for cancer risk of 2 in 1 million per year. The average individual cancer risks calculated in SOARCA within the 10-mile emergency planning zone are all in the 1 in a billion to 1 in a 100 billion per year range. The average individual risk numbers decrease the further the distance out from the plant (e.g., 50 and 100 miles). The SOARCA cancer risk values are all significantly smaller than the NRC-established safety goal of no significant additional risk to life and health.
FFICI     U     NLY - S           INTE           ORMA
 
N Is this study being reviewed by outside experts?
Yes. In addition to the peer review afforded by NRC's Advisory Committee on Reactor Safeguards, an independent external peer review of scientific and technical experts will assess the methodological approach, underlying assumptions, and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art. This peer review is a common practice in research and will show both the strengths and weaknesses of the research project. NRC will continue to use the methods shown to be strengths of the research project, and the experts' comments on the weaknesses will help improve future research projects.
IC U       N   -       TV       R             M}}

Latest revision as of 09:22, 12 November 2019

Communication Plan for the State-of-the-Art Reactor Consequence Analyses (Draft - Revision 3)
ML12024A365
Person / Time
Site: Peach Bottom, Surry  Constellation icon.png
Issue date: 12/08/2011
From:
Office of Nuclear Regulatory Research
To:
References
FOIA/PA-2011-0083
Download: ML12024A365 (11)


Text

Communication Plan for the State-of-the-Art Reactor Consequences Analyses (DRAFT - Revision 3)

Overview The State-of-the-Art Reactor Consequences Analyses (SOARCA) research project is a U.S.

Nuclear Regulatory Commission (NRC) initiative to develop realistic estimates of the potential health effects to the public from a nuclear power plant accident where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences. The project also evaluated and improved, as appropriate, methods and models for realistically evaluating the plant response during such severe accidents, including public evacuation and sheltering. NRC performed this study to calculate realistic information about possibilities for how severe accidents at nuclear power plants could be mitigated and the harm to the public could be prevented or minimized.

The first phase of SOARCA analyzed examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). The first phase has been completed and a summary of the results was provided to the Commission. The staff is now developing a draft NUREG for peer review. Upon completion of the independent external peer-review, the staff will incorporate the peer-review comments and release the results of SOARCA in the form of a technical report (NUREG) and a risk communication information booklet (NUREG/BR).

NRC will then consider whether analyses are needed for other reactor types and sites.

Goals The goal of SOARCA is to determine best estimates of the offsite radiological consequences for severe accidents at U.S. operating reactors using a methodology based on state-of-the-art analytical tools and to present those results using risk communication techniques to achieve informed public understanding of the important factors. These factors include the extent and value of defense-in-depth features of plant design and operation as well as mitigation strategies that are employed to reduce risk. As a result, SOARCA will replace outdated analyses such as d NUREG/CR-2239, "Technical Guidance for Siting Criteria Development," dated November f 1982,------------0=11--thea-al-ss-------- t

Background

To develop information that will help in its regulatory mission to protect the public, NRC has performed several research studies to understand probabilities and potential consequences of severe accidents at nuclear plants. Because limited realistic information was available for these historical studies, they were based on conservative assumptions about how the plants would sie vrbilfly=Iyz

OF11FI LIS E Si AL ItPRATIO" behave. These publicly available estimates have, at times, been misinterpreted and misused.

To improve public understanding, the SOARCA project seeks to produce more realistic and likely estimates.

Over the past 25 years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment. That research has significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents.

During that same time, reactor owners have improved plant designs, emergency procedures, maintenance programs, and operator training, all of which have enhanced plant safety. Plant owners and local governments also have refined and improved emergency preparedness measures to further protect the public in the event of a severe accident. The SOARCA team applied this accumulated research and incorporated plant enhancements to achieve a more realistic evaluation of consequences from severe nuclear accidents. The results of this research will become the foundation for communicating aspects of severe accidents and updating information from older research studies.

The NRC staff used state-of-the-art information and computer modeling tools to develop best estimates of accident progression and, for scenarios in which accidents proceed to core damage, what radioactive material could potentially be released into the environment. The staff then assessed those releases to realistically estimate the potential consequence to the public.

The staff considered the following in these new analyses:

1. Design-specific reactor accident sequence progression, taking into account the plant's current design configuration.
2. Design-specific potential containment failure timing, location, and size.
3. Site-specific emergency planning assumptions, including evacuation and sheltering.
4. Credit for operator actions based on emergency operating procedures, severe accident management guidelines, and post-9/11 and other mitigation measures that were in place at the time of the assessment.
5. Site-specific meteorological conditions and updated population data.

The agency could learn more by rigorously and realistically quantifying a relatively few important events. The project set technical criteria to determine which scenarios were important and focused its resources accordingly. The project team included scenarios having an estimated core damage frequency of 106 per reactor year (one in a million) or greater. Also, bypass scenarios having an estimated core damage frequency of 1Q-7 per reactor year or greater were included.

L ONL-S TIVE I NL R

As noted above, the accident analysis for each scenario included credit for operator mitigation actions. Also, to quantify the benefits of the mitigation measures and to provide a basis for comparison to past analyses of unmitigated severe accident scenarios, these same scenarios were analyzed in the SOARCA project assuming the event proceeded as unmitigated, leading ultimately to an offsite release.

An independent, external peer-review committee will examine the approach and underlying assumptions and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art.

Key Messages General Messages

  • In carrying out its mission to protect public health and safety, NRC performs research to determine the risk of commercial nuclear power plant operation to the public. The SOARCA research project realistically estimates the potential consequences to the public given the best possible understanding of accident phenomena and plant performance under accident conditions.

" The results of this project indicate reactor safety has improved over the years as a result of efforts by industry to improve plant design and operation and by NRC to develop improved regulations to enhance safety.

  • Both mitigated and unmitigated cases predict that no early fatalities will occur and average individual latent cancer fatality risks are very low for the unmitigated scenarios examined.

" Our analyses indicate that potential radiation releases would occur several hours later than earlier thought, and they would be substantially smaller; as a result, offsite consequences from severe accidents at nuclear power plants would be smaller than previously predicted.

" The results of this consequence analysis provide the public, NRC, and other government agencies with a more realistic picture and a better understanding of potential consequences in the unlikely event of an accident.

Additional Key Messages for the Scientific Community Information developed from years of research has been incorporated into the tools that NRC uses to evaluate potential accidents. These tools are the SPAR, MELCOR, and MACCS2 computer codes. These codes were used to select the scenarios, to model FFICIA E ON -NSITI IN NAL IN ATI

IC I ý!!!ýNILYý- ITIV NLFO AT4N--

  • ~ -4 nuclear power plant systems and operator responses to severe accident conditions, and to produce a best estimate of consequences to the public.

This study focuses on those accidents estimated to have a one in a million chance per year or greater of core damage (a core damage frequency of approximately equal to or greater than 10-6 per reactor year). SPAR models will be used to identify those potential scenarios that will be further evaluated.

In addition, the project placed emphasis on sequences that may be a little less likely to occur but with the potential for more severe consequences. Containment bypass events have the potential for more severe consequences and, therefore, those bypass sequences estimated to have a 1 in 10 million chance per year or greater to result in core damage (a core damage frequency equal to or greater than 10.7 per reactor year) were included within the scope of SOARCA. The project teams used the SPAR models to identify the included potential bypass scenarios.

  • Plant-specific MELCOR analyses reflected design-specific features. MELCOR code modeled the nuclear power plant behavior, the progression of the accident, and the radioactive material released into the environment. This includes the timing of fuel damage, component failures, and releases to the environment.
  • Structural analyses determined the expected containment performance during accidents.

" MACCS2 calculations used site-specific actions, emergency planning, weather data, population data, and evacuation times (including sheltering) to estimate consequences such as early fatalities and latent cancer injuries.

Communication Team The'communication team includes the following members and will be responsible for facilitating communication activities for the SOARCA project:

S .Team Manager: Jimi Yerokun, Office of Nuclear Regulatory Research

  • Team Members: Terry Brock, Office of Nuclear Regulatory Research
  • Charles Tinkler, Office of Nuclear Regulatory Research
  • Susan Bagley, Office of the Executive Director for Operations
  • David Decker, Office of Congressional Affairs As the project progresses, it is expected that other NRC staff members will participate in communication activities, as needed.
  • FF U ON SE ITIVE INT L INF M ON

Audiences External Stakeholders include:

" General public

  • Public interest groups
  • Media
  • Congress
  • Licensees
  • Nuclear industry.organizations (e.g., Nuclear Energy Institute, Institute of Nuclear Power Operations, Electric Power Research Institute)
  • State regulators and Agreement States
  • International groups Internal Stakeholders include:

" The Commission

" Advisory Committee on Reactor Safeguards (ACRS)

" NRC staff Fl Y -S II TERN I RMAT

0 AL US LY -S IImWEfk,1NFOFw tQ Communication Tools The following tools will be used to communicate with external stakeholders:

Public Website Information about project will be placed on the external website.

Questions and Answers This contains information that highlights aspects of the project that audience members may inquire about. These questions and answers are given at the end of this Communication Plan.

Fact Sheet A fact sheet will be prepared to provide the public with an overview of the project.

Information booklet A summary of the SOARCA project will be presented in a separate NUREG/CR booklet using plain language and applying risk communication techniques. This booklet is a tool to enable NRC and its stakeholders to develop a common understanding about risk. It will be issued after the peer review is completed.

Public Meetings Meetings will be held to publicly share information at key phases of the project.

Press Releases A press release will be issued after the peer review is completed and at other times as appropriate. Press releases will be coordinated with the Office of Public Affairs.

Technical Reports Technical information about the process and results will be documented in a NUREG and will be made publicly available through the Agencywide Documents Access and Management System (ADAMS) and the NRC's external website. This NUREG is being developed and will be issued after the peer review is completed.

External Briefings Briefings will be provided to Congressional and State stakeholders as requested.

Internal Briefings Prior to releasing the results, the SOARCA staff will hold briefings for technical staff in NRC Regional offices and other interested NRC staff to help prepare them to communicate about the results.

F LU -SENS R INF

MILESTONES OF COMMUNICATION ACTIVITIES COMMUNICATION ACTIVITIES RESPONSIBILITY DATE Semi-annual TA brief T. Brock ongoing Quarterly DEDO brief T. Brock ongoing Meeting with ACRS SOARCA Team July 2009 Independent Peer Review of documents starts - issue SOARCA Team/OPA July 2009 press release I _I Steering Committee meeting T. Brock September 2009 Public release of SOARCA results for Peach Bottom and Surry - The following activities are planned to engage stakeholders to promote a common understanding of the SOARCA results.

Public website update SOARCA Team Early 2010 Briefings on results to Regional and HQ staff prior to T. Brock Early 2010 public release (nonpublic meeting) T._Brockarly_201 Briefings on results to participating licensees T. Brock Early 2010 All-Agreement States and Non-Agreement States T. BrockIFSMEIDILR Early 2010 letter Press release to coincide with the release of the T. BrockIOPA Early 2010 SOARCA results Chairman holds press briefing T. Brock/OPA Early 2010 Public release of NUREG and the NUREG/BR SOARCA Team/SNL/

information booklet OPA Early 2010 Public Workshop SOARCA Team/SNL Early 2010 Regulatory Information Conference (RIC) SOARCA Team March 2010 Presentations on final results Evaluation and Monitoring The communication plan continues to be updated to reflect key ideas being communicated to stakeholders and key decision points in the project's progress. Communication from these venues will be reflected in responses to key questions and ideas during the project's progress.

7 N N I E R NTIW NKL AOR~

F LAýk E01 _18_E'Pl i1:4R I At M _\

Questions and Answers What is the State-of-the-Art Reactor Consequences Analyses (SOARCA) project?

SOARCA is a research project that develops realistic estimates of the potential public health effects from a nuclear power plant accident, where low-likelihood scenarios could release radioactive material into the environment and potentially cause offsite consequences. The project also evaluates and improves, as appropriate, methods and models for realistically evaluating both the plant response during such severe accidents, including evacuation and sheltering and the potential public risk.

Why is the U.S. Nuclear Regulatory Commission (NRC) performing this study?

NRC is doing this study to develop the most realistic evaluations possible for the potential consequences of severe nuclear accidents. Over the years, NRC, industry, and international nuclear safety organizations have completed substantial research on plant response to hypothetical accidents that could damage the core and containment. The results have significantly improved NRC's ability to analyze and predict how nuclear plant systems and operators would respond to severe accidents. Also, plant owners have improved the plant design, emergency procedures, maintenance programs, and operator training, all of which have improved plant safety. Emergency preparedness measures also have been refined and improved to further protect the public in the highly unlikely event of a severe accident.

Combining all of this new information and analysis will improve the realism of accident consequence evaluations.

How will this study be different from earlier studies?

The SOARCA project will:

  • Use an improved understanding of source terms and severe accident phenomenology.
  • Credit the use of severe accident mitigation strategies and procedures.
  • Account for plant improvements.
  • Use modern computer resources and advanced software to yield more accurate results.

In addition, the SOARCA project is designed to be a more realistic estimate. Some of the earlier studies also were designed to be best estimates; however, because they were limited by the available knowledge of accident phenomenology, these older studies were conservative (particularly the very improbable severe accidents). The SOARCA project will provide the latest basis from which the public and decisionmakers can assess the consequences of severe reactor accidents.

0 -S

-FIC IV TERN I MAT

A.

_PRCIAL UAE NLY ITIV AL 1 TIO "9-What are the potential uses of the SOARCA study?

The overarching purpose of this study is to provide more realistic information about potential nuclear power plant consequences to the public and other stakeholders, including Federal, State, and local authorities. This study also will increase understanding of the value of defense-in-depth features of plant design and operation, including the use of mitigative strategies.

What consequence measures are being estimated?

This study assesses the health effects of a potential radiation release to the general public.

State-of-the-art analytical models estimate the individual risk of prompt fatality and latent cancer fatality that could occur in the remote event that a severe reactor accident occurs.

Prompt fatalities are those resulting from exposure to very high doses of radiation as the result of a release. These fatalities occur soon after exposure (days to months). Latent cancer fatalities are those resulting from the long-term effect of radiation exposure. The estimates of public health effects in this new study realistically account for the emergency planning measures in place at each reactor site, unlike some of the past studies that used generic assumptions.

Which plants are participating in the SOARCA project?

The first phase of SOARCA analyzes examples of two major types of nuclear reactor in the United States: (1) Peach Bottom Atomic Station, a boiling water reactor (BWR), and (2) Surry Nuclear Power Plant, a pressurized water reactor (PWR). After the first phase has been completed, NRC will consider whether analyses are needed for other reactor types and sites.

Does this study consider new reactors that may be built?

No. New reactor designs and containments are not part of the project. The project analyzes existing reactors.

Are terrorist acts, such as aircraft impacts, being analyzed as part of SOARCA?

No. The focus of this study is on accident scenarios-not terrorist-related ones-that could potentially lead to a radiological release into the environment. NRC addresses security-related events in separate, non-public analysis.

Are accidents at spent fuel pools considered in this study?

No. This study does not consider spent fuel pools. The project is focused on evaluating the severe and very unlikely reactor core accidents that may occur quickly at operating power reactors.

OKICl LY - IN NA O

IAL IV I INFgR TON Why are the fatality numbers different from the results predicted by earlier research?

NRC is providing the most realistic, most accurate estimates possible. When NRC published previous studies, the available analytical methods and data about nuclear plant operation were cruder and the results were therefore conservative. Since then, NRC and the industry have improved safety and mitigation measures in the plants. In addition, NRC has improved methods to calculate consequences. Therefore, the SOARCA project is an update to the previous research based on all the information known today.

How much different would the numbers be if NRC did the calculations the same way they were done in the past?

The purpose of the SOARCA project is somewhat different from the calculations done in the past because this project is a "best estimate" consequences analysis. In addition, NRC's knowledge, computational capabilities, and modeling methodologies are better now than in the past. A detailed report (available through Agencywide Documents Access and Management System [ADAMS]) will describe the justifications for the changes in both input values and calculation methods-regardless of their impact on the final number.

Why does NRC report individual latent cancer fatality risk and not total cancer fatalities?

Reporting the latent cancer fatality risk promotes better understanding and meaning to individuals. Cancer fatality risk provides easier comparison to other kinds of cancers and context to what the accident scenarios mean to individuals. In addition, this method better represents the risk due to proximity to the site. The focus on individuals from far away to close to the plant shows the increase in risk due to the postulated severe accident. The Environmental Protection Agency and others also commonly use cancer fatality risk as a way to report consequence.

If I live within one of the reported distances in the results of SOARCA, how do I interpret my specific risk relative to the average value reported?

The human health risks calculated in SOARCA are very small. To interpret the average individual cancer risk results from SOARCA, it is helpful to compare to the NRC safety goal for cancer risk of 2 in 1 million per year. The average individual cancer risks calculated in SOARCA within the 10-mile emergency planning zone are all in the 1 in a billion to 1 in a 100 billion per year range. The average individual risk numbers decrease the further the distance out from the plant (e.g., 50 and 100 miles). The SOARCA cancer risk values are all significantly smaller than the NRC-established safety goal of no significant additional risk to life and health.

FFICI U NLY - S INTE ORMA

N Is this study being reviewed by outside experts?

Yes. In addition to the peer review afforded by NRC's Advisory Committee on Reactor Safeguards, an independent external peer review of scientific and technical experts will assess the methodological approach, underlying assumptions, and results obtained for Peach Bottom and Surry to ensure that they are defensible and state-of-the-art. This peer review is a common practice in research and will show both the strengths and weaknesses of the research project. NRC will continue to use the methods shown to be strengths of the research project, and the experts' comments on the weaknesses will help improve future research projects.

IC U N - TV R M