{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 30, 2012 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
 
August 30, 2012  
 
Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080  
 
Oak Harbor, OH 43449-9760  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE AUGUST 9, 2012, PUBLIC MEETING TO DISCUSS NRC'S REVIEW OF FENOC'S ROOT CAUSE ANALYSIS OF DAVIS-BESSE SHIELD BUILDING CRACKS  
OF THE AUGUST 9, 2012, PUBLIC MEETING TO DISCUSS NRCS REVIEW OF FENOCS ROOT CAUSE ANALYSIS OF DAVIS-BESSE SHIELD BUILDING CRACKS


==Dear Mr. Allen:==
==Dear Mr. Allen:==


On August 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Oak Harbor High School in Oak Harbor, Ohio. The meeting was between NRC management and FirstEnergy Nuclear Operating Company representatives to discuss the licensee's results of the root cause evaluation and corrective actions associated with the shield  
On August 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Oak Harbor High School in Oak Harbor, Ohio. The meeting was between NRC management and FirstEnergy Nuclear Operating Company representatives to discuss the licensees results of the root cause evaluation and corrective actions associated with the shield building cracking as well as the NRCs inspection of the licensees root cause activities and actions going forward.
 
The NRC began the meeting by discussing the purpose, agenda, and format of the meeting.
building cracking as well as the NRC's inspecti on of the licensee's root cause activities and actions going forward. The NRC began the meeting by discussing the purpos e, agenda, and format of the meeting. This was followed by a discussion of the backgro und information on the discovery of the cracks in the shield building at the Davis-Besse Nuclear Power Station and the associated NRC initial activities. The licensee then provided a presentation of its shield building condition evaluation, root cause investigation, and proposed corrective actions. During the root cause portion of its presentation, the licensee discussed its shield building concrete and configuration evaluation, analytical analyses, and water intrusion and freezing investigation. The licensee finalized its presentation with a discussion of its planned corrective actions. Following the licensee's presentation, the NRC provided information regarding NRC independent inspection activities of the licensee's root cause evaluation and proposed  
This was followed by a discussion of the background information on the discovery of the cracks in the shield building at the Davis-Besse Nuclear Power Station and the associated NRC initial activities.
 
The licensee then provided a presentation of its shield building condition evaluation, root cause investigation, and proposed corrective actions. During the root cause portion of its presentation, the licensee discussed its shield building concrete and configuration evaluation, analytical analyses, and water intrusion and freezing investigation. The licensee finalized its presentation with a discussion of its planned corrective actions.
corrective actions including the basis of NRC c onclusions. In addition, the NRC discussed the NRC-identified weaknesses of the licensee's root cause report. The NRC finalized its presentation by describing how the license renewal process incorporates the shield building cracking in current and future NRC review and inspection activities
Following the licensees presentation, the NRC provided information regarding NRC independent inspection activities of the licensees root cause evaluation and proposed corrective actions including the basis of NRC conclusions. In addition, the NRC discussed the NRC-identified weaknesses of the licensees root cause report. The NRC finalized its presentation by describing how the license renewal process incorporates the shield building cracking in current and future NRC review and inspection activities.
 
B. Allen   
 
The NRC's meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensee's meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in  and other attendees can be found in Enclosure 2.  


B. Allen                                  The NRCs meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensees meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in  and other attendees can be found in Enclosure 2.
At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.
At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.
Sincerely, /RA/
Sincerely,
David E. Hills, Chief Engineering Branch 1  
                                          /RA/
 
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ'
Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServŽ


==Enclosures:==
==Enclosures:==


As stated Enclosure 1 PUBLIC MEETING PRINCIPAL ATTENDEES August 9, 2012 FirstEnergy B. Allen, Site Vice President, Davis-Besse K. Byrd, Director, Site Engineering
As stated


J. Hook, Manager, Design Engineering  
PUBLIC MEETING PRINCIPAL ATTENDEES August 9, 2012 FirstEnergy B. Allen, Site Vice President, Davis-Besse K. Byrd, Director, Site Engineering J. Hook, Manager, Design Engineering Nuclear Regulatory Commission C. Casto, Regional Administrator, Region III S. Reynolds, Director, Division of Reactor Safety, Region III A. Stone, Chief, Division of Reactor Safety, Engineering Branch 2, Region III D. Hills, Chief, Division of Reactor Safety, Engineering Branch 1, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Holmberg, Senior Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region III D. Kimble, Senior Resident Inspector, Davis-Besse Nuclear Power Station Public Officials Hon. D. Kucinich, U.S. Representative S. Levorchick, Ottawa County (Ohio), Sheriff J. Sass, Ottawa County (Ohio), Chairman, Board of Commissioners S. Arndt, Ottawa County (Ohio), Board of Commissioners M. Stahl, Ottawa County (Ohio), Board of Commissioners S. Weirich, Oak Harbor (Ohio), Chief of Police J. Hatfield, Carroll Township (Ohio), Chief of Police F. Petersen, Ottawa County (Ohio), Emergency Management Director M. Drusbacky, Ottawa County (Ohio), Emergency Management G. Parmigian, Benton-Carroll-Salem (Ohio) School District, Superintendent T. Coffman, Benton-Carroll-Salem (Ohio) School District, Treasurer K. Thorbahn, Oak Harbor (Ohio), Oak Harbor High School Principal B. Martin, State of Ohio, Emergency Management Agency E. Denison, State of Ohio, Department of Public Health V. Leone, Port Clinton (Ohio), Mayor J. Ruvolo, U.S. Representative M. Kaptur, Congressional Assistant A. Longsworth Orr, U.S. Senator S. Brown, Congressional Assistant Enclosure 1
 
Nuclear Regulatory Commission C. Casto, Regional Administrator, Region III  
 
S. Reynolds, Director, Division of Reactor Safety, Region III A. Stone, Chief, Division of Reactor Safety, Engineering Branch 2, Region III D. Hills, Chief, Division of Reactor Safety, Engineering Branch 1, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Holmberg, Senior Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region III D. Kimble, Senior Resident Inspector, Davis-Besse Nuclear Power Station  
 
Public Officials
 
Hon. D. Kucinich, U.S. Representative  
 
S. Levorchick, Ottawa County (Ohio), Sheriff J. Sass, Ottawa County (Ohio), Chairman, Board of Commissioners S. Arndt, Ottawa County (Ohio), Board of Commissioners M. Stahl, Ottawa County (Ohio), Board of Commissioners S. Weirich, Oak Harbor (Ohio), Chief of Police J. Hatfield, Carroll Township (Ohio), Chief of Police F. Petersen, Ottawa County (Ohio), Emergency Management Director M. Drusbacky, Ottawa County (Ohio), Emergency Management G. Parmigian, Benton-Carroll-Salem (Ohio) School District, Superintendent T. Coffman, Benton-Carroll-Salem (Ohio) School District, Treasurer K. Thorbahn, Oak Harbor (Ohio), Oak Harbor High School Principal B. Martin, State of Ohio, Emergency Management Agency E. Denison, State of Ohio, Department of Public Health V. Leone, Port Clinton (Ohio), Mayor J. Ruvolo, U.S. Representative M. Kaptur, Congressional Assistant A. Longsworth Orr, U.S. Senator S. Brown, Congressional Assistant
 
B. Allen   
 
The NRC's meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensee's meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in  and other attendees can be found in Enclosure 2.


1 Enclosure 2 2 Enclosure 2 3 Enclosure 2 4 Enclosure 2 5 Enclosure 2 6 Enclosure 2 B. Allen                                              The NRCs meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensees meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in  and other attendees can be found in Enclosure 2.
At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.
At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.
Sincerely, /RA/
Sincerely,
David E. Hills, Chief Engineering Branch 1  
                                                      /RA/
 
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346; License No. NPF-3 cc w/encl: Distribution via ListServ'
Division of Reactor Safety Docket No. 50-346; License No. NPF-3 cc w/encl: Distribution via ListServŽ


==Enclosures:==
==Enclosures:==
As stated DISTRIBUTION
: Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource
RidsNrrDirsIrib Resource
Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak


DOCUMENT NAME: LTR 083012 DAVIS BESSE  
As stated DISTRIBUTION:                                                Allan Barker Silas Kennedy                                                Christine Lipa RidsNrrDorlLpl3-2 Resource                                    Carole Ariano RidsNrrPMDavisBesse Resource                                  Linda Linn RidsNrrDirsIrib Resource                                      DRPIII Chuck Casto                                                  DRSIII Cynthia Pederson                                              Patricia Buckley Steven Orth                                                  Tammy Tomczak Jared Heck DOCUMENT NAME: LTR 083012 DAVIS BESSE  


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING REGARDING SHIELD BUILDING CRACK.DOCX  
OF PUBLIC MEETING REGARDING SHIELD BUILDING CRACK.DOCX G Publicly Available           G Non-Publicly Available       G Sensitive     G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE         RIII                     RIII                   RIII                   RIII NAME           FNestor-Adorno:cs       DHills DATE           08/29/12                 08/30/12 OFFICIAL RECORD COPY}}
 
G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FNestor-Adorno:cs DHills   DATE 08/29/12 08/30/12 OFFICIAL RECORD COPY}}

Revision as of 23:12, 11 November 2019

08/09/12 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks
ML12243A283
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/30/2012
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML12243A283 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 30, 2012 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

SUMMARY

OF THE AUGUST 9, 2012, PUBLIC MEETING TO DISCUSS NRCS REVIEW OF FENOCS ROOT CAUSE ANALYSIS OF DAVIS-BESSE SHIELD BUILDING CRACKS

Dear Mr. Allen:

On August 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Oak Harbor High School in Oak Harbor, Ohio. The meeting was between NRC management and FirstEnergy Nuclear Operating Company representatives to discuss the licensees results of the root cause evaluation and corrective actions associated with the shield building cracking as well as the NRCs inspection of the licensees root cause activities and actions going forward.

The NRC began the meeting by discussing the purpose, agenda, and format of the meeting.

This was followed by a discussion of the background information on the discovery of the cracks in the shield building at the Davis-Besse Nuclear Power Station and the associated NRC initial activities.

The licensee then provided a presentation of its shield building condition evaluation, root cause investigation, and proposed corrective actions. During the root cause portion of its presentation, the licensee discussed its shield building concrete and configuration evaluation, analytical analyses, and water intrusion and freezing investigation. The licensee finalized its presentation with a discussion of its planned corrective actions.

Following the licensees presentation, the NRC provided information regarding NRC independent inspection activities of the licensees root cause evaluation and proposed corrective actions including the basis of NRC conclusions. In addition, the NRC discussed the NRC-identified weaknesses of the licensees root cause report. The NRC finalized its presentation by describing how the license renewal process incorporates the shield building cracking in current and future NRC review and inspection activities.

B. Allen The NRCs meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensees meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in and other attendees can be found in Enclosure 2.

At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ'

Enclosures:

As stated

PUBLIC MEETING PRINCIPAL ATTENDEES August 9, 2012 FirstEnergy B. Allen, Site Vice President, Davis-Besse K. Byrd, Director, Site Engineering J. Hook, Manager, Design Engineering Nuclear Regulatory Commission C. Casto, Regional Administrator, Region III S. Reynolds, Director, Division of Reactor Safety, Region III A. Stone, Chief, Division of Reactor Safety, Engineering Branch 2, Region III D. Hills, Chief, Division of Reactor Safety, Engineering Branch 1, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Holmberg, Senior Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region III D. Kimble, Senior Resident Inspector, Davis-Besse Nuclear Power Station Public Officials Hon. D. Kucinich, U.S. Representative S. Levorchick, Ottawa County (Ohio), Sheriff J. Sass, Ottawa County (Ohio), Chairman, Board of Commissioners S. Arndt, Ottawa County (Ohio), Board of Commissioners M. Stahl, Ottawa County (Ohio), Board of Commissioners S. Weirich, Oak Harbor (Ohio), Chief of Police J. Hatfield, Carroll Township (Ohio), Chief of Police F. Petersen, Ottawa County (Ohio), Emergency Management Director M. Drusbacky, Ottawa County (Ohio), Emergency Management G. Parmigian, Benton-Carroll-Salem (Ohio) School District, Superintendent T. Coffman, Benton-Carroll-Salem (Ohio) School District, Treasurer K. Thorbahn, Oak Harbor (Ohio), Oak Harbor High School Principal B. Martin, State of Ohio, Emergency Management Agency E. Denison, State of Ohio, Department of Public Health V. Leone, Port Clinton (Ohio), Mayor J. Ruvolo, U.S. Representative M. Kaptur, Congressional Assistant A. Longsworth Orr, U.S. Senator S. Brown, Congressional Assistant Enclosure 1

1 Enclosure 2 2 Enclosure 2 3 Enclosure 2 4 Enclosure 2 5 Enclosure 2 6 Enclosure 2 B. Allen The NRCs meeting presentation slides can be found in the Agencywide Documents Access and Management System (ADAMS) at ML12221A264. The licensees meeting slides can also be found in ADAMS at ML12221A268. A list of principal meeting attendees can be found in and other attendees can be found in Enclosure 2.

At the end of the meeting, members of the public were given the opportunity to ask questions to NRC officials.

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346; License No. NPF-3 cc w/encl: Distribution via ListServ'

Enclosures:

As stated DISTRIBUTION: Allan Barker Silas Kennedy Christine Lipa RidsNrrDorlLpl3-2 Resource Carole Ariano RidsNrrPMDavisBesse Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Chuck Casto DRSIII Cynthia Pederson Patricia Buckley Steven Orth Tammy Tomczak Jared Heck DOCUMENT NAME: LTR 083012 DAVIS BESSE

SUMMARY

OF PUBLIC MEETING REGARDING SHIELD BUILDING CRACK.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FNestor-Adorno:cs DHills DATE 08/29/12 08/30/12 OFFICIAL RECORD COPY