ML12338A437: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 22
| page count = 22
}}
}}
=Text=
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000058-00-BD01                                      Identified: 10/15/2012 Admitted: 10/15/2012                                          Withdrawn:
Rejected:                                                          Stricken:                                                                                                                                                          ENT000058 Other:                                                                                                                                                                                                                            Submitted: March 28, 2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                        N T                  ER                  TS              N                                                  O                                            G                                                            P              O R          IN                  D                  EN            IO                                LD                TI                          EP      T                      H          ZE                    KS            U DN ION        N BE                                R                  N                                                FO                LA                                            IN            C        SI M            PO                  O                                    AT                                                                              PR      IN                    ET                                AR            O LD LD AT FF TIO O  L                e U            M                  K                    PO              C                                AF                SU                        PE      PA        AW                    PE                                    F F U      O LA      pl N            A                    R                  M                                                                  IN                                            R            SK      PI                      EM O                  O                LO                              SC                                            PI                D                                            R              AF AF INS      SU    om EX                  W                    C                                                                                                                                                                              SC SC          IN      C EXTRACTION All blanket insulation. Remove 02_3RD POINT ES TO FWH 23B one blanket upstream and 1 IP2-06-30300,                                                                                                                              9321-2068 1      3EXB-6                                90-DEG ELBOW                                            Y            blanket downstream of elbow. Y    N                      SK-02      28 IAS, 51317542                                Located approximately 2' North and                                                            & 9321-2069 6' West of column B/16,El. 32'.
Calculation reinspection.
03_3RD POINT ES TO FWH 23C                        All blanket insulation. Remove IP2-06-30303,                                                                                5' of insulation from upstream 2      3EXC-2P                                STRAIGHT PIPE                                            Y                                            Y    N                      SK-03      20 IAS, 51317545                                Located approximately 9' North and                elbow weld.
3' East of B/12El. 30'.                                                                                                          Calculation reinspection.
Blanket and Cal Sil insulation.
03_3RD POINT ES TO FWH 23C Remove blanket upstream and IP2-06-30304, 3      3EXC-5                                90-DEG ELBOW                                            Y            60" of cal sil insulation      Y    N                      SK-03      28 IAS, 51317546                                Located 4' North and 3' East of downstream. Possible B/14, El. 25'.
asbestos.                                                                      Calculation reinspection.
03_3RD POINT ES TO FWH 23C                        All blanket insulation. Remove IP2-06-30305                                                                                insulation on entire pipe (~ 7' 4      3EXC-7P                                STRAIGHT PIPE                                            Y                                            Y    N                      SK-03      28 IAS, 51317547                                Located approximately 10' North                  long) exposing elbow welds on and 3' West of A/14, El. 32'.                    each end.                                                                      Calculation reinspection.
Only 10' is blanket, remainder downstream is cal sil. Remove 04_4TH POINT ES TO FWH 24A                        insulation so upstream elbow weld is accessible.Exam is 5  4EXA-3P US          IP2-06-30307          STRAIGHT PIPE                                            Y                                            Y    N                      SK-04      20 Located approximately 13' South of              UPSM pipe, check extent of 17/CC3 El. 28'.                                  previous exam if cal sil needs to be removed.
Calculation reinspection.
05_4TH POINT ES TO FWH 24B                        All blanket insulation. Remove from connection at condenser 6      4EXB-12                                45-DEG ELBOW                                            Y                                            Y    N                      SK-05      20 Located approximately 12' South                  to valve 4EX-3.
and 26' East of A/17, el. 36'.                                                                                                  Calculation reinspection.
05_4TH POINT ES TO FWH 24B                        All blanket insulation. Remove on pipe and uncover welds on 7      4EXB-8P                                STRAIGHT PIPE                                            Y                                            Y    N                      SK-05      20
                                                                                      . Located approximately 13' South                both elbows and CL of A/17, El. 25'                                                                                                          Calculation reinspection.
All blanket insulation. Remove 06_4TH POINT ES TO FWH 24C                        blanket on pipe and uncover welds at valves.
8    4EXC-14P          IP2-06-30315          STRAIGHT PIPE        Pipe located between valves 4EX-5  N                                            Y    N                      SK-06      20 and 4EX-6 Located approximately 20' East of A/15, El. 36'.
Calculation reinspection.
NCW_220                                          All blanket insulation. Remove blanket off valve FCV-1206 9      220-7P          IP2-06-30316          STRAIGHT PIPE        Located approximately 8' West and  N            body, downstream pipe and all  Y    N                    SK-220      12 CL F/15, El. 36'.                                blanket on elbow.
Calculation reinspection.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                    1 of 18                                                                                            2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                      N T                  ER                TS              N                                                  O                                          G                                                            P              O R          IN                  D                  EN              IO                                LD                TI                        EP      T                      H          ZE                    KS            U DN ION      N BE                              R                  N                                                O                LA                                            IN            C        SI M            PO                O                                    AT                              FF                                            PR      IN                    ET                                AR            LD LD AT FF TIO e
U            M                  K                  PO              C                              A                  SU                        PE      PA        AW                      PE                                    FO FO UL O LA        pl N            A                  R                  M                                                                  IN                                            R            SK        PI                      EM O                  O                LO                              SC                                          PI                D                                              R              AF AF INS      SU  om EX                W                  C                                                                                                                                                                              SC SC          IN    C NCW_249                                          All blanket insulation. Remove blanket from valve MS-LC-10      249-19R          IP2-06-30318        CON. EXPANDER        Located on elevated platform West  N            2505 through valve MPS-779    Y    N                    SK-249    6 X 10 of a A/19 and North of the HDT, El.
15'.                                                                                                                            Calculation reinspection.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                  2 of 18                                                                                            2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                            N T                  ER                    TS              N                                                            O                                          G                                                                  P              O R          IN                  D                      EN            IO                                            LD              TI                        EP      T                      H          ZE                      KS                U DN ION      N BE                              R                      N                                                            O              LA                                            IN            C        SI M            PO                O                                      AT                                          FF                                          PR      IN                    ET                                  AR                LD LD AT FF TIO e
U            M                  K                      PO              C                                          A                SU                        PE      PA        AW                      PE                                          FO FO UL O LA        pl N            A                  R                      M                                                                            IN                                            R            SK        PI                        EM O                      O                LO                                          SC                                          PI                D                                                R                  AF AF INS      SU  om EX                W                      C                                                                                                                                                                                              SC SC          IN    C Thermal Shields over these                                                    Low Checworks hours. No components. Removal and                                                      inspections of components on any reinstallation of the thermal                                                23 FWH extraction line in 3EXC-22N                                                                                                                    shields will be required.
11                        IP2-06-30319            NOZZLE                                                                                                                                                        condenser. Also recommended in See Remarks snapshot assessment.
Contiguous points from 23C FWH 03_3RD POINT ES TO FWH 23C                                                                                                                to extraction header. C Train 12      3EXC-22          IP2-06-30519      MITERED ELBOW                                                          Y                                            Y    N                      SK-3      28"    selected as 22A and 22B 13      3EXC-21          IP2-06-30522      MITERED ELBOW Located in condenser 21.                                                                                                                              extraction lines to be replaced 14    3EXC-21P          IP2-06-30524          MITERED PIPE                                                                                                                                                      during 2R18. Note that support 15      3EXC-20          IP2-06-30525      MITERED ELBOW                                                                                                                                                        work orders are tied to nozzle 16    3EXC-20P          IP2-06-30526          MITERED PIPE                                                                                                                                                      inspection (IP2-06-30319) work 17      3EXC-19          IP2-06-30527      MITERED ELBOW                                                                                                                                                        order. If this work order is de-18    3EXC-19P          IP2-06-30528          MITERED PIPE                                                                                                                                                      scoped, support WO's must be 19      3EXC-14          IP2-06-30529                TEE                                                                                                                                                        tied to another inspection.
Mud insulation. Replace with                                                  Leaking, patched areas Extraction Steam Trap                                        blanket after exam.                                                  3/4"    downstream of this trap; see IP2-20                        IP2-06-30808                                                                              N                                            Y    N    9321-F-2031 PIPE, ELBOWS AND Located at column BB14 El. 15' TB                                                                                                            1/2"    06-00419; CR-IP2-2006-03186.
EST-21                                      TEES                                                                                                                                                        OE from Wolf Creek Blanket insulation over                                                                  System Engineer manway.                                                                        recommendation.OE from Unit 3 Located in 36' El. East side TB,                                                                                                            CR-IP3-2005-02334 ER-IP3                                                    INTERNAL            Southeast riser, near stairs to                                                                                                                  18223; WO IP3-05-18223 INSPECTION OF          mezzanine                                                                                                                                  Similar location to Unit 3 crack in 21    Crossunder          IP2-06-30809                                                                              Y                                            N    N      A235308                  32" CROSSUNDER            Manhole on vertical, above elbow.                                                                                                                          weld.
RISER AND TEE.          Manway opposite valve MS-24-1                                                                                                                Inspect internal cladding in riser pressure test valve.                                                                                                                                and tee. Perform UT measurements if thinniing is found.
Representative pipe section of LP Gland piping inside condenser.
Y                                                                                              Possible to work with slop drain PIPE AND ELBOWS                                              Coordinate scaffolding                                                                                    pipng replacement job as these LP Gland 22                        IP2-06-30811        Uninsulated lines Inside Condenser 21                      with extraction line                        N          Y    N        237145                    6"        lines are adjacent to the slop Piping Erosion only (return lines)                                      exam in condenser 21,                                                                                      drains. Siemens Westinghouse IP3-06-30319.                                                                                              Service Bulletin 53009 ST.
System Engineer recommendation.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                                3 of 18                                                                                                  2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                        N T                  ER                  TS              N                                                  O                                          G                                                              P              O R          IN                  D                    EN              IO                                LD                TI                        EP      T                      H          ZE                      KS            U DN ION      N BE                              R                    N                                                  O                LA                                            IN            C        SI M            PO                O                                      AT                              FF                                            PR      IN                    ET                                  AR            LD LD AT FF TIO e
U            M                  K                    PO              C                                A                  SU                        PE      PA        AW                    PE                                      FO FO UL O LA        pl N            A                  R                    M                                                                  IN                                            R            SK      PI                          EM O                    O                LO                              SC                                          PI                D                                                R              AF AF INS      SU  om EX                W                    C                                                                                                                                                                                  SC SC          IN    C FEEDWATER Asbestos Insulation.
Two (2) feet upstream of valve                                                  No evidence of any inspections FW BFD 64 FT-418A Root                                                        DNSM of these venturi. OE from PIPE            75/76_HEADER TO CON PEN E,F                        Stop Stm Gen 21 Isolation,                                                    Mihama to inspect DNSM of flow 23                        IP2-06-30530      DOWNSTREAM OF                                                N            and downstream of venturi      Y    N                      SK-75      18"      monitoring devices. Also OE BFD-69P DS                                                                                                        instrument root valve BFD                                                FLOW ELEMENT Unit 2 Aux Feed Building 33' El.                                                                                                            from June 2006 CHUG Meeting 1 S/G 21 FT-418A low side                                                        Catawba Unit 2 experiencing o
root stop to downstream 45                                                            wear in this location.
elbow.
All blanket insulation. Tee where 6" FW reg valve bypass line enters 18" main. 24 77/78_HEADER TO CON PEN G,H                                                                                                      OE Catawaba 2. ODMI CR-IP2-Steam Generator. Two (2) 2005-03847 Bypass valve FCV-24    BFD-82T            IP2-06-30531              TEE                                                  Y            feet upstream on diameter      Y    N                      SK-77  6" X 18" Unit 2 Aux Feed Building 15' El. S/G                                                                                                447L full open. Inspect Tee branch, and three (3) feet 24 feedwater train                                                                                                                      where bypass joins main upstream and downstream on 18" diameter main.
Blanket Insulation.
75/76_HEADER TO CON PEN E,F From valve to downstream elbow.
25    BFD-77R            IP2-06-30532        CON. EXPANDER          Unit 2 Aux Feed Building 15' El. N                                            Y    N                      SK-76  12" x 18"        Calculation reinspection Immediately downstream of FCV-427 Blanket Insulation.
77/78_HEADER TO CON PEN G,H From valve to downstream elbow.
26      BFD-3R            IP2-06-30533        CON. EXPANDER          Unit 2 Aux Feed Building 15' El. N                                            Y    N                      SK-78  12" x 18"        Calculation reinspection Immediately downstream of FCV-437 93_CON PEN "E" TO STM GEN                          Mirror insulation.
27      BFD-99            IP2-06-30535        90-DEG ELBOW                                              Y            Two (2) feet upstream and      Y    N                      SK-93      18"          Calculation reinspection VC 104' El.                                        three (3) feet downstream.
94_CON PEN "H" TO STM GEN                          Mirror insulation.
28    BFD-101            IP2-06-30538        90-DEG ELBOW                                              Y            Two (2) feet upstream and      Y    N                      SK-94      18"          Calculation reinspection VC 59' El.                                        three (3) feet downstream.
95_CON PEN "G" TO STM GEN                          Mirror insulation.
29    BFD-106            IP2-06-30540        90-DEG ELBOW                                              Y            Two (2) feet upstream and      Y    N                      SK-95      18" VC 104' El.                                        three (3) feet downstream.                                                    Calculation reinspection Blanket Insulation. Remove 75/76_HEADER TO CON PEN E,F 30      BFD-79            IP2-06-30542        90-DEG ELBOW                                              Y            blanket from Valve BFD-7-3 to  Y    N                      SK-77      18" Unit 2 Aux Feed Building 43' El.
penetration                                                                  Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                    4 of 18                                                                                              2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                        N T                  ER                    TS              N                                                  O                                            G                                                            P              O R          IN                  D                      EN              IO                                LD                TI                          EP      T                      H          ZE                    KS            U DN ION      N BE                              R                      N                                                  O                LA                                            IN            C        SI M            PO                O                                        AT                              FF                                            PR      IN                    ET                                AR            LD LD AT FF TIO e
U            M                  K                      PO              C                                A                  SU                        PE      PA        AW                      PE                                    FO FO UL O LA        pl N            A                  R                      M                                                                  IN                                            R            SK        PI                      EM O                      O                LO                              SC                                            PI                D                                              R              AF AF INS      SU  om EX                W                      C                                                                                                                                                                                  SC SC          IN    C Blanket insulation. Remove NCW_9321-F-2120 DS of Valve                                                                                                        blanket around valve and                                                2X 31                        IP2-06-30812        CON. EXPANDER            Located West of control panel in    Y                                            Y N        9321-F-2120 AF138                                                                                                            downstream blanket.                                                    2 1/2 HSB Building, El. 53'.
Calculation reinspection Possible Asbestos insulation                                                    CHECWORKS analysis and 32      BFD 29            IP2-06-30544        90-DEG ELBOW on BFD-29, followed by mirror                                                    snapshhot assessment 73_ BLR FEED PUMPS                                insulation, then blanket on DISCHARGE HDR TO HP HTRS                          BFD-29P. Remove 4' Y            upstream of BFD-29 to          Y    N                      SK-73      30" 26A,B,C 33    BFD-29P            IP2-06-30545        STRAIGHT PIPE                                                              upstream weld on BFD-32.
Located at A/20 El. 15'.
34    BFD-42N            IP2-06-30546            NOZZLE                                                                Possible asbestos insulation.                                                    CHECWORKS analysis.
73_ BLR FEED PUMPS                                Remove insulation around inlet DISCHARGE HDR TO HP HTRS                          nozzle and shell to expose Y                                            Y                            SK-73      18" 35      BFD-42            IP2-06-30547        45-DEG ELBOW            26A,B,C                                            shell to nozzle weld, upstream Located at A/20 El. 15' and 36'.                  elbow and straight pipe.
36    BFD-47N            IP2-06-30548            NOZZLE                                                                Mirror insulation. Remove                                                        CHECWORKS analysis 37      BFD-47            IP2-06-30549        90-DEG ELBOW              FW74-4-FWH26C TO DISHDR                        insulation around outlet nozzle 38    BFD-47P            IP2-06-30553        STRAIGHT PIPE            Located at feedwater outlet from                and shell to expose shell to 39      BFD-48            IP2-06-30554        90-DEG ELBOW                                                Y            nozzle weld., downstream        Y                            SK-74      18" FW Heater 26C, approximately 13' South and 15' West of A/20, El. 36'              piping to valve BFD-4-2; insure 40    BFD-48P            IP2-06-30555        STRAIGHT PIPE                                                              valve to pipe weld exposed.
Possible asbestos insulation.                                                    CHECWORKS analysis FW74-5-FWH26 TO DISHDR                            Remove insulation around 41      BFD-61            IP2-06-30557        90-DEG ELBOW            Elbow located directly over and East Y            elbow and 4' upstream and 6'    Y    N                        74      30" of condensate pumps                                downstream on pipe.
Possible Asbestos insulation.                                                    CHECWORKS analysis.
42      BFD-80            IP2-06-30558        90-DEG ELBOW Remove insulation around                                                        Snapshot assessment.
elbows and 2' upstream of FW77-1-DISHDR TO SG24 Y            BFD-81 and 4' downstream of    Y    N                        77      18" Located in Aux Feed Building 33' El.
43      BFD-81            IP2-06-30559        45-DEG ELBOW                                                              BFD-80.
All blanket insulation. On 30"                                                        CHECWORKS analysis 44    BFD-72T            IP2-06-30560          30" X 18" TEE                                                              run, remove blankets from FW75-2-DISHDR TO SG21 FW76-2-DISHDR TO SG22                              upstream elbow through 45    BFD-78T            IP2-06-30561          30" X 18" TEE                                                                middle of last tee on 30"                              75; 76;    30" x FW77-2-DISHDR TO SG24          Y                                            Y    N header; on 18" branches,                                    77      18" Located in Aux Feed Building, inlet header to FCV's.                      remove 4' downstream of each 46    BFD-84T            IP2-06-30562          30" X 18" TEE                                                                              tee.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                      5 of 18                                                                                              2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                  N T                  ER                TS              N                                                O                                          G                                                          P              O R          IN                  D                  EN              IO                                LD              TI                        EP      T                  H          ZE                    KS              U DN ION      N BE                              R                  N                                                O              LA                                          IN        C        SI M            PO                O                                    AT                              FF                                        PR      IN                ET                                AR              LD LD AT FF TIO e
U            M                  K                  PO              C                              A                SU                      PE      PA        AW                  PE                                      FO FO UL O LA        pl N            A                  R                  M                                                                IN                                          R        SK      PI                      EM O                  O                LO                              SC                                        PI                D                                          R                AF AF INS      SU  om EX                W                  C                                                                                                                                                                          SC SC          IN    C US-FCV-1115                                                                                                      Possible asbestos.(Mud).
4E                                                                                                      Remove insulation on elbows                                            Leak report, FCV-1115 leaking.
47                        IP2-06-30813            Elbow            Boiler Feed Pump 21 recirc line 4th              and 2' upstream and 3'                                                  OE22805 FW recirc cr-mo elbow SEE and 5th elbow DNSM of BFP 21.                    downstream                                                              leak @ elbow extradose REMARKS Back-to-Back elbows                Y                                        Y    N    9321-F-2019                6 Approximately 10' South of column                                                                                        Originally mislabeled as US-LCV-US-FCV-1115                                                    A/16, El. 15'.                                                                                                            1115 4E. Need to change WO's 48                        IP2-06-30814            Elbow 5E                                                                                                                                                                              and substitute US-FCV-1115 4E.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                6 of 18                                                                                        2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                        N T                  ER                  TS              N                                                    O                                            G                                                            P              O R          IN                  D                  EN              IO                                  LD                TI                          EP      T                      H          ZE                      KS            U DN ION      N BE                              R                  N                                                  O                LA                                            IN            C        SI M            PO                O                                    AT                                FF                                            PR      IN                    ET                                  AR            LD LD AT FF TIO e
U            M                  K                    PO              C                                A                  SU                        PE      PA        AW                    PE                                      FO FO UL O LA        pl N            A                  R                  M                                                                    IN                                            R            SK      PI                        EM O                  O                LO                                SC                                            PI                D                                                R              AF AF INS      SU  om EX                W                    C                                                                                                                                                                                  SC SC          IN    C CONDENSATE 81_FWH 24 COND TO FWH 25                            Blanket and Mirror insulation.
(15' el TB) Located approx 15'                      Remove all the blanket at 49      CD-30            IP2-06-30563        90-DEG ELBOW        North and 9' East of 22 Seal          Y            elbow to downstream elbow      Y    N                      SK-81      14" Injection Booster Pmp at 29'el. Near                weld and mirror insu up to Calculation reinspection column BB/17                                        drain vlv Mud insulation, possible asbestos. Remove insul from 50      CD-33            IP2-06-30569        90-DEG ELBOW 82/83_FWH 25 TO HEADER. 25B                            25B FWH shell nozzle, FWH - above shell manway,                      exposing shell to nozzle weld, Y                          to CD-18-1.        Y    N                      SK-82      14" approximately 7' South and 18' East of CC3/18, El. 36'.
51      CD-34            IP2-06-30570        90-DEG ELBOW Calculation reinspection Blanket Insulation. Remove all 82/83_FWH 25 TO HEADER. 15'                        insulation from upstrm 90 deg el. TB. Located on south east side                  elbow to header. In addition, 52      CD-59P            IP2-06-30571        STRAIGHT PIPE        of HDT and 15' west of MCC23.        Y            remove one piece of header      Y    N                      SK-82      24" Approximately 9' South and 13' East                blanket insulation where pipe of CC3/18, El. 36'.                                enters header.
Calculation reinspection Blanket Insulation. Remove all 83/84_HEADER TO BFP                                insulation from root stop vlv SUCTION. 15' TB. Located at 22                      CD-55-1 to 90-deg elbow and 53      CD-75            IP2-06-30574        90-DEG ELBOW                                              Y            from 90-deg elbow upstream      Y    N                      SK-84      24" MBFP suction line First elbow prior to pmp suction nozzle.                              apprx 24" (two bands of blanket insulation).
Calculation reinspection Possible asbestos (mud) on                                                    Per CHECWORKS and snapshot 54      CD-62T            IP2-06-30575              TEE                                                                reducer. Remove all mirror                                          24"        assessment.
insul from Tee branch up to 82/83_FWH 25 TO HEADER. 15' upstrm elbow. Remove 3' of 55    CD-62-P1          IP2-06-30577        STRAIGHT PIPE        el TB. Located south side of HDT,                                                                                      24" Y            mirror insul upstrm of reducer. Y    N                      SK-82 approximately 9' South and 13' East Remove 3 blankets of insul of CC3/18, El. 15'.
downstrm of tee.                                                    14" X 56      CD-61R            IP2-06-30578 12" X 24" REDUCER 24" All blanket insulation.                                                        CHECWORKS analysis. Few 57      CD-115            IP2-06-30579        90-DEG ELBOW        CD80A-3-FWH 22C TO HEADER                          Remove blankets from elbows                                                    inspections in this run.
Located approximately 6' South and    Y            and 3' upstream and            Y    N                    SK-80A      14 10' West of Column F/15, El. 36'.                  downstream of each elbow.
58      CD-116            IP2-06-30581        90-DEG ELBOW HEATER DRAINS Blanket Insulation. Remove 09_FWH 25 DRNS TO HTR DRN                          insulation from inlet side of 59 5EXD-20P DS IP2-06-30582                    STRAIGHT PIPE        TK. 15' TB on south west corner of    N            5EX-8 to upstream of 90-deg    Y    N                      SK-9      10" HDT near Col 18, row CC3                            elbow near floor Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                    7 of 18                                                                                              2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                          N T                  ER                  TS              N                                                      O                                            G                                                              P              O R          IN                  D                    EN              IO                                    LD                TI                          EP      T                      H            ZE                      KS            U DN ION      N BE                              R                    N                                                    O                LA                                              IN            C          SI M            PO                O                                      AT                                  FF                                              PR      IN                    ET                                    AR            LD LD AT FF TIO e
U            M                  K                    PO              C                                  A                  SU                          PE      PA        AW                      PE                                      FO FO UL O LA        pl N            A                  R                    M                                                                      IN                                              R            SK        PI                        EM O                    O                LO                                  SC                                            PI                D                                                  R              AF AF INS      SU  om EX                W                    C                                                                                                                                                                                        SC SC          IN    C Same as number 59 (above) 09_FWH 25 DRNS TO HTR DRN 60 5EXD-20P US IP2-06-30583                    STRAIGHT PIPE                                                N                                              Y    N                      SK-9      10" TK. Same location as number 59 Calculation reinspection Blanket Insulation. Remove 24A FWH TO FWH 23A 36' TB.                            blanket from heat shell to first Located on south west corner of                      45-deg elbow, and insulation 61      4EXD-1P          IP2-06-30585        STRAIGHT PIPE                                                N                                              Y    N                    SK-21A      6" 23A FWH approximately 5' North                        on vessel to expose vessel-to-and 6' East of CC3/12, El. 36'.                      nozzle weld.
Calculation reinspection 24A FWH TO FWH 23A 36' TB.                            Balnket insulation. Remove Located on south west corner of                      insulation from LCV-1115 to 62      4EXD-6          IP2-06-30586        CON. REDUCER                                                  N            4EX-8.                          Y    N                    SK-21A    4" X 3" 23A FWH approximately 3' North and 4' West of CC3/12, El. 36'                                                                                                          Calculation reinspection Blanket Insulation. Remove all 90-DEG RED.                                                                blanket from 4EX-8-1 to where 63      4EXD-40          IP2-06-30587                                22A_FWH 24B DRN TO CV. 36'                                                                                                6" X 4" ELBOW.                                                                        pipe penetrates floor.
TB. Located near 23B FWH at south west side of heater,        N                                              Y    N                    SK-22A approximately 3' North and 15' East 64 4EXD-40P DS IP2-06-30588                  STRAIGHT PIPE.                    of CC3/12, El. 36'.                                                                                                  6" Calculation reinspection Remove existing blanket 23A_FWH 24C DRN TO CV - 15'                          insulation between the two 90-TB. Located 8' west of MBFP                          deg elbows. Insure both pipe 65    4EXD-70P          IP2-06-30589        STRAIGHT PIPE                                                Y                                              Y    N                    SK-23A      6" turbine oil conditioner next to stairs                welds are exposed.
going to 5' el. Pipe located at 33' el.
Calculation reinspection Blanket Insulation. Remove all 25A/B_FWH 23B DRN TO CV. 15'                          of the exisiting blanket 66      3EXD-34          IP2-06-30590              TEE            TB. Located between 21B and 22A        Y            insulation.                      Y    N                    SK-25B      8" Inlet Waterbox.
Calculation reinspection Blanket insulation. Remove insulation from vlv 5EX-15-2 to NCW_18. 15'el TB. Located where pipe penetrates floor.
67      5EXC-14          IP2-06-30591        90-DEG ELBOW          between 22B and 23A inlet              N                                              Y    N                      SK-18      14" DO NOT REMOVE waterboxes.
INSULATION FROM 5EX                                                                                                                            2.                                                                                Calculation reinspection 68      5EXC-21          IP2-06-30592        90-DEG ELBOW NCW_18. 5' el TB. Located above and South of 24 Sump Pump Oil        Y                                N            Y    N                      SK-18      14" 5EXC-21P-1                                                                      Skimmer .
69                        IP2-06-30593        STRAIGHT PIPE US Calculation reinspection 15' TB. Located between 21B and                            All Blanket insulation.
22A inlet waterboxes.                                    Remoove blanket on pipe 70  205-22P US          IP2-06-30607        STRAIGHT PIPE                                                N                                              Y    N                    SK-205        8 Located approximately 12' South                        between valves LCV-5003 and and 15' East of A/16 El. 15'.                          5EX-504, exposing all welds.
Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                        8 of 18                                                                                                2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                            N T                  ER                    TS              N                                                O                                          G                                                                  P              O R          IN                  D                    EN              IO                              LD                TI                        EP      T                      H          ZE                    KS                U DN ION      N BE                              R                    N                                                O                LA                                            IN            C        SI M            PO                O                                      AT                            FF                                            PR      IN                    ET                                  AR                  LD LD AT FF TIO e
U            M                  K                      PO              C                              A                  SU                        PE      PA        AW                      PE                                          FO FO UL O LA        pl N            A                  R                    M                                                                IN                                            R            SK        PI                      EM O                    O                LO                            SC                                          PI                D                                              R                    AF AF INS      SU  om EX                W                      C                                                                                                                                                                                    SC SC          IN    C 15' TB. Located between 21B and 22A inlet water boxes 71  205-24P US          IP2-06-30608        STRAIGHT PIPE                                            Y                                N          Y    N                    SK-205        8 approximately 12' South and 25' East of A/16, El. 5'.
Calculation reinspection 15' TB. Located between 21 and 22                Blanket Insulation. Rmove 72      4EXD-75          IP2-06-30609        90-DEG ELBOW          MBFP and above the MBFP Lube      Y            existing Blanket insulation. Y    N                    SK-23B      6" Oil Conitioner Tank.                                                                                                            Calculation reinspection HD23A-1-FWH24C TO CV                            Mirror insulation. Remove 73      4EXD-61          IP2-06-30610          6" X 4" RED. EL      Located approximately 3' North and N            insul from 4EX-8-2 to where    Y    N                    SK-23A    6" X 4" CHECWORKS analysis and 17' West of A/12, El. 36'.                      line penetrates floor                                                          snapshot assessment.
Blanket Insulation. Remove all                                                CHECWORKS analysis and HD23A-1-FWH24C TO CV. 36' TB.                    insulation between LCV-1115                                                    snapshot assessment.
74      4EXD-60          IP2-06-30611      4" X 3" REDUCER. Located near 23C FWH at south                            and 4EX-8-2.                                                      4" X 3" west side of heater.              N                                            Y    N                    SK-23A HD23A-1-FWH24C TO CV. Same 75    4EXD-60P          IP2-06-30618        STRAIGHT PIPE.                                                                                                                              3" as pt 74.
Blanket Insulation. Remove                                                    No inspections UPSM and DNSM 76    HD-4A DS          IP2-06-30626        STRAIGHT PIPE                                                          insulation from 2' upstream of                                                of flow element. OE Mihama.
Flow Element, downstream to HD20-2-HDP22 TO BFP SUCTION.
Header.
15' TB. Located near discharge  Y                                            Y    N                      SK-20      12" side of 22 HDTP-Col. 15 row CC3.
77    HD-6P US          IP2-06-30628        STRAIGHT PIPE Balnket Insulation. Remove Piping between restricting orifice              insulation from 3EX-540 to                                                    OE Susquehanna Unit 2 and isolation valve 3EX-540. 23B                restricting orifice                                                            OE Oconee Unit 3 and Beaver 78 239-11E                IP2-06-30630          90 degree elbow      FWH Operating vent.                N                                            Y    N      A235304      SK-239        2    Valley Unit 2 6/26/06 CHUG Located Northeast end of FWH                                                                                                    Meeting FW Htr vent d/s of 23B, El. 36'.                                                                                                                  continuous flow restricting orifice.
Altran Small Bore review 2R18 FAC Scope (Ipe0067424).Xls                                                                                                    9 of 18                                                                                                  2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                          N T                  ER                  TS              N                                                            O                                            G                                                              P              O R          IN                  D                  EN            IO                                            LD              TI                          EP      T                      H          ZE                      KS              U DN ION      N BE                              R                  N                                                            O              LA                                              IN            C        SI M            PO                O                                    AT                                          FF                                            PR      IN                    ET                                  AR              LD LD AT FF TIO e
U            M                  K                    PO              C                                          A                SU                          PE      PA        AW                    PE                                        FO FO UL O LA        pl N            A                  R                  M                                                                            IN                                              R            SK      PI                        EM O                  O                LO                                          SC                                            PI                D                                                R                AF AF INS      SU  om EX                W                    C                                                                                                                                                                                              SC SC          IN    C Reheater Drains Blanket Insulation.
Remove insulation on tee 45B_FE 1257-1 TO LCV 1104                                    mainand upstream to 45 elbow 79    MS-1A25            IP2-06-30635              TEE            Located approximately13' South of            Y              and downstream to FE-1257;      Y    N                    SK-45B        6 A/18 at the condenser wall, El. 36'                          branch to pipe hanger.
Calculation reinspection 45C_HDR [1] TO FWH 26A,B,C                                  Blanket Insulation.
Located approximately 5' North and                          Remove blankets on elbow                                                      Calculation reinspection.
80    MS-1A38            IP2-06-30638        45-DEG ELBOW                                                      Y              and blankets on upstream and    Y    N                    SK-45C      10 17' West of A/18, El. 15'. Above                                                                                                            OE23342 RHD elbow leak at HDT.                                                        downstream pipes.                                                              Davis Bessir Blanket Insulation.
45C_HDR [1] TO FWH 26A,B,C                                  Remove insulation on pipe to MS-1A67P 81                        IP2-06-30640        STRAIGHT PIPE        Located approximately 11' North              N              tees on both ends, exposing all Y    N                    SK-45C        6 US and 18' West of A/18, El. 33'.                              welds.
Calculation reinspection 82    MS-1A59            IP2-06-30667        90-DEG ELBOW        45D_HDR [1] TO FWH 26 (CONT.)                                Blanket Insulation.
Located approximately 10' North                              Remove insulation from MS-1A59P                                                    and 16' East of CC3/18, El. 15'.              Y              upstream pipe to downstream    Y    N                    SK-45D        6 83                        IP2-06-30672        STRAIGHT PIPE                                                                                                                                                          Calculation reinspection.
US                                                      Top of HDT accessible from west                              elbow.
OE23342 RHD elbow leak at valve platform @ north end of HDT.                                                                                                                      Davis Bessie Blanket insulation.
Remopve blanket on elbow 48A/B_RDT 21B TO LCV 1105 and upstream and downstream 84    MS-1B26            IP2-06-30673        90-DEG ELBOW        Located approximately 6' North and            Y                                              Y    N                    SK- 48A        6 straight pipe.
24' East of A/15, El. 36'.
Calculation reinspection 85    MS-2B12            IP2-06-30675        90-DEG ELBOW                                                                      Blanket Insulation.
Remove insulation on pipe Y
49A/B_RDT 22B TO LCV 1105A                                  upstream of elbow and 6' on Work with exam points Located approximately 1' South and                          straight pipe. Work with exam  Y    N                    SK-49A        6 86    MS-2B12P          IP2-06-30676        STRAIGHT PIPE                                            MS-2B11-P1 (99) and 11' West of F/16, El. 36'                                    points MS-2B11-P1 (99) and MS-2B11 (100).
MS-2B11 (100).
Calculation reinspection Blanket insulation.
87    MS-2B16            IP2-06-30678        45-DEG ELBOW                                                                        Remove blanket minimum 1' 49A/B_RDT 22B TO LCV 1105A Located approximately 14' South              Y              upstream of MS-2B16 through    Y    N                    SK-49A        6 and 14' West of F/16, El. 36'.                                    MS-2B17 and 2" on 88    MS-2B17            IP2-06-30679        45-DEG ELBOW                                                                                                                                                    Calculation reinspection. Includes downstream pipe.
pipe MS-2B16P Blanket Insulation.
49A/B_RDT 22B TO LCV 1105A                                  Remove blanket upstream of 89    MS-2B22            IP2-06-30680        90-DEG ELBOW        Located approximately 5' South and            N              elbow MS-2B22 and on            Y    N                    SK-49A      10 30' East of A/14, El. 36'.                                  downstream to expose elbow-to-elbow weld.
Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                            10 of 18                                                                                                2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                          N T                  ER                  TS              N                                                              O                                            G                                                              P              O R          IN                  D                  EN              IO                                            LD              TI                          EP      T                      H          ZE                      KS              U DN ION      N BE                              R                  N                                                              O              LA                                              IN            C        SI M            PO                O                                    AT                                          FF                                            PR      IN                    ET                                  AR              LD LD AT FF TIO e
U            M                  K                    PO              C                                            A                SU                        PE      PA        AW                    PE                                        FO FO UL O LA        pl N            A                  R                  M                                                                              IN                                              R            SK      PI                        EM O                  O                LO                                          SC                                          PI                  D                                                R                AF AF INS      SU  om EX                W                    C                                                                                                                                                                                                SC SC          IN    C Blanket Insulation.
Remove insulation on tee runto 49C_HDR [2] TO FWH 26A,B,C                                    upstream and downstream 90    MS-2B42            IP2-06-30681              TEE            Located approximately 10' South                N              flanges, and blankets on      Y    N                      SK-49C and 4' East of CC3/19, El. 36'.                                vertical pipe to next tee.
Calculation reinspection Blanket insulation.
49C_HDR [2] TO FWH 26A,B,C 91    MS-2B50            IP2-06-30682        90-DEG ELBOW        Located approximately 5' North and            Y                                              Y    N                      SK-49C Calculation reinspection. Include 21' West of A/19, El. 15'.
UPSM pipe MS-2B63P. OE23342 49C_HDR [2] TO FWH 26A,B,C                                    Blanket insulation.                                                            RHD elbow leak at Davis Bessie 92    MS-2B52            IP2-06-30683        90-DEG ELBOW        Located approximately 4' South and            Y                                              Y    N                      SK-49C 21' West of A/19, El. 15'.
50A_RDT 23B TO LCV 1105B                                      Blanket insulation                                                            Calculation reinspection.
93    MS-3B14            IP2-06-30684        90-DEG ELBOW        Located approximately 3' North and            Y                                              Y    N                      SK-50A            OE23342 RHD elbow leak at 14' West of F/17, El. 36'.                                                                                                                    Davis Bessie 50A_RDT 23B TO LCV 1105B                                      Blanket and Mirror insulation MS-3B22P 94                        IP2-06-30685        STRAIGHT PIPE        Locate approximately 10' South and            Y                                              Y    N                      SK-50A US 30' West of F/14, El. 36'.                                                                                                                    Calculation reinspection.
50A_RDT 23B TO LCV 1105B                                      Blanket insul;ation 95    MS-3B25            IP2-06-30688        90-DEG ELBOW        Located approximately 6' South and            Y                                              Y    N                      SK-50A 38' West of F/14, El. 36'.                                                                                                                    Calculation reinspection.
96    MS-2A33            IP2-06-30689              TEE                                                                            Blanket Insulation NCW_46B                                                        Remove blanket around valve Located approximately 2' North and            Y              MS-17 body up to condenser    Y    N                      SK-46B 97    MS-2A34            IP2-06-30692              TEE 25' East of A/17, El. 36'.                                    connection.                                                                          Calculation reinspection.
Blanket insulation and Mirror insulation on nozzle-to-tank connection.
98    MS-2B11N            IP2-06-30695            NOZZLE                                                          N              Remove insulation on nozzle and expose nozzle to tank MSD-49A-1-RHDT22B TO CV                                    weld.
99  MS-2B11P-1          IP2-06-30699        STRAIGHT PIPE        Located approximately 8' South and                            Blanket Insulation.                                                              CHECWORKS PICK Snapshot Y    N                        49A        6 13' West of F/16, El. 53' 98 and 99                            Remove blanket from 53'                                                          assessment recommendation.
adjacent to valve MS-890                Y              through floor penetration to Work scaffold with      elbow and downstream pipe.
exam points MS-2B12        Work with exam points MS-100    MS-2B11            IP2-06-30701            ELBOW (85) and MS-2B12P        2B12 (85) and MS-2B12P (86).
(86).
MSR DRAINS 27_MS 21A DRAIN TO MSDT 21A                    Y              N Located adjacent to Northwest      Access to elbow and 1'                                          Y silver 101      1A-20            IP2-06-30705        45-DEG ELBOW        Drains Collection Tank access          upstream and                                          Y                            SK-33B        6 (Lead platform; El. 15'                    downstream to next                                            ?)
elbow.                                                                                            Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                              11 of 18                                                                                                2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                  N T                  ER                TS              N                                                O                                          G                                                        P              O R          IN                  D                EN              IO                                LD              TI                        EP      T                      H          ZE                  KS            U DN ION      N BE                              R                N                                                O              LA                                          IN            C        SI M            PO                O                                  AT                              FF                                          PR      IN                    ET                              AR            LD LD AT FF TIO e
U            M                  K                  PO              C                              A                SU                      PE      PA        AW                    PE                                  FO FO UL O LA        pl N            A                  R                M                                                                IN                                          R            SK      PI                    EM O                O                LO                              SC                                        PI                D                                            R              AF AF INS      SU  om EX                W                  C                                                                                                                                                                          SC SC          IN    C Mud insulation around tee, possible asbestos; mirror insulation on tee run and MSD28-5-MS22A TO MSDT 22A                        blanket on tee branch.
Under MSR 22A Located                            Remove mud on tee 3 feet of 102      2A-18          IP2-06-30707            TEE                                                Y                                          Y    N                      SK-28      12 approximately 8' South and 12' East              mirror both sides of tee run of A/17, El. 53'                                  and blanket between tee and downstream elbow.
Checworks analysis 2R18 FAC Scope (Ipe0067424).Xls                                                                                                12 of 18                                                                                      2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                        N T                  ER                  TS              N                                                O                                        G                                                                P              O R          IN                  D                    EN              IO                                LD              TI                      EP      T                      H            ZE                    KS              U DN ION      N BE                              R                    N                                                O              LA                                          IN            C          SI M            PO                O                                      AT                              FF                                        PR      IN                    ET                                  AR              LD LD AT FF TIO e
U            M                  K                    PO              C                              A                SU                    PE      PA        AW                      PE                                      FO FO UL O LA        pl N            A                  R                    M                                                                IN                                          R            SK        PI                        EM O                    O                LO                              SC                                      PI                  D                                                R                AF AF INS      SU  om EX                W                    C                                                                                                                                                                                SC SC          IN    C MAIN STEAM Y                                                                            Calculation reinspection from Main Steam flow Venturi from 24 9321-F-2540                          2R17; IP-CALC-06-00178.
103                      IP2-06-22106                              SG.                                Y                                        Y    N                                  28" 9321-F-2542                          Inspect pipe downstream of FE-VC El. 107' FE-449                                STRAIGHT PIPE                                                                                                                                        449.
NCW_210                                          N                                Y silver                                        Calculation reinspection.
104    210-3P-2          IP2-06-30709        STRAIGHT PIPE        Located on the South side of the    Y                                        Y                            SK-210        4      Inspect 2 pipes between valves (Lead Drains Collection Tank, El. 15'.                                                  ?)                                          MS-96 and MS-97 Y
22 S/G Main Steam Flow Venturi                                                                                                Per OE 15860 from Calvert Cliffs.
9321-F-2541 105                      IP2-06-30720                              Needs pipe whip restraint removal  Y                                        Y    N                                  28"      Piping wall erosion found around VC El. 107'                                                                                                                    the drain slots at the DNSM end FE-429-DS                              Straight Pipe                                                                                                                                            of the Main Steam Flow Venturi.
Y 23 S/G Main Steam Flow Venturi                                                                                                Per OE 15860 from Calvert Cliffs.
9321-F-2541 106                      IP2-06-30721                              Needs pipe whip restraint removal  Y                                        Y    N                                  28"      Piping wall erosion found around VC El. 107'                                                                                                                    the drain slots at the DNSM end FE-439-DS                              Straight Pipe                                                                                                                                            of the Main Steam Flow Venturi.
Gland Seal Steam Supply                          Blanket insulation.
107                      IP2-06-30722                              Located approximately 6' South and  N                                        Y    N                        263    3" X 6" 263-13R                                Expander                  21' West of F/19, El. 36'.                                                                                                    Calculation reinspection Blanket insulation                                                          OE Wolf Creek. And Darlington Review of WRT's for MST's.
Located 7' North F16; blanket                                                      Y 108                      IP2-06-30723                                                                  N                                        Y            9321-F-2042                          OE IP2-04-25162 leaking strainer insulation                                                                    silver threads. Could be more MST-51                                Pipe, Elbow, Tee                                                                                                                                        extensive in dnsm piping.
Located on El. 15' in Aux Feed                    All mirror insulation 109                      IP2-06-30724 Main Steam Trap 64 Building, adjacent to 22 Auxiliary            N                                        Y    N      9321-F-2041              1", 1/2" OE Wolf Creek. And Darlington MST-64                                Class 1 piping            Feedwater Pump.                                                                                                                Review of WRT's for MST's.
110                      IP2-06-30725 206-16E                                                                                                                                                                                        "Plant Problems Affecting Downstream of                                                                                                                                      Thermal Efficiency" report; leaking valve PCV- Located approximately 5' N and 15'                                                                                                  Operational Focus Meeting.
Y                                Y      Y    Y                          206      8" 1121. Main steam W fROM F17, Under El. 36' grating                                                                                                      Leak report, large leakers to dump to condenser.                                                                                                                                    main condenser. WRT IP2  111                      IP2-06-30726 19922.
206-16P NCW_153 Main Steam                                Blanket insulation.
Located in Aux Feedwater Building,                Remove blanket from pipe 112  MS23-1 DS          IP2-06-30727        STRAIGHT PIPE        El. 65'                            Y            support to VC penetration. Y    N                      SK-153      28" Located adjacent to valve MS-42, S/G 23 to ABFP 22 root stop.                                                                                                  Calculation reinspection NCW_214                                          Mirror insulation 113    214-26E          IP2-06-30729        90-DEG ELBOW          Located at base of column A/16, El. N                                        Y    N                      SK-214 53'.                                                                                                                          Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                  13 of 18                                                                                            2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                      N T                  ER                    TS              N                                                            O                                        G                                                              P              O R          IN                  D                    EN            IO                                          LD                TI                      EP      T                      H          ZE                    KS              U DN ION      N BE                              R                    N                                                          O                LA                                          IN            C        SI M            PO                O                                      AT                                        FF                                          PR      IN                    ET                                AR              LD LD AT FF TIO e
U            M                  K                      PO              C                                        A                  SU                      PE      PA        AW                    PE                                      FO FO UL O LA        pl N            A                  R                    M                                                                          IN                                          R            SK      PI                        EM O                    O                LO                                        SC                                        PI                D                                              R                AF AF INS      SU  om EX                W                    C                                                                                                                                                                                        SC SC          IN    C NCW_254                                                    Blanket insulation 114    254-15E          IP2-06-30730        90-DEG ELBOW          Top of HP Turbine downstream of              Y                                          Y    N                    SK-254 valve MS-1206. El. 53'                                                                                                                Calculation reinspection NCW_259                                                    Blanket insulation.
Located on North end of HP 115      259-9E          IP2-06-30731        90-DEG ELBOW                                                        N                                          Y    N                    SK-259 Turbine, behind Governor Panel El.
53'                                                                                                                                    Calculation reinspection All blanket insulation NCW_267 116      267-6T          IP2-06-30732              TEE              Located approximately12' West and            Y                                          Y    N                    SK-267 5' South of East Mezz. Stairs, El. 60' Calculation reinspection NCW_267                                                    All blanket insulation.
117    267-33P          IP2-06-30733        STRAIGHT PIPE          Located approximately 13' South              N                                          Y    N                    SK-267 and 5' West of F/18, El. 36'                                                                                                          Calculation reinspection Blanket insulation.
NCW_259                                                    Remove insulation around 259-15E                                                      Top of HP Turbine downstream of                            elbow and include insulation                                                OE from Unit 3. Wear found in 118        SEE            IP2-06-30781        90-DEG ELBOW          valve MS-1208.                              y            around valve and downstream  Y    N                    SK-259            these components.
REMARKS                                                        Located approximately 10' South                            pipe, exposing elbow welds.                                                Originally mislabeled as MS-863-and 40' West of F/20, El. 53'.                                                                                                        DS. Need to change WO's and substitute 259-15E NCW_254                                                    Blanket insulation.                                                        OE from Unit 3. Wear found in 254-3E                                                      Top of HP Turbine downstream of                            Remove insulation around                                                    these components.
119        SEE            IP2-06-30782        90-DEG ELBOW          valve MS-1207.                              y            elbow and include insulation Y    N                    SK-254            Originally mislabeled as MS-866-REMARKS                                                        Located approximately 30' East of                          around valve and downstream                                                DS. Need to change WO's and A/19, El. 53'.                                            pipe, exposing elbow welds.                                                substitute 254-3E.
FEEDWATER HEATER SHELLS Inspection of shell                                                                  Mirror Insulation 120                      IP2-06-30784    around extraction          Feedwater Heater 25B shell, El. 36          y                                          Y    N                                        Similar to inspection for FWH 25A FWH 25B                                steam inlets.                                                                                                                                                    and C performed in 2000 Inspection of worn                                                                    Mirror Insulation 121                      IP2-06-30785    areas identified in        Feedwater Heater 24A shell, El. 36          y                                          Y    N FWH24A                                2R16                                                                                                                                                              Calculation reinspection Inspection of worn                                                                    Mirror Insulation 122                      IP2-06-30786    areas identified in        Feedwater Heater 24B shell, El. 36          y                                          Y    N FWH24B                                2R16                                                                                                                                                              Calculation reinspection Inspection of worn                                                                    Mirror Insulation 123                      IP2-06-30787    areas identified in        Feedwater Heater 24C shell, El. 36          y                                          Y    N FWH24C                                2R16                                                                                                                                                              Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                              14 of 18                                                                                          2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                                      N T                  ER                    TS              N                                                          O                                          G                                                              P              O R          IN                  D                    EN            IO                                        LD              TI                        EP      T                      H          ZE                      KS            U DN ION      N BE                              R                    N                                                        O              LA                                          IN            C        SI M            PO                O                                      AT                                      FF                                          PR      IN                    ET                                  AR              LD LD AT FF TIO e
U            M                  K                      PO              C                                        A                SU                      PE      PA        AW                    PE                                      FO FO UL O LA        pl N            A                  R                    M                                                                        IN                                          R            SK      PI                        EM O                    O                LO                                      SC                                        PI                D                                                R              AF AF INS      SU  om EX                W                      C                                                                                                                                                                                      SC SC          IN    C STEAM JET AIR EJECTORS Blanket insulation. Remove TB 36', located approximately 4'                            from tee and minimum of 1' IP2-06-30789 Tee downstream of                                                        N                                          Y    N                        252        3 PCV-1222 steam            South and 3' West of B/13, El. 36'.                          from both ends of run and                                                          System engineer 124      252-1T                            supply to SJAE                                                                                      branch                                                              recommendation, & OE 125      252-5E          IP2-06-30790                                                                                            Possible asbestos.(Mud). Y Main steam supply to TB 36', located approximately 4'                                Remove insulation on elbows                                                System Engineer Y                                                N                        252        3 IP2-06-30791          SJAE's, Elbows        South and 3' West of B/13, El. 36'.                            and 1' upstream and 2'  Y                                              recommendation; elbows DNSM 126      252-7E                              DNSM of PCV-1222                                                                              downstream                                                      of FE; back-to-back config.
BOILER FEED PUMP TURBINE Feed Pump Turbine                                                                  N IP2-06-30792                                TB 5' Located under Boiler Feed                                                        Y 127      215-1P                              #21 drain to BFPT                                                  Y                                                N                        215                From Altran small bore review Pump Turbine.
128      215-2E          IP2-06-30793            drip tank.                                                                                                Y                                                  and calculation reinspection.
HIGH PRESSURE TURBINE DRAINS Y                                                                          OE19798 Failure at bi-metallic Piping UPSM and                                                                                                                                                  weld at VC Summer. OE Unit 3; 129                      IP2-06-30794                                33' Mezz. TB                                Y                                          Y    N                        272 DNSM of orifice                                                                                                                                                  thinned pipe in this location 272-3P                            block                                                                                                                                                            replaced.
First tee UPSM of                                                                    Y FCV-1155, including                                                                                                                                              FCV-1155 leaking; no previous 130                      IP2-06-30795                                33' Mezz. TB                              N                                          Y    N                        236 236-FCV1155                            adjacent elbow and                                                                                                                                              inspections. OE Unit 3, wear T US                            pipe.                                                                                                                                                            found in similar components.
ADDED SCOPE Feedwater Heater                                                                    Y                                                                          Leak under FWH 25C 131                      IP2-06-31989    25C extraction steam      TB 36'-9                                    Y                                          Y    N                        7        18    reinforcement pad CR-IP2-2006-5EX-10N                            inlet nozzle.                                                                                                                                                    06057 Feedwater Heater                                                                    Y                                                                          Leak under FWH 25C 132                      IP2-06-31994    25B extraction steam      TB 36'-9                                    Y                                          Y    N                        7        18    reinforcement pad CR-IP2-2006-5EX-7N                            inlet nozzle.                                                                                                                                                    06057 Feedwater Heater                                                                    Y                                                                          Leak under FWH 25C 133                      IP2-06-31996    25A extraction steam      TB 36'-9                                    Y                                          Y    N                        7        18    reinforcement pad CR-IP2-2006-5EX-1N                            inlet nozzle.                                                                                                                                                    06057 Feedwater Heater                                                                    Y                                                                          Leak under FWH 25C 134                      IP2-06-31998    23A extraction steam      TB 36'-9                                    Y                                          Y    N                        1        18    reinforcement pad CR-IP2-2006-3EXA-1N                            inlet nozzle.                                                                                                                                                    06057 CONTINGENCY WORK ORDERS SUPPORT WORK ORDERS relocation of pipe IP2-06-30969 whip restraints to FE-429-DS                              support FAC exam relocation of pipe IP2-06-30970 whip restraints to FE-439-DS                              support FAC exam 2R18 FAC Scope (Ipe0067424).Xls                                                                                                            15 of 18                                                                                            2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                          N T                  ER                  TS          N                                        O                              G                                            P              O R          IN                  D                    EN          IO                          LD            TI            EP      T                  H          ZE        KS            U DN ION      N BE                              R                    N                                      O            LA                                IN        C        SI M            PO                O                                  AT                        FF                            PR      IN                ET                    AR            LD LD AT FF TIO e
U            M                  K                    PO          C                        A              SU            PE      PA        AW                  PE                        FO FO UL O LA        pl N            A                  R                    M                                                    IN                                R        SK      PI          EM O                    O            LO                        SC                            PI                D                              R              AF AF INS      SU  om EX                W                    Cp p g                                                                                                                                  SC SC          IN    C thermal insulation LP Gland              IP2-06-30971 removal/replacement Piping Erosion                        by Boilermakers to FAC Exams                              thermal insulation inside 21            IP2-06-30977 removal/replacement condenser                              by Boilermalers to FAC Exams                              Open 21 condenser inside 21            IP2-06-30978 for FAC exams inside condenser                              condenser.
2R18 FAC Scope (Ipe0067424).Xls                                                                                      16 of 18                                                              2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                                            N T                  ER                    TS              N                                                O                              G                                                              P              O R          IN                  D                    EN              IO                                LD            TI            EP      T                      H            ZE                    KS            U DN ION      N BE                                R                    N                                                  O            LA                                IN            C          SI M            PO                  O                                      AT                              FF                            PR      IN                    ET                                  AR              LD LD AT FF TIO e
U            M                  K                      PO              C                                A              SU            PE      PA        AW                      PE                                    FO FO UL O LA        pl N            A                    R                    M                                                                IN                                R            SK        PI                      EM O                    O                LO                              SC                            PI                D                                                R              AF AF INS      SU  om EX                  W                      C                                                                                                                                                                  SC SC          IN    C REPAIR/REPLACEMENT WORK ORDERS Repair/Replace                                                                N extraction lines from the LP Turbine to the IP2-06-21854                                Inside 23 condenser.                Y                                  N                                22" 22A Feedwater                                                                                                                                  Based on 2R17 FAC exam this LPFW22A-                              Heater inside the 23                                                                                                                          piping is worn and requires 1N, -2N                            Condenser.
p    p                                                                                                                                  repair/replacemrnt during 2R18 extraction lines from                                                        N                                                                Based on 2R17 FAC exam this LPFW22B-            IP2-06-21860 the LP Turbine to the Inside 22 condenser.                          Y                                  N                                22"      piping is worn and requires 1N, -2N                            22B Feedwater                                                                                                                                  repair/replacemrnt during 2R18.
Y IP2-06-30979 Replace small bore              Turnine building 15'                N                                    N    9321-F-2131                  1" MST-43                              piping Y
IP2-06-30980 Replace small bore              Turbine Building 15'                N                                    N    9321-F-2151              1" 3/4" EST-2                            piping Y
IP2-06-30982 Replace small bore              Turnbine Building 15'              N                                    N    9321-F-2151              1" 3/4" EST-5                            piping Y
IP2-06-30983 Extraction Steam                Turbine Building 15'                Y                                  N                      SK-2  20" X 28" 3EXB-10R                            Reducer Y
IP2-06-31991 Repair of FWH 25C              TB 36'-9                            Y                                  N                        7        18 5EX-10N                            inlet nozzle                                                                                                                                  Repair based on source of leak Y
IP2-06-31995 Repair of FWH 25B              TB 36'-9                            Y                                  N                        7        18      Repair based on source of 25C 5EX-7N                            inlet nozzle                                                                                                                                  FWH leak Repair of FWH 25A                                                            Y                                                                Repair based on source of 25C IP2-06-31997                                TB 36'-9                            Y                                  N                        7        18 5EX-1N                            inlet nozzle                                                                                                                                  FWH leak LEGEND PRE-OUTAGE Insulation likely to A
contain asbestos 2R18 FAC Scope (Ipe0067424).Xls                                                                                                    17 of 18                                                                                2R18 FAC Scope (Ipe0067424).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N                                                                                          N T                  ER            TS          N                                        O                              G                                            P              O R          IN                  D              EN          IO                          LD            TI            EP      T                  H          ZE        KS            U DN ION      N BE                                R              N                                      O            LA                                IN        C        SI M            PO                  O                            AT                        FF                            PR      IN                ET                    AR            LD LD AT FF TIO e
U            M                  K              PO          C                        A              SU            PE      PA        AW                  PE                        FO FO UL O LA        pl N            A                    R              M                                                    IN                                R        SK      PI          EM O              O            LO                        SC                            PI                D                              R              AF AF INS      SU  om EX                  W              C                                                                                                                                      SC SC          IN    C Insulation is a welded stainless TS steel Thermal Shield 2R18 FAC Scope (Ipe0067424).Xls                                                                                  18 of 18                                                              2R18 FAC Scope (Ipe0067424).Xls
1                                                            FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T                                      ER            N                                              G                        S R                                                                                IO                                    N                  H              K BE                          IN                                      RD                                N                          IN        C M                          PO                                      O            I PT                IO        O LD TIO ET        ZE    AR R                              F    LA      T    AW      K        SI      M NU                                                                  RK                                AT                        DR        S              RE AM                                    O              SC                  C          AF SU        IN                    PE EX                                      W            DE                  LO        SC    IN    PA                    PI Following locations walked down and found to be unsuitable for pre-outage exams due to high    Following exams possible to temperature or location.                        examine pre-outage 220-7P                                          4EXD-75 249-19R CD-115 CD-116 5EXC-14 5EXC-21 5EXC-121P-1 US 205-22P US 204-24P US 4EXD-61 4EXD-60 239-11E 206-16E 1 of 1                                                                    2R18P
1                                              FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T                  r                                  N R                                                                    O                                                  N              G                                      KS IN                  fo on                            TI                              N                                IN        CH BE          PO                s on leti                          IP                                O          O LD TIO                                  ZE                  AR M                                                                  R                                TI        F        LA      T    AW        ET      SI U            M                  ea De                            C                                A                                R        SK                              EM N            A                  R                                                                  C          AF      SU      IN  D                  PE                    R ES                                          C      N        A EX                                                    D                                LO          S      I        P                        PI EXTRACTION Moisture separator separating tank A vent to header upstream of FWH 25a,b,and c connection                                                                  7&
SS CR_mo              to header                        5EX-18 Fabricated cross.                                      7A CONDENSATE HEATER DRAINS Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve.      Reducer inspected in 1987 &
ss REHEATER          Check DNSM pipe to see if        R13. Inspect reducer DNSM of                                              Leaking valve in plant. Also OE MS-3A24R                DRAINS                damaged.                          valve and DNSM tee                                                        from Hope Creek; OE19325 Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 47 IP2-06-22870 to close valve.      Reducer inspected in 1987 &
Check DNSM pipe to see if        R13. Inspect reducer DNSM of                                              Leaking valve in plant. Also OE MS-3A23P                ss                    damaged.                          valve and DNSM tee                                                        from Hope Creek; OE19325 1 of 3                                                                                    Deletions
2                                        FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T            r                                  N R                                                              O                                                    N              G                                      KS IN            fo on                            TI                              N                                  IN        CH BE          PO          s on leti                          IP                                O            O LD TIO                                  ZE                    AR M                                                            R                                TI          F        LA      T    AW        ET      SI U            M            ea De                            C                                A                                  R        SK                              EM N            A            R                                                                  C            AF      SU      IN  D                  PE                    R ES                                            C      N        A EX                                              D                                LO            S      I        P                        PI Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve.
Check DNSM pipe to see if                                                                                      Leaking valve in plant. Also OE MS-3A24                  ss              damaged.                                                                                                      from Hope Creek; OE19325 REHEATER DRAINS Through wall leak on Unit 3 (CR-Located over HDT visible from                                                IP3-32006-02270) on Unit 2 South side of HDT approx 20' N                                              similar location:branch extension MS-1A41                  ss              Reheater Drain tee from RHDT's column 18 25' East of CC                            45C              10x10x6 MS-1A63P.
Through wall leak on Unit 3 (CR-IP3-32006-02270) on Unit 2 MS-1A63P                ss                                                                                                  45C              6' pipe similar location:tee MS-1A41 2 of 3                                                                                      Deletions
3                                    FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T          r                        N R                                                O                                            N              G                      KS IN        fo on                  TI                          N                                IN        CH BE          PO        s on leti              IP                            O        O LD TIO                                  ZE    AR M                                              R                            TI        F        LA      T    AW        ET      SI U            M        ea De                  C                            A                              R        SK              EM N            A          R                                                  C          AF      SU      IN  D                  PE      R ES                                      C      N        A EX                                D                            LO        S      I        P                        PI STEAM JET AIR EJECTORS 3 of 3                                                                    Deletions}}

Latest revision as of 19:03, 11 November 2019

Official Exhibit - ENT000058-00-BD01 - Flow Accelerated Corrosion Inspection Points for 2R18, Er IP2-06-26282
ML12338A437
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2012
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A437 (22)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000058-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:

Rejected: Stricken: ENT000058 Other: Submitted: March 28, 2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N FO LA IN C SI M PO O AT PR IN ET AR O LD LD AT FF TIO O L e U M K PO C AF SU PE PA AW PE F F U O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C EXTRACTION All blanket insulation. Remove 02_3RD POINT ES TO FWH 23B one blanket upstream and 1 IP2-06-30300, 9321-2068 1 3EXB-6 90-DEG ELBOW Y blanket downstream of elbow. Y N SK-02 28 IAS, 51317542 Located approximately 2' North and & 9321-2069 6' West of column B/16,El. 32'.

Calculation reinspection.

03_3RD POINT ES TO FWH 23C All blanket insulation. Remove IP2-06-30303, 5' of insulation from upstream 2 3EXC-2P STRAIGHT PIPE Y Y N SK-03 20 IAS, 51317545 Located approximately 9' North and elbow weld.

3' East of B/12El. 30'. Calculation reinspection.

Blanket and Cal Sil insulation.

03_3RD POINT ES TO FWH 23C Remove blanket upstream and IP2-06-30304, 3 3EXC-5 90-DEG ELBOW Y 60" of cal sil insulation Y N SK-03 28 IAS, 51317546 Located 4' North and 3' East of downstream. Possible B/14, El. 25'.

asbestos. Calculation reinspection.

03_3RD POINT ES TO FWH 23C All blanket insulation. Remove IP2-06-30305 insulation on entire pipe (~ 7' 4 3EXC-7P STRAIGHT PIPE Y Y N SK-03 28 IAS, 51317547 Located approximately 10' North long) exposing elbow welds on and 3' West of A/14, El. 32'. each end. Calculation reinspection.

Only 10' is blanket, remainder downstream is cal sil. Remove 04_4TH POINT ES TO FWH 24A insulation so upstream elbow weld is accessible.Exam is 5 4EXA-3P US IP2-06-30307 STRAIGHT PIPE Y Y N SK-04 20 Located approximately 13' South of UPSM pipe, check extent of 17/CC3 El. 28'. previous exam if cal sil needs to be removed.

Calculation reinspection.

05_4TH POINT ES TO FWH 24B All blanket insulation. Remove from connection at condenser 6 4EXB-12 45-DEG ELBOW Y Y N SK-05 20 Located approximately 12' South to valve 4EX-3.

and 26' East of A/17, el. 36'. Calculation reinspection.

05_4TH POINT ES TO FWH 24B All blanket insulation. Remove on pipe and uncover welds on 7 4EXB-8P STRAIGHT PIPE Y Y N SK-05 20

. Located approximately 13' South both elbows and CL of A/17, El. 25' Calculation reinspection.

All blanket insulation. Remove 06_4TH POINT ES TO FWH 24C blanket on pipe and uncover welds at valves.

8 4EXC-14P IP2-06-30315 STRAIGHT PIPE Pipe located between valves 4EX-5 N Y N SK-06 20 and 4EX-6 Located approximately 20' East of A/15, El. 36'.

Calculation reinspection.

NCW_220 All blanket insulation. Remove blanket off valve FCV-1206 9 220-7P IP2-06-30316 STRAIGHT PIPE Located approximately 8' West and N body, downstream pipe and all Y N SK-220 12 CL F/15, El. 36'. blanket on elbow.

Calculation reinspection.

2R18 FAC Scope (Ipe0067424).Xls 1 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C NCW_249 All blanket insulation. Remove blanket from valve MS-LC-10 249-19R IP2-06-30318 CON. EXPANDER Located on elevated platform West N 2505 through valve MPS-779 Y N SK-249 6 X 10 of a A/19 and North of the HDT, El.

15'. Calculation reinspection.

2R18 FAC Scope (Ipe0067424).Xls 2 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Thermal Shields over these Low Checworks hours. No components. Removal and inspections of components on any reinstallation of the thermal 23 FWH extraction line in 3EXC-22N shields will be required.

11 IP2-06-30319 NOZZLE condenser. Also recommended in See Remarks snapshot assessment.

Contiguous points from 23C FWH 03_3RD POINT ES TO FWH 23C to extraction header. C Train 12 3EXC-22 IP2-06-30519 MITERED ELBOW Y Y N SK-3 28" selected as 22A and 22B 13 3EXC-21 IP2-06-30522 MITERED ELBOW Located in condenser 21. extraction lines to be replaced 14 3EXC-21P IP2-06-30524 MITERED PIPE during 2R18. Note that support 15 3EXC-20 IP2-06-30525 MITERED ELBOW work orders are tied to nozzle 16 3EXC-20P IP2-06-30526 MITERED PIPE inspection (IP2-06-30319) work 17 3EXC-19 IP2-06-30527 MITERED ELBOW order. If this work order is de-18 3EXC-19P IP2-06-30528 MITERED PIPE scoped, support WO's must be 19 3EXC-14 IP2-06-30529 TEE tied to another inspection.

Mud insulation. Replace with Leaking, patched areas Extraction Steam Trap blanket after exam. 3/4" downstream of this trap; see IP2-20 IP2-06-30808 N Y N 9321-F-2031 PIPE, ELBOWS AND Located at column BB14 El. 15' TB 1/2" 06-00419; CR-IP2-2006-03186.

EST-21 TEES OE from Wolf Creek Blanket insulation over System Engineer manway. recommendation.OE from Unit 3 Located in 36' El. East side TB, CR-IP3-2005-02334 ER-IP3 INTERNAL Southeast riser, near stairs to 18223; WO IP3-05-18223 INSPECTION OF mezzanine Similar location to Unit 3 crack in 21 Crossunder IP2-06-30809 Y N N A235308 32" CROSSUNDER Manhole on vertical, above elbow. weld.

RISER AND TEE. Manway opposite valve MS-24-1 Inspect internal cladding in riser pressure test valve. and tee. Perform UT measurements if thinniing is found.

Representative pipe section of LP Gland piping inside condenser.

Y Possible to work with slop drain PIPE AND ELBOWS Coordinate scaffolding pipng replacement job as these LP Gland 22 IP2-06-30811 Uninsulated lines Inside Condenser 21 with extraction line N Y N 237145 6" lines are adjacent to the slop Piping Erosion only (return lines) exam in condenser 21, drains. Siemens Westinghouse IP3-06-30319. Service Bulletin 53009 ST.

System Engineer recommendation.

2R18 FAC Scope (Ipe0067424).Xls 3 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C FEEDWATER Asbestos Insulation.

Two (2) feet upstream of valve No evidence of any inspections FW BFD 64 FT-418A Root DNSM of these venturi. OE from PIPE 75/76_HEADER TO CON PEN E,F Stop Stm Gen 21 Isolation, Mihama to inspect DNSM of flow 23 IP2-06-30530 DOWNSTREAM OF N and downstream of venturi Y N SK-75 18" monitoring devices. Also OE BFD-69P DS instrument root valve BFD FLOW ELEMENT Unit 2 Aux Feed Building 33' El. from June 2006 CHUG Meeting 1 S/G 21 FT-418A low side Catawba Unit 2 experiencing o

root stop to downstream 45 wear in this location.

elbow.

All blanket insulation. Tee where 6" FW reg valve bypass line enters 18" main. 24 77/78_HEADER TO CON PEN G,H OE Catawaba 2. ODMI CR-IP2-Steam Generator. Two (2) 2005-03847 Bypass valve FCV-24 BFD-82T IP2-06-30531 TEE Y feet upstream on diameter Y N SK-77 6" X 18" Unit 2 Aux Feed Building 15' El. S/G 447L full open. Inspect Tee branch, and three (3) feet 24 feedwater train where bypass joins main upstream and downstream on 18" diameter main.

Blanket Insulation.

75/76_HEADER TO CON PEN E,F From valve to downstream elbow.

25 BFD-77R IP2-06-30532 CON. EXPANDER Unit 2 Aux Feed Building 15' El. N Y N SK-76 12" x 18" Calculation reinspection Immediately downstream of FCV-427 Blanket Insulation.

77/78_HEADER TO CON PEN G,H From valve to downstream elbow.

26 BFD-3R IP2-06-30533 CON. EXPANDER Unit 2 Aux Feed Building 15' El. N Y N SK-78 12" x 18" Calculation reinspection Immediately downstream of FCV-437 93_CON PEN "E" TO STM GEN Mirror insulation.

27 BFD-99 IP2-06-30535 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-93 18" Calculation reinspection VC 104' El. three (3) feet downstream.

94_CON PEN "H" TO STM GEN Mirror insulation.

28 BFD-101 IP2-06-30538 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-94 18" Calculation reinspection VC 59' El. three (3) feet downstream.

95_CON PEN "G" TO STM GEN Mirror insulation.

29 BFD-106 IP2-06-30540 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-95 18" VC 104' El. three (3) feet downstream. Calculation reinspection Blanket Insulation. Remove 75/76_HEADER TO CON PEN E,F 30 BFD-79 IP2-06-30542 90-DEG ELBOW Y blanket from Valve BFD-7-3 to Y N SK-77 18" Unit 2 Aux Feed Building 43' El.

penetration Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 4 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Blanket insulation. Remove NCW_9321-F-2120 DS of Valve blanket around valve and 2X 31 IP2-06-30812 CON. EXPANDER Located West of control panel in Y Y N 9321-F-2120 AF138 downstream blanket. 2 1/2 HSB Building, El. 53'.

Calculation reinspection Possible Asbestos insulation CHECWORKS analysis and 32 BFD 29 IP2-06-30544 90-DEG ELBOW on BFD-29, followed by mirror snapshhot assessment 73_ BLR FEED PUMPS insulation, then blanket on DISCHARGE HDR TO HP HTRS BFD-29P. Remove 4' Y upstream of BFD-29 to Y N SK-73 30" 26A,B,C 33 BFD-29P IP2-06-30545 STRAIGHT PIPE upstream weld on BFD-32.

Located at A/20 El. 15'.

34 BFD-42N IP2-06-30546 NOZZLE Possible asbestos insulation. CHECWORKS analysis.

73_ BLR FEED PUMPS Remove insulation around inlet DISCHARGE HDR TO HP HTRS nozzle and shell to expose Y Y SK-73 18" 35 BFD-42 IP2-06-30547 45-DEG ELBOW 26A,B,C shell to nozzle weld, upstream Located at A/20 El. 15' and 36'. elbow and straight pipe.

36 BFD-47N IP2-06-30548 NOZZLE Mirror insulation. Remove CHECWORKS analysis 37 BFD-47 IP2-06-30549 90-DEG ELBOW FW74-4-FWH26C TO DISHDR insulation around outlet nozzle 38 BFD-47P IP2-06-30553 STRAIGHT PIPE Located at feedwater outlet from and shell to expose shell to 39 BFD-48 IP2-06-30554 90-DEG ELBOW Y nozzle weld., downstream Y SK-74 18" FW Heater 26C, approximately 13' South and 15' West of A/20, El. 36' piping to valve BFD-4-2; insure 40 BFD-48P IP2-06-30555 STRAIGHT PIPE valve to pipe weld exposed.

Possible asbestos insulation. CHECWORKS analysis FW74-5-FWH26 TO DISHDR Remove insulation around 41 BFD-61 IP2-06-30557 90-DEG ELBOW Elbow located directly over and East Y elbow and 4' upstream and 6' Y N 74 30" of condensate pumps downstream on pipe.

Possible Asbestos insulation. CHECWORKS analysis.

42 BFD-80 IP2-06-30558 90-DEG ELBOW Remove insulation around Snapshot assessment.

elbows and 2' upstream of FW77-1-DISHDR TO SG24 Y BFD-81 and 4' downstream of Y N 77 18" Located in Aux Feed Building 33' El.

43 BFD-81 IP2-06-30559 45-DEG ELBOW BFD-80.

All blanket insulation. On 30" CHECWORKS analysis 44 BFD-72T IP2-06-30560 30" X 18" TEE run, remove blankets from FW75-2-DISHDR TO SG21 FW76-2-DISHDR TO SG22 upstream elbow through 45 BFD-78T IP2-06-30561 30" X 18" TEE middle of last tee on 30" 75; 76; 30" x FW77-2-DISHDR TO SG24 Y Y N header; on 18" branches, 77 18" Located in Aux Feed Building, inlet header to FCV's. remove 4' downstream of each 46 BFD-84T IP2-06-30562 30" X 18" TEE tee.

2R18 FAC Scope (Ipe0067424).Xls 5 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C US-FCV-1115 Possible asbestos.(Mud).

4E Remove insulation on elbows Leak report, FCV-1115 leaking.

47 IP2-06-30813 Elbow Boiler Feed Pump 21 recirc line 4th and 2' upstream and 3' OE22805 FW recirc cr-mo elbow SEE and 5th elbow DNSM of BFP 21. downstream leak @ elbow extradose REMARKS Back-to-Back elbows Y Y N 9321-F-2019 6 Approximately 10' South of column Originally mislabeled as US-LCV-US-FCV-1115 A/16, El. 15'. 1115 4E. Need to change WO's 48 IP2-06-30814 Elbow 5E and substitute US-FCV-1115 4E.

2R18 FAC Scope (Ipe0067424).Xls 6 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C CONDENSATE 81_FWH 24 COND TO FWH 25 Blanket and Mirror insulation.

(15' el TB) Located approx 15' Remove all the blanket at 49 CD-30 IP2-06-30563 90-DEG ELBOW North and 9' East of 22 Seal Y elbow to downstream elbow Y N SK-81 14" Injection Booster Pmp at 29'el. Near weld and mirror insu up to Calculation reinspection column BB/17 drain vlv Mud insulation, possible asbestos. Remove insul from 50 CD-33 IP2-06-30569 90-DEG ELBOW 82/83_FWH 25 TO HEADER. 25B 25B FWH shell nozzle, FWH - above shell manway, exposing shell to nozzle weld, Y to CD-18-1. Y N SK-82 14" approximately 7' South and 18' East of CC3/18, El. 36'.

51 CD-34 IP2-06-30570 90-DEG ELBOW Calculation reinspection Blanket Insulation. Remove all 82/83_FWH 25 TO HEADER. 15' insulation from upstrm 90 deg el. TB. Located on south east side elbow to header. In addition, 52 CD-59P IP2-06-30571 STRAIGHT PIPE of HDT and 15' west of MCC23. Y remove one piece of header Y N SK-82 24" Approximately 9' South and 13' East blanket insulation where pipe of CC3/18, El. 36'. enters header.

Calculation reinspection Blanket Insulation. Remove all 83/84_HEADER TO BFP insulation from root stop vlv SUCTION. 15' TB. Located at 22 CD-55-1 to 90-deg elbow and 53 CD-75 IP2-06-30574 90-DEG ELBOW Y from 90-deg elbow upstream Y N SK-84 24" MBFP suction line First elbow prior to pmp suction nozzle. apprx 24" (two bands of blanket insulation).

Calculation reinspection Possible asbestos (mud) on Per CHECWORKS and snapshot 54 CD-62T IP2-06-30575 TEE reducer. Remove all mirror 24" assessment.

insul from Tee branch up to 82/83_FWH 25 TO HEADER. 15' upstrm elbow. Remove 3' of 55 CD-62-P1 IP2-06-30577 STRAIGHT PIPE el TB. Located south side of HDT, 24" Y mirror insul upstrm of reducer. Y N SK-82 approximately 9' South and 13' East Remove 3 blankets of insul of CC3/18, El. 15'.

downstrm of tee. 14" X 56 CD-61R IP2-06-30578 12" X 24" REDUCER 24" All blanket insulation. CHECWORKS analysis. Few 57 CD-115 IP2-06-30579 90-DEG ELBOW CD80A-3-FWH 22C TO HEADER Remove blankets from elbows inspections in this run.

Located approximately 6' South and Y and 3' upstream and Y N SK-80A 14 10' West of Column F/15, El. 36'. downstream of each elbow.

58 CD-116 IP2-06-30581 90-DEG ELBOW HEATER DRAINS Blanket Insulation. Remove 09_FWH 25 DRNS TO HTR DRN insulation from inlet side of 59 5EXD-20P DS IP2-06-30582 STRAIGHT PIPE TK. 15' TB on south west corner of N 5EX-8 to upstream of 90-deg Y N SK-9 10" HDT near Col 18, row CC3 elbow near floor Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 7 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Same as number 59 (above) 09_FWH 25 DRNS TO HTR DRN 60 5EXD-20P US IP2-06-30583 STRAIGHT PIPE N Y N SK-9 10" TK. Same location as number 59 Calculation reinspection Blanket Insulation. Remove 24A FWH TO FWH 23A 36' TB. blanket from heat shell to first Located on south west corner of 45-deg elbow, and insulation 61 4EXD-1P IP2-06-30585 STRAIGHT PIPE N Y N SK-21A 6" 23A FWH approximately 5' North on vessel to expose vessel-to-and 6' East of CC3/12, El. 36'. nozzle weld.

Calculation reinspection 24A FWH TO FWH 23A 36' TB. Balnket insulation. Remove Located on south west corner of insulation from LCV-1115 to 62 4EXD-6 IP2-06-30586 CON. REDUCER N 4EX-8. Y N SK-21A 4" X 3" 23A FWH approximately 3' North and 4' West of CC3/12, El. 36' Calculation reinspection Blanket Insulation. Remove all 90-DEG RED. blanket from 4EX-8-1 to where 63 4EXD-40 IP2-06-30587 22A_FWH 24B DRN TO CV. 36' 6" X 4" ELBOW. pipe penetrates floor.

TB. Located near 23B FWH at south west side of heater, N Y N SK-22A approximately 3' North and 15' East 64 4EXD-40P DS IP2-06-30588 STRAIGHT PIPE. of CC3/12, El. 36'. 6" Calculation reinspection Remove existing blanket 23A_FWH 24C DRN TO CV - 15' insulation between the two 90-TB. Located 8' west of MBFP deg elbows. Insure both pipe 65 4EXD-70P IP2-06-30589 STRAIGHT PIPE Y Y N SK-23A 6" turbine oil conditioner next to stairs welds are exposed.

going to 5' el. Pipe located at 33' el.

Calculation reinspection Blanket Insulation. Remove all 25A/B_FWH 23B DRN TO CV. 15' of the exisiting blanket 66 3EXD-34 IP2-06-30590 TEE TB. Located between 21B and 22A Y insulation. Y N SK-25B 8" Inlet Waterbox.

Calculation reinspection Blanket insulation. Remove insulation from vlv 5EX-15-2 to NCW_18. 15'el TB. Located where pipe penetrates floor.

67 5EXC-14 IP2-06-30591 90-DEG ELBOW between 22B and 23A inlet N Y N SK-18 14" DO NOT REMOVE waterboxes.

INSULATION FROM 5EX 2. Calculation reinspection 68 5EXC-21 IP2-06-30592 90-DEG ELBOW NCW_18. 5' el TB. Located above and South of 24 Sump Pump Oil Y N Y N SK-18 14" 5EXC-21P-1 Skimmer .

69 IP2-06-30593 STRAIGHT PIPE US Calculation reinspection 15' TB. Located between 21B and All Blanket insulation.

22A inlet waterboxes. Remoove blanket on pipe 70 205-22P US IP2-06-30607 STRAIGHT PIPE N Y N SK-205 8 Located approximately 12' South between valves LCV-5003 and and 15' East of A/16 El. 15'. 5EX-504, exposing all welds.

Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 8 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C 15' TB. Located between 21B and 22A inlet water boxes 71 205-24P US IP2-06-30608 STRAIGHT PIPE Y N Y N SK-205 8 approximately 12' South and 25' East of A/16, El. 5'.

Calculation reinspection 15' TB. Located between 21 and 22 Blanket Insulation. Rmove 72 4EXD-75 IP2-06-30609 90-DEG ELBOW MBFP and above the MBFP Lube Y existing Blanket insulation. Y N SK-23B 6" Oil Conitioner Tank. Calculation reinspection HD23A-1-FWH24C TO CV Mirror insulation. Remove 73 4EXD-61 IP2-06-30610 6" X 4" RED. EL Located approximately 3' North and N insul from 4EX-8-2 to where Y N SK-23A 6" X 4" CHECWORKS analysis and 17' West of A/12, El. 36'. line penetrates floor snapshot assessment.

Blanket Insulation. Remove all CHECWORKS analysis and HD23A-1-FWH24C TO CV. 36' TB. insulation between LCV-1115 snapshot assessment.

74 4EXD-60 IP2-06-30611 4" X 3" REDUCER. Located near 23C FWH at south and 4EX-8-2. 4" X 3" west side of heater. N Y N SK-23A HD23A-1-FWH24C TO CV. Same 75 4EXD-60P IP2-06-30618 STRAIGHT PIPE. 3" as pt 74.

Blanket Insulation. Remove No inspections UPSM and DNSM 76 HD-4A DS IP2-06-30626 STRAIGHT PIPE insulation from 2' upstream of of flow element. OE Mihama.

Flow Element, downstream to HD20-2-HDP22 TO BFP SUCTION.

Header.

15' TB. Located near discharge Y Y N SK-20 12" side of 22 HDTP-Col. 15 row CC3.

77 HD-6P US IP2-06-30628 STRAIGHT PIPE Balnket Insulation. Remove Piping between restricting orifice insulation from 3EX-540 to OE Susquehanna Unit 2 and isolation valve 3EX-540. 23B restricting orifice OE Oconee Unit 3 and Beaver 78 239-11E IP2-06-30630 90 degree elbow FWH Operating vent. N Y N A235304 SK-239 2 Valley Unit 2 6/26/06 CHUG Located Northeast end of FWH Meeting FW Htr vent d/s of 23B, El. 36'. continuous flow restricting orifice.

Altran Small Bore review 2R18 FAC Scope (Ipe0067424).Xls 9 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Reheater Drains Blanket Insulation.

Remove insulation on tee 45B_FE 1257-1 TO LCV 1104 mainand upstream to 45 elbow 79 MS-1A25 IP2-06-30635 TEE Located approximately13' South of Y and downstream to FE-1257; Y N SK-45B 6 A/18 at the condenser wall, El. 36' branch to pipe hanger.

Calculation reinspection 45C_HDR [1] TO FWH 26A,B,C Blanket Insulation.

Located approximately 5' North and Remove blankets on elbow Calculation reinspection.

80 MS-1A38 IP2-06-30638 45-DEG ELBOW Y and blankets on upstream and Y N SK-45C 10 17' West of A/18, El. 15'. Above OE23342 RHD elbow leak at HDT. downstream pipes. Davis Bessir Blanket Insulation.

45C_HDR [1] TO FWH 26A,B,C Remove insulation on pipe to MS-1A67P 81 IP2-06-30640 STRAIGHT PIPE Located approximately 11' North N tees on both ends, exposing all Y N SK-45C 6 US and 18' West of A/18, El. 33'. welds.

Calculation reinspection 82 MS-1A59 IP2-06-30667 90-DEG ELBOW 45D_HDR [1] TO FWH 26 (CONT.) Blanket Insulation.

Located approximately 10' North Remove insulation from MS-1A59P and 16' East of CC3/18, El. 15'. Y upstream pipe to downstream Y N SK-45D 6 83 IP2-06-30672 STRAIGHT PIPE Calculation reinspection.

US Top of HDT accessible from west elbow.

OE23342 RHD elbow leak at valve platform @ north end of HDT. Davis Bessie Blanket insulation.

Remopve blanket on elbow 48A/B_RDT 21B TO LCV 1105 and upstream and downstream 84 MS-1B26 IP2-06-30673 90-DEG ELBOW Located approximately 6' North and Y Y N SK- 48A 6 straight pipe.

24' East of A/15, El. 36'.

Calculation reinspection 85 MS-2B12 IP2-06-30675 90-DEG ELBOW Blanket Insulation.

Remove insulation on pipe Y

49A/B_RDT 22B TO LCV 1105A upstream of elbow and 6' on Work with exam points Located approximately 1' South and straight pipe. Work with exam Y N SK-49A 6 86 MS-2B12P IP2-06-30676 STRAIGHT PIPE MS-2B11-P1 (99) and 11' West of F/16, El. 36' points MS-2B11-P1 (99) and MS-2B11 (100).

MS-2B11 (100).

Calculation reinspection Blanket insulation.

87 MS-2B16 IP2-06-30678 45-DEG ELBOW Remove blanket minimum 1' 49A/B_RDT 22B TO LCV 1105A Located approximately 14' South Y upstream of MS-2B16 through Y N SK-49A 6 and 14' West of F/16, El. 36'. MS-2B17 and 2" on 88 MS-2B17 IP2-06-30679 45-DEG ELBOW Calculation reinspection. Includes downstream pipe.

pipe MS-2B16P Blanket Insulation.

49A/B_RDT 22B TO LCV 1105A Remove blanket upstream of 89 MS-2B22 IP2-06-30680 90-DEG ELBOW Located approximately 5' South and N elbow MS-2B22 and on Y N SK-49A 10 30' East of A/14, El. 36'. downstream to expose elbow-to-elbow weld.

Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 10 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Blanket Insulation.

Remove insulation on tee runto 49C_HDR [2] TO FWH 26A,B,C upstream and downstream 90 MS-2B42 IP2-06-30681 TEE Located approximately 10' South N flanges, and blankets on Y N SK-49C and 4' East of CC3/19, El. 36'. vertical pipe to next tee.

Calculation reinspection Blanket insulation.

49C_HDR [2] TO FWH 26A,B,C 91 MS-2B50 IP2-06-30682 90-DEG ELBOW Located approximately 5' North and Y Y N SK-49C Calculation reinspection. Include 21' West of A/19, El. 15'.

UPSM pipe MS-2B63P. OE23342 49C_HDR [2] TO FWH 26A,B,C Blanket insulation. RHD elbow leak at Davis Bessie 92 MS-2B52 IP2-06-30683 90-DEG ELBOW Located approximately 4' South and Y Y N SK-49C 21' West of A/19, El. 15'.

50A_RDT 23B TO LCV 1105B Blanket insulation Calculation reinspection.

93 MS-3B14 IP2-06-30684 90-DEG ELBOW Located approximately 3' North and Y Y N SK-50A OE23342 RHD elbow leak at 14' West of F/17, El. 36'. Davis Bessie 50A_RDT 23B TO LCV 1105B Blanket and Mirror insulation MS-3B22P 94 IP2-06-30685 STRAIGHT PIPE Locate approximately 10' South and Y Y N SK-50A US 30' West of F/14, El. 36'. Calculation reinspection.

50A_RDT 23B TO LCV 1105B Blanket insul;ation 95 MS-3B25 IP2-06-30688 90-DEG ELBOW Located approximately 6' South and Y Y N SK-50A 38' West of F/14, El. 36'. Calculation reinspection.

96 MS-2A33 IP2-06-30689 TEE Blanket Insulation NCW_46B Remove blanket around valve Located approximately 2' North and Y MS-17 body up to condenser Y N SK-46B 97 MS-2A34 IP2-06-30692 TEE 25' East of A/17, El. 36'. connection. Calculation reinspection.

Blanket insulation and Mirror insulation on nozzle-to-tank connection.

98 MS-2B11N IP2-06-30695 NOZZLE N Remove insulation on nozzle and expose nozzle to tank MSD-49A-1-RHDT22B TO CV weld.

99 MS-2B11P-1 IP2-06-30699 STRAIGHT PIPE Located approximately 8' South and Blanket Insulation. CHECWORKS PICK Snapshot Y N 49A 6 13' West of F/16, El. 53' 98 and 99 Remove blanket from 53' assessment recommendation.

adjacent to valve MS-890 Y through floor penetration to Work scaffold with elbow and downstream pipe.

exam points MS-2B12 Work with exam points MS-100 MS-2B11 IP2-06-30701 ELBOW (85) and MS-2B12P 2B12 (85) and MS-2B12P (86).

(86).

MSR DRAINS 27_MS 21A DRAIN TO MSDT 21A Y N Located adjacent to Northwest Access to elbow and 1' Y silver 101 1A-20 IP2-06-30705 45-DEG ELBOW Drains Collection Tank access upstream and Y SK-33B 6 (Lead platform; El. 15' downstream to next  ?)

elbow. Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 11 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Mud insulation around tee, possible asbestos; mirror insulation on tee run and MSD28-5-MS22A TO MSDT 22A blanket on tee branch.

Under MSR 22A Located Remove mud on tee 3 feet of 102 2A-18 IP2-06-30707 TEE Y Y N SK-28 12 approximately 8' South and 12' East mirror both sides of tee run of A/17, El. 53' and blanket between tee and downstream elbow.

Checworks analysis 2R18 FAC Scope (Ipe0067424).Xls 12 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C MAIN STEAM Y Calculation reinspection from Main Steam flow Venturi from 24 9321-F-2540 2R17; IP-CALC-06-00178.

103 IP2-06-22106 SG. Y Y N 28" 9321-F-2542 Inspect pipe downstream of FE-VC El. 107' FE-449 STRAIGHT PIPE 449.

NCW_210 N Y silver Calculation reinspection.

104 210-3P-2 IP2-06-30709 STRAIGHT PIPE Located on the South side of the Y Y SK-210 4 Inspect 2 pipes between valves (Lead Drains Collection Tank, El. 15'.  ?) MS-96 and MS-97 Y

22 S/G Main Steam Flow Venturi Per OE 15860 from Calvert Cliffs.

9321-F-2541 105 IP2-06-30720 Needs pipe whip restraint removal Y Y N 28" Piping wall erosion found around VC El. 107' the drain slots at the DNSM end FE-429-DS Straight Pipe of the Main Steam Flow Venturi.

Y 23 S/G Main Steam Flow Venturi Per OE 15860 from Calvert Cliffs.

9321-F-2541 106 IP2-06-30721 Needs pipe whip restraint removal Y Y N 28" Piping wall erosion found around VC El. 107' the drain slots at the DNSM end FE-439-DS Straight Pipe of the Main Steam Flow Venturi.

Gland Seal Steam Supply Blanket insulation.

107 IP2-06-30722 Located approximately 6' South and N Y N 263 3" X 6" 263-13R Expander 21' West of F/19, El. 36'. Calculation reinspection Blanket insulation OE Wolf Creek. And Darlington Review of WRT's for MST's.

Located 7' North F16; blanket Y 108 IP2-06-30723 N Y 9321-F-2042 OE IP2-04-25162 leaking strainer insulation silver threads. Could be more MST-51 Pipe, Elbow, Tee extensive in dnsm piping.

Located on El. 15' in Aux Feed All mirror insulation 109 IP2-06-30724 Main Steam Trap 64 Building, adjacent to 22 Auxiliary N Y N 9321-F-2041 1", 1/2" OE Wolf Creek. And Darlington MST-64 Class 1 piping Feedwater Pump. Review of WRT's for MST's.

110 IP2-06-30725 206-16E "Plant Problems Affecting Downstream of Thermal Efficiency" report; leaking valve PCV- Located approximately 5' N and 15' Operational Focus Meeting.

Y Y Y Y 206 8" 1121. Main steam W fROM F17, Under El. 36' grating Leak report, large leakers to dump to condenser. main condenser. WRT IP2 111 IP2-06-30726 19922.

206-16P NCW_153 Main Steam Blanket insulation.

Located in Aux Feedwater Building, Remove blanket from pipe 112 MS23-1 DS IP2-06-30727 STRAIGHT PIPE El. 65' Y support to VC penetration. Y N SK-153 28" Located adjacent to valve MS-42, S/G 23 to ABFP 22 root stop. Calculation reinspection NCW_214 Mirror insulation 113 214-26E IP2-06-30729 90-DEG ELBOW Located at base of column A/16, El. N Y N SK-214 53'. Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 13 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C NCW_254 Blanket insulation 114 254-15E IP2-06-30730 90-DEG ELBOW Top of HP Turbine downstream of Y Y N SK-254 valve MS-1206. El. 53' Calculation reinspection NCW_259 Blanket insulation.

Located on North end of HP 115 259-9E IP2-06-30731 90-DEG ELBOW N Y N SK-259 Turbine, behind Governor Panel El.

53' Calculation reinspection All blanket insulation NCW_267 116 267-6T IP2-06-30732 TEE Located approximately12' West and Y Y N SK-267 5' South of East Mezz. Stairs, El. 60' Calculation reinspection NCW_267 All blanket insulation.

117 267-33P IP2-06-30733 STRAIGHT PIPE Located approximately 13' South N Y N SK-267 and 5' West of F/18, El. 36' Calculation reinspection Blanket insulation.

NCW_259 Remove insulation around 259-15E Top of HP Turbine downstream of elbow and include insulation OE from Unit 3. Wear found in 118 SEE IP2-06-30781 90-DEG ELBOW valve MS-1208. y around valve and downstream Y N SK-259 these components.

REMARKS Located approximately 10' South pipe, exposing elbow welds. Originally mislabeled as MS-863-and 40' West of F/20, El. 53'. DS. Need to change WO's and substitute 259-15E NCW_254 Blanket insulation. OE from Unit 3. Wear found in 254-3E Top of HP Turbine downstream of Remove insulation around these components.

119 SEE IP2-06-30782 90-DEG ELBOW valve MS-1207. y elbow and include insulation Y N SK-254 Originally mislabeled as MS-866-REMARKS Located approximately 30' East of around valve and downstream DS. Need to change WO's and A/19, El. 53'. pipe, exposing elbow welds. substitute 254-3E.

FEEDWATER HEATER SHELLS Inspection of shell Mirror Insulation 120 IP2-06-30784 around extraction Feedwater Heater 25B shell, El. 36 y Y N Similar to inspection for FWH 25A FWH 25B steam inlets. and C performed in 2000 Inspection of worn Mirror Insulation 121 IP2-06-30785 areas identified in Feedwater Heater 24A shell, El. 36 y Y N FWH24A 2R16 Calculation reinspection Inspection of worn Mirror Insulation 122 IP2-06-30786 areas identified in Feedwater Heater 24B shell, El. 36 y Y N FWH24B 2R16 Calculation reinspection Inspection of worn Mirror Insulation 123 IP2-06-30787 areas identified in Feedwater Heater 24C shell, El. 36 y Y N FWH24C 2R16 Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 14 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C STEAM JET AIR EJECTORS Blanket insulation. Remove TB 36', located approximately 4' from tee and minimum of 1' IP2-06-30789 Tee downstream of N Y N 252 3 PCV-1222 steam South and 3' West of B/13, El. 36'. from both ends of run and System engineer 124 252-1T supply to SJAE branch recommendation, & OE 125 252-5E IP2-06-30790 Possible asbestos.(Mud). Y Main steam supply to TB 36', located approximately 4' Remove insulation on elbows System Engineer Y N 252 3 IP2-06-30791 SJAE's, Elbows South and 3' West of B/13, El. 36'. and 1' upstream and 2' Y recommendation; elbows DNSM 126 252-7E DNSM of PCV-1222 downstream of FE; back-to-back config.

BOILER FEED PUMP TURBINE Feed Pump Turbine N IP2-06-30792 TB 5' Located under Boiler Feed Y 127 215-1P #21 drain to BFPT Y N 215 From Altran small bore review Pump Turbine.

128 215-2E IP2-06-30793 drip tank. Y and calculation reinspection.

HIGH PRESSURE TURBINE DRAINS Y OE19798 Failure at bi-metallic Piping UPSM and weld at VC Summer. OE Unit 3; 129 IP2-06-30794 33' Mezz. TB Y Y N 272 DNSM of orifice thinned pipe in this location 272-3P block replaced.

First tee UPSM of Y FCV-1155, including FCV-1155 leaking; no previous 130 IP2-06-30795 33' Mezz. TB N Y N 236 236-FCV1155 adjacent elbow and inspections. OE Unit 3, wear T US pipe. found in similar components.

ADDED SCOPE Feedwater Heater Y Leak under FWH 25C 131 IP2-06-31989 25C extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-10N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 132 IP2-06-31994 25B extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-7N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 133 IP2-06-31996 25A extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-1N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 134 IP2-06-31998 23A extraction steam TB 36'-9 Y Y N 1 18 reinforcement pad CR-IP2-2006-3EXA-1N inlet nozzle. 06057 CONTINGENCY WORK ORDERS SUPPORT WORK ORDERS relocation of pipe IP2-06-30969 whip restraints to FE-429-DS support FAC exam relocation of pipe IP2-06-30970 whip restraints to FE-439-DS support FAC exam 2R18 FAC Scope (Ipe0067424).Xls 15 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W Cp p g SC SC IN C thermal insulation LP Gland IP2-06-30971 removal/replacement Piping Erosion by Boilermakers to FAC Exams thermal insulation inside 21 IP2-06-30977 removal/replacement condenser by Boilermalers to FAC Exams Open 21 condenser inside 21 IP2-06-30978 for FAC exams inside condenser condenser.

2R18 FAC Scope (Ipe0067424).Xls 16 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C REPAIR/REPLACEMENT WORK ORDERS Repair/Replace N extraction lines from the LP Turbine to the IP2-06-21854 Inside 23 condenser. Y N 22" 22A Feedwater Based on 2R17 FAC exam this LPFW22A- Heater inside the 23 piping is worn and requires 1N, -2N Condenser.

p p repair/replacemrnt during 2R18 extraction lines from N Based on 2R17 FAC exam this LPFW22B- IP2-06-21860 the LP Turbine to the Inside 22 condenser. Y N 22" piping is worn and requires 1N, -2N 22B Feedwater repair/replacemrnt during 2R18.

Y IP2-06-30979 Replace small bore Turnine building 15' N N 9321-F-2131 1" MST-43 piping Y

IP2-06-30980 Replace small bore Turbine Building 15' N N 9321-F-2151 1" 3/4" EST-2 piping Y

IP2-06-30982 Replace small bore Turnbine Building 15' N N 9321-F-2151 1" 3/4" EST-5 piping Y

IP2-06-30983 Extraction Steam Turbine Building 15' Y N SK-2 20" X 28" 3EXB-10R Reducer Y

IP2-06-31991 Repair of FWH 25C TB 36'-9 Y N 7 18 5EX-10N inlet nozzle Repair based on source of leak Y

IP2-06-31995 Repair of FWH 25B TB 36'-9 Y N 7 18 Repair based on source of 25C 5EX-7N inlet nozzle FWH leak Repair of FWH 25A Y Repair based on source of 25C IP2-06-31997 TB 36'-9 Y N 7 18 5EX-1N inlet nozzle FWH leak LEGEND PRE-OUTAGE Insulation likely to A

contain asbestos 2R18 FAC Scope (Ipe0067424).Xls 17 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 N N T ER TS N O G P O R IN D EN IO LD TI EP T H ZE KS U DN ION N BE R N O LA IN C SI M PO O AT FF PR IN ET AR LD LD AT FF TIO e

U M K PO C A SU PE PA AW PE FO FO UL O LA pl N A R M IN R SK PI EM O O LO SC PI D R AF AF INS SU om EX W C SC SC IN C Insulation is a welded stainless TS steel Thermal Shield 2R18 FAC Scope (Ipe0067424).Xls 18 of 18 2R18 FAC Scope (Ipe0067424).Xls

1 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T ER N G S R IO N H K BE IN RD N IN C M PO O I PT IO O LD TIO ET ZE AR R F LA T AW K SI M NU RK AT DR S RE AM O SC C AF SU IN PE EX W DE LO SC IN PA PI Following locations walked down and found to be unsuitable for pre-outage exams due to high Following exams possible to temperature or location. examine pre-outage 220-7P 4EXD-75 249-19R CD-115 CD-116 5EXC-14 5EXC-21 5EXC-121P-1 US 205-22P US 204-24P US 4EXD-61 4EXD-60 239-11E 206-16E 1 of 1 2R18P

1 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T r N R O N G KS IN fo on TI N IN CH BE PO s on leti IP O O LD TIO ZE AR M R TI F LA T AW ET SI U M ea De C A R SK EM N A R C AF SU IN D PE R ES C N A EX D LO S I P PI EXTRACTION Moisture separator separating tank A vent to header upstream of FWH 25a,b,and c connection 7&

SS CR_mo to header 5EX-18 Fabricated cross. 7A CONDENSATE HEATER DRAINS Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve. Reducer inspected in 1987 &

ss REHEATER Check DNSM pipe to see if R13. Inspect reducer DNSM of Leaking valve in plant. Also OE MS-3A24R DRAINS damaged. valve and DNSM tee from Hope Creek; OE19325 Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 47 IP2-06-22870 to close valve. Reducer inspected in 1987 &

Check DNSM pipe to see if R13. Inspect reducer DNSM of Leaking valve in plant. Also OE MS-3A23P ss damaged. valve and DNSM tee from Hope Creek; OE19325 1 of 3 Deletions

2 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T r N R O N G KS IN fo on TI N IN CH BE PO s on leti IP O O LD TIO ZE AR M R TI F LA T AW ET SI U M ea De C A R SK EM N A R C AF SU IN D PE R ES C N A EX D LO S I P PI Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve.

Check DNSM pipe to see if Leaking valve in plant. Also OE MS-3A24 ss damaged. from Hope Creek; OE19325 REHEATER DRAINS Through wall leak on Unit 3 (CR-Located over HDT visible from IP3-32006-02270) on Unit 2 South side of HDT approx 20' N similar location:branch extension MS-1A41 ss Reheater Drain tee from RHDT's column 18 25' East of CC 45C 10x10x6 MS-1A63P.

Through wall leak on Unit 3 (CR-IP3-32006-02270) on Unit 2 MS-1A63P ss 45C 6' pipe similar location:tee MS-1A41 2 of 3 Deletions

3 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 T r N R O N G KS IN fo on TI N IN CH BE PO s on leti IP O O LD TIO ZE AR M R TI F LA T AW ET SI U M ea De C A R SK EM N A R C AF SU IN D PE R ES C N A EX D LO S I P PI STEAM JET AIR EJECTORS 3 of 3 Deletions