|
|
(2 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| #REDIRECT [[NRC-2013-0111, G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station]]
| | {{Adams |
| | | number = ML13092A264 |
| | | issue date = 06/19/2013 |
| | | title = G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station |
| | | author name = Leeds E |
| | | author affiliation = NRC/NRR |
| | | addressee name = |
| | | addressee affiliation = |
| | | docket = 05000285 |
| | | license number = DPR-040 |
| | | contact person = Wilkins L, NRR/DORL 415-1377 |
| | | case reference number = G20120458, NRC-2013-0111, OEDO-2012-0390, TAC ME8973 |
| | | package number = ML13092A254 |
| | | document type = 2.206 Petition, Federal Register Notice |
| | | page count = 4 |
| | | project = TAC:ME8973 |
| | | stage = Other |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:[7590-01-P] |
| | NUCLEAR REGULATORY COMMISSION |
| | [Docket No. 50-285, NRC-2013-0111] |
| | Omaha Public Power District, Fort Calhoun Station, Unit 1 AGENCY: Nuclear Regulatory Commission. |
| | ACTION: Request for action; receipt. |
| | |
| | ==SUMMARY== |
| | : The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated June 21, 2012, Mr. Wallace Taylor (the petitioner) has requested that the NRC take enforcement action against Fort Calhoun Station, Unit 1 (FCS). The petitioners requests are included in the SUPPLEMENTARY INFORMATION section of this document. |
| | ADDRESSES: Please refer to Docket ID NRC-2013-0111 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods: |
| | * Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0111. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov. |
| | * NRC's Agencywide Documents Access and Management System (ADAMS): |
| | You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public |
| | |
| | Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. |
| | * NRC's PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. |
| | SUPPLEMENTARY INFORMATION: |
| | On June 21, 2012 (ADAMS Accession No. ML11174A228), the petitioner requested that the NRC take enforcement action with regard to FCS. The petitioner also met with the Petition Review Board (PRB) and supplemented its petition during a teleconference on August 27 and November 19, 2012 (ADAMS Accession Nos. ML12250A714, and ML12352A279, respectively). |
| | As a basis for the request, the petitioner states that the NRC's own guidelines regarding enforcement sanctions would categorize the events at FCS over the past 20 years at Severity Level I, the highest level, because those events involve (1) situations involving particularly poor licensee performance, or involving willfulness; (2) situations when the violation results in a substantial increase in risk, including cases in which the duration of the violation has contributed to the substantial increase; and (3) situations in which the licensee made a conscious decision to be in noncompliance to obtain an economic benefit (63 FR 26630-01, 26642; May 13, 1998). |
| | The petitioner states that the NRC considers these violations to be of significant concern, and it may apply its full enforcement action to remedy these violations, including issuing appropriate |
| | |
| | orders. Id. The petitioner provided supplemental information in support of the petition and states that (1) a support beam was found that was not within allowable limits for stress and loading; (2) given Exelons long history of deliberate misconduct and willful violations at its various nuclear plants around the United States, day-to-day management of FCS by Exelon is likely to worsen FCS performance rather than improve it; (3) the flooding hazard at Fort Calhoun greatly exceeds its flooding protection measures at this time; (4) FCS risk of flooding from each of the six upstream dams has not been evaluated or resolved; and (5) the identification of 614 primary reactor containment electrical penetration seals containing Teflon that could degrade during design-basis accident conditions. |
| | The request is being treated pursuant to § 2.206 of Title 10 of the Code of Federal Regulations, Requests for Action under This Subpart, of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). As provided by § 2.206, appropriate action will be taken on this petition within a reasonable time. |
| | The petitioner requested an opportunity to address the NRR Petition Review Board (PRB). The PRB held recorded teleconferences with the petitioner during which the petitioner supplemented and clarified the petition. The PRB considered results of those discussions in its determination regarding the petitioners request. As a result, the PRB acknowledged the petitioners concerns about containment internal structures, electrical penetrations, and upstream dam failures. The NRC is currently reviewing the issues above related to containment internal structures, electrical penetrations, and upstream dam failures. Both the containment internal structures and electrical penetrations issues have been identified as issues that must be resolved before restart of the facility and have been added to the confirmatory action letter (ADAMS Accession No. ML13057A287). Additionally, the PRB noted that natural disasters, such as flooding, are undergoing NRC review as part of the lessons learned from the Fukushima Dai-ichi event in |
| | |
| | Japan. The NRC staff is evaluating the effect of multiple upstream dam failures as a part of the Fukushima Dai-ichi reviews, as well as other processes. The PRB intends to use the results of the aforementioned reviews to inform its final decision on whether to implement the requested actions. |
| | Dated at Rockville, Maryland, this 19th day of June 2013. |
| | For The Nuclear Regulatory Commission. |
| | /RA/ |
| | Jennifer L. Uhle, Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor Regulation.}} |
Letter Sequence Other |
---|
|
Results
Other: ML13092A248, ML13092A264, ML15063A047, ML15063A050, ML15063A066, ML15068A105, ML15128A346, NRC-2013-0111, G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station
|
MONTHYEARML12250A7142012-08-27027 August 2012 G20120458/EDATS: OEDO-2012-0390 - Transcript of 10 CFR 2.206 Petition Re Fort Calhoun Nuclear Power Station, August 27, 2012, Pages 1-42 Project stage: Acceptance Review ML12352A2792012-11-19019 November 2012 G20120458/EDATS: OEDO-2012-0390 -Transcript from November 15, 2012 Conference Call with 2.206 Petitioner Wallace L. Taylor Fort Calhoun Nuclear Power Station Project stage: Request ML13092A2482013-05-23023 May 2013 G20120458/OEDO-2012-0390 - Acknowledgement Letter, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other ML13092A2642013-06-19019 June 2013 G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other NRC-2013-0111, G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station2013-06-19019 June 2013 G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other ML15068A1052015-03-0909 March 2015 NRR E-mail Capture - Update: Petition Under 10 CFR 2.206 Pertaining to Fort Calhoun Station Project stage: Other ML15063A0662015-04-15015 April 2015 G20120458 - Proposed Director'S Decision, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other ML15063A0502015-04-15015 April 2015 G20120458 - Letter to Licensee, Proposed Director'S Decision, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other ML15063A0472015-04-15015 April 2015 G20120458 - Letter to Petitioner, Proposed Director'S Decision, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other ML15128A3462015-06-0303 June 2015 G20120458 - Letter to Petitioner, Final Director'S Decision, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station Project stage: Other 2013-06-19
[Table View] |
|
---|
Category:2.206 Petition
MONTHYEARML13092A2642013-06-19019 June 2013 G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station NRC-2013-0111, G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station2013-06-19019 June 2013 G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station ML12180A1242012-06-21021 June 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Re 2.206 - Fort Calhoun Nuclear Power Station 2013-06-19
[Table view] Category:Federal Register Notice
MONTHYEARML23333A1092023-12-27027 December 2023 Federal Register Notice - Fort Calhoun Station, Unit 1, License Termination Plan Finding of No Significant Impact ML22178A0472022-07-0404 July 2022 Enclosure - Federal Register Notice - Fort Calhoun Station, Unit 1 - FRN on Public Meeting and Request for Comment on License Termination Plan (License No. DPR-40, Docket No. 50-285) ML21055A4002021-05-14014 May 2021 Enclosure 1: Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Federal Register Notice ML19179A1242019-07-11011 July 2019 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI & SGI & Order Imposing Procedures for Access to SUNSI & SGI: August 6, 2019 ML18318A3602018-11-19019 November 2018 FRN Document for Partial Site Release Requests (License DPR-40,Docket Nos. 50-285 and 72-54) NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2017-0223, FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003)2017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17278A1782017-12-19019 December 2017 FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17261A3432017-11-21021 November 2017 FRN, Environmental Assessment and Finding of No Significant Impact Re Exemption Request from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition ML17172A7352017-10-0404 October 2017 FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements NRC-2017-0202, FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements2017-10-0404 October 2017 FRN, Partial Exemption from 10 CFR 50, Appendix B, 10 CFR 50.59(d)(3), and 10 CFR 50.71(c) Regarding Record Retention Requirements NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2017-0160, FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler2017-07-0707 July 2017 FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler ML17067A3422017-07-0707 July 2017 FRN, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler NRC-2017-0099, FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments2017-04-0707 April 2017 FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML17094A7952017-04-0707 April 2017 Letter, Notification of the Availability of Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML17094A7972017-04-0707 April 2017 FRN, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate and Notice of Meeting to Discuss and Accept Comments ML16232A0892016-08-24024 August 2016 Letter, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation ML16232A0882016-08-24024 August 2016 FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation NRC-2016-0096, FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation2016-08-24024 August 2016 FRN, Withdrawal of an Amendment Request, Changes to Fire Protection License Condition Revised Commitment to Modify Plant Systems as Part of NFPA 805 Implementation NRC-2016-0040, FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements2016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16209A3692016-08-0202 August 2016 Letter, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16209A3702016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements ML16173A1222016-06-24024 June 2016 FRN, Withdrawal of Requested Licensing Action, Request to Revise Current Licensing Basis as Described in the Final Safety Analysis Report to Allow Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 NRC-2015-0269, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 20152015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15328A5502015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15231A8382015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 NRC-2015-0204, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 20152015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 NRC-2012-0014, G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station (TAC Nos. ME6681 and2015-06-0303 June 2015 G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station (TAC Nos. ME6681 and ME66 ML15128A1432015-06-0303 June 2015 G20110506/LTR-11-0402/EDATS: SECY-2011-0402, G20110492/LTR-11-0382/EDATS: OEDO-2011-0387 - FRN, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station ML15062A3732015-04-15015 April 2015 G20110506/LTR-11-0402 and G20110492/LTR-11-0382 - 2.206 Proposed Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun Station ML15092A1842015-04-0606 April 2015 FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra ML15092A1822015-04-0606 April 2015 Letter, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra NRC-2014-0159, FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra2015-04-0606 April 2015 FRN, Withdrawal of License Amendment Request to Revise Updated Safety Analysis Report, to Permit Use of Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra ML15022A6532015-01-26026 January 2015 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 3, 2015 ML14311A6612014-11-10010 November 2014 FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months NRC-2014-0249, FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months2014-11-10010 November 2014 FRN, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14311A6602014-11-10010 November 2014 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months NRC-2014-0193, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 20142014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14233A2082014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14204A5782014-07-25025 July 2014 Notice of Withdrawal of License Amendment Application, Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14204A5922014-07-25025 July 2014 FRN, Notice of Withdrawal of License Amendment Application, Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML13274A0262013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements 2023-12-27
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-285, NRC-2013-0111]
Omaha Public Power District, Fort Calhoun Station, Unit 1 AGENCY: Nuclear Regulatory Commission.
ACTION: Request for action; receipt.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated June 21, 2012, Mr. Wallace Taylor (the petitioner) has requested that the NRC take enforcement action against Fort Calhoun Station, Unit 1 (FCS). The petitioners requests are included in the SUPPLEMENTARY INFORMATION section of this document.
ADDRESSES: Please refer to Docket ID NRC-2013-0111 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods:
- NRC's Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public
Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
SUPPLEMENTARY INFORMATION:
On June 21, 2012 (ADAMS Accession No. ML11174A228), the petitioner requested that the NRC take enforcement action with regard to FCS. The petitioner also met with the Petition Review Board (PRB) and supplemented its petition during a teleconference on August 27 and November 19, 2012 (ADAMS Accession Nos. ML12250A714, and ML12352A279, respectively).
As a basis for the request, the petitioner states that the NRC's own guidelines regarding enforcement sanctions would categorize the events at FCS over the past 20 years at Severity Level I, the highest level, because those events involve (1) situations involving particularly poor licensee performance, or involving willfulness; (2) situations when the violation results in a substantial increase in risk, including cases in which the duration of the violation has contributed to the substantial increase; and (3) situations in which the licensee made a conscious decision to be in noncompliance to obtain an economic benefit (63 FR 26630-01, 26642; May 13, 1998).
The petitioner states that the NRC considers these violations to be of significant concern, and it may apply its full enforcement action to remedy these violations, including issuing appropriate
orders. Id. The petitioner provided supplemental information in support of the petition and states that (1) a support beam was found that was not within allowable limits for stress and loading; (2) given Exelons long history of deliberate misconduct and willful violations at its various nuclear plants around the United States, day-to-day management of FCS by Exelon is likely to worsen FCS performance rather than improve it; (3) the flooding hazard at Fort Calhoun greatly exceeds its flooding protection measures at this time; (4) FCS risk of flooding from each of the six upstream dams has not been evaluated or resolved; and (5) the identification of 614 primary reactor containment electrical penetration seals containing Teflon that could degrade during design-basis accident conditions.
The request is being treated pursuant to § 2.206 of Title 10 of the Code of Federal Regulations, Requests for Action under This Subpart, of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). As provided by § 2.206, appropriate action will be taken on this petition within a reasonable time.
The petitioner requested an opportunity to address the NRR Petition Review Board (PRB). The PRB held recorded teleconferences with the petitioner during which the petitioner supplemented and clarified the petition. The PRB considered results of those discussions in its determination regarding the petitioners request. As a result, the PRB acknowledged the petitioners concerns about containment internal structures, electrical penetrations, and upstream dam failures. The NRC is currently reviewing the issues above related to containment internal structures, electrical penetrations, and upstream dam failures. Both the containment internal structures and electrical penetrations issues have been identified as issues that must be resolved before restart of the facility and have been added to the confirmatory action letter (ADAMS Accession No. ML13057A287). Additionally, the PRB noted that natural disasters, such as flooding, are undergoing NRC review as part of the lessons learned from the Fukushima Dai-ichi event in
Japan. The NRC staff is evaluating the effect of multiple upstream dam failures as a part of the Fukushima Dai-ichi reviews, as well as other processes. The PRB intends to use the results of the aforementioned reviews to inform its final decision on whether to implement the requested actions.
Dated at Rockville, Maryland, this 19th day of June 2013.
For The Nuclear Regulatory Commission.
/RA/
Jennifer L. Uhle, Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor Regulation.