ML13092A264: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[NRC-2013-0111, G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station]]
{{Adams
| number = ML13092A264
| issue date = 06/19/2013
| title = G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station
| author name = Leeds E
| author affiliation = NRC/NRR
| addressee name =
| addressee affiliation =
| docket = 05000285
| license number = DPR-040
| contact person = Wilkins L, NRR/DORL 415-1377
| case reference number = G20120458, NRC-2013-0111, OEDO-2012-0390, TAC ME8973
| package number = ML13092A254
| document type = 2.206 Petition, Federal Register Notice
| page count = 4
| project = TAC:ME8973
| stage = Other
}}
 
=Text=
{{#Wiki_filter:[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-285, NRC-2013-0111]
Omaha Public Power District, Fort Calhoun Station, Unit 1 AGENCY: Nuclear Regulatory Commission.
ACTION: Request for action; receipt.
 
==SUMMARY==
: The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated June 21, 2012, Mr. Wallace Taylor (the petitioner) has requested that the NRC take enforcement action against Fort Calhoun Station, Unit 1 (FCS). The petitioners requests are included in the SUPPLEMENTARY INFORMATION section of this document.
ADDRESSES: Please refer to Docket ID NRC-2013-0111 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods:
* Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0111. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov.
* NRC's Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public
 
Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
* NRC's PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
SUPPLEMENTARY INFORMATION:
On June 21, 2012 (ADAMS Accession No. ML11174A228), the petitioner requested that the NRC take enforcement action with regard to FCS. The petitioner also met with the Petition Review Board (PRB) and supplemented its petition during a teleconference on August 27 and November 19, 2012 (ADAMS Accession Nos. ML12250A714, and ML12352A279, respectively).
As a basis for the request, the petitioner states that the NRC's own guidelines regarding enforcement sanctions would categorize the events at FCS over the past 20 years at Severity Level I, the highest level, because those events involve (1) situations involving particularly poor licensee performance, or involving willfulness; (2) situations when the violation results in a substantial increase in risk, including cases in which the duration of the violation has contributed to the substantial increase; and (3) situations in which the licensee made a conscious decision to be in noncompliance to obtain an economic benefit (63 FR 26630-01, 26642; May 13, 1998).
The petitioner states that the NRC considers these violations to be of significant concern, and it may apply its full enforcement action to remedy these violations, including issuing appropriate
 
orders. Id. The petitioner provided supplemental information in support of the petition and states that (1) a support beam was found that was not within allowable limits for stress and loading; (2) given Exelons long history of deliberate misconduct and willful violations at its various nuclear plants around the United States, day-to-day management of FCS by Exelon is likely to worsen FCS performance rather than improve it; (3) the flooding hazard at Fort Calhoun greatly exceeds its flooding protection measures at this time; (4) FCS risk of flooding from each of the six upstream dams has not been evaluated or resolved; and (5) the identification of 614 primary reactor containment electrical penetration seals containing Teflon that could degrade during design-basis accident conditions.
The request is being treated pursuant to § 2.206 of Title 10 of the Code of Federal Regulations, Requests for Action under This Subpart, of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). As provided by § 2.206, appropriate action will be taken on this petition within a reasonable time.
The petitioner requested an opportunity to address the NRR Petition Review Board (PRB). The PRB held recorded teleconferences with the petitioner during which the petitioner supplemented and clarified the petition. The PRB considered results of those discussions in its determination regarding the petitioners request. As a result, the PRB acknowledged the petitioners concerns about containment internal structures, electrical penetrations, and upstream dam failures. The NRC is currently reviewing the issues above related to containment internal structures, electrical penetrations, and upstream dam failures. Both the containment internal structures and electrical penetrations issues have been identified as issues that must be resolved before restart of the facility and have been added to the confirmatory action letter (ADAMS Accession No. ML13057A287). Additionally, the PRB noted that natural disasters, such as flooding, are undergoing NRC review as part of the lessons learned from the Fukushima Dai-ichi event in
 
Japan. The NRC staff is evaluating the effect of multiple upstream dam failures as a part of the Fukushima Dai-ichi reviews, as well as other processes. The PRB intends to use the results of the aforementioned reviews to inform its final decision on whether to implement the requested actions.
Dated at Rockville, Maryland, this 19th day of June 2013.
For The Nuclear Regulatory Commission.
                                    /RA/
Jennifer L. Uhle, Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor Regulation.}}

Latest revision as of 20:00, 4 November 2019

G20120458/OEDO-2012-0390 - Acknowledgement Federal Register Notice, 2.206 - Wallace Taylor, Sierra Club, Iowa Chapter Ltr to EDO - Fort Calhoun Station
ML13092A264
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/19/2013
From: Leeds E
Office of Nuclear Reactor Regulation
To:
Wilkins L, NRR/DORL 415-1377
Shared Package
ML13092A254 List:
References
G20120458, NRC-2013-0111, OEDO-2012-0390, TAC ME8973
Download: ML13092A264 (4)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-285, NRC-2013-0111]

Omaha Public Power District, Fort Calhoun Station, Unit 1 AGENCY: Nuclear Regulatory Commission.

ACTION: Request for action; receipt.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated June 21, 2012, Mr. Wallace Taylor (the petitioner) has requested that the NRC take enforcement action against Fort Calhoun Station, Unit 1 (FCS). The petitioners requests are included in the SUPPLEMENTARY INFORMATION section of this document.

ADDRESSES: Please refer to Docket ID NRC-2013-0111 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods:

  • NRC's Agencywide Documents Access and Management System (ADAMS):

You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public

Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.

  • NRC's PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

SUPPLEMENTARY INFORMATION:

On June 21, 2012 (ADAMS Accession No. ML11174A228), the petitioner requested that the NRC take enforcement action with regard to FCS. The petitioner also met with the Petition Review Board (PRB) and supplemented its petition during a teleconference on August 27 and November 19, 2012 (ADAMS Accession Nos. ML12250A714, and ML12352A279, respectively).

As a basis for the request, the petitioner states that the NRC's own guidelines regarding enforcement sanctions would categorize the events at FCS over the past 20 years at Severity Level I, the highest level, because those events involve (1) situations involving particularly poor licensee performance, or involving willfulness; (2) situations when the violation results in a substantial increase in risk, including cases in which the duration of the violation has contributed to the substantial increase; and (3) situations in which the licensee made a conscious decision to be in noncompliance to obtain an economic benefit (63 FR 26630-01, 26642; May 13, 1998).

The petitioner states that the NRC considers these violations to be of significant concern, and it may apply its full enforcement action to remedy these violations, including issuing appropriate

orders. Id. The petitioner provided supplemental information in support of the petition and states that (1) a support beam was found that was not within allowable limits for stress and loading; (2) given Exelons long history of deliberate misconduct and willful violations at its various nuclear plants around the United States, day-to-day management of FCS by Exelon is likely to worsen FCS performance rather than improve it; (3) the flooding hazard at Fort Calhoun greatly exceeds its flooding protection measures at this time; (4) FCS risk of flooding from each of the six upstream dams has not been evaluated or resolved; and (5) the identification of 614 primary reactor containment electrical penetration seals containing Teflon that could degrade during design-basis accident conditions.

The request is being treated pursuant to § 2.206 of Title 10 of the Code of Federal Regulations, Requests for Action under This Subpart, of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). As provided by § 2.206, appropriate action will be taken on this petition within a reasonable time.

The petitioner requested an opportunity to address the NRR Petition Review Board (PRB). The PRB held recorded teleconferences with the petitioner during which the petitioner supplemented and clarified the petition. The PRB considered results of those discussions in its determination regarding the petitioners request. As a result, the PRB acknowledged the petitioners concerns about containment internal structures, electrical penetrations, and upstream dam failures. The NRC is currently reviewing the issues above related to containment internal structures, electrical penetrations, and upstream dam failures. Both the containment internal structures and electrical penetrations issues have been identified as issues that must be resolved before restart of the facility and have been added to the confirmatory action letter (ADAMS Accession No. ML13057A287). Additionally, the PRB noted that natural disasters, such as flooding, are undergoing NRC review as part of the lessons learned from the Fukushima Dai-ichi event in

Japan. The NRC staff is evaluating the effect of multiple upstream dam failures as a part of the Fukushima Dai-ichi reviews, as well as other processes. The PRB intends to use the results of the aforementioned reviews to inform its final decision on whether to implement the requested actions.

Dated at Rockville, Maryland, this 19th day of June 2013.

For The Nuclear Regulatory Commission.

/RA/

Jennifer L. Uhle, Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor Regulation.