| title = EN-13-045, Issuance of Notice of Violation Associated with a White Finding to Southern California Edison Company (EA-13-083)
| title = EN-13-045, Issuance of Notice of Violation Associated with a White Finding to Southern California Edison Company (EA-13-083)
| author name = Carpenter R G, Hilton N D
| author name = Carpenter R, Hilton N
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Enforcement Notification
| document type = Enforcement Notification
| page count = 2
| page count = 2
| project =
| stage = Approval
}}
}}
=Text=
{{#Wiki_filter:December 18, 2013 EN 13-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:        Southern California Edison Company                                    EA-13-083 San Onofre Nuclear Generating Station, Unit 3 Docket No.: 50-362
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about December 23, 2013, to Southern California Edison Company (SCE) for a violation associated with a White Significance Determination Process finding identified during an inspection of the San Onofre Nuclear Generating Station (SONGS), Unit 3. This White finding, an issue of low to moderate safety significance, involves the failure of SONGS personnel to verify the adequacy of the thermal-hydraulic and flow-induced vibration design of the Unit 3 replacement steam generators, which resulted in significant and unexpected steam generator tube wear and the loss of tube integrity on Unit 3 Steam Generator 3EO-88 after 11 months of operation.
A Notice of Violation is included based on SCEs failure to meet 10 CFR Part 50, Appendix B, Criterion III, Design Control, which requires, in part, that design control measures shall be established to provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods or by the performance of a suitable testing program. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.
The NRC issued a regulatory conference letter on September 20, 2013, and offered SCE a regulatory conference or an opportunity to respond in writing. SCE provided a written response in a letter dated October 21, 2013, and agreed with the assessment of the significance of the finding. After reviewing the information developed during the inspection, and the information provided by SCE, the staff concluded that the finding is appropriately characterized as White.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination            December 23, 2013 Telephone Notification of Licensee                    December 23, 2013 The State of California will be notified.
CONTACTS: Robert Carpenter, OE, (301) 415-1330                  Nick Hilton, OE, (301) 415-2741
Distribution: EN-13-045, December 23, 2013 OWFN                  OWFN          TWFN      3WFN Regional Offices Chair. Macfarlane    EDO            OCFO      NMSS RI      RII Comm. Svinicki        DEDR          OP CENTER NSIR RIII    RIV Comm. Apostolakis    DEDMRS        OIS Comm. Magwood        OE            FSME          MAIL Comm. Ostendorff      OGC            RES            Public SECY                  NRR            ACRS          OE staff OCA                  OI            RES OPA                  OIG OIP Electronic DISTRIBUTION:
R. Zimmerman, OE N. Hilton, OE R. Carpenter, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ML13352A207 OFFICE        OE:ES                OE:BC NAME          RCarpenter          NHilton DATE          12/18/2013          12/18/2013 OFFICIAL RECORD COPY}}

Latest revision as of 11:08, 4 November 2019

EN-13-045, Issuance of Notice of Violation Associated with a White Finding to Southern California Edison Company (EA-13-083)
ML13352A207
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/18/2013
From: Robert Carpenter, Nick Hilton
NRC/OE
To:
Carpenter R
References
EA-13-083, EN-13-045
Download: ML13352A207 (2)


Text

December 18, 2013 EN 13-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Southern California Edison Company EA-13-083 San Onofre Nuclear Generating Station, Unit 3 Docket No.: 50-362

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about December 23, 2013, to Southern California Edison Company (SCE) for a violation associated with a White Significance Determination Process finding identified during an inspection of the San Onofre Nuclear Generating Station (SONGS), Unit 3. This White finding, an issue of low to moderate safety significance, involves the failure of SONGS personnel to verify the adequacy of the thermal-hydraulic and flow-induced vibration design of the Unit 3 replacement steam generators, which resulted in significant and unexpected steam generator tube wear and the loss of tube integrity on Unit 3 Steam Generator 3EO-88 after 11 months of operation.

A Notice of Violation is included based on SCEs failure to meet 10 CFR Part 50, Appendix B, Criterion III, Design Control, which requires, in part, that design control measures shall be established to provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods or by the performance of a suitable testing program. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.

The NRC issued a regulatory conference letter on September 20, 2013, and offered SCE a regulatory conference or an opportunity to respond in writing. SCE provided a written response in a letter dated October 21, 2013, and agreed with the assessment of the significance of the finding. After reviewing the information developed during the inspection, and the information provided by SCE, the staff concluded that the finding is appropriately characterized as White.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination December 23, 2013 Telephone Notification of Licensee December 23, 2013 The State of California will be notified.

CONTACTS: Robert Carpenter, OE, (301) 415-1330 Nick Hilton, OE, (301) 415-2741

Distribution: EN-13-045, December 23, 2013 OWFN OWFN TWFN 3WFN Regional Offices Chair. Macfarlane EDO OCFO NMSS RI RII Comm. Svinicki DEDR OP CENTER NSIR RIII RIV Comm. Apostolakis DEDMRS OIS Comm. Magwood OE FSME MAIL Comm. Ostendorff OGC RES Public SECY NRR ACRS OE staff OCA OI RES OPA OIG OIP Electronic DISTRIBUTION: