TMI-14-042, Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = Letter type:TMI
| document type = Letter type:TMI
| page count = 4
| page count = 4
| project =
| stage = Response to RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:10 CFR 50.90 TMI-14-042 March 24, 2014 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289  
{{#Wiki_filter:10 CFR 50.90 TMI-14-042 March 24, 2014 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289


==Subject:==
==Subject:==
Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements  
Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements


==References:==
==References:==
: 1) Letter from M. D. Jesse (Exelon Generation Company, LLC) to the U.S. Nuclear Regulatory Commission, "Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements," dated February 4, 2013 2) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1 Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements (TAC NO. MF0628)," dated February 27,2014 By letter dated February 4, 2013, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Three Mile Island Nuclear Station, Unit 1 (TMI-1) (Reference 1). The LAR relates to the proposed deletion of various reporting requirements that are encompassed in the current TMI-1 Technical Specifications.
: 1) Letter from M. D. Jesse (Exelon Generation Company, LLC) to the U.S.
In the Reference 2 letter, the U.S. Nuclear Regulatory Commission requested additional information.
Nuclear Regulatory Commission, "Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements," dated February 4, 2013
Attached is our response.
: 2) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1 Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements (TAC NO. MF0628)," dated February 27,2014 By letter dated February 4, 2013, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Exelon has concluded that the information provided in this response meets the intent of the original submittal (Reference  
(Reference 1). The LAR relates to the proposed deletion of various reporting requirements that are encompassed in the current TMI-1 Technical Specifications.
: 1) and does not impact the conclusions of the: 1) Technical Analysis, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1).
In the Reference 2 letter, the U.S. Nuclear Regulatory Commission requested additional information. Attached is our response.
Response to Request for Additional Information Eliminate Certain Technical Specification Reporting Requirements March 24, 2014 Page 2 There are no regulatory commitments in this letter. If you have any questions concerning this letter, please contact Stephanie J. Hanson at 610-765-5143.
Exelon has concluded that the information provided in this response meets the intent of the original submittal (Reference 1) and does not impact the conclusions of the: 1) Technical Analysis, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1).
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 24th day of March 2014. Respectfully, James Barstow Director -Licensing and Regulatory Affairs Exelon Generation Company, LLC  
 
Response to Request for Additional Information Eliminate Certain Technical Specification Reporting Requirements March 24, 2014 Page 2 There are no regulatory commitments in this letter.
If you have any questions concerning this letter, please contact Stephanie J. Hanson at 610-765-5143.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 24th day of March 2014.
Respectfully, James Barstow Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC


==Attachment:==
==Attachment:==
Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements cc:    USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, TMI, Unit 1 USNRC Project Manager, TMI, Unit 1 R. R. Janati, Bureau of Radiation Protection
ATTACHMENT 1 Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements for Three Mile Island Nuclear Station, Unit 1
Response to Request for Additional Information                                                    Attachment 1 Eliminate Certain Technical Specification Reporting Requirements                                  Page 1 of 1 Docket No. 50-289 Question 1:
The NRC staff concurs that the reactor coolant specific activity data is reported to the NRC via the PI program under the ROP. While the PI program reports reactor coolant specific activity, it does not report all of the information contained in TS 6.9.1.B.5, under the circumstances where activity exceeds the limits of TS 3.1.4.1. Therefore, please provide justification for all of the proposed deletions under this TS section.
===Response===
Nuclear power plants such as Virgil C. Summer, added this reporting requirement in response to Generic Letter 85-19, "Reporting Requirements on Primary Coolant Iodine Spikes." However, as stated in the Commission's Safety Evaluation for Virgil C. Summer Nuclear Station, Unit No.1, Issuance of Amendment Regarding Elimination of Monthly Operating Reports and Certain Annual Reports (T AC NO. MC9155) dated May 19, 2006, which approved the deletion of the reporting requirement pertaining to specific activity; it is no longer common within Technical Specifications (TSs) for nuclear power plants and is not within Standard Technical Specifications (STS) outlined in NUREG-1430. Additionally, the NRC would expect to obtain information about such events or conditions through reports submitted in accordance with 10 CFR 50.72, "Immediate notification requirements for operating nuclear reactors," and 10 CFR 50.73, "Licensee event report system."
For example, similar to V.C. Summer's TS, it is noted that exceeding TMI TS 3.1.4.1 limits requires a plant shutdown if the activity is not restored to within limits within the specified time period, and such a plant shutdown is required to be reported by 10 CFR 50.72. The NRC also obtains information about plant events and adverse conditions through its inspection program.
The specific activity analysis reported annually does not report any information different from the Performance Indicator (PI) Program unless the activity exceeds the TS 3.1.4.1 limit. The removal of the report is intended to eliminate unnecessary use of NRC and plant resources to review redundant data. At TMI, the TS limit has not been exceeded for more than 18 years (> 9 full cycles) of operation.
The limit is not expected to be exceeded unless a significant plant (fuel) issue occurs, which would result in the application of significant plant resources and determine the need for communication with the NRC. For example, in the event that a fuel defect occurs, which would affect the specific activity limits as required by Exelon's Failed Fuel Action Plan procedure (NF-AA-430), the defect would be captured in the Corrective Action Program (CAP), which requires a Root Cause Analysis (RCA) to be performed and an immediate evaluation for reportability to the NRC under the 10 CFR 50.72(b)(3)(ii) reporting criteria. Through the above procedure, all of the additional specific activity analysis is required to be examined in order to evaluate the event. Thus, the information stated in items 6.9.1.B.5.a through e is included as part of the RCA, and would be available for NRC review through its inspection program. Note also that the PI Program would continue to provide all of the other typical radioisotope data.
Question 2:
Are significant changes to the radioactive waste treatment systems reported in the TMI annual effluent report? If not, please supplement the LAR with a statement that the TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report.


Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, TMI, Unit 1 USNRC Project Manager, TMI, Unit 1 R. R. Janati, Bureau of Radiation Protection ATTACHMENT 1 Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements for Three Mile Island Nuclear Station, Unit 1 Response to Request for Additional Information Eliminate Certain Technical Specification Reporting Requirements Docket No. 50-289 Question 1: Attachment 1 Page 1 of 1 The NRC staff concurs that the reactor coolant specific activity data is reported to the NRC via the PI program under the ROP. While the PI program reports reactor coolant specific activity, it does not report all of the information contained in TS 6.9.1.B.5, under the circumstances where activity exceeds the limits of TS 3.1.4.1. Therefore, please provide justification for all of the proposed deletions under this TS section. Response:
===Response===
Nuclear power plants such as Virgil C. Summer, added this reporting requirement in response to Generic Letter 85-19, "Reporting Requirements on Primary Coolant Iodine Spikes." However, as stated in the Commission's Safety Evaluation for Virgil C. Summer Nuclear Station, Unit No.1, Issuance of Amendment Regarding Elimination of Monthly Operating Reports and Certain Annual Reports (T AC NO. MC9155) dated May 19, 2006, which approved the deletion of the reporting requirement pertaining to specific activity; it is no longer common within Technical Specifications (TSs) for nuclear power plants and is not within Standard Technical Specifications (STS) outlined in NUREG-1430.
Additionally, the NRC would expect to obtain information about such events or conditions through reports submitted in accordance with 10 CFR 50.72, "Immediate notification requirements for operating nuclear reactors," and 10 CFR 50.73, "Licensee event report system." For example, similar to V.C. Summer's TS, it is noted that exceeding TMI TS 3.1.4.1 limits requires a plant shutdown if the activity is not restored to within limits within the specified time period, and such a plant shutdown is required to be reported by 10 CFR 50.72. The NRC also obtains information about plant events and adverse conditions through its inspection program. The specific activity analysis reported annually does not report any information different from the Performance Indicator (PI) Program unless the activity exceeds the TS 3.1.4.1 limit. The removal of the report is intended to eliminate unnecessary use of NRC and plant resources to review redundant data. At TMI, the TS limit has not been exceeded for more than 18 years (> 9 full cycles) of operation.
The limit is not expected to be exceeded unless a significant plant (fuel) issue occurs, which would result in the application of significant plant resources and determine the need for communication with the NRC. For example, in the event that a fuel defect occurs, which would affect the specific activity limits as required by Exelon's Failed Fuel Action Plan procedure (NF-AA-430), the defect would be captured in the Corrective Action Program (CAP), which requires a Root Cause Analysis (RCA) to be performed and an immediate evaluation for reportability to the NRC under the 10 CFR 50.72(b)(3)(ii) reporting criteria.
Through the above procedure, all of the additional specific activity analysis is required to be examined in order to evaluate the event. Thus, the information stated in items 6.9.1.B.5.a through e is included as part of the RCA, and would be available for NRC review through its inspection program. Note also that the PI Program would continue to provide all of the other typical radioisotope data. Question 2: Are significant changes to the radioactive waste treatment systems reported in the TMI annual effluent report? If not, please supplement the LAR with a statement that the TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report. Response:
TMI does not currently report significant changes to the radioactive waste treatment systems in the TMI annual effluent report. The TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report.}}
TMI does not currently report significant changes to the radioactive waste treatment systems in the TMI annual effluent report. The TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report.}}

Latest revision as of 07:33, 4 November 2019

Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements
ML14084A270
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/24/2014
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-14-042
Download: ML14084A270 (4)


Text

10 CFR 50.90 TMI-14-042 March 24, 2014 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements

References:

1) Letter from M. D. Jesse (Exelon Generation Company, LLC) to the U.S.

Nuclear Regulatory Commission, "Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements," dated February 4, 2013

2) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Generation Company, LLC), "Three Mile Island Nuclear Station, Unit 1 Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements (TAC NO. MF0628)," dated February 27,2014 By letter dated February 4, 2013, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Three Mile Island Nuclear Station, Unit 1 (TMI-1)

(Reference 1). The LAR relates to the proposed deletion of various reporting requirements that are encompassed in the current TMI-1 Technical Specifications.

In the Reference 2 letter, the U.S. Nuclear Regulatory Commission requested additional information. Attached is our response.

Exelon has concluded that the information provided in this response meets the intent of the original submittal (Reference 1) and does not impact the conclusions of the: 1) Technical Analysis, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1).

Response to Request for Additional Information Eliminate Certain Technical Specification Reporting Requirements March 24, 2014 Page 2 There are no regulatory commitments in this letter.

If you have any questions concerning this letter, please contact Stephanie J. Hanson at 610-765-5143.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 24th day of March 2014.

Respectfully, James Barstow Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC

Attachment:

Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, TMI, Unit 1 USNRC Project Manager, TMI, Unit 1 R. R. Janati, Bureau of Radiation Protection

ATTACHMENT 1 Response to Request for Additional Information regarding Proposed License Amendment Request to revise Technical Specification Reporting Requirements for Three Mile Island Nuclear Station, Unit 1

Response to Request for Additional Information Attachment 1 Eliminate Certain Technical Specification Reporting Requirements Page 1 of 1 Docket No. 50-289 Question 1:

The NRC staff concurs that the reactor coolant specific activity data is reported to the NRC via the PI program under the ROP. While the PI program reports reactor coolant specific activity, it does not report all of the information contained in TS 6.9.1.B.5, under the circumstances where activity exceeds the limits of TS 3.1.4.1. Therefore, please provide justification for all of the proposed deletions under this TS section.

Response

Nuclear power plants such as Virgil C. Summer, added this reporting requirement in response to Generic Letter 85-19, "Reporting Requirements on Primary Coolant Iodine Spikes." However, as stated in the Commission's Safety Evaluation for Virgil C. Summer Nuclear Station, Unit No.1, Issuance of Amendment Regarding Elimination of Monthly Operating Reports and Certain Annual Reports (T AC NO. MC9155) dated May 19, 2006, which approved the deletion of the reporting requirement pertaining to specific activity; it is no longer common within Technical Specifications (TSs) for nuclear power plants and is not within Standard Technical Specifications (STS) outlined in NUREG-1430. Additionally, the NRC would expect to obtain information about such events or conditions through reports submitted in accordance with 10 CFR 50.72, "Immediate notification requirements for operating nuclear reactors," and 10 CFR 50.73, "Licensee event report system."

For example, similar to V.C. Summer's TS, it is noted that exceeding TMI TS 3.1.4.1 limits requires a plant shutdown if the activity is not restored to within limits within the specified time period, and such a plant shutdown is required to be reported by 10 CFR 50.72. The NRC also obtains information about plant events and adverse conditions through its inspection program.

The specific activity analysis reported annually does not report any information different from the Performance Indicator (PI) Program unless the activity exceeds the TS 3.1.4.1 limit. The removal of the report is intended to eliminate unnecessary use of NRC and plant resources to review redundant data. At TMI, the TS limit has not been exceeded for more than 18 years (> 9 full cycles) of operation.

The limit is not expected to be exceeded unless a significant plant (fuel) issue occurs, which would result in the application of significant plant resources and determine the need for communication with the NRC. For example, in the event that a fuel defect occurs, which would affect the specific activity limits as required by Exelon's Failed Fuel Action Plan procedure (NF-AA-430), the defect would be captured in the Corrective Action Program (CAP), which requires a Root Cause Analysis (RCA) to be performed and an immediate evaluation for reportability to the NRC under the 10 CFR 50.72(b)(3)(ii) reporting criteria. Through the above procedure, all of the additional specific activity analysis is required to be examined in order to evaluate the event. Thus, the information stated in items 6.9.1.B.5.a through e is included as part of the RCA, and would be available for NRC review through its inspection program. Note also that the PI Program would continue to provide all of the other typical radioisotope data.

Question 2:

Are significant changes to the radioactive waste treatment systems reported in the TMI annual effluent report? If not, please supplement the LAR with a statement that the TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report.

Response

TMI does not currently report significant changes to the radioactive waste treatment systems in the TMI annual effluent report. The TMI Updated Final Safety Analysis Report will be revised to include these changes in the annual effluent report.